8/6/2019 Decision 637 of Binh Dinh PPC
1/15
THE PEOPLES COMMITTEE
OF BINH DINH PROVINCE
----------
Ref: 637/QD-UBND
THE SOCIALIST REPUBLIC OF VIET NAM
Independence Freedom Happiness
Quy Nhon, 27 Aug 2009
DECISIONOn the approval of the Province Solid Waste Master Plan (PSWMP) for the urban
areas and the industrial zones in Binh Dinh area up to 2020
_______________________
THE CHAIRMAN OF THE PROVINCIAL PEOPLES COMMITTEE
Considering the Law on Organization of the Peoples Council and the Peoples
Committee dated 26 Nov 2003;
Considering the Resolution Nr.10/2009/NQ-HDND dated 15 Jul 2009 of the 10
th
Provincial Peoples Council at the 15 th session adopting the content of the PSWMP for
the urban areas and the industrial zones in Binh Dinh area up to 2020;
Considering the Decree Nr.59/2007/ND-CP dated 7 Apr 2007 of the Government
on the solid waste management;
Considering the proposal of the Department of Construction at the Proposal Letter
Nr.57/TTr-SXD dated 14 Aug 2009 on the PSWMP for the urban areas and the industrial
zones in Binh Dinh area up to 2020;
DECIDES
Article 1. To approve the PSWMP for the urban areas and the industrial zones in
Binh Dinh area up to 2020, with the following main contents:
1. Plan title: PSWMP for the urban areas and the industrial zones in Binh Dinh area
2. View of point and objective of the plan:
a. View of point:
- The PSWMP must conform to the Solid Waste Management Strategy for
the urban area and the industrial zones in Viet Nam up to 2020, which was
approved by the Government, and the Provincial Social-Economic DevelopmentMaster Plan up to 2020. It must also conform to the sector plans (urban, industry,
health) approved by the Provincial Peoples Committee.
- Approach the current solid waste management methods of the advanced
countries in the world, and suit the conditions of Viet Nam. Apply selectively up-
to-date processing technologies that suit the economic conditions, technological
level of our country and our province. Minimize the solid waste amount to be
buried in order to minimize the environmental impact and investment cost as well
as increase the land use effect.
- Arrange reasonably the locations for the solid waste treatment plants in theprovincial area so that each waste treatment plant will serve one area with the
fitting radius (not according to the administrative units). Give the priority to the
1
8/6/2019 Decision 637 of Binh Dinh PPC
2/15
treatment plants for hazardous solid waste, in urban areas and in centralized
industrial zones. Planning and building solid waste treatment plants must assure
the sanitation, must not affect the health, livelihood and living activities of the
population.
b. Objective: General objective:
Formulate the solid waste management general strategy in Binh Dinh area up to
2015, and the orientation up to 2020, in order to ensure the sustainable development of
Binh Dinh province during the development of the Central Focus Economic Zone.
Specific objective:
- Referring to the Resolution of the Provincial Party General Meeting Nr.17:
100% of the urban domestic solid waste, hazardous industrial solid waste, health
solid waste are collected and treated in according to the environmental standards,following the schedule:
+ Up to 2015: 100% of the domestic solid waste from Quy Nhon city and 70% of
the domestic solid waste from other urban areas are collected and treated; 100% of the
solid waste from the industrial zones is separated, collected and treated by applicable
methods.
+ Up to 2020: 100% of the domestic solid waste from Quy Nhon city, 80% of the
domestic solid waste from other urban areas are collected and treated; 100% of the
domestic solid waste from the urban areas is separated at the source.
- Improve the State management effect on solid waste management, increasethe service quality of collection, transporting and treating solid waste, and improve
the living environment quality to meet the increasing demand of the society.
3. Scale and objects of the plan:
- Plan scale: Binh Dinh area with 602,600 ha and about 1,536 million of
population.
- Plan objects:
+ Domestic solid waste from urban areas and from rural residential zones
+ Industrial solid waste from industrial zones, small industrial zones andmanufactories
+ Health solid waste
4. Content of the PSWMP up to 2020:
a. The current situation of solid waste management:
Domestic solid waste:
The current urban domestic solid waste amount from the provincial area is about
306.6 ton/day.
