  • EPC Master Checklist

    1 4/4/11

    Table of Contents Above Ground Piping

    Architectural

    Architectural - Acoustical Treatment

    Architectural - Cabinets and Fixtures

    Architectural - Doors and Frames

    Architectural - Finish Carpentry

    Architectural - Flooring

    Architectural - Lath and Plaster

    Architectural - Rough Carpentry

    Architectural - Scope of Contract

    Architectural - Window Walls and Curtain Walls

    Architectural Specifications

    Architectural Woodwork

    Asphalt

    Auger Cast Piling

    Back charging

    Bank Accounts

    Batch Plant

    Bituminous Concrete Paving

    Boiler Shop Inspection

    Business Development - Account Management

    Business Development - Proposal

    Business Development - Prospect Questions

    Business Development - Teaming Arrangement

    Change Management

    Civil

    Civil - Caissons

    Civil - Culverts and Road Crossing

    Civil - Drilled Piping

    Civil - Insulation

    Civil - Soil Inspection

    Civil - Subgrades and Bases

    Closeout

    Closeout - Project Critique

    Communications

    Concrete

    Constructability

    Construction

    Construction Equipment

    Construction Equipment - Cranes

    Construction Equipment - Motorized

    Construction Equipment - Overhead Crane

    Construction Equipment - Pre-Lift Rigging - Hand Rigging, Including

    Air Tugger

    Construction Equipment - Pre-Lift Rigging - Mobile Crane

    Construction Equipment - Pre-Lift Rigging - Overhead Crane

    Construction Equipment Safety

    Contract

    Cost Control

    Document Control

    Earthwork

    Electrical

    Electrical - Cable

    Electrical - Cable Tray

    Electrical - Cathodic Protection

    Electrical - Conduit

    Electrical - Heat Tracing

    Electrical - High Voltage Motors and Starters

    Electrical - Lighting

    Electrical - Low, Medium, Hi Cable

    Electrical - Manhole

    Electrical - MCC

    Electrical - Rack Panel

    Electrical - Receptacles

    Electrical - UPS and Battery Systems

    Elevator

    Engineering - CADD Approach

    Engineering - Construction Package Release Gate Review

    Engineering - Design Criteria

    Engineering - Electrical Power

    Engineering - Environmental Protection

    Engineering - Equipment

    Engineering - Equipment - Compressors

    Engineering - Equipment - Furnaces and Boilers

    Engineering - Equipment - Heat Exchangers

    Engineering - Equipment - Pressure and Vacuum Relief

    Engineering - Equipment - Pumps

    Engineering - Equipment - Reactors

    Engineering - Equipment - Vessels

    Engineering - Fire Protection

    Engineering - Instrumentation

    Engineering - Internal Audit

    Engineering - Maintenance

    Engineering - Management and Policy Issues

    Engineering - Operations

    Engineering - Personnel Safety

    Engineering - Piping and Valves

    Engineering - Process - Layout

    Engineering - Process Materials and Flowsheet

    Engineering - Site Analysis

    Equipment

    Equipment - Blower and Fan

    Equipment - Boilers, Columns and Vessels

    Equipment Centrifugal Pump

    Equipment - Compressor

    Equipment - Electronic

    Equipment - Exchanger

    Equipment - Fans

  • EPC Master Checklist

    2 4/4/11

    Equipment - Fired Heaters

    Equipment Furnace and Boilers

    Equipment - Gas Detection

    Equipment - Gear Set

    Equipment - Heat Exchangers

    Equipment - Mixer

    Equipment - Overhead Crane

    Equipment - Power Transformer

    Equipment - Pressure Vessel

    Equipment - Process Analyzer

    Equipment - Reciprocating Compressor

    Equipment - Reciprocating Pump

    Equipment - Rotating Equipment Pre-Start

    Equipment - Skid Mounted Equipment

    Equipment - Stack

    Equipment - Sundyne Pump

    Equipment - Switch Gear (Above 600 volts)

    Equipment - Tanks and Vessels

    Equipment - Towers and Columns

    Equipment - Vertical Can Pump

    Equipment -Turbine

    Estimating

    Finance

    Fire Protection

    Fireproofing

    Grout

    Hot Tap

    HVAC

    Industrial Relations

    Instrumentation

    Insulation

    Insurance

    International

    Kickoff

    Landscaping

    Masonry

    Mechanical Completion

    Miscellaneous Steel

    Modular

    Permits

    Personnel

    Pile Foundations

    Piling

    Piping

    Piping - FRP

    Piping - Hygienic

    Planning / Scheduling

    Plot Plan and Equipment Arrangement

    Plumbing

    Procurement

    Procurement - Pre Construction Agenda

    Procurement - Subcontract

    Procurement - Subcontract Plan

    Project Initiation

    Project Reviews

    Protective Coatings

    Protective Coatings - Water Proofing, Damp Proofing

    Quality

    Refractory

    Risk

    Roofing

    Safety

    Safety Indicators

    Safety Management Systems Audit

    Safety Pre Planning and Mobilization

    Scope Definition Contract / Support Services

    Scope Definition Detail Engineering

    Scope Definition Scoping

    Services

    Siding

    Startup and Commissioning

    Structural - Pre Fabricated Structural Wood

    Structural Steel

    Temporary Facilities

    Underground Utilities

    Validation

    Warehousing

    Welding

    Welding - Post Weld Heat Treatment

  • EPC Master Checklist

    3 4/4/11

    Above Ground Piping (TOC) Issue Responsibility/Comments Date Complete Are anchors installed? Yes No Are branches located correctly? Are branches reinforced? Are drain and flush connections installed? Are field supports installed? Are flange face preparation, condition, and rating correct? Are flange material, type and rating correct? Are gaskets the correct type and thickness? Are guides installed? Are high point vents installed? Are Item code numbers correct? Are line slopes per drawing? Are low point drains installed? Are pressure gauge valves installed? Are pressure gauges properly oriented? Are PSVs tested? Are reducer types correct? Are reducers located correctly? Are sample connections installed? Are shoes properly installed and welded? Are spring hangers properly installed? Are temperature connections properly oriented? Are the bolts/studs the correct type, size and length? Are the correct control valves installed? Are there any gouges, nicks, or surface damage? Are valves at meter runs installed? Are weep holes in reinforcing pad? Do drawings stipulate cold spring or pre-spring? Do meters run properly? Do you have torque sequence and values documented? Does U/G have exposure to contaminants? Is bypass installed? Is chain wheel installed when required? Is extension installed? Is flow direction correct? Is installation straight and plumb? Is installed material correct? Is line size correct? Is stem oriented properly? Is there proper clearance for expansion? Is there sufficient supports?

    Architectural (TOC) Issue Responsibility/Comments Date Complete Are acceptability tolerances established? Are ADA codes verified on drawings and with contractors? Are architectural painting systems standardized? Are block-out requirements completed? Is electrical bus duct locations part of that evaluation?

    Are building bays standardized where possible? Are chemical proof doors/finishes required? Are floor coverings approved prior to concrete slab completion? Are glass and mullion strips specified? Are they scheduled early to support the schedule?

    Are measures in place to protect roofing from damage by subcontractors? Are moisture levels mandatory prior to floor covering placement? If yes, what are they?

    Are recessed areas shown on drawings? Are samples of architectural finishes required prior to approval of subcontracts or purchase orders?

    Are special window requirements needed? Are the recessed mounted toilet accessories sch