37
1

CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

Embed Size (px)

Citation preview

Page 1: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

1

Page 2: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

CEO’s Statement --------------------------------------------- 3

Summary of the Company’s Business ------------------ 4-6

Environmental Policy ---------------------------------------- 7

Environmental Management Systems ------------------ 8-14

Environmental Objectives and Achievements -------- 15-19

Environmental Impacts and Reduction Measures --- 20-30

Environmental Social Contribution Activities ------- 31-36

Period and Items Covered Period covered : Fiscal 2014 (From April 1, 2014 to March 31, 2015)

Coverage : Environmental aspects of SMTL

[Sharp Manufactruing (Thailand) Co., Ltd.]

2

Page 3: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

Environmental Philosophy :

We intend to do activity with sincerity

and creativity together with local society

in order to become “Environment and

Humans - friendly company” Formulation and implementation of the strategy on

the basic of a company that is friendly to the earth

and humans by carrying out a sincere and creative

and environmental concepts. By promoting strategic

GQI, GSI that is committed to contributing

to confidence

in the long term and high – quality level

includes products that can be reliable along

with the action item is created on the subject

of energy savings in order to get the trust of

customers as “Sharp Next , Sharp Always ”

【 Environmental vision】

Creation and expansion of “Green Shared Value”. Create shared values and society

in the making of the human life is better from the response to the environmental and

society progress through the reduction of carbon-dioxide, coexistence with the

environment and natural resources.

【Strategic environmental】

Development of sustainable technology (Energy conservation, Resource recycling,

Natural symbiosis)

• Working safely with peace of mind and environmental activities businesses.

• The creation of value in environmental management.

• Share information with society and stockholder.

【Support the business environment】

• Contribute to the environmental through to create products that are environmentally

conscious.

• Efforts to reduce energy use environment by as Super Green Factory.

• Development activities that responsibility to society and environmental capabilities.

• Coexist and cooperate with the surrounding community establishment in an attempt

to prevent pollution to the environment and nature.

MR.SHIGEHARU MAEHARA, SMTL President.

Sharp Manufacturing (Thailand) Co., Ltd.

June 29, 2015

3

Page 4: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

Summary of the organization

Company name Sharp Manufacturing (Thailand) Co., Ltd.

Address 58 Moo 3, Tambol Sampatuan, Amphur Nakornchaisri, Nakornpathom 73120. Thailand.

Managing Director Mr.Shigeharu Maehara

EMR Mr.Hideki Morita

Established August 14, 1992

Production start November 1, 1992

Manpower 522 persons (on March 30, 2015)

Total Land area 44,000 m²

Total building area 14,732 m²

BANGKOK

Nakorn

Pathom Chachoengsao

4

Page 5: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

SMTL’s Organization Managing Director Director General Manager Senior Manager Manager Asst. Manager

Imp ./Exp .-BOI &Prod . Cont .

Sec

reta

ry

Ms.

Nitay

a

Auto Insertion

Mr.Surin

Ms.Hirunya

Mr.Kullayut Ms.Lunthom

Ms.Natanicha

Mr.Saichon

ECR

Mr.Anak

HI / AL Hand Insertion (HI)

PWB / ECR / PE

Mr.Shiroma

Supervisor/Engineer/Officer

Mr.Pichit

Machanical

Mr.Somsak

Ms.Yaowanuch

Mr.Woraphon

Mr.Morita

DS P ro d., P QA, ISO

Mrs.Sunisa

Ms.Saiphon

All Electrical

Mr.Prayoon

ISO Office

Ms.Tidarat

PQA-Outgoing Insp.

Mr.Nattawut

PQA-Incoming Insp.

Mr.Phanomkorn

Mrs.Lakkana

Ms.Jaruwan

Sec

reta

ry

Ms.

Suta

tip

Mr.Maehara

DS (Monochome)

Mr.Jaranthorn

Mrs.Bumrungrat

Mr.Suchart

Sec

reta

ry

Ms.

