11
PROFESSIONAL CV 1 . Name : Engr. Md. Hasmotuzzaman 2 . Designation : HVAC and BMS Consultant & CEO, Utility Professionals 3 . Educational Qualification : B. Sc. in Mechanical Engineering from BUET in 1991 4 . Professional Membership : Member, Institution of Engineers, Bangladesh, M10755 Member, Bangladesh Society of Mechanical Engineers,M01015ME Member Secretary, National Entrepreneurship Development Committee under Institute of Engineers- Dhaka Center, Dhaka. 5 . Date of birth : February 10, 1967 6 . Specialization : HVAC system Design, Consultancy, Projects Management and Testing – Commissioning – Validation especially for Clean Room, Pharmaceutical and Hospital facilities. : Updated with WHO GMP, cGMP, PIC(S) Scheme, NEBB and ISO, ISPE guidelines on Pharmaceuticals facilities. : Updated with Design and Construction standard for Hospital & Health Care Facilities. 7 . Training & Technical Seminar : Updated with ASHRAE, ARI, SMACNA Standards, Trane, Carrier Handbook on HVAC system design and Balancing. : Completed Training Course on Fire Safety in Engineering Staff College under Institute of Engineers, Bangladesh : Completed Training Course on Plumbing and Sanitary Services in Engineering Staff College under Institute of Engineers, Bangladesh : Completed Training Course on Building Construction Regulations and Bangladesh National Building Codes (BNBC) in Engineering Staff College under Institute of Engineers,

CV Engr. Md. Hasmotuzzaman[1]

Embed Size (px)

Citation preview

Page 1: CV Engr. Md. Hasmotuzzaman[1]

PROFESSIONAL CV

1. Name : Engr. Md. Hasmotuzzaman 2. Designation : HVAC and BMS Consultant & CEO, Utility Professionals3. Educational Qualification : B. Sc. in Mechanical Engineering from BUET in 1991

4. Professional Membership : Member, Institution of Engineers, Bangladesh, M10755Member, Bangladesh Society of Mechanical Engineers,M01015MEMember Secretary, National Entrepreneurship Development Committee under Institute of Engineers- Dhaka Center, Dhaka.

5. Date of birth : February 10, 19676. Specialization : HVAC system Design, Consultancy, Projects Management and

Testing – Commissioning – Validation especially for Clean Room, Pharmaceutical and Hospital facilities.

: Updated with WHO GMP, cGMP, PIC(S) Scheme, NEBB and ISO, ISPE guidelines on Pharmaceuticals facilities.

: Updated with Design and Construction standard for Hospital & Health Care Facilities.

7. Training & Technical Seminar

: Updated with ASHRAE, ARI, SMACNA Standards, Trane, Carrier Handbook on HVAC system design and Balancing.

: Completed Training Course on Fire Safety in Engineering Staff College under Institute of Engineers, Bangladesh

: Completed Training Course on Plumbing and Sanitary Services in Engineering Staff College under Institute of Engineers, Bangladesh

: Completed Training Course on Building Construction Regulations and Bangladesh National Building Codes (BNBC) in Engineering Staff College under Institute of Engineers, Bangladesh

: Participated in Training Course on Electrical Services on Building and Industries in Engineering Staff College under Institute of Engineers, Bangladesh

: Participated 2 days long Symposium on HVAC and Energy management system organized by Indian Society for Heating, Ventilation and Air Condition Engineers (ISHRAE) at Kolkata, India in 2003 and 2010.

: Participated several Seminars organized by Bangladesh Society of Mechanical Engineers (BSME), IEB.

: Completed a training course on ‘Bio-Safety, Chemical Safety and Waste Management organized by ICDDR’B, Mohakhali, Dhaka.

8. Service experience : 18 years professional service experience under different organizations on HVAC and other Mechanical Engineering field.

: Visiting Trainer on HVAC system of Bangladesh Industrial Technical Assistance Center (BITAC), Dhaka.

