Ach ieving Operat ionalExcel lenceMarch, 2006
8/13/2019 Emerson Eng
2/58
Copyright Emerson Process Management March 2006 Slide 2
The World Has Gone DIGITAL !
8/13/2019 Emerson Eng
3/58
Copyright Emerson Process Management March 2006 Slide 3
Law Of Accelerat ing Returns
Analysis shows thatTechnological
change isexponential
8/13/2019 Emerson Eng
4/58
Disposable printers?
Storage is free: $65
My old PC
8/13/2019 Emerson Eng
5/58
Copyright Emerson Process Management March 2006 Slide 5
Greenfield
34%
Expansion/
Modernization
66%
We Have To Serve Both Greenf ield and B row nf ieldCustomers
World Area O & G Refining Pharma Chemical Power W & W
NA
LA
W Europe
E Europe
ME
Africa
AP
8/13/2019 Emerson Eng
6/58
8/13/2019 Emerson Eng
7/58
CopyrightEmerson Process Management, March 2006, Slide 7
The Techno logy Universe
Parallel computing
Moores Law
.NET
ArtificialIntelligence
HART
Process Diagnostics
Predictive Algorithms
Energy Scavenging
DSPs
Enhanced EDDL
Ultrasonic
Fuel Cells
MP3
802.11 (beyond G)
802.15.4
GPSFoundationFieldbus
.NETModel BaseProgramming
MEMS
ScaleableGraphics - Avalon
Motes
FireFox
Advanced Signal Processing
OPC UA
Smart Objects
GPRS
PAT
Security S99
Bit Torrent
AES
RSS
XML
UML
Security
VistaSOA
AVALON
W-bluetooth
SkypeOPML
8/13/2019 Emerson Eng
8/58CopyrightEmerson Process Management, March 2006, Slide 8
Operational Excel lence
P
rofit
Cost
$time
Safer operation
Fewer unscheduled outages
Shorter scheduledoutage
Higher sustained
production withminimize costs
Longer duration toscheduled outage
Faster time-to profit
8/13/2019 Emerson Eng
9/58CopyrightEmerson Process Management, March 2006, Slide 9
Smart cars
monitor tirepressure
Tire icon indicates
low pressure
Car advises driver of abnormal situation madepossible via disruptive technologies
8/13/2019 Emerson Eng
10/58CopyrightEmerson Process Management, March 2006, Slide 10
Smart Car MessagesSeat belt
Cargo door openPassenger door openWiper fluid lowTurn signal onRight rear tire pressure low
Change engine oilFuel low
Messages I do not get Check engineBig red oil light
8/13/2019 Emerson Eng
11/58CopyrightEmerson Process Management, March 2006, Slide 11
Two requirements:- Sensing technology- Presentation to user at the right time
8/13/2019 Emerson Eng
12/58CopyrightEmerson Process Management, March 2006, Slide 12
Early
warn ing
Oil Pressure Alarm
time
CarPerfor
mance
Sequence Of Events
Change Oil Light
Major PerformanceImpact
Safety incident
8/13/2019 Emerson Eng
13/58CopyrightEmerson Process Management, March 2006, Slide 13
We Help Our CustomersDeploy Smart Digital Plants
8/13/2019 Emerson Eng
14/58CopyrightEmerson Process Management, March 2006, Slide 14
SMARTMACHINERY HEALTH
MANAGEMENT
SMARTMEASUREMENT
SMARTMEASUREMENT
SMARTANALYTICAL
SMARTANALYTICAL
SMARTSAFETYSMARTSAFETY
Smart Plant Arch itectu re
SMART
ASSET OPTIMIZATION
SMARTFINAL CONTROL
SMARTFINAL CONTROL
SMART
DIGITAL CONTROL
SAFETY
8/13/2019 Emerson Eng
15/58CopyrightEmerson Process Management, March 2006, Slide 15