- The separation of solid waste has not been done at the source. The separation at
the landfills is spontaneous.
2
8/6/2019 Decision 637 of Binh Dinh PPC
3/15
- The collection and transport of solid waste: In Quy Nhon city, the average
collection rate is 85%. In the districts, the collection is 15-30% and usually carried
out at the towns and some town-adjacent communes.
- The treatment of solid waste: The treatment technology is mainly burying. In Binh
Dinh province, there are 9 landfills, in which there is only one hygienic landfill inLong My. The other landfills in districts are temporary, unhygienic. They do not
have the wastewater treatment system, enclosure walls. They are small, from 0.5
to 1 ha. Therefore, they cannot meet the demand of solid waste treatment in the
future.
Industrial solid waste:
- The industrial solid waste in Binh Dinh province has not been collected
systematically, so there are no statistic figures on the industrial solid waste
amount.
- The separation of the industrial solid waste has not been done thoroughly, themanufactories usually only separate the solid waste that gives them some
economic value. The solid waste that has no economic value, inclusive of
hazardous solid waste, is collected and mixed with domestic solid waste.
- The collection and transport of industrial solid waste is in charge of the
manufactories.
- The treatment of industrial solid waste: The industrial solid waste that can be
recycled is sold to the waste purchasing agencies or recycling agencies. The
hazardous industrial solid waste has not been separated and treated systematically
as stipulated.
Health solid waste:
- Health solid waste includes 2 components: hazardous solid waste and non-
hazardous solid waste.
- Currently, the total hospital beds in the entire province are about more than 2,500.
The total health solid waste from hospitals in Binh Dinh province is estimated
more than 700 ton/year, in which hazardous solid waste is about more than 100
ton/year.
- All the hospitals in Binh Dinh province separate solid waste at the source and treatthe hazardous solid waste relatively well by incinerators. However, some other
health agencies has not separated solid waste at the source, health solid waste is
collected and mixed with domestic solid waste and then transported to the
landfills, or buried at unsuitable places that can cause environment pollution.
b. Forecast of the solid waste amount up to 2020:
The total solid waste amount in the entire province is expected to be 8,073
ton/day, in which:
- Domestic solid waste: 1,176 ton/day
- Industrial solid waste: 6,724 ton/day
- Health solid waste: 8.5 ton/day
3
8/6/2019 Decision 637 of Binh Dinh PPC
4/15
(The building waste in urban areas is not the object of this plan)
c. Planning the system of solid waste separation collection transport:
Domestic solid waste:
- Separation at the source: Solid waste needs to be separated at the source(households, organizations ) into 3 categories: organic waste, recyclable waste
and non-recyclable waste.
- Collection process:
+ In urban areas (towns, cities): Separate solid waste at the source for all
households having domestic solid waste. Manually collect solid waste to
intermediate points daily. Mechanically transport solid waste to centralized
separation and treatment areas.
+ In rural residential zones: Manually collect solid waste to intermediate points
daily or every two days. Mechanically transport solid waste to landfills within20km.
Industrial solid waste:
- Separation: Industrial solid waste must be separated at manufactories,
industrial zones or small industrial zones; separated into recyclable, reusable,
fertilized, buried and hazardous solid waste. The separation of solid waste at the
centralized separation area of the industrial zones aims to gather a large solid
waste amount of many industrial manufactories.
- Collection, transport: For the industrial zones / small industrial zones: The
collection and transport must conform to the solid waste management regulationof the industrial zones / small industrial zones. For the manufactories that do not
belong to the industrial zones / small industrial zones: The separation, collection
and transport is self-managed through contracting with an agency who is licensed
to collect and transport solid waste.
Health solid waste:
- Health solid waste includes: domestic health solid waste and hazardous
health solid waste from hospitals, and health solid waste from other health
agencies.
- Health solid waste from all health agencies is separated at the source, after
separation, they will be collected and transported to the dumping ground of
hospitals or the treatment plant. The detailed process is as follows:
+ After being separated at the source, domestic health solid waste from health
agencies is collected and transported to the landfills and is treated together with
urban domestic solid waste.