: Visited following overseas factory for professional purpose:1. Trane Air Conditioning Factory (Malaysia), 2. Daikin Air Conditioning Factory (Malaysia),

Page 2: CV Engr. Md. Hasmotuzzaman[1]

23. American Air Filter (AAF) Factory (Malaysia),4. J&E Hall Air Conditioning Factory (Malaysia), 5. SKM Air Conditioning Factory (UAE), 6. Broad Cogeneration based AC Factory (China), 7. Shuangliang Cogeneration based AC Factory (China), 8. Gree Air Conditioning Factory (China), 9. Suzhou Gusu Air Conditioning Purifying Factory (China) 10. Blue-Star Air Conditioning Factory, (India)11. JSP & Square Cooling Tower factory at Bankok,

(Thailand)12. Saiver HVAC Factory (Malaysia)13. Fuji Aire Air Conditioning Factory (Malaysia)14. Cleanroom Equipmrent & Filter Factory of IAQ

(Malaysia).15. HVAC manufacturing facility of Zamil AC, (KSA)

9. Contact : Cell Phone +88 01819222674Email: <[email protected]>

WORK EXPERIENCES:A. Commercial Projects1. System design and work execution of 312 Ton capacity central Air conditioning Plant at Hotel

Rajmoni Issa Khan International, Dhaka.

2. Supervision of Energy Management System erection works at US Embassy in Dhaka under ICEL.

3. System design and work execution of 48 TR capacity central A/C work at Anchor Tower, Kawran Bazar, Dhaka.

4. System design and work execution of 260 TR capacity central A/C work at BEL Tower of Beximco Engineering Ltd., Dhanmondi, Dhaka.

5. System design, work execution and commissioning of 156 TR capacity central A/C works at the Head Office Building of Beximco Pharmaceuticals Ltd., Dhanmondi, Dhaka.

6. Project execution and commissioning of 380 TR capacity central Air Conditioning Project at Jamuna Multipurpose Bridge Authority, Banani, Dhaka.

7. Monitoring of 1500 TR capacity HVAC Services work as Project Coordinator at The Westin Dhaka Hotel, Gulshan, Dhaka.

8. Design of central Air conditioning system of capacity 1400 ton for Shopping complex-cum-commercial building of K. S. Engineering (ongoing).

9. Design of HVAC and Building Management System of capacity 1800 Ton for proposed World Trade Center, Chittagong on behalf of Concord Engineers (ongoing). .

10. Design of central Air Conditioning system of capacity 250 Ton for Unocal Bangladesh Block 12 Ltd. Bibyana, Sylhet on behalf of Dexterous Consultants Limited, Dhanmondi, Dhaka.

11. Design of 270 Ton capacity Air Conditioning system for F. R. AC Market, Feni.

12. Design of Air conditioning system for different Customer Services Centers of Grameenphone.

13. Work supervision and Testing, Commissioning and Balancing of HVAC system of Canadian Chancery and Residence Building at Dhaka under AHCL

2

Page 3: CV Engr. Md. Hasmotuzzaman[1]

314. Design and work supervision of central Air Conditioning system of capacity 900 ton for Doreen

Tower, Gulshan 2, Dhaka.

15. Work supervision of HVAC, Electrical and Fire Protection system of head office of Standard Chartered Bank, Bangladesh at Gulshan, Dhaka.

16. Design and work supervision of 140 Ton capacity central Air Conditioning system for National Load Despatch Center (NLDC) at Aftabnagar, Badda, Dhaka.

17. Consultancy on central Air Conditioning system of capacity 600 ton for Independent University, Bangladesh, Baridhara, Dhaka.

18. Design Consultancy HVAC, Fire, Electrical, Data and Telecommunication System for Netherland Embassy, Bangladesh.

19. Consultancy on Co-generation System of capacity 2250 ton for Grameenphone Corporate Head Quarter at Basundhara, Dhaka Bangladesh on behalf of Dana International.

20. Design of central Air Conditioning system of capacity 1000 Ton for proposed Tokyo Square, Shopping Complex of Japan Garden City Ltd. Dhaka, (submitted).

21. Design of HVAC and BMS System for Crown Pacific Hotel at Cox’s Bazar.under Destiny Group.

22. Design of central Air Conditioning system design of capacity 350 Ton for building B11, Banani, Dhaka, (ongoing).

23. Design of central Air Conditioning system of capacity 750 Ton Premier Plaza of BTI Ltd. at Pragati Sharani, Gulshan, Dhaka, (submitted).

24. Design of Air Conditioning system of capacity 600 Ton for Head Office of City Bank Ltd, Gulshan-2, Dhaka,

25. Feasibility study and Design of Central Air Conditioning system of capacity 400 Ton for IDB Building extension work at Agargaon, Dhaka (submitted) under JPZ Consultants.

