© 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 1 2013 Procurement Key Issues: Going Deeper and Broader to Deliver Borderless Procurement Services In 2013, enterprises are trying to not just grow globally, but to balance local agility with global scale in their value chains. To do so, internal business services that support them must be equally borderless, from the geographic, organizational, technology and other standpoints. Four imperatives were identified by participants in our 2013 Enterprise Key Issues Study: Fostering the agility required to achieve profit goals when revenue falls short of expectations, and to add value to procurement services without additional headcount or budget. Continuing to move toward a more standardized and global approach to the business and to procurement operations. Maturing the concepts of process ownership beyond the basics of process standardization, and creating value by working across functional, business unit and geographic borders. Obtaining insights, intelligence and actionable strategies from data generated by procurement activities. It is likely that growth will always be the top priority for CEOs, but for the other senior executives (including procurement leaders) who participated in the study, improving operating margin actually overtook increasing revenue compared to 2012 (Fig. 1). By Michel Janssen, Pierre Mitchell and Lynne Schneider Procurement Executive Insight Study Results Analysis January 21, 2013 Executive Summary Of all the Hackett Key Issues Studies conducted in the last five years, the 2013 edition shows the greatest year- over-last change in priorities for both performance and capability-related issues. Procurement executives expect to be extremely busy in the coming year supporting the enterprise focus on profitable growth. In response, they are working to expand the quantity and quality of their organization’s spend influence via sourcing, category management and increasingly, supplier relationship management. Many of their priorities in the coming year will require greater cross-functional collaboration with business units, functional partners, Global Business Services groups and third parties. While priorities may vary based on individual enterprise strategies, in 2013 the overarching goal is to deliver more value without more resources.

Dificuldades Do Setor de Compras

Embed Size (px)

DESCRIPTION

Manual

Citation preview

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 1

    2013 Procurement Key Issues: Going Deeper and Broader to Deliver Borderless Procurement Services

    In 2013, enterprises are trying to not just grow globally, but to balance local agility with global scale in their value chains. To do so, internal business services that support them must be equally borderless, from the geographic, organizational, technology and other standpoints.

    Four imperatives were identified by participants in our 2013 Enterprise Key Issues Study:

    Fostering the agility required to achieve profit goals when revenue falls short of expectations, and to add value to procurement services without additional headcount or budget.

    Continuing to move toward a more standardized and global approach to the business and to procurement operations.

    Maturing the concepts of process ownership beyond the basics of process standardization, and creating value by working across functional, business unit and geographic borders.

    Obtaining insights, intelligence and actionable strategies from data generated by procurement activities.

    It is likely that growth will always be the top priority for CEOs, but for the other senior executives (including procurement leaders) who participated in the study, improving operating margin actually overtook increasing revenue compared to 2012 (Fig. 1).

    By Michel Janssen, Pierre Mitchell and Lynne Schneider

    Procurement Executive Insight

    Study Results Analysis

    January 21, 2013

    Executive SummaryOf all the Hackett Key Issues Studies conducted in the last five years, the 2013 edition shows the greatest year-over-last change in priorities for both performance and capability-related issues. Procurement executives expect to be extremely busy in the coming year supporting the enterprise focus on profitable growth. In response, they are working to expand the quantity and quality of their organizations spend influence via sourcing, category management and increasingly, supplier relationship management. Many of their priorities in the coming year will require greater cross-functional collaboration with business units, functional partners, Global Business Services groups and third parties. While priorities may vary based on individual enterprise strategies, in 2013 the overarching goal is to deliver more value without more resources.

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 2

    The enterprise is looking under every stone for improvement opportunities. This of course helps set the agenda for procurement organizations to support. On the revenue and growth enablement front alone, procurement organizations have a broad spectrum of supplier engagement options planned to support enterprise strategies in 2013 (Fig. 2).

    FIG. 1 Summary: Enterprise key issues in 2013

    Source: Enterprise Key Issues Study, The Hackett Group, 2013

    Improve operating margin 90%

    88%

    88%

    83%

    82%

    82%

    77%

    77%

    74%

    68%

    49%

    Accelerate revenue growth

    Largest increase

    Improve customerservice/satisfaction

    Reduce overhead cost

    Increase operational agilityand flexibility

    Enhance employee/talentretention and development

    Improve cash flow/working capital

    Reduce total supply chain cost

    Manage enterprise risk

    Grow emerging market presence

    Achieve non-financial, social responsibilityand sustainability-related objectives

    0 20 40 60 80 100

    +/- 3% CHANGE FROM 2012

    Percent of companies ranking issue as important" or "extremely important"

    FIG. 2 Procurement initiatives planned for next 12-24 months in support of the enterprise strategy

    Source: Revenue/Growth Enablement Study, The Hackett Group, 2012

    Joint ventures/strategic partnerships

    Mergers & acquisitions

    Ensuring value chain partners'ability to scale for growth

    Improving brand perception(e.g., sustainability, diversity, etc.)