+ Hazardous health solid waste: For big hospitals, it is required to build their own
incinerations to treat hazardous health solid waste. For individual health agencies,
hazardous health solid waste is collected by specialized means and transported toincinerations at centralized treatment plants.
4
8/6/2019 Decision 637 of Binh Dinh PPC
5/15
- Manage health solid waste according to the Health Solid Waste
Management Regulation issued enclosing to the Decision Nr.43/2007/QD-BYT of
the Ministry of Health.
d. Planning solid waste treatment system up to 2020:
- In every district, city and town, there is 1 hygienic and standard solid wastetreatment plant. The operation radius of each solid waste treatment plant is about
20km. Each treatment plant can receive and treat domestic solid waste from urban
areas and rural residential zones of other administrative areas but within its
operation radius.
- Domestic solid waste from urban areas and rural residential zones, non-
hazardous industrial solid waste and non-hazardous health solid waste are treated
in the district administrative areas (apart from Tuy Phuoc district, which can use
Long My landfill).
Planning solid waste treatment plants up to 2020:
- 1 conjugate treatment plant at Cat Nhon commune of Phu Cat district, 70 ha
(approved by the Prime Minister in the Decision Nr.1440/QD-TTg dated 6 Oct
2008, which approves the construction plan of the solid waste treatment plants for
3 focus economic zones South, Central and North up to 2020).
- 14 treatment plants in districts and city of Binh Dinh province.
- 11 incinerations of hazardous health solid waste, used for district health
agencies, placed in solid waste treatment plants. Place 4 incinerations of hazardous
health solid waste at big hospitals: Provincial Polyclinic, Tuberculosis and Lung
hospital, Bong Son Polyclinic and Phu Phong Polyclinic.
- The location of treatment plants must assure the current building criteria on
solid waste, in which, it need to assure the criteria on geology and hydrography. It
must be far away from big rivers, clean water supply sources, residential zones
and assure the ecological environment.
Orientation of solid waste treatment technology:
Apply up-to-date processing technologies that suit the conditions of Viet Nam,
minimize the solid waste amount to be buried. The applicable technologies are: Recycle,
Reuse Process Burn Hygienically bury.- Intensify recycling, reusing solid waste, especially industrial solid waste.
- For organic solid waste, compost them for the agriculture through the up-
to-date and comprehensive technological line.
- For the hazardous industrial solid waste and health solid waste, burn them
by up-to-date incinerations.
- Bury the inert substances, which can not be recycled or reused, the ashes
and cinder that are left after the burning of hazardous solid waste. The landfill
cells must be hygienic according to Viet Nam standard.
5. Solution:
a. Management Operation mechanism:
5
8/6/2019 Decision 637 of Binh Dinh PPC
6/15
- The State manages through policies and guidelines. Encourage and mobilize all
fund sources from the community and the society in the solid waste management;
give investment incentives in order to promote the privatization in solid waste
management at the steps of collection, transport and process.
- The community is the subject conducting the management of solid waste.- The enterprises (organizations), which manage the solid waste, implement their
tasks with the high responsibility to the community, under the supervision of the
community and the inspection of the State.
b. Task assignment:
- The Peoples Committee of Binh Dinh province: direct the state management in all
the activities relating to the solid waste management in the provincial area; assign,
decentralize the localities and advising agencies to execute, monitor and handle.
- The Department of Construction, relating departments and the Peoples
Committees of districts/city have the functions of advising and executing
according to the direction of the PPC and the task assignment of this plan.
c. The implementation schedule:
- The period up to 2015:
+ Focus on the training, capacity building and awareness raising; strengthen the
awareness of the officers and the people on the solid waste treatment in theunlimited administrative areas; initially separate the solid waste at the source in
large urban zones, industrial zones, small industrial zones, manufacturers and
health enterprises; improve the policy frame.+ Focus on the investment and construction of new solid waste treatment plants
for the districts of Hoai Nhon, Phu My, Phu Cat (at Cat Nhon commune), An
Nhon and Tay Son; focus on the rehabilitation of the Long My solid waste
treatment plant, using every fund source of domestic or abroad.
+ Strengthen the socialization of the solid waste management; increase the
capacity of solid waste collection and transport; invest in the health solid waste
management system.
