  • 5/21/2018 CID Pilecaps

    1/96

    Project Lotsafee House

    Client BigBucks PLC Made by Date Page

    Location Pilecap G14 Rod 23-Jul-14 101

    PILECAP DESIGN to BS 8110:1997 Checked Revision Job No

    Originated from CiD Pilecaps.xlson CD 2001 Concrete Innovation & Design - - P200

    MATERIALS fcu 35 N/mm h agg 20 mm c

    1.5 concrefy 460 N/mm S cover 50 mm s 1.05 steel

    Pile capacity 200 kN m cover 75 mm onc density 23.6 kN/m

    DIMENSIONS mm

    A = 400= 350 B = 1500= 350 C = 400

    E = 750

    Pile = 375 epthH = 400

    COLUMN ACTIONS kN, kNm characteristic

    DEAD IMPOSED WIND

    Axial (kN) 218 104.2 27.5 PLOT (to scale)

    PILECAP

    COLUMN

    UNREGISTERED

    COPY

    Concrete Innovation & Desig

    Double Pilecap

    KEY

    . . .

    H (kN) 0 0 0

    REINFORCEMENT PILE REACTIONS kN

    BOTTOM M = 156.5 kNm PILE 1 PILE 2

    d = 309.0 mm, As = 1,243 mm Gk + Qk 147.4 192.2

    7 T16 B = 1,407 mm Gk + Qk +Wk 159.3 207.7TOP M = 0.0 kNm

    d = 337.0 mm, As min = 416 mm

    6 T10 T = 471 mm 6 T10 02 T

    LINKS

    V = 279.7 kN, v = 1.131 N/mm

    vc = 0.625 N/mm

    (v - vc)b = 405.1 N/mm Links 11 T8 03.200 + 2x11 T8 04.200

    4 Legs T8 @ 200 LINKS = 440.4 N/mm

    VALID DESIGNSTATUS

    ELEVATION

    7 T16 01 B

  • 5/21/2018 CID Pilecaps

    2/96

    Project Lotsafee House

    Client BigBucks PLC Made by Date Page

    Location Pilecap F13 Rod 23-Jul-14 15

    PILECAP DESIGN to BS 8110:1997 Checked Revision Job No

    Originated from CiD Pilecaps.xls on CD 2001 Concrete Innovation & Design - - P200

    Cap load = 27.6 kN Group centre @ 751 m from pile 1

    PILE REACTIONSkN

    PILE 1 PILE 2 PILE 3 OVERTURNING MOMENTS- kNmchar

    Gk + Qk 140.4 168.9 191.9 . DEAD IMPOSED WIND

    k + Qk +Wk 139.3 172.9 199.0 . Mx 10.0 5.0 2.0

    .4Gk + 1.6Qk 189.9 231.6 265.4 My 20.0 10.0 5.0

    Gk + 1.4Wk 99.2 125.3 145.0 .

    (Gk+Qk+Wk) 156.2 196.4 227.8

    BENDING MOMENTS- kNm

    Myvof colM ^of col

    Mx

    E-W STEEL N-S STEEL

    '

    172.5 94.3 148.1

    112.0 60.9 95.6

    1.4Gk + 1.6Qk Gk + 1.4Wk

    114.0 59.6 93.8

    Concrete Innovation & Desig

    Triple Pilecap

    1.2(Gk+Qk+Wk)

    UNREGISTERED

    COPY

    = . = . = .

    b = 1050 b = 1798 min As = 0.13%

    d = 307.0 d = 287.0

    K = 0.0498 K = 0.0220

    z = 288.9 z = 272.7

    As = 1363 As = 955

    Provide 1363 Provide 955

    No = 5 No = 4

    As prov = 1571 As prov = 1257

    fs = 266 fs = 233

    Max clear S = 280.0 Max clear S = 280.0

    Min clear S = 25.0 Min clear S = 25.0

    Clear S = 121.0 5 T20 B Clear S = 168.0 4 T20 B

    SHEAR Crit section is 112.5 from pile centres

    PILES 2 & 3 8links

    V = 265.4 b = 1050 As% = 0.487 .

    av = 537.5 v = 0.8233 c 2d/av = 0.6790

    (v - vc)b = 420.0 of legs = 3 Spacing = 150 3 Legs T8 @ 150 LINKSPILE 1 8links

    V = 189.9 b = 1234 As% = 0.355 .

    av = 638.2 v = 0.5361 vc = 0.5348

    (v - vc)b = 493.6 of legs = 4 Spacing = 175 4 Legs T8 @ 175 LINKS

    PUNCHING Column Face At Fig 3.23 critical section

    V = 686.8 =4167 d ave = 297

    v = 1.927 v = 0.555 av = 494.0

    v max = 4.733 ok c 2d/av = 0.655 ok

  • 5/21/2018 CID Pilecaps

    3/96

    Project Lotsafee House

    Client BigBucks PLC Made by Date Page

    Location Pilecap E12 Rod 23-Jul-14 29PILECAP DESIGN to BS 8110:1997 Checked Revision Job No

    Originated from CiD Pilecaps.xls on CD 2001 Concrete Innovation & Design - - P2000

    Cap load = 42.5 kN OVERTURNING MOMENTS- kNmcharacte

    DEAD IMPOSED WIND

    PILE REACTIONSkN Mx 10.5 5.2 2.1

    PILE 1 PILE 2 PILE 3 PILE 4 My 20.9 10.5 5.2

    Gk + Qk 150.5 162.6 174.6 186.7 .

    k + Qk +Wk 151.1 164.8 179.3 192.9 .

    .4Gk + 1.6Qk 202.5 220.2 237.9 255.6

    Gk + 1.4Wk 107.5 117.8 129.2 139.5 .

    (Gk+Qk+Wk) 168.6 185.0 202.4 218.8

    BENDING MOMENTS- kNm

    Myvof col

    My of colMyof col

    E-W STEEL BOTTOM TOP N-S STEEBOTTOM TOP

    101.4 159.1

    1.4Gk + 1.6Qk Gk + 1.4Wk 1.2(Gk+Qk+Wk)

    237.9 128.7 201.9

    190.2

    220.2 118.4 185.5222.1 120.9 189.5

    Concrete Innovation & Design

    4 Pile Cap

    UNREGISTERED

    COPY

    M = 237.9 0.0 M = 222.1 0.0 K' = 0.1558

    b = 2000 2000 b = 2000 2000 min As = 0.13%

    d = 369.0 395.0 d = 357.0 385.0

    K = 0.0250 0.0000 K = 0.0249 0.0000

    z = 350.6 375.3 z = 339.2 365.8

    As = 1549 0 As = 1495 0

    Provide 1549 0 Provide 1495 0No = 14 8 No = 14 8

    As prov = 1583 628 As prov = 1583 628

    fs = 300 8 T10 T1 fs = 289 8 T10 T2Max clear S = 288.0 Max clear S = 288.0

    Min clear S = 25.0 Min clear S = 25.0

    Clear S = 132.0 Clear S = 132.0

    14 T12 B1 14 T12 B2

    BEAM SHEAR Critical section is 112.5 mm from pile centres

    EW (NS plane) 8links

    V = 475.8 v = 0.6447 As% = 0.215 .

    av = 537.5 c 2d/av = 0.5930 v - vc b = 800.0No of legs = 8 Spacing = 200 8 Legs T8 @ 200 LINKS

    NS (EW plane)

    V = 493.5 v = 0.6911 As% = 0.222 .

    av = 537.5 c 2d/av = 0.5800 (v - vc)b = 800.0

    No of legs = 8 Spacing = 200 8 Legs T8 @ 200 LINKS

    PUNCHING Column Face At Fig 3.23 critical section

    V = 916.2 =4300 d ave = 363

    v = 1.803 v = 0.587 av = 537.5

    v max = 4.733 ok c 2d/av = 0.589 ok

  • 5/21/2018 CID Pilecaps

    4/96

    Project Lotsafee House

    Client BigBucks PLC Made by Date Page

    Location Pilecap D11 Rod 23-Jul-14 55

    PILECAP DESIGN to BS 8110:1997 Checked Revision Job No

    Originated from CiD Pilecaps.xls on CD 2001 Concrete Innovation & Design - - P2000

    Cap load = 91.3 kN OVERTURNING MOMENTS- kNmcharacteristic

    DEAD IMPOSED WINDMx 19.1 5.3 2.1

    My 23.3 10.6 5.3

    PILE REACTIONSkN

    PILE 1 PILE 2 PILE 3 PILE 4 PILE 5

    Gk + Qk 167.0 180.3 185.5 198.7 182.9 .

    k + Qk +Wk 169.6 184.0 190.9 205.3 187.5 .