Todays Smart Field Devices Predict AbnormalSituat ions
On-board computing power enablesstep changes in functionality
Often have more than one processvariable for a single pipe intrusion
Full with diagnostics
health of deviceis known
health of the applicationis
monitored health of the processis monitored
At 12:45 tomorrow, this valve will fail
8/13/2019 Emerson Eng
16/58CopyrightEmerson Process Management, March 2006, Slide 16
Early warning
Device failure
time
PlantPerf
ormance
In tel l igent Devices Repo rt Health
Device alert
Process Impact
Safety Incident
8/13/2019 Emerson Eng
17/58CopyrightEmerson Process Management, March 2006, Slide 17
SMARTMACHINERY HEALTH
MANAGEMENT
SMARTMEASUREMENT
SMARTMEASUREMENT
SMARTANALYTICAL
SMARTANALYTICAL
SMARTSAFETYSMARTSAFETY
Smart Plant Arch itectu re
SMARTASSET OPTIMIZATION
SMARTFINAL CONTROL
SMARTFINAL CONTROL
SMART
DIGITAL CONTROL
SAFETY
8/13/2019 Emerson Eng
18/58CopyrightEmerson Process Management, March 2006, Slide 18
Smart Predict ive AlertsPressure Transm it ter Examp le
Sensor failure
8/13/2019 Emerson Eng
19/58CopyrightEmerson Process Management, March 2006, Slide 19
Smart Predict ive AlertsPressure Transm it ter Examp le
Process problem
8/13/2019 Emerson Eng
20/58CopyrightEmerson Process Management, March 2006, Slide 20
Smart Predict ive AlertsValve Example
Valve is performing sub-optimally
8/13/2019 Emerson Eng
21/58CopyrightEmerson Process Management, March 2006, Slide 21
Smart Predict ive AlertsValve Example
Valve needs maintenance
8/13/2019 Emerson Eng
22/58CopyrightEmerson Process Management, March 2006, Slide 22
Smart Predict ive AlertsCompresso r Protect ion Example
Compressor needs maintenance
8/13/2019 Emerson Eng
23/58CopyrightEmerson Process Management, March 2006, Slide 23
10 Year Old Plants Do Not Have Predict iv eCapabil i t ies
Process view is fuzzy Process view clear
8/13/2019 Emerson Eng
24/58
8/13/2019 Emerson Eng
25/58
8/13/2019 Emerson Eng
26/58
CopyrightEmerson Process Management, March 2006, Slide 26
Motor Overheating
time
DevicePerformance
Alarms To Operator?Example shown : NO
Impellor Imbalance
Process Impact
Time For Act ion > 6 months
Early alarm to MAINTENANCE only asthere is a long time before process impact.
8/13/2019 Emerson Eng
27/58
CopyrightEmerson Process Management, March 2006, Slide 27
time
DevicePerformance
Alarms To Operator?Examp le shown: NO (long time before failure)
Valve frozen open inutilities plant
Process impact
Time For Act ion > 1 year
Early alarm to MAINTENANCE only as there islong time before process impact
8/13/2019 Emerson Eng
28/58
CopyrightEmerson Process Management, March 2006, Slide 28
time
DevicePerformance
Failure of a Crit icalValve Colum nImpacts The Process Immediately
Valve frozen open indistillation column
Process impact
Time For Act ion < 30 minutes
Early alarm to MAINTENANCE and OPERATORas action is required immediately to prevent
process problems
8/13/2019 Emerson Eng