- The period from 2015 to 2020: Increase the capacity of solid waste collection and
transport (transition projects); build centralized solid waste treatment plants for thedistricts that have not had any treatment plant; rehabilitate the existing treatment
plants and build the recycling, reusing and treatment lines for hazardous solid
waste; socialize the solid waste management (transition projects); conduct the
separation at the source at the high level.
d. Cost estimation:
- The total investment is estimated about 1,610 billion VND, in which, about 862
billion VND for the period up to 2015, about 748 billion VND for the period from
2016 to 2020.
- Fund source: government budget (244 billion), loan from ODA organizations andother foreign organizations (588 billion), grant (248 billion), socialization fund
from private enterprises and other fund sources (532 billion).
6
8/6/2019 Decision 637 of Binh Dinh PPC
7/15
Article 2. To assign the Department of Construction to bear the main
responsibility and get the coordination of other departments and Peoples Committees of
districts/city to instruct and implement all the contents of the Plan enclosed to this
Decision; and make the periodical reports on the situation, especially on the difficulties
and problems, sending to the PPC for timely direction and solution.
Article 3. The Chief of PPC Secretariat, the Directors of the Department of
Planning and Investment, Construction, National Resources and Environment, Finance,
Industry and Commerce, Science and Technology, Health, the Chief of Nhon Hoi
Economic Zone Management Unit, the Chairpersons of district/city Peoples
Committees, and the heads of relating agencies are responsible for executing this
Decision since the signing date./.
Recipients:
- As referred to in the Article 3;
- Ministry of Construction;- Provincial Standing Committee of the Party;
- Provincial Standing Committee of the PeoplesCouncil;
- Chairman and Vice Chairpersons of PPC;- Provincial Police Department;
- Department of Justice;
- Quy Nhon Urban Environment Ltd. Company;- Binh Dinh newspaper and TV station;
- Provincial center of official gazette;
- Secretariat leaders;
- Admin, K14 and K4 filed.
ON BEHALF OF PPC
CHAIRMAN
signed and stamped
Nguyen Van Thien
7
8/6/2019 Decision 637 of Binh Dinh PPC
8/15
ANNEX 1
ESTIMATED AMOUNT OF SOLID WASTE UP TO 2015 AND 2020
(Enclosing to the Decision Nr.637/QD-UBND dated 27 August 2009 of the Provincial Peoples Committee)
Domesticsolid
waste
Buildingsolid
waste
Industrialsolid
waste
Healthsolid
waste
Sewer
mudTotal
Domesticsolid
waste
Buildingsolid
waste
Industrialsolid
waste
Healthsolid
waste
Sewer
mudTotal
1 Quy Nhon 508 40.6 1107.6 5.64 30.48 1,692 676 54.1 1590.1 6.23 40.56 2,367
2 An Nhon 93.95 7.5 54 0.22 5.64 161 118.5 9.5 77.6 0.24 7.11 213
3 Tuy Phuoc 21.5 1.7 9.8 0.15 1.29 34 30.2 2.4 14 0.17 1.81 49
4 Phu Cat 56.625 4.5 118.6 0.18 3.4 183 88.05 7 4545.3 0.2 5.28 4,646
5 Tay Son 44.75 3.6 253.1 0.44 2.69 305 69.5 5.6 363.3 0.48 4.17 443
6 Van Canh 10.3 0.8 3.2 0.07 0.62 15 13 1 4.5 0.07 0.78 19
7 Hoai Nhon 80 6.4 30.4 0.61 4.8 122 103 8.2 43.6 0.67 6.18 162
8 Hoai An 15.875 1.3 4.2 0.08 0.95 22 18.95 1.5 6 0.09 1.14 28
9 Phu My 28.3 2.3 50 0.17 1.7 82 37.4 3 71.7 0.18 2.24 11510 An Lao 8.55 0.7 3.1 0.07 0.51 13 12.3 1 4.4 0.07 0.74 19
11 Vinh Thanh 6.95 0.6 2.8 0.07 0.42 11 8.7 0.7 4 0.07 0.52 14
Total 875 70 1,637 8 53 2,642 1,176 94 6,725 8.5 71 8,073
Nr Dis trict
The year of 2015 The year of 2020
1
8/6/2019 Decision 637 of Binh Dinh PPC
9/15
ANNEX 2
THE LIST OF THE PROVINCE SOLID WASTE MASTER PLAN (PSWMP) FOR THE URBAN AREAS AND THEINDUSTRIAL ZONES IN BINH DINH AREA UP TO 2020
(Enclosing to the Decision Nr.637/QD-UBND dated 27 August 2009 of the Provincial Peoples Committee)
Nr District/City Treatment plantPlan scale
(ha)Treatment technology Service scale Note
1 Phu Cat Cat Nhon solid
waste treatmentplant (SWTP)
70 - Bury domestic solid waste
- Bury non-hazardous industrialsolid waste
- Burn and bury hazardous solidwaste;
- Recycle inorganic solid waste;
- Treat health solid waste(burn).