26 Design of M&E System (HVAC, Fire, Electrical, Plumbing, Telecommunication, CCTV, BMS) for Mika group Head office building at Uttara, Dhaka under Volume Zero,(submitted)

27 Design of HVAC and BMS systems for BRAC-Aarong Flagship Building at Uttara, Dhaka.

28. Design of HVAC system as National Consultant (Mechanical) for Padma Multipurpose Bridge (End facility) under Maunsell-Aecom Consortium, Newzealand.(submitted)

29. Design of HVAC System & BMS for Hotel Sea Star (Service Apartment) , Cox’s Bazar.(ongoing).

30. Design of HVAC System & BMS for an Hotel (not named) of Mr. Bashar (1.93,000 sft area) at Cox’s Bazar.(ongoing).

31. Design of HVAC System (800 Ton) for NCC Bank Head Office at Motijheel, Dhaka. (ongoing).

32. Design of HVAC System (600 Ton) for Kurmitola Golf Club at Dhaka. (ongoing).

33. Design of HVAC System for Al-Arafah Islami Bank Head Office at Motijheel, Dhaka. (ongoing).

34. Design of VRF type HVAC System of capacity 200 for Triton Textile Ltd, Dhaka. (Submitted).

35. Design of HVAC & BMS System of capacity 600 ton for proposed Police Plaza, Gulshan, Dhaka. (Submitted).

36. Design of HVAC & Fire Protection System for proposed Defense Staff College and Command Council (DSCSC), (area 208,000 sft), Mirpur, Dhaka. (ongoing).

3

Page 4: CV Engr. Md. Hasmotuzzaman[1]

437. Design of HVAC System of capacity 450 ton for proposed Giant Business Center, Uttara, Dhaka.

(submitted).

38. Design of HVAC System of capacity 600 ton for DCC-Borak Commercial complex, Banani, Dhaka. (submitted).

38. Design of HVAC & BMS System of capacity 300 ton for proposed Muktijodha Jadughar Agargaonl, Dhaka. (ongoing).

B. Hospitals & Diagnostic center Projects1. Execution and commissioning of 168 TR capacity central Air Conditioning Project for Operation

Theaters of Khawza Yunus Ali Hospital, Enayetpur, Sirajganj.

2. System design and work execution of 1020 TR capacity DX and central Air Conditioning Project for Cabins, ICU, CCU, OPD, etc. area of Khajwa Yunus Ali Hospital, Enayetpur, Sirajganj,

3. System design and project execution of 17TR capacity HVAC system for MRI and associated area of Popular Diagnostic Limited, Dhanmondi, Dhaka

4. Design and work supervision for 120 ton capacity central Air Conditioning system for Prescription Aid Diagnostic Center, Banani, Dhaka.

5. Design modifications with fabrication and installation of HVAC system for Operation Theaters, ICUs, CCUs and Fire Protection system (partially) of Square Hospitals Limited, Dhaka

6. Design of central A/C system of capacity 300 ton for proposed CARe Hospital 1, Shamoli, Dhaka

7. Design of HVAC system of capacity 360 Ton for proposed Wari Golden Hospitals, Dhaka.

8. Design of HVAC system of capacity 1000 Ton for proposed Kurmitola Armed Forces Hospitals (500 beds), Dhaka.

9. Design of HVAC system of capacity 50 Ton for proposed Regional Hospitals of Diabatic Association of Bangladesh under Simed International, The Netherland.

10. Design of HVAC system of capacity 180 Ton for proposed Teaching Hospitals of Diabatic Association of Bangladesh under Simed International, The Netherland.

11. Design of central A/C system of capacity 300 ton for proposed CARe Hospital 2, Shamoli, Dhaka

12. Design review and redesign of HVAC (capacity 1650 ton) and BMS system of for proposed Imperial Hospitals, Chittagong (Ongoing).

13. Design of HVAC system of capacity 2000 Ton for proposed Ibn-Sina Medical College and Hospitals, Shaymoli, Dhaka (Ongoing).

14. Design of HVAC system of capacity 2000 Ton for proposed ICDDR’B Hospitals, Mohakhali, Dhaka under Deltadesh Ltd. (Ongoing).

C. Industrial Projects - Pharmaceuticals Industries1. System refurbishment with HVAC redesign and balancing of 80 TR capacity HVAC system at

Solids production area of Beximco Pharmaceuticals Ltd., Tongi, Gazipur.

2. System design of 36 TR capacity central Air conditioning system at Tablet Manufacturing Area of Glaxo Bangladesh Ltd., Chittagong.

4

Page 5: CV Engr. Md. Hasmotuzzaman[1]

53. System design, work execution and commissioning of 46 TR capacity central A/C works at L.C. &

O. section, Basic Chemicals of Beximco Pharmaceuticals Ltd., Tongi.

4. System design, work execution and commissioning of 165 TR capacity central A/C work at Generic products and Veterinary Drugs area of The Acme Laboratories Ltd., Dhamrai.