    .4Gk + 1.6Qk 215.8 235.0 242.8 261.9 238.9

    Gk + 1.4Wk 114.5 126.5 131.2 143.2 128.8 .

    (Gk+Qk+Wk) 181.6 198.9 207.2 224.5 203.0

    BENDING MOMENTS- kNm

    Myvof col

    My of col

    Myof col

    Concrete Innovation & Design

    346.9

    388.4

    318.5

    345.1

    1.4Gk + 1.6Qk Gk + 1.4Wk

    332.2

    270.0

    294.0

    185.4

    211.1

    170.6

    187.3

    UNREGISTERED

    COPY

    292.8

    5 Pile Cap

    1.2(Gk+Qk+Wk)

    E-W STEEL BOTTOM TOP N-S STEEBOTTOM TOP

    16 12 16 12

    M = 345.1 0.0 M = 388.4 0.0 K' = 0.1558

    b = 2539 2539 b = 2539 2539 min As = 0.13%

    d = 501.0 532.0 d = 517.0 544.0

    K = 0.0155 0.0000 K = 0.0164 0.0000

    z = 476.0 505.4 z = 491.2 516.8

    As = 1655 0 As = 1805 0Provide 1980 0 Provide 1980 0

    No = 10 10 No = 10 10

    As prov = 2011 1131 As prov = 2011 1131

    fs = 252 10 T12 T2 fs = 275 10 T12 T1Max clear S = 284.0 Max clear S = 284.0

    Min clear S = 25.0 Min clear S = 25.0

    Clear S = 251.0 Clear S = 251.0

    10 T16 B2 10 T16 B1

    BEAM SHEAR Critical section is 112.5 mm from pile centres

    EW NS lane 10links

    V = 496.9 v = 0.3906 As% = 0.158 .

    av = 807.0 vc = 0.4746 (v - vc)b = 1015.6No of legs = 10 Spacing = 325 10 Legs T10 @ 325 LINKS

    NS EW lane

    V = 504.7 v = 0.3845 As% = 0.153 .

    av = 807.0 vc = 0.4847 v - vc b = 1015.6

    No of legs = 10 Spacing = 325 10 Legs T10 @ 325 LINKS

    PUNCHING Column Face No other critical section

    V = 955.5 =6456 d ave = 509

    v = 1.251 v = 0.000 av = 807.0

    v max = 4.733 ok c 2d/av = 0.480 ok

  • 5/21/2018 CID Pilecaps

    5/96

    Project Lotsafee House

    Client BigBucks PLC Made by Date Page

    Location Pilecap C10 Rod 23-Jul-14 28

    PILECAP DESIGN to BS 8110:1997 Checked Revision Job No

    Originated from CiD Pilecaps.xls on CD 2001 Concrete Innovation & Design - - P2000

    Cap load = 101.2 kN OVERTURNING MOMENTS- kNm characteristic

    DEAD IMPOSED WINDMx 19.2 5.3 2.1

    My 23.4 10.7 5.3

    PILE REACTIONS kN

    PILE 1 PILE 2 PILE 3 PILE 4 PILE 5 PILE 6

    Gk + Qk 141.2 153.8 147.8 160.3 154.3 166.9 .

    k + Qk +Wk 144.2 157.9 151.8 165.5 159.4 173.0 .

    .4Gk + 1.6Qk 180.4 198.5 190.0 208.1 199.6 217.7

    Gk + 1.4Wk 95.7 107.1 101.7 113.0 107.6 119.0 .

    (Gk+Qk+Wk) 151.9 168.3 161.0 177.4 170.1 186.5

    BENDING MOMENTS - kNm

    M v of col

    My ^of col

    M of col

    - -

    6 Pile Cap

    UNREGISTERED

    COPY

    Concrete Innovation & Design

    1.4Gk + 1.6Qk Gk + 1.4Wk 1.2(Gk+Qk+Wk)

    252.8

    397.9 213.0 336.2

    438.2 237.9 374.4

    270.8 144.9 229.4

    296.6 161.1

    - -

    16 12 16 12

    M = 296.6 0.0 M = 438.2 0.0 K' = 0.1558

    b = 3300 3300 b = 2000 2000 min As = 0.13%

    d = 551.0 582.0 d = 567.0 594.0

    K = 0.0085 0.0000 K = 0.0195 0.0000

    z = 523.5 552.9 z = 538.7 564.3

    As = 1293 0 As = 1857 0Provide 2789 0 Provide 1857 0

    No = 14 14 No = 10 10

    As prov = 2815 1583 As prov = 2011 1131

    fs = 141 4 T12 T2 fs = 283 10 T12 T1

    Max clear S = 284.0 Max clear S = 284.0

    Min clear S = 25.0 Min clear S = 25.0

    Clear S = 227.4 Clear S = 191.1

    14 T16 B2 10 T16 B1

    BEAM SHEAR Critical section is 112.5 mm from pile centres

    EW (NS plane) 10 links

    V = 624.4 v = 0.3434 As% = 0.155 .

    av = 537.5 c 2d/av = 0.7783 v - vc b = 1320.0

    No of legs = 14 Spacing = 350 14 Legs T10 @ 350 LINKS

    NS (EW plane)

    V = 417.3 v = 0.3680 As% = 0.177 .

    av = 1187.5 vc = 0.3972 v - vc b = 800.0

    No of legs = 10 Spacing = 425 10 Legs T10 @ 425 LINKS

    PUNCHING Column Face No other critical section

    V = 1194.4 = 6504 d ave = 559

    v = 1.257 v = 0.000 av = 537.5

    v max = 4.733 ok c 2d/av = 0.808 ok

  • 5/21/2018 CID Pilecaps

    6/96

    Bar schedule ref : 202 01 Rev: -

    Site ref : Date prepared :

    Job no : P2000 UNREGISTERED COPY Prepared by : Rod hecked by : -

    A * B * C * D * E/R *

    mm mm mm mm mm

    01 T 16 4 7 28 2375 21 130 2175

    02 T 10 4 6 24 2175 00

    03 T 8 4 11 44 2075 51 270 695 115

    04 T 8 4 22 88 500 31 115 50 270 115

    3-Pile Caps 05 T 20 3 5 15 2275 21 245 1890

    06 T 12 3 3 9 1875 00

    07 T 8 3 12 36 1975 51 270 650 115

    08 T 8 3 12 36 500 31 115 50 270 115

    09 T 20 3 4 12 2000 21 190 1715

    10 T 12 3 4 12 1700 00

    Type andsize

    No.

    ofmbrs

    Lotsafee House

    Concrete Innovation & Design

    23-Jul-14

    Double

    Pilecaps

    Member Bar mark

    No. of

    barsin

    each

    Total No.

    Length of

    each bar

    mm

    Shapecode

    11 T 8 3 7 21 1800 51 235 600 115

    12 T 8 3 14 42 475 31 115 50 235 115

    4-Pile 13 T 12 5 14 70 2100 21 125 1890

    14 T 10 5 8 40 1875 00

    15 T 12 5 14 70 2100 21 125 1890

    16 T 10 5 8 40 1875 00

    17 T 8 5 80 400 525 31 115 50 295 115

    5-Pile 18 T 16 2 10 20 2625 21 130 2410

    19 T 12 2 10 20 2400 00

    21 T 16 2 10 20 2650 21 145 2410

    22 T 12 2 10 20 2400 00

    20 T 10 2 80 160 700 31 120 60 440 120

    6-Pile 23 T 16 1 14 14 2100 21 130 1890

    24 T 12 1 14 14 1875 00

    26 T 16 1 10 10 3450 21 165 3175

    27 T 12 1 10 10 3175 00

    28 T 10 1 84 84 750 31 120 60 490 120

    This schedule complies with BS 8666. ILECAP DESIGN to BS 8110:1997

    * Specified in multiples of 5mm. 2000 Concrete Innovation & Design Specified in multiples of 25mm.

    1,373 kg on this schedule

  • 5/21/2018 CID Pilecaps

    7/96

    NOTES

    Concrete grade C35.

    Cover 75 mm bottom.

    Cover 50 mm top & side

    -4No

    -3No

    Refer to GA drawings

    for orientation and

    dimensions.

    -5No

    This drawing is

    PLAN (Pilecap F13)

    ELEVATION

    6 T10 02 T

    8 T10 16 T

    7 T16 01 B

    Links 8x10 T8 17 200

    4 T12 10 T 4 T20 09 B

    8 T10 14 T1 T12 13 B1

    8 Link Legs

    T12 15 B2

    5 T20 05 B

    PLAN (Pilecap G14) PLAN (Pilecap E12)

    2Pile

    Cap

    3Pile

    Cap

    inks 11 T8 03.200 + 2x11 T8 04.20

    ELEVATION

    4Pile

    Cap

    .

