Split Air Conditioning System
Course Code: Split AC-01
Engineer M Rouf Khan
7/29/2019 BTS AC SYSTEM
3/40
AIM
. SCOPE
. Safety Points
Introduction to HVAC
. International Standards
Designing Parameters
. System Design
General Points for Mobiserve Sites
Installation at Mobiserve Sites
Use of AC Tools
Working of Split AC
Precautions
Most Common Problems
Inspection & Maintenance
Contents
3
7/29/2019 BTS AC SYSTEM
4/40
4
AIM
Provide Thermal Comfort
To Increase:
Technical Knowledge & Professional Skills,
To Reduce:
Human Errors at sites,Trouble shooting time,
Number of Repeated Alarms
Maintenance Cost.
7/29/2019 BTS AC SYSTEM
5/40
5
SCOPE
Build a project team
aware to use method(s) & technique(s) to form a
CoolingSystem by locally available resources i.e.
materials & manufacturing techniques and be
able to run & maintain it.
7/29/2019 BTS AC SYSTEM
6/40
6
Safety Points
Always follow instructions.
Keep the work area clean.
Keep flammable and combustible items away
from spark producing activities.
Know where the emergency stop buttons are positioned in the
workshop.
Always be patient, never rush in the working area.
Keep hands away from moving/rotating machinery.
7/29/2019 BTS AC SYSTEM
7/40
7
H- Heating
V- Ventilation
AC- Air Conditioning
1. Room Temperature2. Humidity
3. Air Quality
4. Air Flow
Factors
Introduction to HVAC System
7/29/2019 BTS AC SYSTEM
8/40
8
ASHRAE American Society of Heating,Refrigerating and Air-Conditioning
Engineers
National Fire Protection AssociationNFPA
International Standards
7/29/2019 BTS AC SYSTEM
9/409
Room cooling requirements
Temperature and Humidity range
Placement of IDU & ODU
Space considerations
Effect on Equipment performance
Efficiency
Environmental Impact
Designing Parameters
7/29/2019 BTS AC SYSTEM
10/4010
Designing Parameters
Heat Load Calculations:
Outside temp -5 C to +50 C
Room size 15 X 10
Heat due to opaque surfaces = 1866.2 W
Heat due to fenestration = 732 W
Internal Loads ( equipment ) = 2689.66 W
Total Load = 5.287 kW
7/29/2019 BTS AC SYSTEM
11/4011
Designing Parameters
Heat Load = 5.287 kW
Cabin Relative Humidity = 40%
Evaporator Temperature = 4C
Refrigerant Used = R22
Refrigeration Cycle : Vapor Compression
7/29/2019 BTS AC SYSTEM
12/4012
Result
Evaporator Pressure = 3 bar
Condenser Pressure = 12 bar
Heat Load = 5.287 KW
Condenser Cooling Load= 6.308 KW
Compressor Work = 1.02 KW
Mass Flow Rate = 1.94 l/min
7/29/2019 BTS AC SYSTEM
13/4013
System Design
7/29/2019 BTS AC SYSTEM
14/4014
System Design
OD unit
ID unit
7/29/2019 BTS AC SYSTEM
15/4015
System Design
7/29/2019 BTS AC SYSTEM
16/4016
System Design
Split Air Conditioner
7/29/2019 BTS AC SYSTEM
17/4017
System Design
Split Air Conditioner
7/29/2019 BTS AC SYSTEM
18/40
18
General Points for Mobiserve Sites
Zones
1-Inside Shelter
2- Outside Shelter
Thermostat
7/29/2019 BTS AC SYSTEM
19/40
19
General Points for Mobiserve Sites
Coil
NC NO
27 Thermostat
Fuse
2
Amp 2
From A/C1 C.B From A/C2 C.B
L
F
A2 A2
24 Hrs Timer
A/C1 Contactor A/C2 Contactor
C 1
A1 A1
N
To A/C1 To A/C2
To control the time
of working for each
A/C and it consistsof:
24 Hrs timer + 2
contactors + fuse
base with fuse 2
Amp + thermostat
Time Control circuit
7/29/2019 BTS AC SYSTEM
20/40
20
Central Station
General Points for Mobiserve Sites
7/29/2019 BTS AC SYSTEM
21/40
21
Indoor Unit
Installation at Mobiserve Sites
Thermostat
Remote
7/29/2019 BTS AC SYSTEM
22/40
Outdoor Unit
Condenser
Compressor
Installation at Mobiserve Sites
22
7/29/2019 BTS AC SYSTEM
23/40
23
Thermostat
Indoor Items Outdoor Items
Indoor Bracket & Hole Outdoor Bracket
Pipe Connection Outdoor UnitPipe Connection Indoor Unit
Electric Connection Outdoor door Unit
Installation
7/29/2019 BTS AC SYSTEM
24/40
Use of AC Tools
Swaging & Flaring Tool 2 way Valve for liquid
3 way Valve for Gas
Refrigerant 22
Mani Fold Valve Piping & Accessories
24
7/29/2019 BTS AC SYSTEM
25/40
25
Thermostat
Installation at Mobiserve Sites
7/29/2019 BTS AC SYSTEM
26/40
Working of Split AC
26
7/29/2019 BTS AC SYSTEM
27/40
Routing of Cable.
Routing of Pipes.
Should be routed through areas oflow risk
Angle of pipe and cable hole should be proper
If Cables are installed less than 2.25m above the
floor should they normally be protected.
Precautions
7/29/2019 BTS AC SYSTEM
28/40
Most Common Problems
Remote Control
Wall Thermostat
Dirty Air Filter
Coils Blockage
Capacitor
Fuses
Refrigerant Leakage
7/29/2019 BTS AC SYSTEM
29/40
Most Common Problems
Thermostat
Remote
Air Filter
7/29/2019 BTS AC SYSTEM
30/40
Most Common Problems
Capacitor
In case of LG system we
have a combine capacitor for
motor and fan
30
Compressor
7/29/2019 BTS AC SYSTEM
31/40
Most Common Problems
Fuse on PCB Assembly
31
7/29/2019 BTS AC SYSTEM
32/40
Most Common Problems
Out Door Unit
Flare Nut
7/29/2019 BTS AC SYSTEM
33/40
Inspection and Maintenance
Leak check by Soapy water
33
7/29/2019 BTS AC SYSTEM
34/40
Inspection and Maintenance
Proper Purging of Air
34
7/29/2019 BTS AC SYSTEM
35/40
Inspection and Maintenance
Proper charging of gas through low pressure side
35
7/29/2019 BTS AC SYSTEM
36/40
Inspection and Maintenance
Indoor & Outdoor Unit
DAILY
WEEKLY
Monthly
inspections and issue a certificate after each inspection. It is
normal practice to be cleaned and checked on each monthly visit
so that the entire system has been properly maintained after the
fourth visit.
7/29/2019 BTS AC SYSTEM
37/40
Inspection and Maintenance
Proper cleaning of Condenser and Evaporator.
Keep the air filters clean
Keep the indoor evaporator & outdoor condensercoils clean
Every yearLubricate Indoor blower motor and outdoor unit fan
motor bearings.
Finally, a record should be kept of all maintenance and repairsmade to the system. It is always helpful to have a history of the
system.
37
7/29/2019 BTS AC SYSTEM
38/40
38