Plo

ypun

Managing Director

Ms.Narita

MD Staff

Mr.Hase Ms.Kimura

Purchasing

Mrs.Wanida Ms.Rungnapa

Ms.Nataya

Ms.Busakorn

Ms.Sasiwimon

Ms.Rudchanok

Ms.Methika

Business Support

Imp./Exp. & BOI

Mr.Miura

Parts Cont.

Mr.Surachai

Mr.Chaichan

Mr.Thanat

Prod. Cont.

Ms.Piyanuch

Ms.Phanthip Ms.Sirikhwan

MIS

Mr.Thongchai Mr.Chawapon

Accounting

HR&GA

Mr.Rinyapat

Ms.Warunee

Mr.Kitazaki

Parts / Prod. Cont.

Ms.Malee

Ms.Sasithorn

Financial & Admin

Mr.Naruse

Mrs.Anchana

Mr.Chakkrit

PWB

Ms.Prirat

Ms.Komkay

Ms.Wasana

Safety Officer

General Affair

Human Resource

Ms.Panadda

Ms.Orawan

DS (color MFP)

Ms.Chitraporn Ms.Suparat

Mr.Nuttapon Mr.Anan

5

Page 6: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

6

Our Products

Page 7: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

7

Page 8: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

8

We has certified ISO14001 by AJA EQS, History; - Jan 27th,2000 : Certified ISO14001:1996 - Feb 18th,2005 : Extension scope of ISO14001:1996 for Solar module - Aug 2nd,2005 : Extension scope of ISO14001:1996 for Multi Function Printer - Jan 26th,2007 : Upgrade ISO14001:1996 to ISO14001:2004 - Feb 26th,2009 : Renew the Certificate of ISO14001:2004 - Feb 26th,2012 : Renew the Certificate of ISO14001:2004 - Feb 21th,2014 : Extension scope of ISO 14001:2004 for LDC monitor (IDP/IWB) - Feb 26th,2015 : Renew the Certificate and Extension scope of ISO 14001:2004 for ECR (Electronic Cash Register)

Page 9: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

9

Auto Insertion

Hand Insertion

Alignment

Working committee

ISO team

Page 10: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

10

We are responsible to control document of Environmental management system, internal audit and support to all department and section in order to improve our Environmental Management System. Moreover, we also conduct the social activities that affect society and the environment that are not directly related to the operation of the organization such as plantation and donation etc.

Ms.Kitsana Samkasorn

MD

EMR

ISO Office group

Mr.Shigeharu Maehara

Mr.Hideki Morita

Ms.Tidarat Prodpromjariya

Ms.Yaowanuch Rodkanpai

Page 11: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

11

• PR-GA-001-E • PR-GA-002-E • PR-MR-001-E • PR-MR-002-E • PR-MR-003-E • PR-MR-004-E • PR-MR-005-E • PR-MR-006-E • PR-MR-007-E • PR-MR-008-E • PR-MR-009-E • PR-MR-010-E • PR-MR-011-E • PR-MR-012-E • PR-MR-013-E • PR-MR-014-E • PR-MR-015-E • PR-MR-016-E

Support Document :

Waste Water Treatment Training, Awareness and Competence Management Review Document and data control EMS Internal Audit Identification and evaluation of environmental aspects Control of records Waste Management Management of Chemical and Hazardous Material Setting Objectives, Target and Environmental Management Program Identification of law/Regulation Communication Corrective and Preventive Action Emergency Preparedness Monitoring and Measurement Maintenance Control of Subcontractor Evaluation of Compliance

Registration of environmental aspects Registration of environmental law and requirements The list of chemicals and hazardous materials Registration of environmental monitoring and measurement. The list of machinery or equipment which environmental impact The list of contractors The list of Internal Auditor The environmental Objective/Target and management program Responsible for self-defense fire service (Emergency plan)

Page 12: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

Training Course

Trainer Training date

Participants

Emergency plan : Responsible for self-defense chemical leaked service

SMTL Jun. 4, 2014 40 persons

Emergency plan : Responsible for self-defense fire service

Wat-Plang, Local Government

Mar. 30, 2015 Lecture : - 60 persons Fieldwork : - 100% of SMTL member

12

Page 13: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

13

(on June 4, 2014)

Responsible for self-defense Chemical leaked service (Emergency plan),

Page 14: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

14

(on March 30, 2015), Trainer from Wat-Plang Local Government.

