6
CURRICULEM VITAE DEEPAK KUMAR JAISWAL Ranchi Jharkhand Mob :( +91) 8864042515 Email: [email protected] CAREER OBJECTIVE I want to be the part of the organization which provide me ample opportunity to utilize and improve my technical, analytical and managerial skill WORK SYNOPSIS Project Under taken Employe r Designati on Working Duratio n Skill BSNL GU East Nutek India ltd Qality Lead Nov-13 to Current Installation Quality Inspection of RNC, IBSC,SGSN ,MGW,power Plant ,Battery Bank ,Microwave ,DG Bed ,shelter, earthing and tower, Preparation of Model site and getting approval from customer , installation quality of BTS and Node B, Commissioning ,AT, Approval on P6 ,site creation in ericsson RNC and BSC, troubleshooting ,node b commissioning 3922,Knowladge About LTE, training to vender team ,RBS 2964,2206 commissioning and Site Creation In BSC MTS MS (Mumbai NOC) Zephyr BSS Engg March -12 to May-13 Technical Support , Re homing , Server installation , CDMA, EVDO, Call Flow ,Parameter Update , IP, OMCR Reliance ZTE Telecom India PVt LTD Telecom Engg Apr-10-Feb- 12 BSC Commissioning, Server Installation, software Up Gradation, Project Roll Out, alarm Troubleshooting TATA Docomo ZTE Telecom Telecom Engg May-09- Apr-10 GSM , Project Rollout Commissioning, AT, Transmission, NMS

Deepak Jaiswal Resume2

Embed Size (px)

Citation preview

Page 1: Deepak Jaiswal Resume2

CURRICULEM VITAE DEEPAK KUMAR JAISWAL Ranchi Jharkhand Mob :( +91) 8864042515 Email: [email protected] CAREER OBJECTIVE

I want to be the part of the organization which provide me ample opportunity to utilize and improve my technical, analytical and managerial skill

WORK SYNOPSIS

Project Under taken

Employer Designation Working Duration

Skill

BSNL GU East

Nutek India ltd

Qality Lead Nov-13 to Current

Installation Quality Inspection of RNC, IBSC,SGSN ,MGW,power Plant ,Battery Bank ,Microwave ,DG Bed ,shelter, earthing and tower, Preparation of Model site and getting approval from customer , installation quality of BTS and Node B, Commissioning ,AT, Approval on P6 ,site creation in ericsson RNC and BSC, troubleshooting ,node b commissioning 3922,Knowladge About LTE, training to vender team ,RBS 2964,2206 commissioning and Site Creation In BSC

MTS MS (Mumbai NOC)

Zephyr BSS Engg March -12 to May-13

Technical Support , Re homing , Server installation , CDMA, EVDO, Call Flow ,Parameter Update , IP, OMCR

Reliance ZTE Telecom India PVt LTD

Telecom Engg Apr-10-Feb-12

BSC Commissioning, Server Installation, software Up Gradation, Project Roll Out, alarm Troubleshooting

TATA Docomo

ZTE Telecom India PVt LTD

Telecom Engg May-09- Apr-10

GSM , Project RolloutCommissioning, AT, Transmission, NMS

Reliance ZTE Telecom India PVt LTD

Telecom Engg Dec-08- May-09

Site integration , On air , Site Creation ,RF parameter Update ,Troubleshooting , Alarm Monitoring ,coordination with rf engineer for drive test

Reliance Adecco Residential Engg

Jun-07- nov-08

BSC, MSC,MGW BTS Installation ,Site Integration , Site on Air , AT , coordinating to TI Partner

JOB PROFILEAND RESPONSIBILITY

Page 2: Deepak Jaiswal Resume2

CURRENTLY WORKING IN BSNL GU(2G,3G) PROJECT IN ZTE TELECOM Installation of ZXG10 IBSC, ZXWR RNC , PDU Rack ,ODF Rack, SMPS(Exicom) Installation of SGSN,MSC,GMSC, GMGW,JUNIPAR FIREWALL, ROUTER , SWITCH IN ARTTC INSTALLATION OF POWER PLANT(EXICOM), SMPS(DELTA) IN ARTTC INSTALLATION AND COMMISSINING OF SDR 8800(INDOOR) AND SDR 8900A(OUTDOOR) Installation of Microwave(0.6) IPassolink 200 and guideline to TI partner SWAPPING OF THE Ericsson 2G(RBS 2964) AND 3G(RBS 3922) TO ZTE SDR Redeployment of RBS 2964(900 & 1800 ) band and RBS 3922(3G) Media testing in ,call testing and alarm testing , Integration , Software Downloading and On Air Of the Sites Alarm configuration and verification through OMCR Coordination with Vender and Customer for Site integration Training to the Vender Team For the Site Commissioning Providing On Line Support for the Commissioning of SDR to TEAM Providing Support to Ti Partner for Commissioning of ericcson 3g BTS . Installation guideline to Vender Team for Indoor and Outdoor SDR Knowledge About Transmission and Planning (SDH, PDH) Swapping of Ericsson RBS 3922, 2964 and 2206, Commissioning of RBS 3922 and 2964, 2206, and there AT. Creation of Site in RNC3810,and BSC Troubleshooting OF alarm In RBS 3922, 2206 and 2964. Creation of site in RNC 3810, troubleshooting Creation of Site in ericsson BSC and troubleshooting.

