ESTIMATI Messrs. : Sankyu - Thai Co.,Ltd. Wellgrow Industrial Estate Ph III 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bang Chachoengsao 24180 . Tel 038-522280 - 7 Attn. : Mr. Surathep Lertsara Manager CC. : คคค คคคคค คคคคคคคค Project : New Injection Machine Installation Location : Wellgrow Industial Estate Title of works : Addition Works For New Toshiba Inje Job No. : SKT 080925 Revision : 0 คคคคคค คคคคคคคค คคคคคคคคคค EIR ENGINEERING CO., 228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Ma 228/94 หหหห 5 ห.หหหหหหหหหหห ห.หหหหหหหห ห.หหหหห

Den So 080925 Addition Inj11-12 Install

  • Upload
    eir

  • View
    25

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Den So 080925 Addition Inj11-12 Install

Revision Date:04/08/2023

ESTIMATION

Messrs. : Sankyu - Thai Co.,Ltd.Wellgrow Industrial Estate Ph III

90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong

Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

Attn. : Mr. Surathep Lertsara

Manager

CC. : คุ�ณ วิ�ชาญ เดี�ยรดีาษ

Project : New Injection Machine Installation

Location : Wellgrow Industial Estate

Title of works : Addition Works For New Toshiba Injection Install

Job No. : SKT 080925

Revision : 0

บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดีEIR ENGINEERING CO.,LTD.

228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270

Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

228/94 หมู่�� 5 ถ. ศรี�นครี�นทรี ต. บางเมู่�อง อ. เมู่�อง จ. สมู่�ทรีปรีาการี 10270

Page 2: Den So 080925 Addition Inj11-12 Install

Revision Date:04/08/2023

Page 3: Den So 080925 Addition Inj11-12 Install

Revision Date:04/08/2023

ESTIMATION

บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดี

228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270

Page 4: Den So 080925 Addition Inj11-12 Install

Revision Date:04/08/2023

Page 5: Den So 080925 Addition Inj11-12 Install

Page 5 of 15 EIR Engineering Co.,Ltd.

บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดีEIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

QUOTATION

Quotation No. : SKT 080925

Messrs. : Sankyu - Thai Co.,Ltd.: Wellgrow Industrial Estate Ph III

: 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,

: .A.Bangpakong Chachoengsao 24180

Tel. : Tel 038-522280 - 7 Fax. 038-522288

Attn. : Mr. Surathep Lertsara

: Manager

1) Price ( Baht ) : 38,640.00

2) Project : New Injection Machine Installation

3) Title of work : Addition Works For New Toshiba Injection Install

4) Term of Payment : Within 30 days

Item Description

1 DIRECT COST

2 INDIRECT COST

3 EXPENSE & PROFIT

TOTAL

VAT 7%

FINAL AMOUNT

We hope that our confirmation will meet with your requirement and look forward to receiving your valuable order in due course

Page 6: Den So 080925 Addition Inj11-12 Install

Page 6 of 15 EIR Engineering Co.,Ltd.

228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

QUOTATION

Date : 24 September 2008

Validity of Quotation :

Preparing Period :

Delivery :

Revised : 0

P/O No. :

Excluded Vat 7%

Addition Works For New Toshiba Injection Install

Description Quantity Unit Amount

1 LOT 31,600.00

1 LOT 2,000.00

1 LOT 5,040.00

TOTAL 38,640.00 VAT 7% 2,704.80

FINAL AMOUNT 41,344.80 We hope that our confirmation will meet with your requirement and look forward to receiving your valuable order in due course

Your Faithfully,

Page 7: Den So 080925 Addition Inj11-12 Install

Page 7 of 15 EIR Engineering Co.,Ltd.

Sukhon Thewaran

Manager

Page 8: Den So 080925 Addition Inj11-12 Install

บร�ษ�ท อี�ไอีอีาร� เอี�นจิ�เน�ยร��ง จิ�ากั�ดีEIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

SUMMARY OF QUOTATION

Bidder : EIR ENGINEERING CO.,LTD.

Client : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation

Title of work : Addition Works For New Toshiba Injection Install

Item Description

1 Direct Cost

A Addition Works For New Toshiba Injection Install

Subtotal 1

2 Indirect Cost

2.1 Site Staff and Supervisor

2.2 Transportation

2.3 Tool and consumption

2.4 Site Expense

1 Temporary Facilities

2 Small Construction Supplies

3 Utility Supply Costs

Subtotal 2

3 Expense & Profit

GRAND TOTAL

Page 9: Den So 080925 Addition Inj11-12 Install

228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakarn 10270Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

SUMMARY OF QUOTATION

Quotation No. : SKT 080925

Date : 24 September 2008Revision No. : 0

Q'ty Unit Unit Cost Total Amount

1 lot 31,600.00 31,600.00

31,600.00

1 lot

1 lot

1 lot 2,000.00

1 lot

2,000.00

5,040.00

GRAND TOTAL 38,640.00

Page 10: Den So 080925 Addition Inj11-12 Install

document.xlsBOQ Page 10 of15 EIR Engineering Co.,Ltd.

Estimation SheetClient : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation

Location : Wellgrow Industial Estate

Title Of Work : Addition Works For New Toshiba Injection Install

No. Description

1 DIRECT COST

A Addition Works For New Toshiba Injection Install

A1 INJECTION 11 M/C TAKEOFF AND RE-INSTALL WORK

- PM11 MDB PANEL

- NEW INJECTION MACHINE 700 A.