    A strategic/business planning processeffectively supporting growth

    and related initiatives

    Finding new target industries, channelsand channel partners

    Penetrating international markets

    Pursuing game-changinginnovation/technology

    Improving sales & marketingeffectiveness in existing channels

    Developing/improving traditionalproducts and services

    Strategic supplier partnering (e.g., JVs, joint IP licensing)

    Supplier acquisitions

    Supplier capability/capacity development

    Supplier diversity;supplier sustainability

    Supplier business reviews;supplier eventst

    Supplier market intelligence

    Supply base localization

    Open innovation

    Joint promotions;demand pull tactics

    Early supplier involvementin design

    Enterprise growth strategies

    Related initiatives

    Supplier-related activity

    0 20 40 60 80 100

    HIGH MODERATE

    43%

    36%

    34%

    28%

    22%

    25%

    43%

    36%

    14%

    14%

    39%

    43%

    31%

    34%

    33%

    46%

    25%

    32%

    34%

    21%

    82%

    79%

    65%

    62%

    55%

    71%

    68%

    68%

    48%

    35%

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 3

    The challenge will be finding a way to fund these strategic pursuits when staffing and budgets remain tight. Although revenue is expected to grow during 2012-2013, albeit slowing relative to 2011-2012, procurement budgets will be flat going into 2013, with operating budgets expected to drop by 0.40% and FTE levels by 0.50% (Fig. 3).

    Since procurement, like other functions, is being required to do more with less, it will need to do things differently. Based on the Key Issues Study findings, there is plenty of change on the horizon:

    Globalizing value chains means globalizing direct as well as indirect procurement re-sources that are increasingly part of a broader business services delivery group, such as a Global Business Services organization.1 Companies have average of 12% of their FTEs already located in low-cost regions, a number that is expected to reach 21% in within two years.

    Roughly one-third to one-half of companies have created a global design for policy/strategy standards, process designs, technology platforms, KPIs and master data man-agement (MDM) with plans to increase those levels to 50-60% within three years.

    KPIs, MDM and near-real-time analytics are key to enabling closed-loop performance management processes for the enterprise (i.e., enterprise performance management, or EPM) or for procurement/supply chain (which Hackett calls supply performance management).2 Timely analytics are not always easy to come by in large, global en-terprises. In our recent globalization study, we found that 80% of top-quartile perform-ers offer visibility in near real-time or within one day, compared to only 28% of the peer group.

    Since a one-size-fits-all procurement Service Delivery Model (SDM) is insufficient for the complex needs of large organizations, the ability to mass-customize procurement processes as services by category, stakeholder, contract type, buy-pay channel, ge-ography, etc., is paramount. Using a procurement SDM to design tailored services for end-to-end processes is a key principle behind enterprise process ownership (some-times known as global process ownership) and Global Business Services strategies. In the study, we found that 21% of procurement organizations are scoping their enter-prise process ownership to cross-functional, end-to-end processes (e.g., purchase-to-pay or source-to-settle).

    Building these new capabilities is not easy, and procurement, perhaps more than any other function, realizes the importance of tailoring its approach to influence stakeholders and help them gain better performance outcomes. This means helping to maximize the

    FIG. 3 Projected changes in revenue, procurement budgets and headcount

    Overall revenue growth Procurement operatingbudget

    Number of staff (FTEs) in the procurement function

    Source: Key Issues Study, The Hackett Group, 2013

    7.9%

    6.5%

    1.16%0.31%

    -0.40%

    2012 COMPARED TO 2011

    -0.50% -1012345678

    2013 COMPARED TO 2012

    1 In 2012, The Hackett Group conducted a globalization research study and created an associated Globaliza-tion Index to measure the extent of globalization of the enterprise operating model; globalization of business services delivery (including procurement); and finally, the degree of alignment between the two.

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 4

    value of third-party relationships. As with last years Key Issues Study, the 2013 edition validated that procurement is generally doing a good job helping stakeholders capture this value, especially relative to how well other functions perform. Only 10-20% of non-procurement study respondents believe that uncaptured value is a major issue for 2013 (Fig. 4).

