Upload
ranu-januar
View
220
Download
0
Embed Size (px)
Citation preview
8/14/2019 CV Farid Nur Sany.docx
1/4
Curriculum Vitae
Date of birth : May 8th, 1988
Nationality : Indonesian
Education : Sepuluh Nopember Institute of Technology
Surabaya
Summary of Experience:
Having more than two years experiences as Mechanical Engineer. The
main responsibilities are doing engineering activities for Material(Solid and Liquid) Handling and Package Equipment. During my
career I have involved in several overseas and local project, starting
from remarkable Donggi Senoro LNG Project. I am familiar with
Oil&Gas industry. Combination between my curiosity and willingness
to learn helped me to grow according to the demands of my job.
Languages :
Indonesia (native) English
Employment History (Summary) :
May 2011Present PT. JGC Indonesia, JakartaIndonesia
Mechanical Engineer
Assignment :
Overseas :
August 9th10th, 2012 Emergency Release System (ESR) Test of LNG Marine Loading Armfor DSLNG Project, Schwelm - Germany
August 14th, 2012 Factory Acceptance Test (FAT) of LNG Marine Loading Arm forDSLNG Project, SchwelmGermany
Domestic :
July 29th, 2012 Pre-Inspection Meeting of Overhead and Jib Crane for DSLNGProject, BogorIndonesia
November 22th, 2012 Factory Acceptance Test of 2 Unit Jib Crane for DSLNG Project,BogorIndonesia
December 20th, 2012 Factory Acceptance Test of Overhead Crane for DSLNG Project,BogorIndonesia
April 25th, 2013 HAZID meeting for INPEX Masela FLNG FEED Project,JTM Consortium Office, Jakarta - Indonesia
Farid Nur [email protected]
081-332-79-75-90
mailto:[email protected]:[email protected]:[email protected]8/14/2019 CV Farid Nur Sany.docx
2/4
Career Highlight :
2011 ~ Present : Mechanical EngineerPT. JGC Indonesia1. Project : Donggi Senoro LNG Project (May 2011March 2013)
Status : EPC Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Preparation of deliverables document including design specification, data
sheet and technical evaluation of vendors proposal for LNG Marine
Loading Arm, Overhead Crane, Maintenance Shop Equipment, and
Warehouse Fit-Out.
2. Project : Gassi-Touil Algeria Project (June 2011May 2012)
Status : EPC Project
Home office : PT. JGC Indonesia (remote basis)
Position : Engineer
Responsibility : Preparation of deliverables document including design specification, data
sheet and technical evaluation of vendors proposal for Maintenance Shop
Equipment
3. Project : FCCU RU-III Revamping Project (June 2011December 2011)
Status : FEED Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Design engineering study and preparation of deliverables documents
including design specification, data sheet and technical evaluation of
vendorsproposal for Overhead Crane, TSS Package, and Manual Loading
Arm.
4. Project : Arun LNG Regasification Terminal Project (June 2011December 2011)
Status : EPC Estimation Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Preparation of budgetary price and deliverables document including design
specification, data sheet and technical evaluation of vendors proposal forLoading Arm, Nitrogen Generator Package, and LNG Re-Gasification Unit.
8/14/2019 CV Farid Nur Sany.docx
3/4
5. Project : Pertamina Pulau Sambu Fuel Terminal (August 2012December 2012)
Status : EPC Estimation Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Preparation of budgetary price and deliverables document including design
specification, data sheet and technical evaluation of vendors proposal for
Reverse Osmosis Package, Loading Arm, Overhead Crane, Oily Water
Separator, Mixer, and Gangway Tower.
6. Project : PLN CNG GresikLombok (December 2012February 2013)
Status : EPC Estimation Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Preparation of budgetary price and deliverables document including design
specification, data sheet and technical evaluation of vendors proposal for
High Pressure Loading Arm, Nitrogen Generator Package, and Chiller Unit.
7. Project : INPEX Masela FLNG Project (January 2013Present)
Status : FEED Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Design engineering study and preparation of deliverables document
including design specification, data sheet and technical evaluation of
vendors proposal forLoading Arm and Offshore Pedestal Crane.
8. Project : Jalur Pipa Gas ArunBelawan Project (February 2013March 2013)
Status : EPC Estimation Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Design engineering study and preparation of deliverables document
including design specification, data sheet and technical evaluation of
vendors proposal for Hydrocarbon Pump (API 610) and Instrument Air
Package.
8/14/2019 CV Farid Nur Sany.docx
4/4
9. Project : CPP Matindok (February 2013March 2013)
Status : EPC Estimation Project
Home office : PT. JGC Indonesia
Position : Engineer
Responsibility : Design engineering study and preparation of deliverables document
including design specification, data sheet and technical evaluation of
vendors proposal forAir Compressor, Centrifugal Pump, and Blower.
Training / Course :
May 2011 Basic Mechanical SealPT. Eagle Burgmann Indonesia June 2011 Marine Loading ArmMr. Shigeo Niizawa December 2011 Basic CoatingPT. Carboline Indonesia March 2012 Familiarization of Basic Floating LNG (FLNG)Mr. Shigeo Niizawa April 2012 How to Read Logic DiagramMr. Heru Cahyono December 2012 Shaft Alignment TrainingMr. Sutrisno