Responsible for self-defense fire service (Emergency plan)

Page 15: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

15

Objective in Fiscal 2014 Results Self Evaluation

All employees will be trained The matter of Environmental, 20 hours by average within March 2015.

22 hours

Perform environmental activities, 3 activities within March 2015.

3 activities

Reduce electricity using by 2% (19,479 kWh) within March 2015. Remark : - Electricity using in FY2013 = 973,940 kWh - Target to reduce 2% = 19,479 kWh - in FY2014 should not use = 954,461 kWh electricity over than

Electricity using in FY2014 is 1,411,140 kWh

Remark : Its over than our target as 456,679 kWh or 48%

Reduce water using 2% within March 2015. Remark : - Water using in FY2013 = 8,814 m³ - Target to reduce 2% = 177 m³ - in FY2014 should not use = 8,638 m³ water over than

Water using in FY2014 is 12,688 m³

Remark : Its over than our target as 4,050 m³ or 47%

Page 16: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

16

Objective in Fiscal 2014

Target Results Self Evaluation

All employees will be trained The matter of Environmental

20 hours, within March 2015

22 hours

From May 2014-March 2015, SMTL’s employees had trained the matter of Environmental is 22 hours by average.

Page 17: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

Objective in Fiscal 2014

Target Results Self Evaluation

Perform environmental activities

3 activities, within March 2015

3 activities

In FY2014, we had conducted 3 activities of Environmental as following Go Green 2014, by release crabs to the sea at The Sea Farming Demonstration Unit

in Kungkrabaen Bay, Chanthaburi province. Donate the used cosmetics to volunteer (Bird makeup) for use to makeup face of

dead body or distribute to the school is lacking for use to makeup the student in the school's activity.

To distribute the tree for Father’s Day celebration.

17

Page 18: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

18

Objective in Fiscal 2014 Target Results Self Evaluation

Reduce electricity using 2% (19,479 kWh) Remark : - Electricity using in FY2013 = 973,940 kWh - Target to reduce 2% = 19,479 kWh - in FY2014 should not use = 954,461 kWh electricity over than

In FY2014, electricity using should not over

954,461 kWh

1,411,140 kWh

In FY2014 we had Electricity using 1,411,140 kWh. It is over than target as 456,679 kWh or 48%. The cause of Electricity using have over the target because of we have construction new building and production mount increased, then we can not control the volume of electricity using in FY2014. However, in FY2015 we continue to set the target for reduce 2% of electricity using one more time.

Page 19: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

19

Objective in Fiscal 2014 Target Results Self Evaluation

Reduce water using 2% (177 m³) Remark : - Water using in FY2013 = 8,814 m³ - Target to reduce 2% = 177 m³ - water using in FY2014 = 8,638 m³ should not over than

In FY2014, water using should not over

8,638.00 m³

12,688.00 m³

In FY2014 we had water using 12,688 m³. It is over than our target as 4,050 m³ or 47%. The cause of water using over the target because of we have construction new building and production amount increased, then we can not control the volume of water using in FY2014. However, in FY2015 we continue to set the target for reduce 2% of water using one more time.

Page 20: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

20

Input

Electricity 1,515,220.0

LPG 2,304.0

Output

CO2 777.3

(ton-CO2/kWh)

6,909.7

(ton-CO2/kg)

3,360 3,264 2,130 1,440 2,304

10.8 10.5

6.9

4.3

6.9

-

2.0

4.0

6.0

8.0

10.0

12.0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

2010 2011 2012 2013 2014

LPG using & CO2 emission

Usage (kg) CO2.(Ton-CO2/kg)

(Ton-CO2/kg)

2,266,460

1,972,100

1,580,050

1,081,460

1,515,220

1,271.5

1,106.3

810.6

554.8

777.3

100.0

300.0

500.0

700.0

900.0

1,100.0

1,300.0

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

2010 2011 2012 2013 2014

Electric using & Co2 emission

Usage (kWh) CO2.(Ton-CO2/kWh)

(Ton-CO2/kWh)

Year 2014, CO2 emission of Electricity using is 777.3 Ton-CO2/kWh.