    There is still opportunity to improve, however. Plus, procurements stakeholders who have a notoriously short memory when it comes to its historical successes are ratcheting up their expectations for procurement to develop ever-deeper capabilities and deliver more impactfully across a much broader set of KPIs in 2013.

    Procurement Key Issues It Will Be a Busy 2013Of all the Hackett Key Issues Studies conducted in the last five years, in 2013 we see the greatest change over the previous year in priorities for both performance and capability-related issues. Reducing purchased costs remains at the top of performance-related concerns, but the increase to 90% of companies clearly shows that, for better or worse, cost reduction is king (Fig. 5). However, innovation has shot up in the rankings and is now tied with spend influence as the number-two priority. Interestingly, although innovation is primarily a revenue-generation strategy, only 34% of organizations consider supporting growth enablement beyond innovation to be a major or critical priority.

    Another interesting finding is that 50% of procurement organizations are placing a major emphasis on reducing the cost of procurement operating expense in the coming year, compared to 25% in 2012. The focus here is not only to support top-down cost-reduction mandates from finance or elsewhere, but also to free up funds and resources for higher-value activities.

    2 See the two-part Hackett series on supply analytics and information management referenced in the Related Hackett Research section at the end of this document.

    FIG. 4 Only a small minority of non-procurement executives feel that untapped supplier value and procurement value are major issues for 2013

    Percent of procurement stakeholders indicatingthey have difficulty getting enough value

    from supplier relationships

    Percent of procurement stakeholders indicatingthey have difficulty getting enough value from the

    procurement function to maximize supplier relationships

    Source: Key Issues Study, The Hackett Group, 2013

    0

    10

    20

    30

    40

    50

    60

    0

    10

    20

    30

    40

    50

    6040%

    Finance IT HR Finance IT HR

    33% 29% 33% 27% 24%

    11%

    20%14%

    5%

    13%

    3%20%14%

    5%

    AN ONGOING ISSUE

    IMPORTANT ISSUE TO ADDRESS IN 2013

    MOST IMPORTANT INTERNAL SUPPORT ISSUE WE FACE

    59%55%

    45%

    52%47%

    35%

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 5

    Managing supply risk has also increased in priority as a means of profit protection. Supplier compliance is receiving particular attention, with an emphasis on efficient management of cross-functional workflows relating to regulatory requirements and supplier compliance with performance expectations. These processes create headaches for suppliers and buyers alike, and can detract from strategic value creation when participants are bogged down in processing paper and spreadsheets. Building such capabilities is a combination of process change (e.g., using supplier stratification to tailor workflows and information), master data management, analytics, measurement systems and more, and leads naturally to the topic of improving procurement capabilities in 2013 (Fig. 6).

    FIG. 5 Key procurement performance-related issues in 2013

    Percent of organizations citing issue as major or critical

    Source: The Hackett Group 2013 Key Issues Study

    0 20 40 60 80 100

    Reduce/avoid purchased costs72%

    90%

    53%

    76%

    44%

    76%

    51%

    69%

    42%

    56%

    39%

    52%

    40%

    52%

    25%

    50%

    32%

    34%

    20%

    26%

    Expand purchasings scope/influence

    Increase innovation and product/service support

    Deepen influence on complex indirectspend categories

    Reduce supply risk

    Drive more value frompurchase-to-pay process

    Free up cash

    Reduce procurementoperating cost

    Enable growthbeyond innovation

    Environmental sustainabilityor supplier diversity

    20132012

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 6

    As episodic sourcing activity is broadening to a life cycle-based category management approach, new capabilities must be built, including broader supplier relationship management (SRM), deeper supplier/market intelligence (and associated analytics), and the way in which these knowledge-based processes can be delivered as services in a scalable way. The idea is to set up a one-to-many approach through a Center of Excellence (CoE) serving both procurement and its stakeholders. A good example is supply market intelligence (SMI), in which a CoE supports multiple value objectives including reducing risk, speeding up sourcing, improving negotiations, supporting new-market entry and competitive intelligence scenarios. It might be provided to category managers who then use it to serve their stakeholders; alternatively, it might serve enterprise strategic planning staff or others. Building such a major capability requires a major effort involving implementation of many lower-level capabilities (Fig. 7).