29/58
CopyrightEmerson Process Management, March 2006, Slide 29
Plants Must Have An A larm Message Map
Cost ofIgnoringAlarm
Time To Avoid Process/Safety Impact
A larm Dest inat ion Map
High Priority Medium Priority
Low PriorityMedium Priority
Operator
Maintenance Optimization Personnel Safety Personnel
Maintenance Optimization Personnel History Collection
Operator Maintenance Safety Personnel
8/13/2019 Emerson Eng
30/58
CopyrightEmerson Process Management, March 2006, Slide 30
The Impo rtance Of A larm Hand l ing
In the last 11 minutes before explosion, the operators had torecognize, acknowledge and act on 276 alarms
Milford Haven was 25x therecommended maximum
8/13/2019 Emerson Eng
31/58
CopyrightEmerson Process Management, March 2006, Slide 31
SMARTMACHINERY HEALTH
MANAGEMENT
SMARTMEASUREMENT
SMARTMEASUREMENT
SMARTANALYTICAL
SMARTANALYTICAL
SMARTSAFETYSMARTSAFETY
A larm Messaging Map
SMARTASSET OPTIMIZATION
SMARTFINAL CONTROL
SMARTFINAL CONTROL
SMART
DIGITAL CONTROL
SAFETY
Predictive AbnormalSituation Alarms
Degraded SafetyAlarms
Asset Health
8/13/2019 Emerson Eng
32/58
8/13/2019 Emerson Eng
33/58
CopyrightEmerson Process Management, March 2006, Slide 33
PT-101
Alert The Operator Before Process Impact
Operator Interface
8/13/2019 Emerson Eng
34/58
CopyrightEmerson Process Management, March 2006, Slide 34
SMARTMACHINERY HEALTH
MANAGEMENT
SMARTMEASUREMENT
SMARTMEASUREMENT
SMARTANALYTICAL
SMARTANALYTICAL
SMARTSAFETYSMARTSAFETY
Al l A sset Alarms To Maintenance
SMARTASSET OPTIMIZATION
SMARTFINAL CONTROL
SMARTFINAL CONTROL
SMARTDIGITAL CONTROL
SAFETY
ASSET INTERFACE
8/13/2019 Emerson Eng
35/58
CopyrightEmerson Process Management, March 2006, Slide 35
Maintenance / ReliabilityDashboard
8/13/2019 Emerson Eng
36/58
CopyrightEmerson Process Management, March 2006, Slide 36
SMARTMACHINERY HEALTH
MANAGEMENT
SMARTMEASUREMENT
SMARTMEASUREMENT
SMARTANALYTICAL
SMARTANALYTICAL
SMARTSAFETYSMARTSAFETY
A ll Safety A larms To Safety Personnel
SMARTASSET OPTIMIZATION
SMARTFINAL CONTROL
SMARTFINAL CONTROL
SMARTDIGITAL CONTROL
SAFETY
Degraded SafetyAlarms
8/13/2019 Emerson Eng
37/58
CopyrightEmerson Process Management, March 2006, Slide 37
Safety Personnel Are Roam ing
Cell phone, pager, email Detailed Summary
8/13/2019 Emerson Eng
38/58
8/13/2019 Emerson Eng
39/58
CopyrightEmerson Process Management, March 2006, Slide 39
Exceed EEMUA guidelines
Alarm AnalysisDashboard
I A S t Pl t D Th N b Of Al T
8/13/2019 Emerson Eng
40/58
CopyrightEmerson Process Management, March 2006, Slide 40
In A Smart Plant, Does The Number Of Alarms Tothe Operator Inc rease?
No
Best practices areestablished in the design ofthe alarm system
EEMUA
Alarm Map
Early warning alarmsproperly acted on mayactually decreasetheincoming alarms asprocess alarms may be
avoided
P H lth D l i U t i f t R l t A t 200
8/13/2019 Emerson Eng
41/58
CopyrightEmerson Process Management, March 2006, Slide 41
Poo r Health Del ivers Unsat isfactory Resu lts A t 200kph !! !
