    Review Design on Bena Irrigation Extension Hydrology

    CHAPTER III

    HYDROLOGY

    3.1. THE HYDROLOGY DATA

    The hydrological data that was available are as follows:

    (1) Daily rainfall data at Noilmina catchment area:

    Station of rainfallrecorder

    No. Sta Elevation Long of data

    ebobo !1" TTS # $ years (1$%& ' 1$$ )

    *etalan !!+ TTS # 1% years (1$,, ' 1$$ )

    Nif*-ani !! TTS # 1% years (1$,, ' 1$$ )

    Source : Data 1994 up to 1999 taken from Climatological Station, Lasiana-Kupang

    (") limatological data

    Data ty/e 0eteorology Sta eriod

    0onthly solar radiation ebobo "! years (1$,& 2 1$$&)

    0onthly wind velocity ebobo "! years (1$,& 2 1$$&)

    0onthly h*midity ebobo "! years (1$,& 2 1$$&)

    0onthly tem/erat*re ebobo "! years (1$,& 2 1$$&)

    Source : Hidrological eport, !"# $asapatria %unatama, 1999&'(((

    This data is *sed for calc*lation of eva/otrans/iration with enman 0ethod.

    (3) 4ct*al Discharge

    4ct*al discharge got by co*nting discharge which overflow of Linamn*t* 5eir6 /assing

    of sco*ring gate and inta-e gate at the time of field visit. alc*lation of discharge based

    on water level at the */stream of weir6 geometry of sco*ring gate and geometry of inta-e

    gate.

    NIPPON KOEI DISIMPIII - 1

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    2/15

    Review Design on Bena Irrigation Extension Hydrology

    4s for the discharge data7s shall be as follows:

    Date "'8*li'"!!3

    1!'4*g*st'"!!3

    ",'4*g*st'"!!3

    " 'Se/tm'"!!3

    1,' ctbr '"!!3

    11'Nov'"!!3

    Discharge(m3/s)

    3.+" 1. 1. , 1.+, ".33 3.+&

    (+) 9*/ab*mi 0a/

    9*/a *mi 0a/ by a-os*rtanal6 Scale 1 : " !!!

    Descri/tions N*mber of sheet Ty/e of ma/

    atchment 4rea Noilmina 13 sheets ard co/y and Digital file

    ena D1 ;rrigation Scheme 3 sheets rint and Digital file

    ( ) atchment area

    Data of catchment area Noilmina 9iver on Linamn*t* 5eir are as follows:

    9iver : Noilmina

    5idth of catchment area : 1&1%63, -m "

    Length of main river : ,$.!! -m

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    3/15

    Review Design on Bena Irrigation Extension Hydrology

    NIPPON KOEI DISIMPIII - 3

    LUAS CATCHMENT AREA

    - INTAKE LINAMNUTU = 1618 Km2

    INTAKETAEKOLA

    LINAMNUTUINTAKE

    1.618 Km

    LEGENDA

    STASIUN HUJAN

    JALAN

    SUNGAI

    U

    Figur 3.1 . atchment 4rea Noilmina 9iver in Linamn*t* 5eir

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    4/15

    Review Design on Bena Irrigation Extension Hydrology

    3.2. WATER REQUIREMENT

    5ater re=*irement for /addy is determined ta-ing into acco*nt several factors mentioned

    bellow: Land /re/aration ons*m/tive *se ercolation and infiltration 5ater layer re/lacement Effective rainfall ;rrigation efficiency ro//ing /attern

    a) La ! "re"ara#i$

    ;n ena irrigation scheme6 water layer re=*irement for land /re/aration is ass*med to be

    " ! mm in total6 incl*ding "!! mm for sat*ration and /lo*ghing and ! mm for standing

    water immediately after trans/lanting.