It is over than FY2013 as 40.10%, because of we had construction

new building and production amount increased hen it cause of

electricity using and CO2 increased .

CO2 emission = Electric using (kWh) * 0.513 kg-CO2 / 1000

Year 2014, CO2 emission of LPG using is 6.3 Ton-CO2/kg.

It is over than FY 2013 as 60.47%, because of we had new

employees increased then we use LPG for canteen increased.

CO2 emission = LPG using (kg) * 2.999 kg-CO2/kg / 1000

Page 21: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

21

FY

Electricity usage LPG usage Total of Reduction

Investment (Baht)

Cost Saving (Baht) Unit

(kWh) CO2 Emission

(ton-CO2/kWh) Unit (m2)

CO2 Emission (ton-CO2/kg)

CO2 emission (ton-CO2)

Energy saving (kWh)

CO2 emission (ton-CO2/kg)

Reduction Ratio

2011 1,972,100.0 1,011.7 3,264.0 9.8 1,021.5 13,972.8 7.17 0.7% 151,565.00 51,978.82

2012 1,580,050.0 810.6 2,130.0 6.4 817.0 41,718.5 21.40 2.6% 330,606.20 171,880.20

2013 1,081,460.0 554.8 1,440.0 4.3 559.1 17,301.6 8.88 1.6% 51,827.00 80,971.39

2014 1,515,220.0 777.3 2,304.0 6.9 784.2 18,977.5 9.7 1.2% 195,564.00 18,977.46

The activities for Energy saving in FY2014

Activities Reduction Investment

(Baht) Payback

period (year) kW kWh/year Saving (Baht)

Change Air condition because it is low efficiency and out of order 1) Engineering Storage

0.21

430.33

1,897.75

36,742.00

19.36

2) CTO (DS Production) 1.30 2,663.93 11,747.95 122,080.00 10.39

3) IQC 0.59 1,209.02 5,331.76 36,742.00 6.89

Total 2.10 4,303.28 18,977.46 195,564.00 -

Sample of Energy saving Activity

Page 22: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

22

Calculation for saving energy effect

Activity : Change Air condition for Engineering Part Storage

Description kW kWh/year Baht/year

Energy using before reduction 3.28 6,721.31 29,640.98

Energy using after reduction 3.07 6,290.98 27,743.23

Energy saving 0.21 430.33 1,897.75

Investment money 36,742.00 Baht

Pay back return 19.36 Baht

Calculation of Cost Saving : Formular : Cost saving /year = Energy saving (kW) x working hours in FY2014(hours) x Electricity purchase (unit) = 0.21 x 2,049.18 x 4.41 = 1,897.75 Baht/year Remark : Working hours in FY2014 = 246 x 8.33 = 2,049.18 hours - Working day in FY2014 = 246 days - Working time (8:00am.–5:20pm) = 8 hours and 20 minute or 8.33 hours Electricity purchasing = 4.41 Baht/unit (by estimated)

Page 23: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

23

Calculation for saving energy effect

Activity : CTO (DS Production)

Description kW kWh/year Baht/year

Energy using before reduction 12.50 25,614.75 112,961.05

Energy using after reduction 11.20 22,950.82 101,213.10

Energy saving 1.30 2,669.93 11,747.95

Investment money 122,080.00 Baht

Pay back return 10.39 Baht

Calculation of Cost Saving : Formular : Cost saving /year = Energy saving (kW) x working hours in FY2014(hours) x Electricity purchase (unit) = 1.30 x 2,049.18 x 4.41 = 11,747.95 Baht/year Remark : Working hours in FY2014 = 246 x 8.33 = 2,049.18 hours - Working day in FY2014 = 246 days - Working time (8:00am.–5:20pm) = 8 hours and 20 minute or 8.33 hours Electricity purchasing = 4.41 Baht/unit (by estimated)

