CV Farid Nur Sany.docx

Embed Size (px)

Citation preview

  • 8/14/2019 CV Farid Nur Sany.docx

    1/4

    Curriculum Vitae

    Date of birth : May 8th, 1988

    Nationality : Indonesian

    Education : Sepuluh Nopember Institute of Technology

    Surabaya

    Summary of Experience:

    Having more than two years experiences as Mechanical Engineer. The

    main responsibilities are doing engineering activities for Material(Solid and Liquid) Handling and Package Equipment. During my

    career I have involved in several overseas and local project, starting

    from remarkable Donggi Senoro LNG Project. I am familiar with

    Oil&Gas industry. Combination between my curiosity and willingness

    to learn helped me to grow according to the demands of my job.

    Languages :

    Indonesia (native) English

    Employment History (Summary) :

    May 2011Present PT. JGC Indonesia, JakartaIndonesia

    Mechanical Engineer

    Assignment :

    Overseas :

    August 9th10th, 2012 Emergency Release System (ESR) Test of LNG Marine Loading Armfor DSLNG Project, Schwelm - Germany

    August 14th, 2012 Factory Acceptance Test (FAT) of LNG Marine Loading Arm forDSLNG Project, SchwelmGermany

    Domestic :

    July 29th, 2012 Pre-Inspection Meeting of Overhead and Jib Crane for DSLNGProject, BogorIndonesia

    November 22th, 2012 Factory Acceptance Test of 2 Unit Jib Crane for DSLNG Project,BogorIndonesia

    December 20th, 2012 Factory Acceptance Test of Overhead Crane for DSLNG Project,BogorIndonesia

    April 25th, 2013 HAZID meeting for INPEX Masela FLNG FEED Project,JTM Consortium Office, Jakarta - Indonesia

    Farid Nur [email protected]

    081-332-79-75-90

    mailto:[email protected]:[email protected]:[email protected]
  • 8/14/2019 CV Farid Nur Sany.docx

    2/4

    Career Highlight :

    2011 ~ Present : Mechanical EngineerPT. JGC Indonesia1. Project : Donggi Senoro LNG Project (May 2011March 2013)

    Status : EPC Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Preparation of deliverables document including design specification, data

    sheet and technical evaluation of vendors proposal for LNG Marine

    Loading Arm, Overhead Crane, Maintenance Shop Equipment, and

    Warehouse Fit-Out.

    2. Project : Gassi-Touil Algeria Project (June 2011May 2012)

    Status : EPC Project

    Home office : PT. JGC Indonesia (remote basis)

    Position : Engineer

    Responsibility : Preparation of deliverables document including design specification, data

    sheet and technical evaluation of vendors proposal for Maintenance Shop

    Equipment

    3. Project : FCCU RU-III Revamping Project (June 2011December 2011)

    Status : FEED Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Design engineering study and preparation of deliverables documents

    including design specification, data sheet and technical evaluation of

    vendorsproposal for Overhead Crane, TSS Package, and Manual Loading

    Arm.

    4. Project : Arun LNG Regasification Terminal Project (June 2011December 2011)

    Status : EPC Estimation Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Preparation of budgetary price and deliverables document including design

    specification, data sheet and technical evaluation of vendors proposal forLoading Arm, Nitrogen Generator Package, and LNG Re-Gasification Unit.

  • 8/14/2019 CV Farid Nur Sany.docx

    3/4

    5. Project : Pertamina Pulau Sambu Fuel Terminal (August 2012December 2012)

    Status : EPC Estimation Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Preparation of budgetary price and deliverables document including design

    specification, data sheet and technical evaluation of vendors proposal for

    Reverse Osmosis Package, Loading Arm, Overhead Crane, Oily Water

    Separator, Mixer, and Gangway Tower.

    6. Project : PLN CNG GresikLombok (December 2012February 2013)

    Status : EPC Estimation Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Preparation of budgetary price and deliverables document including design

    specification, data sheet and technical evaluation of vendors proposal for

    High Pressure Loading Arm, Nitrogen Generator Package, and Chiller Unit.

    7. Project : INPEX Masela FLNG Project (January 2013Present)

    Status : FEED Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Design engineering study and preparation of deliverables document

    including design specification, data sheet and technical evaluation of

    vendors proposal forLoading Arm and Offshore Pedestal Crane.

    8. Project : Jalur Pipa Gas ArunBelawan Project (February 2013March 2013)

    Status : EPC Estimation Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Design engineering study and preparation of deliverables document

    including design specification, data sheet and technical evaluation of

    vendors proposal for Hydrocarbon Pump (API 610) and Instrument Air

    Package.

  • 8/14/2019 CV Farid Nur Sany.docx

    4/4

    9. Project : CPP Matindok (February 2013March 2013)

    Status : EPC Estimation Project

    Home office : PT. JGC Indonesia

    Position : Engineer

    Responsibility : Design engineering study and preparation of deliverables document

    including design specification, data sheet and technical evaluation of

    vendors proposal forAir Compressor, Centrifugal Pump, and Blower.

    Training / Course :

    May 2011 Basic Mechanical SealPT. Eagle Burgmann Indonesia June 2011 Marine Loading ArmMr. Shigeo Niizawa December 2011 Basic CoatingPT. Carboline Indonesia March 2012 Familiarization of Basic Floating LNG (FLNG)Mr. Shigeo Niizawa April 2012 How to Read Logic DiagramMr. Heru Cahyono December 2012 Shaft Alignment TrainingMr. Sutrisno