EuroVelo Network and Ukraine Ed Lancaster, [email protected] Velo Forum, Yevpatoria, Friday 12 th October 2012 ECF gratefully acknowledges financial support from the European Commission.

EuroVelo and Ukraine

Embed Size (px)

DESCRIPTION

Ed Lancaster on EuroVelo routes

Citation preview

Page 1: EuroVelo and Ukraine

EuroVelo Network and Ukraine

Ed Lancaster, [email protected] Velo Forum, Yevpatoria, Friday 12th October 2012

ECF gratefully acknowledges financial support from the European Commission.

Page 2: EuroVelo and Ukraine

Content

1. Reintroduce EuroVelo 2. Developing a route3. Minimum requirements4. Next steps

Page 3: EuroVelo and Ukraine

Introduction to EuroVeloThe 14 EuroVelo routes are:

North – South Routes:1 – Atlantic Coast Route3 – Pilgrims Route5 – Via Romea Francigena7 – Sun Route9 – Baltic - Adriatic11 – East Europe Route13 – Iron Curtain Trail15 – Rhine RouteWest – East Routes:2 – Capitals Route4 – Central Europe Route6 - Atlantic – Black Sea8 – Mediterranean RouteCircuits:10 – Baltic Sea Cycle Route12 – North Sea Cycle Route

Total network: Over 70,000 km

Page 4: EuroVelo and Ukraine

4

Definition of a EuroVelo route

New and existing routes should fulfill the following basic criteria:• Are based on existing or

planned national or regional routes;

• Involve at least 2 countries;• Are at least 1,000 km in length;• Are easy to communicate

(marketing potential); and• Have action plans in place.

Page 5: EuroVelo and Ukraine

EuroVelo 4

• Central Europe Route.• Roscoff, France to Kiev,

Ukraine.• Countries involved:

France, Belgium, Netherlands, Germany, Czech Republic, Poland and Ukraine.

• Total length: approximately 4,000 km.

• Signage installed in parts of France in 2012.

Page 6: EuroVelo and Ukraine

Potential impact of EuroVelo

Once the network is completed (estimated to be 2020):• It could account for 60

million cycle tourism trips.

• Generating 7 billion Euro of direct revenue per year.

Page 7: EuroVelo and Ukraine

Guidance on the route development process

• Manual prepared at the end of 2011

• Defines the minimum requirements of EuroVelo routes.

• Explains the actions for route development projects.

Page 8: EuroVelo and Ukraine

The principles for route selection and development

• Safety• Attractiveness• Coherence and

directness• Comfort

Page 9: EuroVelo and Ukraine

Route Development Process

Initial survey to include:• Attractions.• Existing and planned

national/regional routes.

• Existing and planned services.

• Marketing and promotion.

• Organisation, awareness raising and funding opportunities.

Page 10: EuroVelo and Ukraine

Prepare an Action Plan

Once a route has been agreed, then need to prepare an action plan. This should cover:

• Target groups.• Evaluation of the

planned itinerary.

Page 11: EuroVelo and Ukraine

The elements of EuroVelo routes

Page 12: EuroVelo and Ukraine

Route infrastructure

• National standards must be respected.• Public roads: if speed is over 30km/h there

should be maximum 2,000 motor vehicles per day. Exceptionally up to 4,000 vehicle units per day.

• Cycle lanes separated from traffic / asphalted shoulders (less than 10,000 vehicle units per day).

• If cannot meet EuroVelo standards then alternatives should be provided (routes or public transport).

Page 13: EuroVelo and Ukraine

The current status

Page 14: EuroVelo and Ukraine

Route infrastructure

• The surface should be suitable for use by cyclists with any type of trekking or touring bike.

• High gradients (more than 6% on longer sections; more than 10% on shorter sections) should be avoided wherever possible.

• For daily sections that include more than a 1,000m elevation, alternative solutions should be provided.

Page 15: EuroVelo and Ukraine

Signage

• Complete and consistent signing according the national standards.

• Integration of EuroVelo signs.

Page 16: EuroVelo and Ukraine

Public transport connections• Public transport connections at

least at every 150 km and to substitute ‘problematic’ sections.

• Regular bike transportation with adequate capacity, comfort and safety.

• Detailed, regularly updated service information and booking facilities available online

• Safe bike storage and parking capacity at public transport interchanges.

Page 17: EuroVelo and Ukraine

Cycling Friendly Services

• Basic accommodation should be available at the start and end of every daily section (every 30 – 90 km).

• A range of standards available. • Food and drink (at pubs,

restaurants etc.) in the middle of every daily section (every 15 – 45 km).

• Rest areas if food and drink not provided frequently enough.

• Bike repair stations at intervals no greater than 150 km.

Page 18: EuroVelo and Ukraine

• Web communication within EuroVelo.com.

• Detailed information is mandatory in national level websites, or regional as a second priority.

• Smart phone applications, audio guides and social media.

• Printed promotional leaflets, guide books, detailed maps etc.

Information and promotional tools

Page 19: EuroVelo and Ukraine

Prepare an Action Plan

Once a route has been agreed, then need to prepare an action plan. This should cover:

• Target groups.• Evaluation of the planned

itinerary.• Actions (including timings and

priorities).• Estimates of costs and

resources.• Delegation of tasks.

Page 20: EuroVelo and Ukraine

Next steps: realisation of the route

• Lobbying and awareness raising.• Preparation of detailed plans.• Assembly of funding.• Implementation• Maintenance and Operation. • Usage monitoring.

Page 21: EuroVelo and Ukraine

EuroVelo Organisation Overview

EuroVelo Council

ECF Board

EuroVelo Management

Team

NECC/C

Project Partners

Project Partners

NECC/C

Project Partners

Project Partners

NECC/C

Project Partners

Project Partners

Project Partners

Page 22: EuroVelo and Ukraine

National EuroVelo Coordination Centres and Coordinators

Page 23: EuroVelo and Ukraine

Manuals and Guides

www.eurovelo.org

European

certification

Web guidelin

es

Corporate design

Page 24: EuroVelo and Ukraine

Дякую за увагу!

For more information [email protected]