    FIG. 6 Strategic priority of capability-related issues in 2013

    Percent of organizations citing issue as major or critical

    Source: Key Issues Study, The Hackett Group, 2013

    0 20 40 60 80 100

    Strategic sourcing 71%

    88%

    58%

    81%

    53%

    64%

    52%

    64%

    43%

    57%

    34%

    56%

    38%

    50%

    32%

    45%

    26%

    43%

    19%

    34%

    17%

    33%

    23%

    14%

    Category management

    Supplier relationship management (SRM)

    Value contribution visibility

    Upgrade of talent/skills

    Supply market intelligence

    Continuous imprvovement

    Upgrading technology tools

    Procurement shared services/CoEs/BPO/globalization

    Upgrading information capabilities

    Process sourcing/placement

    20132012

    Knowledge management

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 7

    Of course, SMI is only one type of capability that is being established in CoEs (Fig. 8). Sourcing workflow support (including tactical sourcing and buying desks), analytics, knowledge management, benchmarking, training and other areas are similarly popular. CoEs can be run in the procurement organization, corporate headquarters, the Global Business Services organization or even in business units (the latter via a virtual model, in which resources report through the CoE but remain at their normal work location).

    FIG. 7 Supply market intelligence (SMI) capability-building priorities

    SM

    I typ

    esS

    MI s

    trat

    egie

    s

    Source: Key Issues Study, The Hackett Group, 2013

    Other

    Tying SMI to broader corporatecompetitive/MI efforts

    Increasing executive awareness,buy-in and funding

    Mining social media and other external sitesfor specific intelligence

    Ensuring the company minimizes its footprintin intelligence posted externally

    Communicating of SMI externally to interested stakeholders

    Communicating of SMI internallywithin procurement

    Using third-party content more cost-effectively

    Building custom internal intelligence/KM platform

    Integrating analytic applications toexternal intelligence

    Improving how intelligence is tied toprocesses and job roles

    Category-specific pricing indices

    Monitoring supply marketsfor innovation/growth possibilities

    Category/industry trends and events

    Third-party category knowledge/intelligence reports

    Supplier-specific financial/risk intelligence

    0 10 20 30 40 50 60 70 80

    SOME FOCUS IN 2013 MAJOR FOCUS IN 2013

    31%

    35%

    23%

    32%

    31%

    35%

    39%

    42%

    40%

    31%

    35%

    37%

    40%

    31%

    34%

    31%

    31%

    23%

    34%

    24%

    24%

    16%

    11%

    8%

    8%

    16%

    11%

    8%

    5%

    13%

    8%

    2%

    62%

    58%

    57%

    56%

    55%

    51%

    50%

    50%

    48%

    47%

    46%

    45%

    44%

    42%

    33%

    45%

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131 Procurement Executive Insight I The Hackett Group I 8

    Strategic ImplicationsIt is clear from the 2013 Key Issues Study that procurement is going to be very busy in the coming year, not only just to stay in step with the business, but also to build capabilities for the longer term. The three areas of capability-building receiving the most attention are category management, supplier relationship management (SRM) and improving the source-to-settle operating model. Most procurement organizations have a weaker formal mandate than they would like in these areas, but the smartest among them have learned to be opportunistic, using external events and internal business initiatives to provide the impetus for building new capabilities. They are also more deliberate in systematizing newly built capabilities in order to extend them to additional areas of spend and stakeholder engagement.

    Unquestionably, this continual process of broadening procurements value objectives, scorecard and capabilities is arduous. More than brute strength, flexibility will help the procurement organization go global in step with the business.

    Related ResearchUnlimited Options to Realize Borderless Business Services: Distilling the Key Issues of 2013, January 2013

    Procurement Centers of Excellence, December 2012

    The Case for Enterprise Process Ownership: Spotlight on the Purchase-to-Pay Process, November 2012

    World-Class Supply Analytics and Information Management, Part 1: Analytics, May 2012

    World-Class Supply Analytics and Information Management, Part 2: Supply Information Management, May 2012

    FIG. 8 Competencies and services offered in procurement Centers of Excellence(percent of companies)

    Source: The Hackett Group, 2012

    IN PLACE, WORKING WELL

    A FOCUS IN 2013 A FOCUS IN 2013 (TO INTEGRATE WITH CORPORATE CoE/GBS)

    NOT A FOCUS AREA

    Supplier support/help-desk

    Specialized domains(e.g., logistics, asset disposition)

    Talent management

    Finance-specific(e.g., costing, auditing, working capital)

    Contract/commercial excellence

    Program/project management

    Continuous improvement support(e.g., Lean/Six Sigma)

    Benchmarking, KPIs,value measurement/tracking

    Technology support

    Knowledge management

    Regulatory compliance(if different from supply risk)

    Supply market intelligence (SMI)