5. Execution of 1250 TR capacity HVAC Project at new factory of Beximco Pharmaceuticals Ltd. Tongi, under supervision of CMPS&F / APC, Australia.

6. Work execution and commissioning of 180 TR capacity HVAC system for Sterile Facility of Aventis Limited Tongi, under supervision of CMPS&F, Australia.

7. System design, work execution and commissioning of 60 TR capacity central A/C work at the Sterile Project of Drugs International Limited, Tongi.

8. Work execution and commissioning of 60 TR capacity HVAC works for Estrogenic and non-estrogenic area of Organon Bangladesh Limited.

9. Tendering, work execution and commissioning of 270 TR capacity HVAC project of Rhone-Poulenc Rorer Bangladesh Limited under supervision of APC Ltd., Australia.

10. Tendering, Work execution and commissioning of 430 TR capacity HVAC project of Fisons Bangladesh Limited under supervision of APC Ltd., Australia.

11. System design, work execution and commissioning of 55 TR capacity central A/C work at Hoechst Marion Roussel (BD) Ltd., Tongi.

12. Project execution and commissioning of 60 TR capacity central Air Conditioning project for Admin building at Novartis Bangladesh Limited, Tongi, Gazipur.

13. Project execution and commissioning of 93 TR capacity central Air Conditioning Project at Square Pharmaceutical Factory, Kaliakoir, Gazipur.

14. Consultancy on HVAC system up-gradation for Solids & Liquids area of GlaxoSmithKline Chittagong.

15. System design and work execution of 66 TR capacity central Air Conditioning Project for Liquid and ORS area of Eskayef Bangladesh Ltd., Tongi, Gazipur.

16. System design 64Ton capacity HVAC system for Hamdard Laboratories (Waqf) Bangladesh.

17. Project execution and commissioning of 117 TR capacity HVAC system at ACI PharmaceuticalFactory, Narayangonj.

18. System design and execution of 45 TR capacity HVAC system for Animal Health area of Novartis (Bangladesh) Ltd.

19. System design, work execution and commissioning of 70 TR capacity HVAC system at Somatec Pharmaceuticals Limited, Demra, Dhaka

20. System design and execution of 340 TR capacity Chiller plant for HVAC system at Square Pharma Pabna Unit.

21. Tendering, Project execution and Commissioning of 64 TR capacity HVAC system with BMS for Central Dispensing and Storage area of Aventis Bangladesh Ltd.. Tongi, Gazipur.

22. System design and project execution of 50TR capacity HVAC system for QC area of Organon Bangladesh Limited, Tongi, Gazipur.

23. Execution of 937.5 TR capacity HVAC system for Solids, Liquids, Central Dispensing, Sterile, and Cephalosporin area of Popular Pharmaceuticals Limited, Tongi, Gazipur.

5

Page 6: CV Engr. Md. Hasmotuzzaman[1]

624. Tendering, Shop drawing preparation and project execution of 80 TR capacity HVAC system for

Novo Healthcare and Pharma Ltd, Mirpur, Dhaka.

25. Design, work supervision and documentation of 117 TR capacity HVAC system for Pellet production area (MHRA Certified) of Eskayef Tongi factory.

26. Supervision of Fire Protection installation work of Popular Pharmaceuticals Limited on behalf of Siemens Bangladesh Limited at Tongi, Gazipur.

27. Design, documentation and validation of HVAC system for Hormone extension area of Organon Bangladesh Limited.

28. Consultancy and Validation of Clean Room HVAC system for JMI-Bangla Co. Ltd, Comilla

29. Design and documentation of HVAC system for proposed Microbiology, ORS, Packaging and QC area of Eskayef Tongi factory.

30. Balancing of Pressure gradient and Air Change rate of HVAC system for Hormone Area of Renata Pharmaceuticals Limited (MHRA certified).

31. Testing, fault identification and validation of HVAC system with IQ-OQ documentation for Beacon Pharmaceuticals Limited, Mymensing.

32. Design, documentation and validation of HVAC system with BMS of capacity 180 ton for Syntho Laboratories, Gazipur.

33. Design, Work supervision, Testing-Commissioning-validation of 270 ton HVAC system with BMS of Virgo Pharmaceuticals Ltd, Gazipur, Dhaka (submitted).

34. System Design, Consultancy and Testing-Commissioning-Validation of 150 ton HVAC system with BMS for General Production and Cephalosporin area of Monico Pharmaceuticals Ltd.

