Clamp Prototype Install and Schedules
RIKEN/RBRCItaru Nakagawa
APR
• Muon Arm Upgrade for W boson Detection ( 含む Absorber effect 、 S/N) - ラルフ
• Muon Trigger Performance (efficiency w/ cosmic 等 Run10 データ解析) - 深尾- MuTr Cross Talk and Recapacitation effect - 今津- Recap clamp R&D - ケンタロー、中川
Deadline : Feb. 8
Clamp Schedule
2010 2011
12 1 2 3 4 5 6 7 8 9 10
Dry Air Cover Install
Prototype-1 Delivery
DeliveryInstall & Test50 more
Clamps
300 Clamps
Delivery
Install
Supply Parts
Road To Be Approved Clamp Install
• Evaluate X-Talk Quench Effect (Jan) -> Tsutomu’s Code
• Prove HV Performance (~July)• Budget• Production Schedule to be fit in by End of
October• Scaffold Construction
Cramp Production Schedule• 60 個(2ヶ月)– 発注:4月末 -> 納品6月末
• 320個(2〜4ヶ月?)– 発注 : 6月〜8月 -> 納品9月+10月末(分納)– インストール4〜8週間
Bottom Line6月のパフォーマンスを確認後プロダクションへ(遅くて7月第一週)
部品調達2〜3週間を6月中に依頼すれば間に合うかも?クランプ取り付けのユーティリティーは満足できるレベル。プリント基板は Fix でよいか?基盤の製作を前倒しすればさらに speed up 。変更の可能性がある部分は•プローブ(ピン/ゴム)•コーティング剤の材質や塗り方?•電圧読み出しプローブ
Octant-8 Clamp Install
Octant 8
38103810
38103811
38113811
38123812
38133813
1-pin type
4-pin type
Installed Clamps (Octant-8)
Octant-7 Clamp Install
Octant 7
37103710
37103711
37113711
37123712
37133713
Conductive Rubber type
Dead in Run9Wire 192-223But fixed in Run10
Installed Clamps (Octant-7)
Clamp Prototype Install Summary
• 3 types of clamps (3 each are installed to North Station-3, Octant-7 and 8, Gap-0.
• Nearly 100% electrical contacts were achieved by the clamps without removing coating. -> Clamp works well!
• Will test with HV up to 1.5k with Ar/Co2 gas this week before closing the hatch.
• Observing relieved cross talk effect may be difficult because of partial coverage (only 30% of all anode wires in Oct-8, 15% in Oct-7).
Improving HV performance
1. Better Coating2. Dry air cover to Station-3
1. need to evaluate cost-effectiveness2. Can be kept as back up if the prototype clamps
behave poorly against HV
coating
• Turned out present anodes are mostly exposed to air. The existing coating is not isolating HV circuit from air well.
• Redo coating with higher viscosity type
Dry Air Cover Support
Dry Air Cover • Mechanical Design by REPIC
• First 2~3 Prototypes Delivery by Dec.28?
• Install in Maintenance Day
Dry Air Line Available @Oct8
Expert Shift MuTrig-FEE Please Sign Up!
your_ccount@rcf2:/phenix/WWW/run/11/contacts/mutrg_experts.html Edit by Yourself
Expert Shift MuTrPlease sign up!
Muon Trigger Event Display
Developed by TsutomuShould Add RPC?
Task List• Run Plan
– Special Data Taking– Low B-field (Yoshi) – Zero suppression off run (different luminosity?) How many statistics needed?– MuTr HV Scan (Cosmic/Beam?)
• Dump Important parameters into Database (Yoshi+Katsuro) • Threshold, Latency, BCLK window, Logic, (Delta_s?, LUT?)
• Optimization of Parameters (Yoshi+Katsuro+Itaru)– Threshold .vs multiplicity– Logic– BCLK Window
• Low Level Online Monitor (Katsuro)• Stability monitor (Seoul)
• Low Level• Physics (J/psi) mass width, position, S/N, etc…
• Semi-Online Track Monitoring (Yoshi?)– Rejection power .vs rate– Efficiency .vs rate – Efficiency map