Page 24: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

24

Calculation for saving energy effect

Activity : IQC room (PQA department)

Description kW kWh/year Baht/year

Energy using before reduction 3.66 7,500.00 33,074.99

Energy using after reduction 3.07 6,290.98 27,743.23

Energy saving 0.59 1,209.02 5,331.76

Investment money 36,742.00 Baht

Pay back return 6.89 Baht

Calculation of Cost Saving : Formular : Cost saving /year = Energy saving (kW) x working hours in FY2014(hours) x Electricity purchase (unit) = 0.59 x 2,049.18 x 4.41 = 5,331.76 Baht/year Remark : Working hours in FY2014 = 246 x 8.33 = 2,049.18 hours - Working day in FY2014 = 246 days - Working time (8:00am.–5:20pm) = 8 hours and 20 minute or 8.33 hours Electricity purchasing = 4.41 Baht/unit (by estimated)

Page 25: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

Investigation item Total of waste

(kg.)

Recycle by Vendor Landfill (kg.)

Total

(kg.) Valuable (Baht)

Total

(kg.)

Cost

(Baht)

Compound waste 3,616.6 1,481.6 8,542.1 2,135.0 22,956.2

Waste plastics 27,444.8 27,444.8 179,539.5 0.0 0.0

Scrap metal 11,802.7 11,802.7 1,764,016.7 0.0 0.0

Waste paper 197,323.0 197,323.0 552,504.4 0.0 0.0

Wood chips 606.6 606.6 944.0 0.0 0.0

Toxic waste 460.0 0.0 0.0 460.0 3,986.0

General waste 6,140.0 0.0 0.0 6,140 42,000.0

Solar waste 0.0 0.0 0.0 0.0 0.0

Amount (kg)

Ratio (%)

247,393.7 238,658.7 2,505,546.7 8,735.0 68,942.2

100% 96.5% 3.5%

Waste data in Year 2014

Year Total of Waste

(kg) Waste recycle

(kg.) Valuable

(Baht) Waste Landfill

(kg.) Cost

(Baht)

FY2013 271,404.4 259,768.2 3,465,847.2 11,636.3 69,466.60

FY2014 247,393.7 238,658.7 2,505,546.7 8,735.0 68,942.2

Trends of Recycle waste and Waste Landfill

96%

4%

Precentage of waste

Recycle by Vendor Landfill (kg.)

2,505,546.7

68,942.2

0.0

500,000.0

1,000,000.0

1,500,000.0

2,000,000.0

2,500,000.0

3,000,000.0

Profit from sale Treatment cost

(Baht) Comparison of Treatment cost

and profit from sale.

25

Page 26: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

26

13,539.0

11,764.0

9,590.0

13,600.0

0.0

50,000.0

100,000.0

150,000.0

200,000.0

250,000.0

300,000.0

350,000.0

400,000.0

450,000.0

500,000.0

0.0

2,000.0

4,000.0

6,000.0

8,000.0

10,000.0

12,000.0

14,000.0

2011 2012 2013 2014

Water using (m3)

Payment (Thai baht)

Linear (Water using (m3))

Item Unit Apr'13 May'13 Jun'13 Jul'13 Aug'13 Sep'13 Oct'13 Nov'13 Dec'13 Jan'14 Feb'14 Mar'14 Cumulative

Water using m3 912.0 928.0 1,000.0 972.0 908.0 1,006.0 1,123.0 1,143.0 1,223.0 1,272.0 1,504.0 1,609.0 13,600.0 ACCM m3 912.0 1,840.0 2,840.0 3,812.0 4,720.0 5,726.0 6,849.0 7,992.0 9,215.0 10,487.0 11,991.0 13,600.0 - Valuable Baht 30,878.6 31,422.2 33,868.2 32,917.0 30,742.7 34,073.6 38,079.7 38,764.5 41,030.2 43,181.5 51,125.1 54,720.3 460,803.6