    Connecting slabs &

    ELEVATION

    ks 12 T8 07 150 + 12 T8 08 1

    ks 7 T8 11 175 + 2x7 T8 12 1

    3 T12 06 T

    cksPLC

    feeHouse

    DCOPY

    PLAN (Pilecap C10)

    ELEVATION

    10 T12 22 T1 10 T16 21 B1 14 T16 23

    Links 10x8 T10 20 325

    10 T12 19 10 T12 27

    ELEVATION

    Big

    B

    Lot

    sa

    Projec

    t

    Client

    T16 18 B2

    NREGISTE

    T16 26 B1

    T12 24 T2

    202

    23-Ju

    l-14

    -

    DwgNo

    Date

    Revision

    P2000

    14 Link Legs

    JobNo

    teInnovation&

    Desig

    PLAN (Pilecap D11)

    5Pile

    Cap-

    2N

    o

    p-

    1No

    ELEVATIONLinks 14x6 T10 25 35010 Link Legs

    Ro

    d-

    Checked

    Concr

    Madeby

    ELEVATION 6Pile

    C

  • 5/21/2018 CID Pilecaps

    8/96

    DiagramsDOUBLE Control

    Cap X 0 0 800 800 0 2300 C/L -50 850 400 400

    Cap Y 0 2300 2300 0 0 800 1150 1150 -50 2350

    Column X 225 225 575 575 225 Fill 260 260 295 295 330 330 365 365

    Column Y 975 1325 1325 975 975 975 1325 975 1325 975 1325 975 1325375 diameter piles

    X 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### -93.8 -64.1

    Y ##### ##### ##### ##### ##### ##### -93.8 -64.1 -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2

    Pile X 400.0 367.4 335.9 306.3 279.5 256.4 237.6 223.8 215.3 212.5 215.3 223.8 237.6 256.4 279.5 306.3 335.9

    Pile 1 Y 212.5 215.3 223.8 237.6 256.4 279.5 306.3 335.9 367.4 400.0 432.6 464.1 493.8 520.5 543.6 562.4 576.2

    Pile 2 Y 1713 1715 1724 1738 1756 1779 1806 1836 1867 1900 1933 1964 1994 2021 2044 2062 2076ELEVATION

    Cap X 0 0 2300 2300 0

    Cap Y 240 640 640 240 240

    Piles X 212.5 212.5 587.5 587.5 1713 1713 2088 2088 Col X 975 975 1325 1325

    Piles Y 0 240 0 240 0 240 0 240 Col Y 640 940 640 940

    Cutoff X 212.5 212.5 587.5 587.5 1713 1713 2088 2088

    Cutoff Y 240 290 290 240 240 290 290 240

    Bar X 50 50 2250 2250 space No start end

    Top bar Y 580 580 580 580 centre 1260 7 550 1750

    Btm bar Y 455 325 325 455 ends 230 2 65

    E Links X 65 65 65 65 265 265 2235 2235 2235 2235 2035 2035

    E Links Y 315 590 315 590 315 590 315 590 315 590 315 590

    C Links X 550 550 750 750 950 950 1150 1150 1350 1350 1550 1550

    C Links Y 315 590 315 590 315 590 315 590 315 590 315 590TRIPLE

    Cap X 0 0 2000 2000 1350 650 0 0 1826 C/L 0 2000 1000 1000

    Control

  • 5/21/2018 CID Pilecaps

    9/96

    Cap Y 1126 1826 1826 1126 0 0 1126 0 2000 1101 1101 -50 1876

    Column X 850 850 1150 1150 850 Fill 880 880 910 910 940 940 970 970

    Column Y 950.7 1251 1251 950.7 950.7 950.7 1251 950.7 1251 950.7 1251 950.7 1251

    375 diameter piles

    X 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### -93.8 -64.1

    Y ##### ##### ##### ##### ##### ##### -93.8 -64.1 -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2

    Pile 1 X 1000 967 936 906 879 856 838 824 815 813 815 824 838 856 879 906 936

    Pile 2 X 350 317 286 256 229 206 188 174 165 163 165 174 188 206 229 256 286

    Pile 3 X 1650 1617 1586 1556 1529 1506 1488 1474 1465 1463 1465 1474 1488 1506 1529 1556 1586

    Pile 1 Y 163 165 174 188 206 229 256 286 317 350 383 414 444 471 494 512 526

    Pile 2&3 Y 1289 1291 1300 1314 1332 1355 1382 1412 1443 1476 1509 1540 1570 1597 1620 1638 1652SOUTH ELEVATION

    Cap X 0 0 2000 2000 0 650 650 1350 1350

    Ca Y 240 640 640 240 240 240 640 240 640

    Piles X 162.5 162.5 537.5 537.5 1463 1463 1838 1838 Col X 850 850 1150 1150

    Piles Y 0 240 0 240 0 240 0 240 Col Y 640 940 640 940

    Cutoff X 162.5 162.5 537.5 537.5 1463 1463 1838 1838 813 813 1188 1188

    Cutoff Y 240 290 290 240 240 290 290 240 0 240 0 240

    Top bar X 50 50 1950 1950

    Top bar Y 580 580 580 580 space No start end

    Btm bar X 50 50 1950 1950 centre 1075 8 475 1525

    Btm bar Y 555.5 325 325 555.5 ends 187.5 2 68.75E Links X 68.75 68.75 68.75 68.75 218.8 218.8 1931 1931 1931 1931 1781 1781

    E Links Y 315 590 315 590 315 590 315 590 315 590 315 590

    C Links X 475 475 625 625 775 775 925 925 1075 1075 1225 1225

    C Links Y 315 590 315 590 315 590 315 590 315 590 315 590EAST ELEVATION

    Cap X 0 0 1826 1826 0 1126 1126

    Cap Y 240 640 640 240 240 240 640

    Piles X 162.5 162.5 537.5 537.5 1289 1289 1664 1664 Col X 951 951 1251 1251

  • 5/21/2018 CID Pilecaps

    10/96

    Piles Y 0 240 0 240 0 240 0 240

    Cutoff X 162.5 162.5 537.5 537.5 1289 1289 1664 1664

    Cutoff Y 240 290 290 240 240 290 290 240

    Top bar X 50 766 1126 1776

    Top bar Y 568 568 568 568 space No start end

    Btm bar X 50 50 1776 1776 centre 826 5 413 1113

    Btm bar Y 527 337 337 527 ends 187.5 2 56.25

    E Links X 56.25 56.25 56.25 56.25 231.3 231.3

    E Links Y 327 580 327 580 327 580

    C Links X 413 413 588 588 763 763 938 938 1113 1113 1113 1113

    C Links Y 327 580 327 580 327 580 327 580 327 580 327 580QUADRUPLE Control

    Cap X 0 0 2000 2000 0 2000 C/L -50 2050 1000 1000

    Ca Y 0 2000 2000 0 0 2000 1000 1000 -50 2050

    Column X 850 850 1150 1150 850 Fill 880 880 910 910 940 940 970 970

    Column Y 800 1200 1200 800 800 800 1200 800 1200 800 1200 800 1200

    375 diameter piles

    X 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### -93.8 -64.1

    Y ##### ##### ##### ##### ##### ##### -93.8 -64.1 -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2

    Pile 1&3 X 350 317 286 256 229 206 188 174 165 163 165 174 188 206 229 256 286

    Pile 2&4 X 1650 1617 1586 1556 1529 1506 1488 1474 1465 1463 1465 1474 1488 1506 1529 1556 1586

    Pile 1&2 Y 163 165 174 188 206 229 256 286 317 350 383 414 444 471 494 512 526Pile 3&4 Y 1463 1465 1474 1488 1506 1529 1556 1586 1617 1650 1683 1714 1744 1771 1794 1812 1826