    %) C$ &u'"#i(e u&e

    ons*m/tive *se was calc*lated by the modified enman method

    ) Per $*a#i$ a ! i +i*#ra#i$

    ercolation rate in general de/ends on soil characteristic> normally /ercolation rate after

    in*ndated is aro*nd 1'3 mm?day. @or ena irrigation scheme6 the val*e of /ercolation

    ass*med to be " mm?day.

    !) Wa#er *a,er re"*a e'e #

    5ater layer re/lacement is ! mm (or 3.3 mm?day for half month) at one month and two

    month after the trans/lantation res/ectively.

    e) E++e #i(e Rai +a**

    The calc*lation of effective rainfall for /addy is based on ,!A from a half'month rainfall

    with "! A no f*lfilled /ossibility (9 %!)6 while /alawiBa ,!A from a half'month rainfallwith !A no f*lfilled /ossibility (9 !). 9ainfall data that is *sed for ena irrigation area is

    NIPPON KOEI DISIMPIII - 4

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    5/15

    Review Design on Bena Irrigation Extension Hydrology

    9ainfall data ebobo station6 beca*se that is nearest station and re/resented rainfall

    condition in ena irrigation area.

    9ainfall data ebobo station from 1$%& *ntil 1$$ are ta-en from CLa/oran idrologi 6T. 8asa/atria *natama6 1$$$?"!!!.

    Effective rainfall for ebobo station as fallows:

    Descripti1on Sat Jan Peb ar !pr ei J"nR#$% mm &'#% $' '$#' %#' & #' *3#% 1 #% %#% %#% '#% %#%R#'% mm 1&3# 1'$#% $% +1# $+#% *#% &*#' % #' #% %#%%# % x R#$% (Pa,,-) mm 31#' '+#* &1#% &*#& 33#3 1 #1 11#+ %#% %#% 3#' %#%%# % x R#'% (Pa.awi a) mm 1%%# 11%# '$#$ *#3 &3#& *+#$ *#$ + %

    Sat J". !gt Sep 0 t 2op DesR#$% mm %#% %#% %#% %#% %#% %#% %#% %#% %#% +#%R#'% mm 1#% %#% %#% %#% %#% %#% %#% %#% %#% $#*%# % x R#$% (Pa,,-) mm %#% %#% %#% %#% %#% %#% %#% %#% %#% #3%# % x R#'% (Pa.awi a) mm %# %#% %#% %#% %#% %#% %#% %#% %#% &

    +) Irriga#i$ e++i ie ,

    efore irrigation water reaches /addy field thro*gh canal systems6 a =*arter */ to one'

    third of water in general is lost d*e to /ercolation6 management losses6 and illegal *se.

    ;rrigation efficiency eF/resses as ratio between water reach to /addy fields and water

    inta-e.

    Loss of irrigation water by canal system is generally considered as follows:

    1 2 "". A at tertiary system

    ,. 2 1". A at secondary canal

    ,. 2 1". A at /rimary canal

    Th*s6 total efficiency is:

    G Eff. Tertiary system F Eff. Secondary system F Eff. rimary canal.

    Hal*e of totally efficiency is aro*nd !. $ 2 !.,3. @or ena irrigation scheme6 losses in

    each canal system are considered as follows:

    %!A at tertiary system

    $!A at secondary canal

    $!A at /rimary canal

    Th*s6 total efficiency is !.& .

    NIPPON KOEI DISIMPIII - 5

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    6/15

    Review Design on Bena Irrigation Extension Hydrology

    g) Cr$""i g "a##er

    ro/osed cro//ing /attern for ena irrigation scheme is C addy ;2 addy ;; and alawiBa

    starting from the firs half of November 1.

    3.3. WATER A-AILA ILITY

    The water availability for farming is *s*ally *sed on de/endable discharge %!A6 or failed

    level "!A. The analyse res*lt of water availability of Noimina 9iver which based on the

    calc*lation res*lt from Ni//on Ioei6 is shown on Ta%*e 3.1.