Data of Water using in FY2014

912.0 928.0 1,000.0 972.0 908.0 1,006.0 1,123.0 1,143.0 1,223.0 1,272.0

1,504.0 1,609.0

-

500.0

1,000.0

1,500.0

2,000.0

Apr'13 May'13 Jun'13 Jul'13 Aug'13 Sep'13 Oct'13 Nov'13 Dec'13 Jan'14 Feb'14 Mar'14

(m3) Water using in FY2014

Water using Linear (Water using)

Item Unit 2011 2012 2013 2014

Water usage

Water using (m3)

13,539.0 11,764.0 9,590.0 13,600.0

Payment (Thai baht)

361,933.0 374,938.6 324,544.4 460,803.6

Trend of Water using from FY2011 - FY2014

The trend of water using in FY2014

is higher than FY2013 is 29.49%

by estimated, cause is construction

new building and have increased

new employees.

Page 27: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

27

New Chemical, we will keep on the shelf with identified by condensation MSDS

Usage chemical will be kept in the cabinet by protect leak with aluminum tray and identified by condensation MSDS.

Page 28: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

28

Atmosphere Emissions

Item Parameter Sampling area Standard Level

Results Status Standard Unit Reference

Workplace Tin (Sn) - Soldering machine 2 mg/m³ * 0.31 Pass

- Alignment/Harness unit 2 mg/m³ * 0.36 Pass

- Sub Assembly (ECR) 2 mg/m³ * 0.26 Pass

Styrene - Adjustment (DS-A) 100 ppm * 0.41 Pass

- Adjustment (DS-B) 100 ppm * 0.38 Pass

- Outgoing Inspection (DS) 100 ppm * 0.33 Pass

Thinner as Xylene - Auto insert (SMT) 200 ppm * 1.7 Pass

Total Dust - DV unit 15 mg/m³ * 3.96 Pass

- Toner Cartridge 15 mg/m³ * 3.44 Pass

- Outgoing Inspection (DS) 15 mg/m³ * 3.51 Pass

Respirable dust - DV unit (K.Jarin M.) 5 mg/m³ * 0.26 Pass

- Toner Adjustment DS-CTO (K.Teeraphon J.)

5 mg/m³ * 0.28 Pass

Stack Tin (Sn) - Stack No.1 - mg/m³ ** 0.38 Pass

- Stack No.2 - mg/m³ ** 0.59 Pass

- Stack No.4 - mg/m³ ** 0.44 Pass

- Stack No.5 - mg/m³ ** 0.61 Pass

Total Suspended Particulate (TSP)

- Stack of Toner hood 320 mg/m³ ** 12.11 Pass

- Stack of DV hood 320 mg/m³ ** 18.12 Pass

Ambient Tin (Sn) - In front of High-Voltage power

- mg/m³ *** ND Pass

Total Dust - Behind Toner room 0.33 mg/m³ *** 0.12 Pass

Reference :

* The notification of the Ministry of Interior on the Occupational safety in the working environment (Chemical)

** The notification of Ministry of Industry, B.E.2549 (2006) under the topic of “The polluted Air Emission from

Factory” define

*** The notification of the National Environment Board No.24 (2547) regarding air quality in the atmosphere.

Monitored by C.E.M Technology (Thailand) Co., Ltd., on Dec. 25-26, 2014

Page 29: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

29

Noise

Item Parameter Sampling area Standard Level

Results Status Standard Unit Reference

Workplace Noise level (8 hours)

Auto Insertion dept.

- Axial machine 90 dB(A) * 80.6 Pass

- Radial machine 90 dB(A) * 81.1 Pass

- SMT machine 90 dB(A) * 81.6 Pass

Annoyance Noise

Noise level (24 hours)

- Canteen 70 dB(A) ** 67.1 Pass

- In front of Compressor room (TV)

70 dB(A) ** 68.6 Pass

Annoyance Noise (24 hours)

- Canteen 10 dB(A) ** 6.8 Pass

- In front of Compressor room (TV)

10 dB(A) ** 7.5 Pass

Reference :

* The notification on “The regulation standard in the management of the occupational safety environment about Health,

Light and Noise”, B.E. 2549 (2006).