-Treat domestic solid waste and non-hazardous
industrial solid waste for Phu Cat district, Hoa Hoi
industrial zone, Cat Trinh industrial zone, smallindustrial zones of Phu Cat district and Nhon Hoi
economic zone;
- Burn and bury hazardous industrial solid waste forthe whole province;
- Recycle inorganic solid waste for the whole
province
Build a new
plant
2 Phu Cat Phu Cat 2 SWTP
(to the north of Ba
mountain)
10 - Burn domestic solid waste - The north and northeast of Phu Cat district. Build a newplant
3 Quy Nhon city
and Tuy Phuoc
district
Long My SWTP 30 - Burn domestic solid waste;
- Burn non-hazardous industrialsolid waste;
- Process organic fertilizer;
- Treat health solid waste
(burn).
- Burn domestic solid waste and non-hazardousindustrial solid waste for Tuy Phuoc district and Quy
Nhon city;
- Process organic solid waste into organic fertilizer
for Quy Nhon city, Tuy Phuoc district and Van Canh
district
Extend and
upgrade the
existing
plant, which
is 6ha
4 Quy Nhon city Phuoc My SWTP 4 - Process and recycle stonepowder
- Solid waste of stone powder at Phu Tai and LongMy industrial zones
Existingproject
5 An Nhon
provincialtown
Nhon Tho SWTP 20 - Burn urban domestic solid
waste;
- Burn non-hazardous industrialsolid waste;
- Treat health solid waste
(burn).
- An Nhon provincial town Build a newplant
6 Bong Son
provincial
Hoai Duc SWTP 20 - Burn urban domestic solid
waste;- Bong Son provincial town Build a new
plant
2
8/6/2019 Decision 637 of Binh Dinh PPC
10/15
town - Burn non-hazardous industrialsolid waste;
- Treat health solid waste
(burn).
7 Hoai Nhon Hoai Nhon 2
SWTP (Hoai Son)
10 - Burn urban domestic solid
waste;
- Burn non-hazardous industrialsolid waste;
- Treat health solid waste(burn).
- Hoai Nhon district (after the establishment of Bong
Son provincial town)
Build a new
plant
8 Phu My My Phong SWTP 16 - Burn urban domestic solid
waste;- Burn non-hazardous industrialsolid waste;- Process organic fertilizer;
- Treat health solid waste(burn).
- Burn domestic solid waste for Phu My district;
- Burn non-hazardous industrial solid waste for PhuMy district;
- Process organic solid waste into organic fertilizerfor the districts of Phu Cat, Phu My, Hoai Nhon, Hoai
An, An Nhon and Tay Son
Build a new
plant
9 Phu My Phu My 2 SWTP 10 - Burn urban domestic solid
waste;
- The west of Phu My district Build a new
plant
10 An Lao An Trung SWTP 5 - Burn urban domestic solid
waste;
- Burn non-hazardous industrialsolid waste;
- Treat health solid waste
(burn).
- An Lao district Build a new
plant
11 Vinh Thanh Vinh Quang
SWTP
5 - Burn urban domestic solid
waste;
- Burn non-hazardous industrial
solid waste;- Treat health solid waste(burn).