    SOUTH ELEVATION

    Cap X 0 0 2000 2000 0

    Cap Y 270 720 720 270 270

    Piles X 162.5 162.5 537.5 537.5 1463 1463 1838 1838 Col X 850 850 1150 1150

    Piles Y 0 270 0 270 0 270 0 270 Col Y 720 1058 720 1058

    Cutoff X 162.5 162.5 537.5 537.5 1463 1463 1838 1838

    Cutoff Y 270 320 320 270 270 320 320 270 No start end S

  • 5/21/2018 CID Pilecaps

    11/96

    Top bar X 50 1950 Btm bar X 50 50 1950 1950 10 100 1900 200

    Top bar Y 670 670 Btm bar Y 470 345 345 470 8 100 1900 257

    Links X 100 100 357 357.1 614 614.3 871 871.4 1129 1129 1386 1386

    Links Y 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5EAST ELEVATION

    Cap X 0 0 2000 2000 0

    Cap Y 270 720 720 270 270

    Piles X 162.5 162.5 537.5 537.5 1463 1463 1838 1838 Col X 800 800 1200 1200

    Piles Y 0 270 0 270 0 270 0 270 Col Y 720 1058 720 1058

    Cutoff X 162.5 162.5 537.5 537.5 1463 1463 1838 1838

    Cutoff Y 270 320 320 270 270 320 320 270 No start end S

    Top bar X 50 1950 Btm bar X 50 50 1950 1950 10 100 1900 200

    Top bar Y 645 645 Btm bar Y 495 370 370 495 8 100 1900 257

    Links X 100 100 300 300 500 500 700 700 900 900 1100 1100QUINTRUPLE Control

    Cap X 0 0 2539 2539 0 2539 C/L -50 2589 1270 1270

    Cap Y 0 2539 2539 0 0 2539 1270 1270 -50 2589

    Column X 1045 1045 1495 1495 1045 Fill 1090 1090 1135 1135 1180 1180 1225 1225

    Column Y 1120 1420 1420 1120 1120 1120 1420 1120 1420 1120 1420 1120 1420

    375 diameter piles

    X 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### -93.8 -64.1

    Y ##### ##### ##### ##### ##### ##### -93.8 -64.1 -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2Pile 1&3 X 350 317 286 256 229 206 188 174 165 163 165 174 188 206 229 256 286

    Pile 2&4 X 2189 2156 2125 2095 2068 2045 2027 2013 2004 2002 2004 2013 2027 2045 2068 2095 2125

    Pile 5 X 1270 1237 1205 1176 1149 1126 1107 1093 1085 1082 1085 1093 1107 1126 1149 1176 1205

    Pile 1&2 Y 163 165 174 188 206 229 256 286 317 350 383 414 444 471 494 512 526

    Pile 3&4 Y 2002 2004 2013 2027 2045 2068 2095 2125 2156 2189 2222 2253 2283 2310 2333 2351 2365

    Pile 5 Y 1082 1085 1093 1107 1126 1149 1176 1205 1237 1270 1302 1334 1363 1390 1413 1432 1446SOUTH ELEVATION

    Cap X 0 0 2539 2539 0

  • 5/21/2018 CID Pilecaps

    12/96

    Cap Y 360 960 960 360 360

    Piles X 162.5 162.5 537.5 537.5 2002 2002 2377 2377 Col X 1045 1045 1495 1495

    Piles Y 0 360 0 360 0 360 0 360 Col Y 960 1410 960 1410

    Cutoff X 162.5 162.5 537.5 537.5 2002 2002 2377 2377 1082 1082 1457 1457

    Cutoff Y 360 410 410 360 360 410 410 360 0 410 410 0 No start end

    Top bar X 50 2489 Btm bar X 50 50 2489 2489 8 132 2407

    Top bar Y 885 885 Btm bar Y 590 460 460 590 10 100 2439

    Links X 132 132 457 457 782 782 1107 1107 1432 1432 1757 1757

    Links Y 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5EAST ELEVATION

    Cap X 0 0 2539 2539 0

    Cap Y 360 960 960 360 360

    Piles X 162.5 162.5 537.5 537.5 2002 2002 2377 2377 Col X 1120 1120 1420 1420

    Piles Y 0 360 0 360 0 360 0 360 Col Y 960 1410 960 1410

    Cutoff X 162.5 162.5 537.5 537.5 2002 2002 2377 2377 1082 1082 1457 1457

    Cutoff Y 360 410 410 360 360 410 410 360 0 410 410 0 No start end

    Top bar X 50 2489 Btm bar X 50 50 2489 2489 8 132 2407

    Top bar Y 910 910 Btm bar Y 565 435 435 565 10 100 2439

    Links X 100 100 359.9 359.9 619.8 619.8 879.7 879.7 1140 1140 1399 1399SEXTRUPLE Control

    Cap X 0 0 2000 2000 0 3300 C/L -50 2050 1000 1000

    Cap Y 0 3300 3300 0 0 2000 1650 1650 -50 3350Column X 825 825 1175 1175 825 Fill 860 860 895 895 930 930 965 965

    Column Y 1400 1900 1900 1400 1400 1400 1900 1400 1900 1400 1900 1400 1900

    375 diameter piles

    X 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### -93.8 -64.1

    Y ##### ##### ##### ##### ##### ##### -93.8 -64.1 -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2

    Pile 1,3,5 X 350 317 286 256 229 206 188 174 165 163 165 174 188 206 229 256 286

    Pile 2,4,6 X 1650 1617 1586 1556 1529 1506 1488 1474 1465 1463 1465 1474 1488 1506 1529 1556 1586

    Pile 1&2 Y 163 165 174 188 206 229 256 286 317 350 383 414 444 471 494 512 526

  • 5/21/2018 CID Pilecaps

    13/96

    Pile 3&4 Y 1463 1465 1474 1488 1506 1529 1556 1586 1617 1650 1683 1714 1744 1771 1794 1812 1826

    Pile 5&6 Y 2763 2765 2774 2788 2806 2829 2856 2886 2917 2950 2983 3014 3044 3071 3094 3112 3126SOUTH ELEVATION

    Cap X 0 0 2000 2000 0

    Cap Y 390 1040 1040 390 390

    Piles X 162.5 162.5 537.5 537.5 1463 1463 1838 1838 Col X 825 825 1175 1175

    Piles Y 0 390 0 390 0 390 0 390 Col Y 1040 1528 1040 1528

    Cutoff X 162.5 162.5 537.5 537.5 1463 1463 1838 1838

    Cutoff Y 390 440 440 390 390 440 440 390 No start end

    Top bar X 50 1950 Btm bar X 50 50 1950 1950 6 125 1875

    Top bar Y 965 965 Btm bar Y 620 490 490 620 10 100 1900

    Links X 125 125 475 475 825 825 1175 1175 1525 1525 1875 1875

    Links Y 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5EAST ELEVATION

    Cap X 0 0 3300 3300 0

    Cap Y 390 1040 1040 390 390

    Piles X 162.5 162.5 537.5 537.5 1463 1463 1838 1838 2763 2763 3138 3138

    Piles Y 0 390 0 390 0 390 0 390 0 390 0 390

    Cutoff X 162.5 162.5 537.5 537.5 1463 1463 1838 1838 2763 2763 3138 3138

    Cutoff Y 390 440 440 390 390 440 440 390 390 440 440 390 No start end

    Top bar X 50 3250 Btm bar X 50 50 3250 3250 8 162.5 3138

    Top bar Y 990 990 Btm bar Y 600.5 465 465 600.5 14 100 3200Links X 100 100 338.5 338.5 576.9 576.9 815.4 815.4 1054 1054 1292 1292

    DRAWING -EAST ELEVATION 1total length 10452 First C/L @ 1270 2nd C/L @ 5361 Last C/L @ 9452

    Cap X 119.5 119.5 2420 2420 119.5 4448 4448 6274 6274 4448 5574 5574 8452 8452

    Cap Y 300 700 700 300 300 300 700 700 300 300 300 700 250 700

    Piles X 332 332 707 707 1832 1832 2207 2207 4610 4610 4985 4985

    Piles Y 0 300 0 300 0 300 0 300 0 300 0 300

    Column X 1095 1095 1445 1445 5398 5398 5698 5698 9252 9252 9652 9652

    Column Y 700 1075 700 1 075 700 1075 700 1075 700 1075 700 1075

  • 5/21/2018 CID Pilecaps

    14/96

    Cutoff X 332 332 707 707 1832 1832 2207 2207 4610 4610 4985 4985 5736 5736

    Cutoff Y 300 350 350 300 300 350 350 300 300 350 350 300 300 350

    Top bar X 169.5 2370 4498 6224 8502 10402

    Top bar Y 640 640 628 628 625 625

    Btm bar X 169.5 169.5 2370 2370 4498 4498 6224 6224 8502 8502 10402 10402

    Btm bar Y 515 385 385 515 587 397 397 587 475 350 350 475

    Links X 184.5 184.5 184.5 184.5 384.5 384.5 2355 2355 2355 2355 2155 2155

    Links Y 375 650 375 650 375 650 375 650 375 650 375 650DRAWING -EAST ELEVATION 2

    Cap X 0 0 2539 2539 0 3711 3711 7011 7011 3711 10452

    Cap Y 100 700 700 100 100 50 700 700 50 50 700

    Piles X 162.5 162.5 537.5 537.5 2002 2002 2377 2377 3873 3873 4248 4248

    Piles Y 0 100 0 100 0 100 0 100 0 50 0 50

    Column X 1120 1120 1420 1420 5111 5111 5611 5611

    Column Y 700 1075 700 1 075 700 1075 700 1075

    Cutoff X 162.5 162.5 537.5 537.5 1082 1082 1457 1457 2002 2002 2377 2377 3873 3873