- CHILLER MACHINE 100 A.

- MOLD TEMP MACHINE

- HOPPER DRYER MACHINE

- JET LOADER

- CRUSHER

- TAKEOFF AND RE-WIRING CABLE CV 1 C - 185x3 (x2) sq.

- TAKEOFF AND RE-INSTALL CABLE THW 1C - 50 sq. G

- TAKEOFF AND RE-WIRING CABLE CV 1 C - 95x3 sq.

- TAKEOFF AND RE-WIRING CABLE THW 1C - 16 sq. G

- TAKEOFF AND RE-WIRING CABLE CV 4 C - 2.5 sq.

- TAKEOFF AND RE-WIRING CABLE CV 4 C - 2.5 sq.

- TAKEOFF CABLE RACK W:300 L:3000

- TAKEOFF CABLE RACK W:200 L:3000

- TAKEOFF CABLE RACK ACCESSORIES

- TAKEOFF WIREWAY W:300 FOR P-M11 AND P-M12

- TAKEOFF STEEL SUPPORT C:75 800X660X400

- STEEL SUPPORT C:75 1500X300X1500

- INSTALL CABLE RACK W:300 L3000 WITH COVER

- INSTALL CABLE RACK W:200 L3000 WITH COVER

- HORIZONTAL RACK W:200

- SPECIAL TEE RACK W:200/300

- COVER HORIZONTAL RACK W:200

Page 11: Den So 080925 Addition Inj11-12 Install

document.xlsBOQ Page 11 of15 EIR Engineering Co.,Ltd.

Estimation SheetClient : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation

Location : Wellgrow Industial Estate

Title Of Work : Addition Works For New Toshiba Injection Install

No. Description

- COVER SPECIAL TEE RACK W:200/300

- STEEL SUPPORT C:100 L:400

- WIRING CONNECT ACCESSORIES

- MISCELENEOUS

- PAINTING WORK

- LABOR CHARGE

TOTAL A1

A2 SUB-PANEL INJECTION 11,12 MODIFIED

- SUB-PANEL 11 W550X H1000 XL200

- SUB-PANEL 12 W550X H1000 XL201

- WIRE AND CABLE CV 1C-95 x3 ( R,S,T)

- WIRE AND CABLE THW 1C-16 ( G )

- MAIN BUSBAR (R,S,T)

- GROUND BUSBAR (G)

- FLANGE SOCKET SLOPING 32A 3P+E IP67

- POWER PLUGS 32A 3P+E IP67

- ABB BREAKER T1N 32AT 3P MCCB (TAKEOFF)

- ABB BREAKER T1N 32AT 3P MCCB

- ABB BREAKER T1N 160AT 3P MCCB (NEW INSTALL)

- LABOR CHARGE

TOTAL A2

TOTAL A

Page 12: Den So 080925 Addition Inj11-12 Install

document.xlsBOQ Page 12 of15 EIR Engineering Co.,Ltd.

Estimation SheetClient : Sankyu - Thai Co.,Ltd.Project : New Injection Machine Installation

Location : Wellgrow Industial Estate

Title Of Work : Addition Works For New Toshiba Injection Install

No. Description

Page 13: Den So 080925 Addition Inj11-12 Install

document.xlsBOQ Page 13 of15 EIR Engineering Co.,Ltd.

Date : 24 September 2008Job Number : SKT 080925Revision : 0

Labour Cost

Q'ty Unit Unit Price Total Cost Remark

1 SET Existing

1 SET Existing

1 SET Existing

1 SET Existing

1 SET Existing

1 SET Existing

1 SET Existing

1 LOT Existing Inj. M/C No.11

1 LOT Existing Inj. M/C No.11

1 LOT Existing Sub-Panel11

1 LOT Existing Sub-Panel11

1 LOT Existing Crusher

1 LOT Existing Lighting

1 LOT Existing

1 LOT Existing

1 LOT Existing

1 LOT Existing

1 LOT Existing

1 LOT Existing

1 LOT Existing

1 LOT Existing

1 SET 1,200.00 1,200.00

1 SET 1,650.00 1,650.00

1 SET 700.00 700.00

Page 14: Den So 080925 Addition Inj11-12 Install

document.xlsBOQ Page 14 of15 EIR Engineering Co.,Ltd.

Date : 24 September 2008Job Number : SKT 080925Revision : 0

Labour Cost

Q'ty Unit Unit Price Total Cost Remark

1 SET 1,250.00 1,250.00

8 SET 250.00 2,000.00

1 LOT 2,000.00 2,000.00

1 LOT 1,000.00 1,000.00

1 LOT 800.00 800.00

1 LOT 15,000.00 15,000.00

25,600.00

1 SET Existing

1 SET Existing

1 SET Existing

1 SET Existing

2 SET Existing

2 SET Existing

2 SET Existing

2 SET Existing

2 SET Existing CRUSHER

2 SET Existing FOR MOLDCHANGE C/P

2 SET 2,600.00 5,200.00 FOR HOT RUN C/P

1 LOT 800.00 800.00

6,000.00

31,600.00

Page 15: Den So 080925 Addition Inj11-12 Install

document.xlsBOQ Page 15 of15 EIR Engineering Co.,Ltd.

Date : 24 September 2008Job Number : SKT 080925Revision : 0

Labour Cost

Q'ty Unit Unit Price Total Cost Remark