1
S. N. Description Unit Rate Unit Rate Depth Unit Rate Depth Unit Rate Unit Rate Unit Rate INR INR (m) INR (m) INR INR INR a) upto 50 m 9,900 a) upto 50 m 9,900 b) upto 100 m 11,000 b) upto 100 m 11,000 b) upto 200 m 11,200 b) upto 200 m 11,200 2 In-situ permeability tests at every 5m intervals or change in strata Using single/double packer in rock and over burden. No. 2,000 No. 2,000 - No. 2,000 - No. 2,000 No. 2,000 No. 2,000 3 Shifting charges for the machines from one location to the other Per Hole 30,000 Per Hole 30,000 - Per Hole 1,00,000 - Per Hole 1,00,000 Per Hole 30,000 Per Hole 40,000 4 Mobilization &Demobilisation Charges for equipments Per Drilling Rig 2,00,000 Surge Shaft Power House Penstock No. 9,900 1 Carrying out Diamond Core Drilling (NX Size hole) with Double/Triple Tube Core Barrel with Hydraulic Feed Rotary Drilling Machine, in overburden & bedrock, including stacking & preservation of rock cores in core boxes & collection of rock core samples for laboratory tests. Per mtr. upto 50 m 9,900 Per mtr. upto 50 m Annexure-A Summary of Geo Technical Investigations Barrage Intake Tunnel m m Per mtr. upto 50 mtr. 9,900 9,900

Bugetary Estimate Tojo Vikas

Embed Size (px)

DESCRIPTION

aa

Citation preview

  • !

    "! "! "! "! "! "!

    #$%%

    %

    &' # &' # &

    '

    &

    ' &' #

    &

    '(

    (

    )*+,

    -%.

    &

    ,

    /

    "!

    - , -

    , 0"1 $* 2

    ,3 3 -

    4 2 ' 5

    / , )

    +

    +

    %

    6 + %

    %

    !

    &!

    &!

    !"#$%

    & #$

    &!

    !