    Cutoff Y 100 150 150 100 0 150 150 0 100 150 150 100 50 100

    Top bar X 50 2489 3761 6961

    Top bar Y 650 650 650 650

    Btm bar X 50 50 2489 2489 3761 3761 6961 6961

    Btm bar Y 305 175 175 305 260.5 125 125 260.5

    Links X 100 100 359.9 359.9 619.8 619.8 879.7 879.7 1140 1140 1399 1399Links Y 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5

    DRAWING -SOUTH ELEVATION 1

    Cap X 869.5 869.5 1670 1670 869.5 4361 4361 6361 6361 4361 5011 5011 5711 5711

    Cap Y 300 700 700 300 300 300 700 700 300 300 300 700 300 700

    Piles X 1082 1082 1457 1457 4523 4523 4898 4898 5823 5823 6198 6198

    Piles Y 0 300 0 300 0 300 0 300 0 300 0 300

    Column X 1095 1095 1445 1445 5211 5211 5511 5511 9302 9302 9602 9602

    Column Y 700 1075 700 1 075 700 1075 700 1075 700 1075 700 1075

  • 5/21/2018 CID Pilecaps

    15/96

    Cutoff X 1082 1082 1457 1457 4523 4523 4898 4898 5173 5173 5548 5548 5823 5823

    Cutoff Y 300 350 350 300 300 350 350 300 0 350 350 0 300 350

    Top bar X 4411 6311 8502 10402

    Top bar Y 640 640 650 650

    Btm bar X 4411 4411 6311 6311 8502 8502 10402 10402

    Btm bar Y 615.5 385 385 615.5 450 3 25 325 4 50

    Links X 4430 4430 4430 4430 4580 4580 6292 6292 6292 6292 6142 6142

    Links Y 375 650 375 650 375 650 375 650 375 650 375 650DRAWING -SOUTH ELEVATION 2

    Cap X 0 0 2539 2539 0 4361 4361 6361 6361 4361 10452

    Cap Y 100 700 700 100 100 50 700 700 50 50 700

    Piles X 162.5 162.5 537.5 537.5 2002 2002 2377 2377 4523 4523 4898 4898

    Piles Y 0 100 0 100 0 100 0 100 0 300 0 300

    Column X 1045 1045 1495 1495 5186 5186 5536 5536

    Column Y 700 1075 700 1 075 700 1075 700 1075

    Cutoff X 162.5 162.5 537.5 537.5 1082 1082 1457 1457 2002 2002 2377 2377 4523 4523

    Cutoff Y 100 150 150 100 0 150 150 0 100 150 150 100 50 100

    Top bar X 50 2489 4411 6311

    Top bar Y 625 625 625 625

    Btm bar X 50 50 2489 2489 4411 4411 6311 6311

    Btm bar Y 330 200 200 330 280 150 150 280

    Links X 132 132 457 457 782 782 1107 1107 1432 1432 1757 1757Links Y 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5

    DRAWING -PLANS 1

    Cap X 869.5 869.5 1670 1670 869.5 4361 4361 6361 6361 5711 5011 4361 8452 8452 10452

    Cap Y 0 2300 2300 0 0 1363 2063 2063 1363 237 237 1363 150 2150 2150

    Pile 1 X 1270 1237 1205 1176 1149 1126 1107 1093 1085 1082 1085 1093 1107 1126 1149 1176 1205

    Pile 1 Y 213 215 224 238 256 279 306 336 367 400 433 464 494 521 544 562 576

    Pile 2 X 1270 1237 1205 1176 1149 1126 1107 1093 1085 1082 1085 1093 1107 1126 1149 1176 1205

    Pile 2 Y 1713 1715 1724 1738 1756 1779 1806 1836 1867 1900 1933 1964 1994 2021 2044 2062 2076

  • 5/21/2018 CID Pilecaps

    16/96

    Pile 3 X 6011 5978 5947 5917 5890 5867 5848 5835 5826 5823 5826 5835 5848 5867 5890 5917 5947

    Pile 3 Y 1526 1528 1537 1551 1569 1592 1619 1649 1680 1713 1746 1777 1807 1834 1857 1875 1889

    Pile 4 X 10102 10069 10038 10008 9981 9958 9940 9926 9917 9915 9917 9926 9940 9958 9981 10008 10038

    Pile 4 Y 1613 1615 1624 1638 1656 1679 1706 1736 1767 1800 1833 1864 1894 1921 1944 1962 1976

    Column X 1095 1095 1445 1445 1095 5211 5211 5511 5511 5211 9302 9302 9602 9602 9302

    Column Y 975 1325 1325 975 975 1188 1488 1488 1188 1188 950 1350 1350 950 950

    Fill X 1130 1130 1165 1165 1200 1200 1235 1235 1270 1270 1305 1305

    Fill Y 975 1325 975 1325 975 1325 975 1325 975 1325 975 1325DRAWING -PLANS 2

    Cap X 0 0 2539 2539 0 3711 3711 7011 7011 3711 10452

    Cap Y 0 2539 2539 0 0 269.5 2270 2270 269.5 269.5 2539

    Pile 1 X 350 317 286 256 229 206 188 174 165 163 165 174 188 206 229 256 286

    Pile 1 Y 163 165 174 188 206 229 256 286 317 350 383 414 444 471 494 512 526

    Pile 2 X 2189 2156 2125 2095 2068 2045 2027 2013 2004 2002 2004 2013 2027 2045 2068 2095 2125

    Pile 2 Y 163 165 174 188 206 229 256 286 317 350 383 414 444 471 494 512 526

    Pile 3 X 350 317 286 256 229 206 188 174 165 163 165 174 188 206 229 256 286

    Pile 3 Y 2002 2004 2013 2027 2045 2068 2095 2125 2156 2189 2222 2253 2283 2310 2333 2351 2365

    Pile 4 X 2189 2156 2125 2095 2068 2045 2027 2013 2004 2002 2004 2013 2027 2045 2068 2095 2125

    Pile 4 Y 2002 2004 2013 2027 2045 2068 2095 2125 2156 2189 2222 2253 2283 2310 2333 2351 2365

    Pile 5 X 1270 1237 1205 1176 1149 1126 1107 1093 1085 1082 1085 1093 1107 1126 1149 1176 1205

    Pile 5 Y 1082 1085 1093 1107 1126 1149 1176 1205 1237 1270 1302 1334 1363 1390 1413 1432 1446

    Pile 6 X 6473 6476 6485 6498 6517 6540 6567 6597 6628 6661 6693 6725 6755 6781 6804 6823 6837Pile 6 Y 1920 1887 1855 1826 1799 1776 1757 1743 1735 1732 1735 1743 1757 1776 1799 1826 1855

    Column X 1045 1045 1495 1495 1045 5111 5611 5611 5111 5111

    Column Y 1120 1420 1420 1120 1120 1095 1095 1445 1445 1095

    Fill X 1090 1090 1135 1135 1180 1180 1225 1225 1270 1270 1315 1315

    Fill Y 1120 1420 1120 1420 1120 1420 1120 1420 1120 1420 1120 1420

  • 5/21/2018 CID Pilecaps

    17/96

    400 400 435 435 470 470 505 505 540 540

    975 1325 975 1325 975 1325 975 1325 975 1325

    -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2 184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6

    184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### #####

    367.4 400.0 432.6 464.1 493.8 520.5 543.6 562.4 576.2 584.7 587.5 584.7 576.2 562.4 543.6 520.5 493.8 464.1 432.6

    584.7 587.5 584.7 576.2 562.4 543.6 520.5 493.8 464.1 432.6 400.0 367.4 335.9 306.3 279.5 256.4 237.6 223.8 215.3

    2085 2088 2085 2076 2062 2044 2021 1994 1964 1933 1900 1867 1836 1806 1779 1756 1738 1724 1715

    1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750

    315 590 315 590 315 590 315 590 315 590 315 590

  • 5/21/2018 CID Pilecaps

    18/96

    1000 1000 1030 1030 1060 1060 1090 1090 1120 1120

    950.7 1251 950.7 1251 950.7 1251 950.7 1251 950.7 1251

    -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2 184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6