    Analytics

    Specialized sourcing support

    0 20 40 60 80 100 120

    28%

    29%

    35%

    35%

    39%

    42%

    43%

    45%

    47%

    47%

    52%

    54%

    58%

    59%

    15%

    14%

    33%

    11%

    26%

    19%

    24%

    35%

    19%

    35%

    12%

    25%

    29%

    22%

    7%

    5%

    7%

    4%

    9%

    7%

    6%

    7%

    9%

    6%

    7%

    4%

    4%

    4%

    50%

    52%

    25%

    50%

    27%

    32%

    27%

    12%

    25%

    11%

    28%

    18%

    8%

    16%

  • 2013 The Hackett Group, Inc.; All Rights Reserved. | 6000131

    This publication has been prepared for general guidance on the matters addressed herein. It does not constitute professional advice. You should not act upon the information contained in this publication without obtaining specific professional advice.

    Email: [email protected]

    www.thehackettgroup.com

    Atlanta +1 770 225 3600

    London +44 20 7398 9100

    Atlanta, New York, Chicago, San Francisco,

    London, Paris, Frankfurt, Amsterdam,

    Budapest, Hyderabad, Sydney

    About the Advisors

    Michel Janssen

    Principal and Chief Research Officer

    Mr. Janssen is responsible for developing The Hackett Groups core intellectual property, including thought leadership. He works with the companys Executive Advisory Council to understand the strategic impact of new and emerging trends on the business functions. He also heads Hacketts team of researchers and analysts in the US, Europe and India in the design and implementation of research studies; analysis of

    results; and production of resulting findings. Previously Mr. Janssen was president of Supplier Solutions for Everest Group and co-founded the Everest Research Institute. In addition, he provided strategic oversight for Everests Outsourcing Center, the worlds largest outsourcing community and vehicle for identifying early industry trends. He was also a senior director in Gartner Groups Strategic Sourcing practice and held numerous management positions with EDS.

    Pierre Mitchell

    Senior Director, Procurement Research

    Mr. Mitchell is responsible for leading the development of research and other intellectual property within Hacketts Procurement Executive Advisory Program, where he also serves as an adjunct business advisor. He has over 20 years of industry and consulting experience in procurement, supply chain and information technology. Mr. Mitchell is quoted widely in the press and speaks at numerous industry events on

    supply management trends and technologies. Previously he was vice president of supply management research at AMR Research and a manager at Arthur D. Little, where he led numerous supply chain and procurement transformations at Fortune 500 companies. Other industry positions include manufacturing project manager at The Timberland Company, materials manager at Krupp Companies and engineer at EG&G Torque Systems.

    Lynne Schneider

    Senior Research Director

    Ms. Schneider is responsible for leading the development of research and other intellectual property for multiple programs. She has worked in consulting and related research for over 20 years. Her previous positions included Director of Research for Kennedy Consulting Research and Advisory, as well as a variety of internal and external consulting positions with international companies. As Director of Business Process

    Improvement at American Greetings, Ms. Schneider managed a portfolio of strategic and operations projects, including both staff and line functions. She was also a senior consultant in Towers Watsons Organization Effectiveness practice and a consultant in the Change Management practice at Accenture.

    The Hackett Group, a global strategic

    business advisory, operations consulting

    and finance strategy firm, is a leader

    in business best practices, business

    benchmarking, and transformation

    consulting services including strategy and

    operations, working capital management,

    and globalization advice. Utilizing best

    practices and implementation insights

    from more than 7,500 benchmarking

    studies, executives use The Hackett

    Groups empirically-based approach to

    quickly define and implement initiatives

    that enable world-class performance.

    Through its REL group, The Hackett

    Group offers working capital solutions

    focused on delivering significant cash flow

    improvements. Through its Archstone

    Consulting group, The Hackett Group

    offers Strategy & Operations consulting

    services in the Consumer and Industrial

    Products, Pharmaceutical, Manufacturing,

    and Financial Services industry sectors.

    Through its Hackett Technology Solutions

    group, The Hackett Group offers business

    application consulting services that help

    maximize returns on IT investments. The

    Hackett Group has completed benchmark

    studies with over 2,800 major corporations

    and government agencies, including 97%

    of the Dow Jones Industrials, 86% of the

    Fortune 100, 90% of the DAX 30 and 48%

    of the FTSE 100.

    Founded in 1991, The Hackett Group was

    acquired by Answerthink, Inc. in 1997.

    Answerthink was renamed The Hackett

    Group, Inc. in 2008. The Hackett Group has

    global offices in the United States, Europe

    and Asia/Pacific and is publicly traded on

    the NASDAQ as HCKT.