57
BEST PRACTICES WITH CHIP SEALS by Scott Shuler

by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Embed Size (px)

Citation preview

Page 1: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

BEST PRACTICES WITH CHIP SEALS

by

Scott Shuler

Page 2: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

What Are Chip Seals?

Page 3: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Traffic Control

Page 4: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Steps Involved

• Preconstruction

– Select Appropriate Pavement

– Select Materials

– Design Quantities

– Equipment Calibration

• Construction

– Weather

– Preparing

Surface

– Binder

Application

– Chip Application

– Rolling

– Sweeping

– Traffic Control • QC

– Sieve Analysis

– Moisture Content

– Embedment Depth

– Emulsion Viscosity

Page 5: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

5

Aggregate • Properties

– Crushed

• 2 Mechanically Fractured Faces

– Hard

• Low LA Loss– Cubical

• No Flat or Elongated– One or Two Sized

– Clean

• No -200

• Or…at least < 2%

Like THIS

Right?

Page 6: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Damp Chips

Page 7: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Design

• Chip Quantity

• Emulsion Quantity

• Substrate Condition

Page 8: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Chip and Emulsion Quantity

• Spread Rate

– One Stone Thick

– Or…..

Design

About 40%

Page 9: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design
Page 10: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Getting it One Stone Thick

• Do ‘Board Test’– Spread Chips One Stone Thick on 1 sy Board

– Weigh it

Design

Page 11: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

11

Emulsion • Properties

– Thick Enough, but Not Too Thick

– Fast Setting, but Not Too Fast

– Sticky

• Spray Rate

– Embed Chips about 30-50% Initially

– Traffic Embeds to 75-90%

Design

Page 12: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Su

bstr

ate

To

o S

oft

?

Page 13: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

13

Spray Rate in gsy

%embedment x avg mat depth

* [ {1- (W / 62.4 G)} * T ] + V

– Where

• W = Loose Unit Weight of Aggregate, pcf

• G = Bulk Specific Gravity of Aggregate

• T = Traffic Correction

• V = Surface Condition Correction

Design

=

Page 14: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Conditions

• Dry– No rain threatening

– Pavement Dry

• Low Wind– <10 mph

• Temperate– 60 - 90F

Page 15: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Te

xtu

re

Page 16: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Equipment Calibration

Page 17: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Pressure Distributor

Page 18: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Because This is What We Want

…..Almost

Page 19: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

First:

Take It’s Temp

Page 20: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

What’s the

Temperature?

This

is Too

Cold !

Page 21: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Second:

Measure Viscosity

Page 22: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

20 to 70 seconds at 85 to 150F for a 6 mm orifice

or

10 to 60 seconds at 85 to 140F for a 7.5 mm orifice

Page 23: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Third:

What’s the Nozzle Size?

Page 24: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

The

Right

Nozzle

for the

Job

Page 25: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design
Page 26: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design
Page 27: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Fourth:

Where Do They Go?

Page 28: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Right

Here

But,

not

Lined

Up

Like

This

Page 29: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Use The

Wrench

Page 30: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

15 to 30

degrees

Page 31: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

All Nozzle Angles Should be Equal

Or…

Page 32: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Fifth:

How High The Bar?

Page 33: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

This is Too High

Overlap Creates

Streaks

Page 34: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design
Page 35: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

This is the Result

Page 36: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Sixth:

Are We Spraying the Correct

Rate?

Page 37: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Use t

he G

au

ge?

NO !

Page 38: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Use t

he D

ip S

tick

NO !

Page 39: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

For Etnyre,

0 gal

is at the

Top !0 gallon

mark

Page 40: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Match Transverse Joints

– Start and Stop on Paper

Nice Angles !

Page 41: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Seventh

Is the Spreader

Calibrated?

Page 42: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

How Even is the Veil ?

Page 43: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Measure the

Distance and Width

to Get Rid of Two or Three

Truckloads

This is Your Chip Spread

Rate

Page 44: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design
Page 45: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

8

How Many Rollers?

Page 46: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

• Rubber-Tire• 3 mph, Max (fast walk)

• Equal Tires

• Equal Tire Pressure

• Enough for 1 Coverage Before Gelling

Page 47: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

9

When Do We Sweep?

Page 48: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

NC

HR

P R

eport

680

“Bro

om

Sim

ula

tor”

Page 49: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

• Brooms

– Push or Pickup• EASY Pressure

• Nylon

– Timing

• Before Traffic

• When Moisture is < 85%

Page 50: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Pilot Car

Page 51: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Traffic Control

• Pilot Cars

– 15-25 mph depending on traffic volume

Construction

Page 52: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

10

Some Tips

Page 53: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

‘Light’ Showing Through Should be Uniform

Page 54: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Nice Veil

But…

Page 55: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Excess Chips

Page 56: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Edge Nozzle Needed

Page 57: by Scott Shulerpavementvideo.s3.amazonaws.com/2016_NPPC/Track1/TRACK 1 - Thu… · Steps Involved • Preconstruction – Select Appropriate Pavement – Select Materials – Design

Questions ?

Thank You !