    184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### #####

    967 1000 1033 1064 1094 1121 1144 1162 1176 1185 1188 1185 1176 1162 1144 1121 1094 1064 1033317 350 383 414 444 471 494 512 526 535 538 535 526 512 494 471 444 414 383

    1617 1650 1683 1714 1744 1771 1794 1812 1826 1835 1838 1835 1826 1812 1794 1771 1744 1714 1683

    535 538 535 526 512 494 471 444 414 383 350 317 286 256 229 206 188 174 165

    1661 1664 1661 1652 1638 1620 1597 1570 1540 1509 1476 1443 1412 1382 1355 1332 1314 1300 1291

    1375 1375 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525

    315 590 315 590 315 590 315 590 315 590 315 590

  • 5/21/2018 CID Pilecaps

    19/96

    1113 1113 1113 1113 1113 1113 1113 1113 1113 1113 1113 1113

    327 580 327 580 327 580 327 580 327 580 327 580

    1000 1000 1030 1030 1060 1060 1090 1090 1120 1120

    800 1200 800 1200 800 1200 800 1200 800 1200

    -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2 184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6

    184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### #####

    317 350 383 414 444 471 494 512 526 535 538 535 526 512 494 471 444 414 383

    1617 1650 1683 1714 1744 1771 1794 1812 1826 1835 1838 1835 1826 1812 1794 1771 1744 1714 1683

    535 538 535 526 512 494 471 444 414 383 350 317 286 256 229 206 188 174 1651835 1838 1835 1826 1812 1794 1771 1744 1714 1683 1650 1617 1586 1556 1529 1506 1488 1474 1465

  • 5/21/2018 CID Pilecaps

    20/96

    1643 1643 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

    357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5

    1300 1300 1500 1500 1700 1700 1900 1900 1900 1900 1900 1900

    1270 1270 1315 1315 1360 1360 1405 1405 1450 1450

    1120 1420 1120 1420 1120 1420 1120 1420 1120 1420

    -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2 184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6

    184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### #####317 350 383 414 444 471 494 512 526 535 538 535 526 512 494 471 444 414 383

    2156 2189 2222 2253 2283 2310 2333 2351 2365 2374 2377 2374 2365 2351 2333 2310 2283 2253 2222

    1237 1270 1302 1334 1363 1390 1413 1432 1446 1454 1457 1454 1446 1432 1413 1390 1363 1334 1302

    535 538 535 526 512 494 471 444 414 383 350 317 286 256 229 206 188 174 165

    2374 2377 2374 2365 2351 2333 2310 2283 2253 2222 2189 2156 2125 2095 2068 2045 2027 2013 2004

    1454 1457 1454 1446 1432 1413 1390 1363 1334 1302 1270 1237 1205 1176 1149 1126 1107 1093 1085

  • 5/21/2018 CID Pilecaps

    21/96

    S

    325

    260 2082 2082 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407

    447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5

    S

    325

    260

    1659 1659 1919 1919 2179 2179 2439 2439 2439 2439 2439 2439

    1000 1000 1035 1035 1070 1070 1105 1105 1140 1140

    1400 1900 1400 1900 1400 1900 1400 1900 1400 1900

    -32.6 0.0 32.6 64.1 93.8 120.5 143.6 162.4 176.2 184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6

    184.7 187.5 184.7 176.2 162.4 143.6 120.5 93.8 64.1 32.6 0.0 -32.6 -64.1 -93.8 ##### ##### ##### ##### #####

    317 350 383 414 444 471 494 512 526 535 538 535 526 512 494 471 444 414 383

    1617 1650 1683 1714 1744 1771 1794 1812 1826 1835 1838 1835 1826 1812 1794 1771 1744 1714 1683

    535 538 535 526 512 494 471 444 414 383 350 317 286 256 229 206 188 174 165

  • 5/21/2018 CID Pilecaps

    22/96

    1835 1838 1835 1826 1812 1794 1771 1744 1714 1683 1650 1617 1586 1556 1529 1506 1488 1474 1465

    3135 3138 3135 3126 3112 3094 3071 3044 3014 2983 2950 2917 2886 2856 2829 2806 2788 2774 2765

    S

    350

    200

    1875 1875 1875 1875 1875 1875 1875 1875 1875 1875 1875 1875

    477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5

    Col X 1400 1400 1900 1900

    Col Y 1040 1528 1040 1528

    S

    425

    2381531 1531 1769 1769 2008 2008 2246 2246 2485 2485 2723 2723

    10452 10452 8452

    700 250 250

    5736 5736 6111 6111 8615 8615 8990 8990 9915 9915 10290 10290

    0 300 0 300 0 250 0 250 0 250 0 250

  • 5/21/2018 CID Pilecaps

    23/96

    6111 6111 8615 8615 8990 8990 9915 9915 10290 10290

    350 300 250 300 300 250 250 300 300 250

    669.5 669.5 869.5 869.5 1070 1070 1270 1270 1470 1470 1670 1670375 650 375 650 375 650 375 650 375 650 375 650

    5173 5173 5548 5548 6473 6473 6848 6848

    0 50 0 50 0 50 0 50

    4248 4248 5173 5173 5548 5548 6473 6473 6848 6848

    100 50 50 100 100 50 50 100 100 50

    1659 1659 1919 1919 2179 2179 2439 2439 2439 2439 2439 2439387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5

    8452 8452 10452 10452 8452

    250 700 700 250 250

    8615 8615 8990 8990 9915 9915 10290 10290

    0 250 0 250 0 250 0 250

  • 5/21/2018 CID Pilecaps

    24/96

    6198 6198 8615 8615 8990 8990 9915 9915 10290 10290

    350 300 250 300 300 250 250 300 300 250

    4836 4836 4986 4986 5136 5136 5286 5286 5436 5436 5586 5586375 650 375 650 375 650 375 650 375 650 375 650

    5823 5823 6198 6198

    0 300 0 300

    4898 4898 5823 5823 6198 6198

    100 50 50 100 100 50

    2082 2082 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5

    10452 8452 10452

    150 150 2300

    1237 1270 1302 1334 1363 1390 1413 1432 1446 1454 1457 1454 1446 1432 1413 1390 1363 1334 1302

    585 588 585 576 562 544 521 494 464 433 400 367 336 306 279 256 238 224 215

    1237 1270 1302 1334 1363 1390 1413 1432 1446 1454 1457 1454 1446 1432 1413 1390 1363 1334 1302

    2085 2088 2085 2076 2062 2044 2021 1994 1964 1933 1900 1867 1836 1806 1779 1756 1738 1724 1715

  • 5/21/2018 CID Pilecaps

    25/96

    5978 6011 6043 6075 6105 6131 6154 6173 6187 6195 6198 6195 6187 6173 6154 6131 6105 6075 6043

    1898 1901 1898 1889 1875 1857 1834 1807 1777 1746 1713 1680 1649 1619 1592 1569 1551 1537 1528

    10069 10102 10135 10166 10196 10223 10246 10264 10278 10287 10290 10287 10278 10264 10246 10223 10196 10166 10135

    1985 1988 1985 1976 1962 1944 1921 1894 1864 1833 1800 1767 1736 1706 1679 1656 1638 1624 1615

    1340 1340 1375 1375 1410 1410 5241 5241 5271 5271 5301 5301975 1325 975 1325 975 1325 1188 1488 1188 1488 1188 1488

    317 350 383 414 444 471 494 512 526 535 538 535 526 512 494 471 444 414 383

    535 538 535 526 512 494 471 444 414 383 350 317 286 256 229 206 188 174 165

    2156 2189 2222 2253 2283 2310 2333 2351 2365 2374 2377 2374 2365 2351 2333 2310 2283 2253 2222

    535 538 535 526 512 494 471 444 414 383 350 317 286 256 229 206 188 174 165

    317 350 383 414 444 471 494 512 526 535 538 535 526 512 494 471 444 414 383

    2374 2377 2374 2365 2351 2333 2310 2283 2253 2222 2189 2156 2125 2095 2068 2045 2027 2013 2004

    2156 2189 2222 2253 2283 2310 2333 2351 2365 2374 2377 2374 2365 2351 2333 2310 2283 2253 2222

    2374 2377 2374 2365 2351 2333 2310 2283 2253 2222 2189 2156 2125 2095 2068 2045 2027 2013 2004

    1237 1270 1302 1334 1363 1390 1413 1432 1446 1454 1457 1454 1446 1432 1413 1390 1363 1334 1302

    1454 1457 1454 1446 1432 1413 1390 1363 1334 1302 1270 1237 1205 1176 1149 1126 1107 1093 1085

    6845 6848 6845 6837 6823 6804 6781 6755 6725 6693 6661 6628 6597 6567 6540 6517 6498 6485 64761887 1920 1952 1984 2013 2040 2063 2082 2096 2104 2107 2104 2096 2082 2063 2040 2013 1984 1952

