EPRTM reactors in the world
Rome, January 19, 2010
Marco Graziano – AREVA Vice President Business Development
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.2
Outline
EPRTM reactors under-construction
Experience feedback from current EPRTM projects
Upcoming EPRTM projects and corresponding opportunities for suppliers
EPRTM reactors under-construction
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.4
4 EPR™ Reactors underconstruction worldwide
Flamanville 3
Taishan 1&2
Olkiluoto 3
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.5
The EPR™ Reactor construction projects
Olkiluoto 3
Flamanville 3
Taishan 1&2
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.6
The OL3 project description
Olkiluoto 3
Where Olkiluoto, Finland
Contract signed Dec 18, 2003
Customer Teollisuuden Voima Oy (TVO) Supplier Consortium formed by AREVA and Siemens AG (73% / 27%)
and led by AREVA
Supply scope 1 EPR™ unit in turnkey construction
First Concrete July 2005
Net electric output 1,600 MWe
Reactor thermal output 4,300 MWth
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.7
Reactor Building & Safeguard buildings view
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.8
Main Control Room lifted & in place
Main Control Room lifting – 20.5.09
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.9
Reactor Pressure Vessel (RPV) and Steam Generators (SG) on site
January 09RPV delivery at OL3
November 09SG delivery at OL3
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.10
The EPR™ Reactor construction projects
Olkiluoto 3
Flamanville 3
Taishan 1&2
Copyright EDF
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.11
The FA3 project descriptionFlamanville 3
Where Flamanville, France
Contract signed Apr 11, 2007
Customer Electricité de France (EDF)
Main Suppliers AREVA & Alstom
AREVA Supply scope 1 EPR™ unit- Nuclear Island – Nuclear Steam Supply System (NSSS)- Nuclear Island Engineering & Procurement (NI EP)
First Concrete Dec 2007
Net electric output 1,630 MWe
Reactor thermal output 4,300 MWth
Copyright EDF Copyright EDF Copyright EDF
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.12
The FA3 Site
On the AREVA perimeter:
70%+ of orders placed
Engineering 65%+ completed
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.13
Steam GeneratorManufacturing ongoing
Machining of the Steam Generators
AREVA Saint-Marcel
Copyright EDF
Copyright EDF
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.14
The EPR™ Reactor construction projects
Olkiluoto 3
Flamanville 3
Taishan 1&2
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.15
Taishan 1&2 Project description
Taishan
Where Taishan, China
Contract signed November 26, 2007
Customer China Guangdong Nuclear Power Holding Corp. Ltd. (CGNPC),
represented by the Taishan Nuclear Power Company (TSNPC)
Main Suppliers AREVA in consortium with two subsidiaries of CGNP, Alstom
AREVA Supply scope NI Design and Procurement for 2 EPR™ units
First Concrete November 2009
Net electric output 1,660 MWe
Reactor thermal output 4,590 MWth
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.16
Main developments
Creation of a New Joint Design Team inShenzhen (October ’09)Creation of “WECAN”, a joint AREVA-CGNPC engineering JVPrimary equipment progress� Forging: launched for heavy components� Manufacturing of the steam generator has started in
AREVA St Marcel for Taishan Unit 1 in November and is ongoing
� Manufacturing of the Reactor Pressure Vessel in MHI has started in November and is in progress
Experience feedback fromcurrent EPRTM projects
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.18
Lessons Learned Process
A well defined and continuous Lessons Learned process: over 500 lessons learned so far (captured, analyzed, distributed)including 300 from OL3 Construction Site
A valuable input toward future projects, Standard EPR, Project Management, Procurement, Construction and Engineering Methods
A common and simple tool accessible to all project teams
AREVA NP
�����������������
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.19
Lessons LearnedExperience Feedback
The AREVA experience from four EPRTM under construction is:� systematically taken into account from the beginning� made available for future EPRTM projects� increasing the performance of the AREVA group
Future EPRTM will benefit from these experiences
OLKILUOTO 3 FLAMANVILLE 3 TAISHAN 1&2 FUTURE EPRTM
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.20
12111009080706050403020100Years
ConstructionAuthorization
OperatingLicense
Decisionin Principle
Construction License OperatingLicense
CombinedLicense
Pre-Design Certification
Nuclear Site Licensing
Generic Design Acceptance
Building licensing certainty:A significant asset for future projects
13
ConstructionAuthorization
OperatingLicense
14
Upcoming EPRTM projects and corresponding opportunities for suppliers
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.22
660373
2008 2030
262 End of theoretical lifetime549
AREVA targets 1/3 of accessible new build market and the leadership in life extension and power uprates (market worth tens of billions of euros)
359
New builds
GWe nets installed
Lifetime extensions
190
824: WEO1- 2008- 450 ppm Policy Scenario
731: WNA2 - 2007- High Estimate
748: IAEA - 2008 – High Estimate
529: WNA - 2007 - Reference
473: IAEA - 2008 – Low Estimate
433: WEO - 2008 – Reference Scenario
498: DOE3 EIA4 - 2008 Reference Case
AREVA target
684: WEO- 2008- 550 ppm Policy Scenario
Forecasts published
by international
organizations
(AREVA target 2007: 636)
1. World Energy Outlook
2. World Nuclear Association
3. US Department of Energy
4. Energy Information Administration
The nuclear revival is here…
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.23
More than 20 EPR™ reactor projects under development worldwide
Under development
Prospects
Under construction
USA
� EPR™ technology selected by six utilities
� Design Certification Application rulemaking planned for 2012
4
PROSPECTSminimum
� The Netherlands, Czech Republic, Switzerland, Poland, Finland, Brazil, Canada and China
10
� Second EPR™ project for EDF, GDF SUEZ, Total in Penly
� Possible 3rd EPRTM
project under discussion
FRANCE1 + 1
� 4 units announced by EDF
� 4 units targeted with EON/RWE
� Further units with GDF-SUEZ, Iberdrola & SSE
� Industrial partnerships with Balfour Beatty-Vinci and Rolls Royce covering engineering, manufacturing and construction
4 + 4
� OLKILUOTO 3 under construction
1
FRANCE
� FLAMANVILLE 3 under construction
1
FINLANDUK
CHINA
� 2 units (TAISHAN 1&2) under construction
2
� Memorandum of Understanding with NPCIL for 2 EPR™reactors at the Jaitapursite, up to 6 units possible
� Strategic alliance withBharat Forge
� Framework agreement with TCE Consulting Engineers (Tata) for engineering services
2 + 4 INDIA
� ENEL and EDF decided to develop a project for the construction of 4 EPR reactors in Italy
ITALY4
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.24
… be part of the AREVA supply chain and potentially participate in ~10 projects before
the first Italy EPR comes online
By 2020, ~10 EPRs are planned to be already online with current opportunities in:� The UK� The US� France� …
A unique business opportunity to ramp up your skills and increase your business before taking part in the Italian EPR construction
Tavolo ENEL-CONFINDUSTRIA per la qualificazione delle imprese – Roma – 19 Gennaio 2010 p.25
Summary
Success is in your hands�Company management commitment
�Disseminate safety and quality cultures
�Relation based on trust and transparency
Become part of the EPR™ supply chain on numerous ongoing projects worldwide and build up your capabilitiesLeverage your capabilities and Certified Supplier status to build the EPR™ Italian fleet