E pect Poor Performance In Plants With Poo r A sset
8/13/2019 Emerson Eng
42/58
CopyrightEmerson Process Management, March 2006, Slide 42
Mercury FilledTransmitters & Switches
DisconnectedDamper Drive
Leaking ValveBody
Expect Poor Performance In Plants With Poo r AssetHealth
Poor Equipment Results in PoorPerformance and Unsafe Plants
Expect Poor Performance In Plants With Poo r A sset
8/13/2019 Emerson Eng
43/58
CopyrightEmerson Process Management, March 2006, Slide 43
Expect Poor Performance In Plants With Poo r AssetHealth
Poorly performing control is identified
Advanced ControlDashboard
8/13/2019 Emerson Eng
44/58
8/13/2019 Emerson Eng
45/58
Some Smart Plant Bui lders
Shell- Deer Park,Tx** $32M*(vs. HW)- FCCU, HydrocrackerPetrobras Brazil(3)** $17M(displaced Bailey)- Coker, Blending, Crude
Pemex- Tula $3M(displaced HW)- Alkylation UnitShell Motiva Norco $17M*(displaced HW)- Reformers(2), DHT, NHT, SMR, HCPdvsa, Curacao** $5M*(displaced Foxboro)- SRU(4), H2 Plant, HydrocrackerMOL PLC, Hungary $10M*(vs. YEW, HW)- Diesel Hydrotreater, Sulfur PlantRompetrol(Romania) $20M(Modernization)- Entire RefineryBP SECCO $30M(vs. YEW)- Ethylene ComplexCenex, Montana $1.5M(vs. Moore)- DesulfurizationScanraff, Lysekil $1M(vs HW)- Merox, Propylene, FCCU***Yukos, Odessa $2M(vs HW, YEW)- Isomerization, Reformer*-MAC Scope of supply **- Facility in operation ***- Portion of FCCU
-64 Refineries with PlantWeb last 30 months, over 500 PlantWeb installations in Refining-Process units: FCCU, Hydrotreaters(Diesel and Naphtha), SRU, H2 Plant, SMR, AlkylationUnits, Crude Unit, Vacuum Unit, Asphalt unit, Delayed Coker, Hydrocracker,
Reformer
8/13/2019 Emerson Eng
46/58
CopyrightEmerson Process Management, March 2006, Slide 46
Shell Deer Park Revamp 2003
8/13/2019 Emerson Eng
47/58
CopyrightEmerson Process Management, March 2006, Slide 47
Shell Deer Park Refining CompanyDeer Park Refining Limited Partnership
Our Vision Shell Deer Park
Use the newest technology to create the Refinery of theFuture
Concentrate on safetyand environmental concernsSystem must be robust
Focus on costLow life cycle cost Manpower trainingMust be easyto operate and
maintain
Obsolesce resistancemust be based on industrystandard software norms
8/13/2019 Emerson Eng
48/58
CopyrightEmerson Process Management, March 2006, Slide 48
Contro l Room
BEFORE AFTER
Shell Deer Park Refining CompanyDeer Park Refining Limited Partnership
8/13/2019 Emerson Eng
49/58
CopyrightEmerson Process Management, March 2006, Slide 49
Cabinet
BEFORE AFTER
Shell Deer Park Refining CompanyDeer Park Refining Limited Partnership
8/13/2019 Emerson Eng
50/58
CopyrightEmerson Process Management, March 2006, Slide 50
Field Junct ion
BEFORE AFTER
Shell Deer Park Refining CompanyDeer Park Refining Limited Partnership
8/13/2019 Emerson Eng
51/58
8/13/2019 Emerson Eng
52/58
CopyrightEmerson Process Management, March 2006, Slide 52
Resu lts Delivered
Operational Excellence
Safety: No OSHAs
Environmental: No Incidents
State of the art operating interfaces
Financial
1% maintenance cost reduction achieved(3%+ is believed possible)
Overall 1-3% utilization improvement
Improved unit reliability
Greatly improved maintenance effectiveness
Huge project savings by reutilizing previous engineering
BARRIERS
8/13/2019 Emerson Eng
53/58
CopyrightEmerson Process Management, March 2006, Slide 53
BARRIERSTo Operat ional Excel lence
Overly aggressive focus onCAPEX
The technology change is theeasiest
In plant visionaries arenecessary and hard to find
Management support is critical
The human resistance tochange is greater than you think
8/13/2019 Emerson Eng
54/58
CopyrightEmerson Process Management, March 2006, Slide 54
Satellite Service Providers Know Tire Pressure
What use is there for the old-fashioned tire gauge?
8/13/2019 Emerson Eng
55/58
CopyrightEmerson Process Management, March 2006, Slide 55
Change Or Be Changed There are two kinds of organizations in today's world:
those that are changing
those that are going out of business
Similarly, there are also two kinds of people
Those who are changing
Those who are setting themselves up to be victims of change
Jim Clemmerhttp://www.clemmer.net
http://www.clemmer.net/http://www.clemmer.net/8/13/2019 Emerson Eng
56/58
CopyrightEmerson Process Management, March 2006, Slide 56
Cannot Be Done Without TechnologyCannot Be Done With Technology Alone
8/13/2019 Emerson Eng
57/58
CopyrightEmerson Process Management, March 2006, Slide 57
Technology And Experience Deliver Performance