Operation and Maintenance in SHYAM SISTEMA (MTS) MUMBAI NOC

ALARM TROUBLESHOOTING ,MONITERING AND ESCALATION OF ZXC10 BSC AND DSDR 8200 BTS DAILEY HEALTH CHECKUP OF BSC (CPU UTILIZATION, RESOURCES STATUS AND ASSOCIATION STATUS) E1 UTILIZATION CALCULATION, AUGMENTATION AND MIGRATION OF SITES FROM E1 TO IP CE UTILIZATION CALCULATION AND AUGMENTATION AFTER CUSTOMER APPROVAL SITE CREATION ,INTEGRATION , ONAIR AND ALARM CONFIGURATION PREPARATION OF ALARM REPORT ,PERFORMANCE REPORT , CPU UTILIZATION REPORT ,E1

UTILIZATION REPORT , CE UTILIZATION REPORT, WINDOWS 2003 SERVER INSTALLATION , SQL SERVER INSTALLATION AND TROUBLESHOOTING CALL FAILURE TROUBLESHOOTING WITH THE HELP OF SERVICE OBSERVATION EVDO SPEED ISSUE, TROUBLESHOOTING AND RESOLUTION WITH THE HELP OF TRANSMISSION, PDSN

AND RF ENGINEER. PROVIDING TECHNICAL SUPPORT TO CLEAR VSWR, RSSI AND HARDWARE ALARM CALCULATION OF UPLOAD AND DOWNLOAD OF 1X AND EVDO DATA

Page 3: Deepak Jaiswal Resume2

CURRICULEM VITAE TAKING CONFIGURATION AND SQL SERVER BACKUP BSC CONFIGURATION , SITE CONIGURATION, SOFTWARE UPGRADATION OF ZXC10 KNOWLADGE ABOUT CDMA PROTOCAL , CALL FLOW , SIGNALLING FLOW

PROJECT ROLL OUT IN TATA DOCOMO

INSTALLATION COMMISSINING AND AT OF ZXG10IBSC CREATION ,COMMISSINING AND AT OF SDR 8200 AND SDR 8900 DAY TO DAY TROUBLESHOOTING AND CLEARANCE OF SITE ALARM VSWR MEASUREMENT AND POWER CALIBERATION OF THE SITE SUCCESSFULLY REMOVE THE FAULTY BACKPLANE OF ZXG10 IBSC COORDINATION WITH CUSTOMER FOR LINK DETAILS AND SITE INTEGRATION PLANNING COORDINATE WITH VENDER TEAM FOR SITE INSTALLATION ,MUX INSTALLATION AND

COMMISSINING GIVEN TRAINNING TO SITES ENGINEER FOR COMMISSINING OF SITES KNOWLADGE ABOUT GSM ARCHITECTURE , PROTOCOL , SS7 AND CALL FLOW COORDINATION WITH THE INFRA MANAGER TO RESOLVE SITE INFRA ISSUE SITE SURVEY AND RFI

PROJECT ROLL OUT AND O&M IN RELIANCE

INSTALLATION , COMMISSINING AND AT OF ZXC10 BSC CONFIGURATION OF THE SITES , INTEGRATION AND ONAIR VENDER MANAGEMENT FOR THE INSTALLATION AND AT OF THE SITES COORDINATE WITH THE CUSTOMER FOR E1 AVAILABILITY AND MATERIAL DISPATCH. MONITERING , TROUBLESHOOTING AND CLEARANCE OF ALARM OF BSC AND BTS SOFTEWARE UPGRADATION OF THE BSC AND SITES E1 CONFIGURATION AND CASCEDDING OF THE SITES COORDINATE WITH RF ENGINEER FOT THE DRIVE TEST AND THERE KPI DEFINING OF THE NEIGHBOUR LIST OF THE SITES AND CARRIER UPGRADATION Successfully completed the Swap of lucent BTS from ZTE BTS HEALTH CHECKUP OF THE BSC AND THERE BACKUP PROVIDING TECHENICAL SUPPORT TO THE SITES ENGINEER AND BSC ENGINEER Coordination with DT engineer for neighbor list update during drive test, Parameter Update According to Standard RF parameter (RADIOUS, FER,POWER CONTROL

PARAMETER) KNOWLADGE GSM PROTOCAL (CC, MM,RR, MTP, SCCP ,BSSAP) CALL FLOW. WINDOWS 2003 SERVER INSTALLATION , SQL SERVER INSTALLATION, NETNUMEN

INSTALLATION

Page 4: Deepak Jaiswal Resume2

KEY QUALIFICATION B. Tech, Electronics & Communication Engineering (2007), GLAITM U.P.TECH MATHURA with

Aggregate of 65.5 %

ADDITIONAL TRAINING AND ACCREDITATION TWO Week GSM(GERAN) Advance Training From IEC Bangalore in 2010 TWO Week CDMA Level A Training From IEC Bangalore in 2007 KNOWLADGE ABOUT LTE TECHNOLOGY, ARCHITECTURE PROTOCALL, CHANNEL. KNOWLADGE ABOUT 3 G ARCHITECTURE , PROTOCAL(MAC, RLC, PDCP,RRC, BMC), CHANNELS, CALL FLOW,KNOWLADGE ABOUT IP

PERSONAL INFORMATION Name : Deepak Kumar jaiswal Date of Birth : 1March , 1984. Fathers Name : OM Prakash Jaiswal. Address : bhadohi Utter Pradesh

:

Page 5: Deepak Jaiswal Resume2

CURRICULEM VITAE