- Vinh Thanh district Build a new
plant
12 Van Canh Hiep Hoa SWTP
(Am ravine)
4 - Burn urban domestic solid
waste;
- Burn non-hazardous industrialsolid waste;- Treat health solid waste
(burn).
- Van Canh district Build a new
plant
13 Tay Son Tay Xuan SWTP 16 - Burn urban domestic solid - Burn domestic solid waste for Tay Son district; Build a new
3
8/6/2019 Decision 637 of Binh Dinh PPC
11/15
waste;
- Burn non-hazardous industrialsolid waste;
- Treat health solid waste(burn).
- Burn non-hazardous industrial solid waste for TaySon district, Binh Nghi industrial zone and small
industrial zones of Tay Son district;
plant
14 Tay Son SWTP at the
North of Tay Son
district
- - Burn urban domestic solid
waste;
- For the north of Tay Son and adjacent areas Build a new
plant
15 Hoai An An Thanh SWTP 5 - Burn urban domestic solid
waste;
- Burn non-hazardous industrial
solid waste;- Treat health solid waste
(burn).
- Hoai An district Build a new
plant
Total 225 -
4
8/6/2019 Decision 637 of Binh Dinh PPC
12/15
ANNEX 3
PLAN OF THE HEALTH SOLID WASTE INCINERATORS
IN BINH DINH PROVINCE
(Enclosing to the Decision Nr.637/QD-UBND dated 27 August 2009of the Provincial Peoples Committee)
Nr District/CityAmount of health
solid waste (kg/day)
Incinerator capacity
(kg/time)
Frequency
(time/week)
1 Quy Nhon 846.1 700 7 (2 times/day)
2 An Nhon 32.5 50 5
3 Bong Son provincial town 60 100 3
4 Hoai Nhon 17.2 50 35 Phu Cat 27.5 50 3
6 Tay Son 65.7 100 5
7 Van Canh 10 30 4
8 Hoai An 12.5 30 4
9 Phu My 25 50 3
10 An Lao 10 30 4
11 Vinh Thanh 10 30 4
1,152.8
1 Quy Nhon 934.2 700 7 (2 times/day)2 An Nhon 35.9 50 5
3 Bong Son provincial town 67.5 100 4
4 Hoai Nhon 19.3 50 3
5 Phu Cat 30.3 50 3
6 Tay Son 72.6 100 5
7 Van Canh 11 30 4
8 Hoai An 13.8 30 4
9 Phu My 27.6 50 3
10 An Lao 11 30 4
11 Vinh Thanh 11 30 4
1,272.8
The period up to 2015
The period up to 2020
Total
Total
5
8/6/2019 Decision 637 of Binh Dinh PPC
13/15
ANNEX 4
TASK ASSIGNMENT ON THE IMPLEMENTATION
OF THE PROVINCE SOLID WASTE MASTER PLAN FOR THE URBAN
AREAS AND THE INDUSTRIAL ZONES IN BINH DINH AREA UP TO 2020
(Enclosing to the Decision Nr.637/QD-UBND dated 27 August 2009of the Provincial Peoples Committee)
Agency Functions, duties
Department of
Construction
- Be the advisor of the PPC in directing the implementation of the
PSWMP for the urban areas and the industrial zones in the
province up to 2020, be the leader in the coordination with other
departments to draw up an implementation plan up to 2020.
- Assess the construction plan of solid waste treatment plants,
monitor and supervise the construction as planned.
- Coordinate with the districts and the Department of Planning and
Investment to make the list of investment projects according to the
priority order to arrange the fund sources (government budget,
ODA fund and other fund sources according to the socialization
policy).
- Bear the main responsibility in the coordination with other
departments to draw up the Provincial Solid Waste Management
Regulation (in the districts, city, industrial zones, and health
enterprises) and then submit it to the PPC for approval as a
basement of state management.
- Bear the responsibility in the coordination with the Department of Natural Resources and Environment to instruct the district/city
Peoples Committees on the technical standards and conditions of
location selection and solid waste intermediate point construction
at rural residential zones.
Department of
Planning and
Investment
- Bear the main responsibility in the coordination with the relating
departments to draw up investment incentive policies for the
organizations that take part in the solid waste collection, transport
and treatment in the province, and then submit it to the PPC for
approval.