    Ta%*e 3.1. De/endable Discharge %!A

    Unit : m 3 /sec

    8an*ary @ebr*ary 0arch 4/ril 0ay 8*ne

    ; ;; ; ;; ; ;; ; ;; ; ;; ; ;;

    $#+% 13# $# % **#1% 11# % +#*% $# % $#*% #3% #1% '#$% +%

    8*ly 4*g*st*s Se/tember ctober November December

    ; ;; ; ;; ; ;; ; ;; ; ;; ; ;;

    &% 3# % 3#'% *#+% *#$% *#'% *#*% 1#$% 1#+% 1#$% 3#3% 3#'% Source: Analysis by Nippon Koei

    3./. WATER ALANCE

    ;rrigation area is determined based on the water balance analysis6 *sing the following

    form*la:

    A 0 Q DR

    5here:

    4 G 4rea to irrigated ( a)

    J G De/endable discharge (m 3?sec)

    D9 G Diversion 9e=*irement (l?sec?ha)

    n ena irrigation scheme6 cro//ing /attern addy ; 2 addy ;; 2 alawiBa is done with

    calc*lation of irrigation water diversion needed with fo*r alternatives /lanting starting Nov'16

    NIPPON KOEI DISIMPIII - 6

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    7/15

    Review Design on Bena Irrigation Extension Hydrology

    Nov'"6 Des'16 Des'". The detail calc*lation can be seen on A##a 'e #& 6 and the calc*lation

    res*lt is shown on Ta%*e 3.2 */ to Ta%*e 3. .

    Ta%*e 3.2. 5ater alance for Nov'1

    NIPPON KOEI DISIMPIII - 7

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    8/15

    Review Design on Bena Irrigation Extension Hydrology

    Ta%*e 3.3. 5ater alance for Nov'"

    NIPPON KOEI DISIMPIII - 8

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    9/15

    Review Design on Bena Irrigation Extension Hydrology

    Ta%*e 3./. 5ater alance for Dec'1

    NIPPON KOEI DISIMPIII - 9

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    10/15

    Review Design on Bena Irrigation Extension Hydrology

    Ta%*e 3. . 5ater alance for Dec'"

    NIPPON KOEI DISIMPIII - 10

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    11/15

    Review Design on Bena Irrigation Extension Hydrology

    ase on the calc*lation res*lt6 that is choose alternative the first /lanting on Dec'1 with water

    diversion needed ena irrigation scheme is 1.+1 lt?sec?ha ( Ta%*e 3./ ). 5idth of the irrigation

    area that will be design is 36 !! ha6 so that will get the cro/ intensity is "$1A. The gra/hic of water balance ena 5eir is shown on Figure 3.2 .

    3. . DRAINAGE MODUL

    The drainage of ena irrigation scheme will be /rovided by a system which incor/orates a

    collector drain and an internal drainage net wor- discharging to the nat*ral water co*rsescrossing the irrigation area. The drainage re=*irements are estimated for two -inds of area6 i.e.

    the rice field area and the non'rice field area.

    a. Ri e Fie*! Area

    ;n order to assess the drainage re=*irement in rice field6 the D 59D7s Design riteria was

    ado/ted. The drainage water re=*irement for rice field area is estimated base on the maFim*m

    NIPPON KOEI DISIMPIII - 11

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    12/15

    Review Design on Bena Irrigation Extension Hydrology

    3'day rainfall with a ret*rn /eriod of years. Drainage water re=*irement of &.!! l?sec?ha was

    *sed for designing drainage canal.

    b. N$ Ri e Fie*! Area

    The drainage water re=*irement for non'rice area is divided into two drainage re=*irements6

    namely6 the /ea- drainage re=*irement and the design drainage re=*irement. The /ea-

    drainage water re=*irement is estimated by the Der 5ed*wen or 9ational @orm*la7s by *sing

    maFim*m daily rainfall with a years ret*rn /eriod.

    The design drainage re=*irement is estimated by the following form*la *sing the maFim*m

    one day rainfall with a 'years ret*rn /eriod.