35. System Design, Consultancy and Validation of 220 TR capacity HVAC system with BMS for General Production and Cephalosporin area of Sharif Pharmaceuticals Ltd. (submitted).

36. System Design and Consultancy of HVAC system for General Production area of A. M. (Abdul Monem) Pharma Ltd. Dhamrai, Dhaka (held up).

37. System Design, Consultancy and Validation of HVAC system for DIL Unani Gazipur, Dhaka.

38. System Design, Consultancy and Validation of HVAC system for JMI Pharmaceuticals Ltd., Comilla (submitted).

39. System Design, Consultancy and Validation of 200 Ton capacity HVAC system for General Production and Penicillin of M. M. Pharmaceuticals Ltd. Saver, Dhaka. (ongoing).

40. System re-design and validation of 60 TR capacity HVAC system for Healthcare Pharma Ltd. Gazipur, Dhaka.

41. System Design, Consultancy and Validation of HVAC system for Albert David Bangladesh Ltd. Under Project Consultant Limited, India. (submitted).

42. Working as an HVAC sub-consultant of APC Australia for new Injectable facility of Nuvista Pharma (submitted).

43. System re-design, up-gradation and validation of 50 TR capacity HVAC system for Eskayef Bangladesh Ltd., Mirpur, Dhaka. (held up).

44. Renovation and GMP up-gradation of HVAC System for Essential Drug Company Limited, Tejgaon, Dhaka (submitted).

6

Page 7: CV Engr. Md. Hasmotuzzaman[1]

745. Renovation and GMP up-gradation of HVAC System for Unimed & Unihealth Limited,

Rajendrapur, Gazipur.

46. Working as an HVAC Consultant of General Pharmaceuticals Ltd. of total area 53,000 sft.

47. System Design, Consultancy and Validation of HVAC system for Injectable area Opsonin Bangladesh Ltd. on behalf of CTL.

48. Working as an HVAC sub-consultant of APC Australia for new facility of Opsonin Pharmaceuticals Ltd,of total area 4,00,000 sft (ongoing).

49. System Design, Consultancy and Validation of HVAC system for Tajarat Pharmaceuticals Ltd, (62,000 sft), Narayanganj, Dhaka. (ongoing)

C.2. Other Industries1. Erection of 900 TR capacity Air-Water system Central Air Conditioning Plant at Kader Synthetic

Fibers Ltd., Gazipur, under supervision of Toray Engineering Co., Japan.

2. System design and work execution of Cooling System for 3x1150 KVA Gas Engine Generator at Kader Synthetic Fibers Ltd., Gazipur.

3. System design, work execution and commissioning of 110 TR capacity Water Chiller for process cooling at Trice Pack Limited, Sonargaon, Naryanganj.

4. System design, work execution and commissioning of 88 TR capacity process cooling system at Sinobangla Industries Pte. Limited, at Daudkandi.

5. System design and work execution of Cooling System for 2x1150 KVA Gas Engine Generator at R. M. Continuous Galvanizing Mills Limited at Baghbari, Narshingdi.

6. System design, work execution and commissioning of 60 TR capacity central A/C work at Kamalpur Hatchery of Aftab Bohumukhi Farm Limited at Kishorgonj.

7. System re-designing and commissioning of 2250 TR co-generation based water chilling system for Shameem Composite & Spinning Mills Ltd, Gazipur.

8. Installation of Utility Piping for Scampi World Limited (Hatchery farm) at Sirajgonj

9. Design of Evaporative Air Cooling system for Supreme Jute Mills of Shams Group at Savar.

10. Design, installation and commissioning of 36 Ton capacity HVAC system for DNS Satellite Hub station at EPZ Dhaka.

11. Design, supply and installation of Evaporative Air Cooling system for 2 Greenhouses and Cold Room HVAC for paddy stores of East-West Seeds (Bangladesh) Limited, Bashon, Gazipur .

12. Consultancy on Industrial Refrigeration system (Ammonia based) of capacity 270 Ton in Bengal Meat Processing Industries, Kashinathpur, Pabna.

13. Design of HVAC system of capacity 380 ton for Making, Packing and CTS area of AK Tobacco, Laksham, Comilla on behalf of Electro Mart Ltd.

14. Design of Mechanical Ventilation system for TAMPACO Foils Ltd, Tongi, Gazipur (ongoing).

15. Consultancy on Redesign and renovation of HVAC system of capacity 1150 ton for British American Tobacco, Dhaka Factory, Bangladesh (ongoing).

7