- Bear the main responsibility in the coordination with the relatingdepartments to submit the Tender Regulation or Order Regulation
of solid waste collection, transport and treatment service in the
province to the PPC for approval and issuing.
- Arrange the government budget for the solid waste management
plans approved by the PPC.
Department of
Natural Resources
and Environment
- Be in charge of the state management on environment matters at
the intermediate points, solid waste treatment plants in the
province.
- Bear the main responsibility in the coordination with the
Department of Industry and Commerce, Binh Dinh EconomicZone Management Unit and the district/city PCs to periodically
inspect and supervise the solid waste management situation at the
6
8/6/2019 Decision 637 of Binh Dinh PPC
14/15
industrial zones, small industrial zones and enterprises in the
province.
- Bear the main responsibility in the coordination with the
Department of Health to periodically inspect and supervise the
solid waste management situation at the health agencies in the
province.
- Preside over the program of solid waste separation at the source.
- Bear the main responsibility in the coordination with other
departments to appraise the compositions and properties of solid
waste imported to Binh Dinh.
- Make annual reports on solid waste management, including
domestic solid waste, industrial solid waste, health solid waste and
hazardous solid waste in the province, and then send them to the
Provincial Peoples Council and Provincial Peoples Committee.
- Coordinate with the Department of Natural Resources and
Environment to instruct the district/city Peoples Committees onthe technical standards and conditions of location selection and
solid waste intermediate point construction at rural residential
zones.
Department of
Finance
- Appraise and submit the tariff of solid waste collection, transport
and treatment service in the province to the PPC for approval.
- Bear the main responsibility in the coordination with other
departments to draw up tax and finance incentive policies for the
organizations that take part in the socialization of solid waste
management.
Department ofIndustry and
Commerce
- Be in charge of the state management on industrial solid waste,monitor and supervise regularly the compositions of industrial
solid waste, the amount of solid waste at industrial zones, trade
villages and enterprises, and the implementation of solid waste
management regulations in the province.
- Give the instructions on the collection, transport and treatment of
hazardous solid waste originated from industrial production.
Binh Dinh Economic
Zone Management
Unit and district/city
PCs
- Direct and organize the solid waste management within their
scales of control.
- Coordinate with environment inspectors and environment police
officers to inspect and penalize any breach of environmentalprotection regulations in term of solid waste at industrial zones.
Department of Health - Be in charge of the state management on health solid waste in the
province.
- Regularly supervise the collection and treatment of hazardous
solid waste originated from health activities in the province.
Department of
Science and
Technology
- Appraise the technologies and equipments of solid waste treatment
and recycling in the province.
- Appraise the treatment technologies of hazardous solid waste in
the province.
- Coordinate with the Department of Natural Resources and
Environment to assess the compositions and properties of solid
7
8/6/2019 Decision 637 of Binh Dinh PPC
15/15
waste imported to Binh Dinh from abroad.
PCs of city, districts
(provincial towns)
- Organize and implement the task of state management on
environment and sanitation matters inclusive of solid waste in their
areas.
- Coordinate with the relating departments to draw up investment
plans of solid waste treatment plants in their areas, implement the
PSWMP as approved.
- Set up the tariff of solid waste collection and treatment service in
their areas, request the DoF to assess it, and then submit it to the
PPC for approval.
- Be in charge of planning solid waste intermediate points for rural
residential zones in their areas.
Urban Environmental
Company /
Cooperatives / Solid
waste collection teams
- Collect, transport and treat solid waste according to the signed
contracts.
- Coordinate with the DoNRE to implement pilot activities and promote the solid waste separation program at the source (at
households, organizations, offices, schools, trading service
enterprises )
Environment Police - Check and penalize administratively any breach of environmental
law; conduct investigation to any breach of environmental law;
verify environment criteria
- Take the initiative in engaging reconnaissance missions to any
environmental trouble spot.
- Coordinate with the natural resources and environment branch,
through the combination of common administrative penalization
methods and security professional methods, to delve into the
penalization of breach on solid waste management and illegal solid
waste import.
- Have the authority to suspend an enterprise if any breach on
environment is detected. If the enterprise does not make good his
breach, he will be prosecuted to the law.
8