    1360 1360 1405 1405 1450 1450 5161 5161 5211 5211 5261 5261

    1120 1420 1120 1420 1120 1420 1095 1445 1095 1445 1095 1445

  • 5/21/2018 CID Pilecaps

    26/96

    0.0

    #####

    400.0

    212.5

    1713

    1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750

    315 590 315 590 315 590 315 590 315 590 315 590 315 590 315

  • 5/21/2018 CID Pilecaps

    27/96

    0.0

    #####

    1000350

    1650

    163

    1289

    1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525 1525

    315 590 315 590 315 590 315 590 315 590 315 590 315 590 315

  • 5/21/2018 CID Pilecaps

    28/96

    1113 1113 1113 1113 1113 1113 1113 1113 1113 1113 1113 1113 1113 1113 1113

    327 580 327 580 327 580 327 580 327 580 327 580 327 580 327

    0.0

    #####

    350

    1650

    1631463

  • 5/21/2018 CID Pilecaps

    29/96

    1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

    357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5 657.5 357.5

    1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

    0.0

    #####350

    2189

    1270

    163

    2002

    1082

  • 5/21/2018 CID Pilecaps

    30/96

    2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407

    447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5 897.5 447.5

    2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439

    0.0

    #####

    350

    1650

    163

  • 5/21/2018 CID Pilecaps

    31/96

    1463

    2763

    1875 1875 1875 1875 1875 1875 1875 1875 1875 1875 1875 1875 1875 1875 1875

    477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5 977.5 477.5

    2962 2962 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200

  • 5/21/2018 CID Pilecaps

    32/96

    1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870375 650 375 650 375 650 375 650 375 650 375 650 375 650 375

    2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439 2439387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5 837.5 387.5

  • 5/21/2018 CID Pilecaps

    33/96

    5736 5736 5886 5886 5886 5886 5886 5886 5886 5886 5886 5886 5886 5886 5886375 650 375 650 375 650 375 650 375 650 375 650 375 650 375

    2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407 2407187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5 637.5 187.5

    1270 ## 5328 5297 ## 5240 5217 ## 5185 5176 ## 5176 5185 ## 5217 5240 ## 5297 5328 ## 5393

    213 ## 402 411 ## 443 466 ## 523 554 ## 620 651 ## 708 731 ## 763 772 ## 772

    1270 ## 4678 4647 ## 4590 4567 ## 4535 4526 ## 4526 4535 ## 4567 4590 ## 4647 4678 ## 4743

    1713 ## 1528 1537 ## 1569 1592 ## 1649 1680 ## 1746 1777 ## 1834 1857 ## 1889 1898 ## 1898

  • 5/21/2018 CID Pilecaps

    34/96

    6011 ## 8769 8738 ## 8681 8658 ## 8626 8617 ## 8617 8626 ## 8658 8681 ## 8738 8769 ## 8835

    1526 ## 1615 1624 ## 1656 1679 ## 1736 1767 ## 1833 1864 ## 1921 1944 ## 1976 1985 ## 1985

    10102

    1613

    5331 5331 5361 5361 5391 5391 5421 5421 5451 5451 5481 5481 9332 9332 93621188 1488 1188 1488 1188 1488 1188 1488 1188 1488 1188 1488 950 1350 950

    350 ## 3876 3885 ## 3917 3940 ## 3997 4028 ## 4093 4125 ## 4181 4204 ## 4237 4245 ## 4245

    163 ## 587 555 ## 499 476 ## 443 435 ## 435 443 ## 476 499 ## 555 587 ## 652

    2189 ## 3876 3885 ## 3917 3940 ## 3997 4028 ## 4093 4125 ## 4181 4204 ## 4237 4245 ## 4245

    163 ## 1887 1855 ## 1799 1776 ## 1743 1735 ## 1735 1743 ## 1776 1799 ## 1855 1887 ## 1952

    350 ## 5176 5185 ## 5217 5240 ## 5297 5328 ## 5393 5425 ## 5481 5504 ## 5537 5545 ## 5545

    2002 ## 587 555 ## 499 476 ## 443 435 ## 435 443 ## 476 499 ## 555 587 ## 652

    2189 ## 5176 5185 ## 5217 5240 ## 5297 5328 ## 5393 5425 ## 5481 5504 ## 5537 5545 ## 5545

    2002 ## 1887 1855 ## 1799 1776 ## 1743 1735 ## 1735 1743 ## 1776 1799 ## 1855 1887 ## 1952

    1270 ## 6476 6485 ## 6517 6540 ## 6597 6628 ## 6693 6725 ## 6781 6804 ## 6837 6845 ## 6845

    1082 ## 587 555 ## 499 476 ## 443 435 ## 435 443 ## 476 499 ## 555 587 ## 652

    64731920

    5311 5311 5361 5361 5411 5411 5461 5461 5511 5511 5561 5561

    1095 1445 1095 1445 1095 1445 1095 1445 1095 1445 1095 1445

  • 5/21/2018 CID Pilecaps

    35/96

    1750

    590

  • 5/21/2018 CID Pilecaps

    36/96

    1525

    590

  • 5/21/2018 CID Pilecaps

    37/96

    1113

    580

  • 5/21/2018 CID Pilecaps

    38/96

    1900

    657.5

    1900

  • 5/21/2018 CID Pilecaps

    39/96

    2407

    897.5

    2439

  • 5/21/2018 CID Pilecaps

    40/96

    1875

    977.5

    3200

  • 5/21/2018 CID Pilecaps

    41/96

    1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 4504 4504650 375 650 375 650 375 650 375 650 375 650 375 650 387 640

    2439 3811 3811 4049 4049 4288 4288 4526 4526 4765 4765 5003 5003 5242 5242

    837.5 138 638 138 638 138 638 138 638 138 638 138 638 138 638

  • 5/21/2018 CID Pilecaps

    42/96

    5886 5886 5886 5886 5886 5886 5886 5886 5886 5886 5886 5886 5886 8552 8552650 375 650 375 650 375 650 375 650 375 650 375 650 338 638

    2407 4486 4486 4836 4836 5186 5186 5536 5536 5886 5886 6236 6236 6236 6236

    637.5 138 638 138 638 138 638 138 638 138 638 138 638 138 638

    5425 5455 5481 5504 5523 5537 5545 5548 5545 5537 5523 5504 5481 5455 5425 5393 5361 8802 8769 8738 8708 8681

    763 749 731 708 681 651 620 587 554 523 493 466 443 425 411 402 400 313 315 324 338 356

    4775 4805 4831 4854 4873 4887 4895 4898 4895 4887 4873 4854 4831 4805 4775 4743 4711 #### #### #### #### 9981

    1889 1875 1857 1834 1807 1777 1746 1713 1680 1649 1619 1592 1569 1551 1537 1528 1526 313 315 324 338 356

  • 5/21/2018 CID Pilecaps

    43/96

    8866 8896 8923 8946 8964 8978 8987 8990 8987 8978 8964 8946 8923 8896 8866 8835 8802

    1976 1962 1944 1921 1894 1864 1833 1800 1767 1736 1706 1679 1656 1638 1624 1615 1613

    9362 9392 9392 9422 9422 9452 9452 9482 9482 9512 9512 9542 9542 9572 95721350 950 1350 950 1350 950 1350 950 1350 950 1350 950 1350 950 1350

    4237 4223 4204 4181 4155 4125 4093 4061 4028 3997 3967 3940 3917 3898 3885 3876 3873

    684 713 740 763 782 796 804 807 804 796 782 763 740 713 684 652 620

    4237 4223 4204 4181 4155 4125 4093 4061 4028 3997 3967 3940 3917 3898 3885 3876 3873

    1984 2013 2040 2063 2082 2096 2104 2107 2104 2096 2082 2063 2040 2013 1984 1952 1920

    5537 5523 5504 5481 5455 5425 5393 5361 5328 5297 5267 5240 5217 5198 5185 5176 5173

    684 713 740 763 782 796 804 807 804 796 782 763 740 713 684 652 620

    5537 5523 5504 5481 5455 5425 5393 5361 5328 5297 5267 5240 5217 5198 5185 5176 5173

    1984 2013 2040 2063 2082 2096 2104 2107 2104 2096 2082 2063 2040 2013 1984 1952 1920

    6837 6823 6804 6781 6755 6725 6693 6661 6628 6597 6567 6540 6517 6498 6485 6476 6473