    Q! 0 4.115 a R6 ) A 4.72

    Jd : Design drainage re=*irement (l?se)

    4 : 9*noff coefficient

    9( ) : 0aFim*m one day rainfall with a 'years ret*rn /eriod

    4 : Drainage area (ha)

    The design drainage discharge with a 'years ret*rn /eriod is:

    Q! 0 1.52 8 .3 8 A 4.72

    3.5. PEA9 DI:CHARGE

    There are many nat*ral drains ? river from hill at the left side of irrigation area. The nat*ral

    drain crossing with main canal6 so that need crossing str*ct*re i.e. a=*ed*ct6 cross drain6 andover ch*te. a/acity of its str*ct*re was designed with /ea- discharge. The catchment area

    fig*re of nat*ral drain ? river is shown on A##a 'e #&.

    4nalysis /ea- discharge for the eFternal drainage *se 9ational method6 that is method of

    5ed*wen6 as/er6 and 0ononobe. ;n general method of 9ational can be written down as

    follows:

    Jn G K . ; . 4 or Jn G K . . = n . 4

    NIPPON KOEI DISIMPIII - 12

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    13/15

    Review Design on Bena Irrigation Extension Hydrology

    5here :

    Jn G flood discharge for ret*rn /eriod n (m 3?s)>

    M G catchment area (-m ")>

    ; G rainfall intensity (mm?ho*r)>

    K G r*noff coefficient (')>

    G red*ction coefficient of rainfall area>

    =n G rainfall in m 3?s.-m " for ret*rn /eriod n

    L G length of river (-m)

    4ccording to 0ononobe7s method6 rainfall intensity can be calc*lated by the form*la as

    follows :

    ; G ( 9n ? "+ ) ("+ ? t) "?3

    5here :

    t G L ? (," slo/e !.&)

    4ccording to 5ed*wen and as/er6 r*noff coefficient can be eF/ressed:

    ' 5ed*wen : K G 1 2 (+.1?( . = n # ,))

    ' as/er : K G (1#!.!1".4 !., ) ? ( 1# !.!, 4 !., )

    9*noff coefficient of the methods corres/onding to r*noff coefficient in the /roBect area that

    re/resenting res*lt of the calibration and sim*lation rainfall'r*noff model (1$,,'1$$ ) from

    the Tan- and Nreca model li-e as follows:

    ' on the ena basin : K G !." 2 !.+ >' on the 0ala-a basin : K G !.+%, 2 !.&>

    Data of eFternal drainage on the ena irrigation area co*ld be seen on the Ta%*e 3.5 . and

    9eca/it*lation for design of eFternal /ea- discharge co*ld be seen on the Ta%*e 3.; .

    NIPPON KOEI DISIMPIII - 13

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    14/15

    Review Design on Bena Irrigation Extension Hydrology

    Ta%*e 3.5. atchment 4rea data for eFternal drain

    No. of .4

    5idth of .4

    (-m ")

    Length of 9iver (-m)

    Elevation

  • 7/25/2019 Chapter-3 Bena Hydrology IND

    15/15

    Review Design on Bena Irrigation Extension Hydrology

    eneraliOation of eFternal drainage flood discharge on ena ;rrigation area based on the

    com/*tation flood discharge by 9ational method for vario*s ret*rn /eriod as the following

    4=*etion.

    J " G %.""!$ 4!. $,

    6 9 "

    G !.$%!&J G 1!.1%$ 4 !.&"&" 6 9 " G !.$%+!

    J 1! G 11.""$ 4 !.&3, 6 9 " G !.$% "

    J " G 1".3!3 4 !.&+%1 6 9 " G !.$%&3

    J ! G 1".$,+ 4 !.& +! 6 9 " G !.$%&%

    J 1!! G 13. &! 4 !.& %+ 6 9 " G !.$%,"5here J is flood discharge in m 3?s and 4 is atchment area in -m " .

    NIPPON KOEI DISIMPIII - 15