** Ministry of Industry regarding the noise level and the noise level caused by Manufacturer B.E. 2548 (2005).

Monitored by C.E.M Technology (Thailand) Co., Ltd., on Dec. 25-26, 2014

Page 30: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

30

Pollutant Loads of Public Water Areas

Parameter Unit Standard

level

Results

6/5/14 2/7/14 3/9/14 5/11/14 7/1/15 5/3/15

pH 5.5-9.0 6.4 6.0 7.3 6.20 7.30 5.8

T.D.S mg/L 3000 418.0 410.0 430.0 554.0 608.0 520.0

SS mg/L 50 16.0 <10.0 <10.0 <10.0 12.0 <10.0

COD mg/L 120 38.0 <30.0 <30.0 <30.0 54.0 30.0

BOD mg/L 20 <2.0 5.0 <2.0 4.0 5.0 4.0

Oil & Grease mg/L 5 <1.0 2.5 <1.0 <1.0 <1.0 <1.0

Pb mg/L as Pb 0.2 <0.05 <0.05 0.10 <0.05 <0.05 <0.05

TNK mg/L as N 100 2.8 2.6 <2.0 <2.0 11.7 2.1

Monitored by GOSHU TECHNOSERVICE CO.,LTD.

Reference : Ministry of Industry No.2 (2539), the defining feature of the effluent discharged outside the factory.

Page 31: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

31

In order to restore the integrity of the ecosystem and build awareness of employees in the conservation of natural resources and environment. Sharp Manufacturing (Thailand) Co.,Ltd. by Mr.Shigeharu Maehara, Managing Director together with the staff more than 200 persons have released 200 crabs to the nature at the Sea Farming Demonstration Unit in Kungkrabaen Bay, Chanthaburi province on June 7, 2014.

Page 32: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

32

Page 33: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

33

In order to build awareness of employees in the importance of recycling . Sharp Manufacturing (Thailand) Co. Ltd. arrange a donated of used cosmetics in September 2014 in order to donate to volunteer (Bird makeup) use to makeup face of dead body or distribute to the school is lacking for use to makeup the student in the school's activity. In this activity we had collected 6 kg. of the used cosmetics from SMTL member, it be able to reduce Carbon-dioxide (CO2) 1.8 kg-CO2/year

[reference from : http://www.jica.go.jp/thailand/english/office/topics/pdf/events100929_01.pdf; If we reduce 1 kg. of waste, it is able to reduce 0.3 kg-CO2]

Page 34: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

The cosmetics donated to Volunteer

The Volunteer use the used cosmetic to makeup face of dead body

Or distribute to the school is lacking

34

Page 35: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

35

[reference from : www.dept.go.th; Golden shower tree 1 tree absorb carbondioxide 10.5 kg/year.]

In order to build awareness of employees in the environmental. Sharp Manufacturing (Thailand) Co.,Ltd. had distribute 365 pcs of Golden shower tree to SMTL member in order to planting at home on Father’s Day. Anyway, if the Golden shower tree is grown up, it be able to absorb Carbondioxide (CO2) in air 3,832.5 kg/year.

Page 36: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

36

To get tree at the nursery Phutthamonthon.

Page 37: CEO’s Statement - シャープ株式会社 · CEO’s Statement ... PQA-Outgoing Insp. Mr.Nattawut ... Responsible for self-defense fire service (Emergency plan) Training

Sharp Manufacturing (Thailand) Co.,Ltd. 58 Moo3, Tambol Sampatuan, Amphur Nakornchaisri, Nakornpathom 73120 Tel : (66) 34 389 200-2, (66) 34 227 947-9 Managing Director, Mr.Shigeharu Maehara : [email protected] General Manager, Mr.Hideki Morita : [email protected] ISO Manager, Ms.Tidarat Prodpromjariya : [email protected]

37