    684 713 740 763 782 796 804 807 804 796 782 763 740 713 684 652 620

  • 5/21/2018 CID Pilecaps

    44/96

  • 5/21/2018 CID Pilecaps

    45/96

  • 5/21/2018 CID Pilecaps

    46/96

  • 5/21/2018 CID Pilecaps

    47/96

  • 5/21/2018 CID Pilecaps

    48/96

  • 5/21/2018 CID Pilecaps

    49/96

  • 5/21/2018 CID Pilecaps

    50/96

    4504 4504 4679 4679 4861 4861 5036 5036 5211 5211 5386 5386 5561 5561 5561 5561387 640 387 640 387 640 387 640 387 640 387 640 387 640 387 640

    5480 5480 5718 5718 5957 5957 6195 6195 6434 6434 6672 6672 6911 6911 6911 6911

    138 638 138 638 138 638 138 638 138 638 138 638 138 638 138 638

  • 5/21/2018 CID Pilecaps

    51/96

    8809 8809 9066 9066 9323 9323 9581 9581 9838 9838 #### #### #### #### #### ####338 638 338 638 338 638 338 638 338 638 338 638 338 638 338 638

    6236 6236 6236 6236 6236 6236 6236 6236 6236 6236 6236 6236 6236 6236 6236 6236

    138 638 138 638 138 638 138 638 138 638 138 638 138 638 138 638

    8658 8640 8626 8617 8615 8617 8626 8640 8658 8681 8708 8738 8769 8802 8835 8866 8896 8923 8946 8964 8978 8987 8990

    379 406 436 467 500 533 564 594 621 644 662 676 685 688 685 676 662 644 621 594 564 533 500

    9958 9940 9926 9917 9915 9917 9926 9940 9958 9981 #### #### #### #### #### #### #### #### #### #### #### #### ####

    379 406 436 467 500 533 564 594 621 644 662 676 685 688 685 676 662 644 621 594 564 533 500

  • 5/21/2018 CID Pilecaps

    52/96

  • 5/21/2018 CID Pilecaps

    53/96

  • 5/21/2018 CID Pilecaps

    54/96

  • 5/21/2018 CID Pilecaps

    55/96

  • 5/21/2018 CID Pilecaps

    56/96

  • 5/21/2018 CID Pilecaps

    57/96

  • 5/21/2018 CID Pilecaps

    58/96

  • 5/21/2018 CID Pilecaps

    59/96

    5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561387 640 387 640 387 640 387 640 387 640 387 640 387 640 387

    6911 6911 6911 6911 6911 6911 6911 6911 6911 6911

    138 638 138 638 138 638 138 638 138 638

  • 5/21/2018 CID Pilecaps

    60/96

    #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####338 638 338 638 338 638 338 638 338 638 338 638 338 638 338

    6236 6236 6236 6236 6236 6236 6236 6236 6236 6236

    138 638 138 638 138 638 138 638 138 638

    8987 8978 8964 8946 8923 8896 8866 8835 8802

    467 436 406 379 356 338 324 315 313

    #### #### #### #### #### #### #### #### ####

    467 436 406 379 356 338 324 315 313

  • 5/21/2018 CID Pilecaps

    61/96

  • 5/21/2018 CID Pilecaps

    62/96

  • 5/21/2018 CID Pilecaps

    63/96

  • 5/21/2018 CID Pilecaps

    64/96

  • 5/21/2018 CID Pilecaps

    65/96

  • 5/21/2018 CID Pilecaps

    66/96

  • 5/21/2018 CID Pilecaps

    67/96

  • 5/21/2018 CID Pilecaps

    68/96

    5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 5561 8552 8552640 387 640 387 640 387 640 387 640 387 640 387 640 338 638

  • 5/21/2018 CID Pilecaps

    69/96

    #### #### #### #### #### #### ####638 338 638 338 638 338 638

  • 5/21/2018 CID Pilecaps

    70/96

  • 5/21/2018 CID Pilecaps

    71/96

  • 5/21/2018 CID Pilecaps

    72/96

  • 5/21/2018 CID Pilecaps

    73/96

  • 5/21/2018 CID Pilecaps

    74/96

  • 5/21/2018 CID Pilecaps

    75/96

  • 5/21/2018 CID Pilecaps

    76/96

  • 5/21/2018 CID Pilecaps

    77/96

    8752 8752 8952 8952 9152 9152 9352 9352 9552 9552 9752 9752 9952 9952 #### ####

    338 638 338 638 338 638 338 638 338 638 338 638 338 638 338 638

  • 5/21/2018 CID Pilecaps

    78/96

  • 5/21/2018 CID Pilecaps

    79/96

  • 5/21/2018 CID Pilecaps

    80/96

  • 5/21/2018 CID Pilecaps

    81/96

  • 5/21/2018 CID Pilecaps

    82/96

  • 5/21/2018 CID Pilecaps

    83/96

  • 5/21/2018 CID Pilecaps

    84/96

  • 5/21/2018 CID Pilecaps

    85/96

  • 5/21/2018 CID Pilecaps

    86/96

    #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####

    338 638 338 638 338 638 338 638 338 638 338 638 338 638 338

  • 5/21/2018 CID Pilecaps

    87/96

  • 5/21/2018 CID Pilecaps

    88/96

  • 5/21/2018 CID Pilecaps

    89/96

  • 5/21/2018 CID Pilecaps

    90/96

  • 5/21/2018 CID Pilecaps

    91/96

  • 5/21/2018 CID Pilecaps

    92/96

  • 5/21/2018 CID Pilecaps

    93/96

  • 5/21/2018 CID Pilecaps

    94/96

  • 5/21/2018 CID Pilecaps

    95/96

    #### #### #### #### #### #### ####

    638 338 638 338 638 338 638

  • 5/21/2018 CID Pilecaps

    96/96

    FILE NAME CID Pilecaps.xls

    VERSION 1.3 (9 August 2001). UNREGISTERED COPY

    COPYRIGH 2000, 2001 Concrete Innovation & Design. All rights reserved.

    REQUIREMENTS

    Excel 2000 or Excel 97, running under Windows 98.

    TTF Fonts MarkerR, Tekton~N and Tekton~I (as used by RCC 2000 spread

    DESIGN ASSUMPTIONS

    The bending moment method has been assumed throughout (as opposed t

    REGISTRATION

    Single user license 100 plus VAT 2 - 5 user licenses 50 plus VAT (each)

    more than 5 users free

    PILECAP DESIGN to BS 8110:1997

    for EXCEL 97/2000

    To order a registered copy of the finalised version, please send a cheque payable to

    Concrete Innovation & Design at the address given below. Delivery will be by zipped E-mail attachment, with a VAT invoice by post. Please include your postal and E-mail

    addresses and a contact phone number. If you also send a copy of your logo, this will

    be added to sheet headers free of charge. If a copy is required on 3.5" HD floppy disk,

    Rigid caps are assumed. In thin 5 and 6 pile caps, some localised top

    yeilding may occur above internal piles. If any piles are in tension, proceed

    LICENSE for USE and DISTRIBUTION

    DISCLAIMER

    CONTACT

    For further information, please contact

    Concrete Innovation & Design

    43 Matthews Drive E-mail: [email protected]

    Maidenbower, Crawley

    West Sussex RH10 7HJ

    This spreadsheet is NOT a public domain program. It is copyrighted by the Authors* ( * Concret

    Innovation & Design) . This software is protected by United Kingdom copyright law and also by

    international treaty provisions. The Authors grant you a license to use this software for evaluation

    purposes for an indefinite period. You may not use, copy, rent, lease, sell, modify, decompile, unprotect,disassemble, otherwise reverse engineer, or transfer the licensed program except as provided in this

    agreement. Any such unauthorised use shall result in immediate and automatic termination of this

    license. All rights not expressly granted here are reserved to the Authors. You may copy and distribute

    THIS SOFTWARE IS PROVIDED FOR EVALUATION ONLY, ON AN "AS IS" BASIS. THE AUTHORS*

    DISCLAIM ALL WARRANTIES RELATING TO THIS SOFTWARE, WHETHER EXPRESSED OR

    IMPLIED, INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTIES OF MERCHANTABILITY

    OR FITNESS FOR A PARTICULAR PURPOSE. THE AUTHORS* SHALL NOT BE LIABLE FOR ANY

    INDIRECT, CONSEQUENTIAL, OR INCIDENTAL DAMAGES ARISING OUT OF THE USE OR

    INABILITY TO USE SUCH SOFTWARE, EVEN IF THE AUTHORS HAVE BEEN ADVISED OF THE

    POSSIBILITY OF SUCH DAMAGES OR CLAIMS. THE PERSON USING THE SOFTWARE BEARS ALL

    Your fee will entitle you to free upgrades for a period of 12 months from registration.