Evaluacion_Economica2.xlsx

Embed Size (px)

Citation preview

Plan de ProduccinperiodArea incorporada (m2)kt RealProduccion (Tpd)Area agotada (m2)Ley CuT %Ley % MoLey CuT insitu %g/t Agg/t AsArea activa (m2)Velocidad de Extraccin t/(m2-day)Recuperacion (% CuR)Wi kwh/tcR.ProbadasR. ProbablesS/N1192001077.4299301.30970.05511.29460.0555466.8192000.155989.211713.29149.650.402192002525.6701601.41120.06241.3710.0629747.93384000.182789.249213.31852.531.416.13168004512.71253501.40050.06471.39430.0651709.72552000.227189.250213.19139.651.88.64128006475.3179878001.36770.06151.51970.0668624.59680000.264589.132113.20548.246.75.15128008292.32303436001.21230.05921.42390.0684507.15800000.287989.073613.13246.549.53.96120009002.425007160001.1060.0691.33070.0791562.15884000.282989.529113.01346.145.97.9792009012.425034160001.08590.06851.26470.078669.65816000.306889.445313.00251.240.58.2884009007.82502256001.01730.06941.27670.0851803.51740000.338189.535913.01146.445.87.8964009011.225031224000.90040.06440.98160.0692724.25748000.334689.397113.0883542.622.41064009008.42502352001.00860.07511.11710.0824863.18588000.425689.236713.1664835.816.21148009006.825019128000.78860.06031.0040.0794630.32584000.428488.777913.00559.916.923.21206633.418426288000.61390.04220.70920.0536441.01456000.404187.906113.1862923.847.21302689746976000.79820.04370.9410.0542608.04168000.444688.690213.44610.848.141.21401675.3465464000.83190.03031.25730.0473542.7992000.505889.610113.28347.43022.6150262.1728.055555555628000.50310.01470.10740.0032365.528000.2689.964313.18700100Total12800088192.11280001.03360.06251.19050.0721654.52514130.335889.158213.11344.739.316

Costo MLCOSTO DESARROLLO MLPrecios Precio Producto (Cobre) (US$/lb)24409.20US$/TonACCESOSmLunareaUS$/mLPrecio Subproducto (Molibdeno) (US$/Kg)1635273.60US$/TonAcceso Principal (Entrada y Salida)3264m6x67200Acceso Nivel Hundimiento200m3.6x3.62880CostosAcceso Nivel Produccin300m4x4,54500Costo mina-concentradora (US$/Ton)15Acceso Nivel de Transporte400m4x44200Costo de inversin (US$/Tonc Conc)2Sub nivel Ventilacin500m4x42160Costo tratamiento concentrado (US$/Ton Conc)50TOTAL4664Costo refinacin (CuS$/Lb Cu)24.5540.127US$/Ton

Ley concentrado (%)30SUBNIVEL DE VENTILACINmLunareaUS$/mLChimenea de extraccin100m6m diam7320Recuperacin procesoChimenea de Inyeccin200m6 m diam.7320Recuperacin Molibdeno (%)60Galera de inyeccin200m4x42160Recuperacin Concentrado (%)85Galera de extraccin200m4x42160Cruzados200m4x42160PenalidadesTOTALValos As (US$/100ppm)0.25Sobre (ppm)2000NIVEL DE HUNDIMIENTOmLunareaUS$/mLRecuperacin As (%)90Cruzados100m3.6 x 3.61920Galeras de Hundimiento100m3.6 x 3.61720Caractersticas BlqoueChimenea de Ventilacin100m1.8 m diam2000NO SE SI ES NECESARIO OTRA CENTILACION APARTE DE LA QUE VIENE DEL NV.Volumen (M3)7200Perforacin de Hundimiento100mb21SI NO LO ENCONTRAMOS, NO LO PONEMOSTOTAL4447

Desarrollo HorizontalDesarrollo VerticalFortificacinTipoDimensiones mTipo FortificacionCosto US$/metro linealTipoDimensionesCosto US$/metro linealTipoCosto US$/metro linealNIVEL DE PRODUCCINmLunareaUS$/mLValorUnidadValorUnidadPernoMallaShotcreteTotal (2007-2008)Proyeccin Largo PlazoGalera Produccin5368m4.5 x 43500Tnel Acceso 7,0 x 7,0 m Completa 10848US$/m Chimenea Ventilacin = 6,0 m 7320US$/m 5.7 x 5.1464.58277.31595.21337.091470.799Calles (Cruzados)1733m4.5 x 42520Tnel Acceso 6,0 x 6,0 m Completa 7200US$/m Chimenea Ventilacin = 5,0 m 6120US$/m 2.9 m10006Galeras de Zanja6552m4.5 x 42520Tnel Acceso 5,0 x 5,0 m Completa 5400US$/m Chimenea Ventilacin = 3,0 m 2640US$/m 5.2 x 4.6386.14227.91513.441127.491240.239Chimenea Piloto (Bateas)100m1.5 m diam3200300Galera Ventilacin 7,0 x 7,0 m Simple 4920US$/m Piques de Traspaso = 3,6 m 4080US$/m 2.5 m10006Desquinche Cruce Calle/Zanja Fortificado100m25000NO SE SI ESTO ES NECESARIOGalera Ventilacin 5,0 x 5,0 m Simple 3240US$/m Chimenea Traspaso = 1,8 m 1920US$/m 4.2 x 4.1278.57182.12424.86885.55974.105Zanjas (Bateas)30m86Galera Ventilacin 4,0 x 4,0 m Simple 2160US$/m Piques de Marinas = 2,0 m 3600US$/m 2.3 m 10006Desquinche Area Martillos100mCabeceras de hundimiento 3,6 x 3,6 m Simple 1920US$/m 5.2 x5.1299.5226.28529.071054.851160.335Parrillas100un8x24 pulg.3250Cabeceras de hundimiento 3,6 x 3,6 m Completa 3000US$/m 2.5 m10006TOTAL14083Galera Comunicacin 3,6 x 3,6 m Completa 2880US$/m 6.2 x 6.1680.85324.52692.21697.571867.327Cruzados y Galera Zanja 4,3 x 3,8 m Simple 2520US$/m 3.5 m10006Galera de Produccin 4 x 3.6 m completa 3500US$/m2.7 x 2.6138.15115.8268.54522.49574.739Puntos de Extraccin821un20000Galera de Hundimiento 4 x 3.6 m Solo malla 2300US$/m2.3 m 10006Galera de Hundimiento 3.6 x 3.6 mSolo malla 1720US$/m5 x 4.9332.89245.75541.11119.741231.714NIVEL DE TRANSPORTEmLunareaUS$/mL2.9 m10006Galerias con Correas100m5x532403.7 x 3.6186.06166.53384.78737.37811.107Piques de Traspaso100m3.6 m diam.4080TOTAL200RESUMENFootsprint m2TIPOMETROSm/m2128000Produccin (4x4.5)53150.0415257812Zanja (4x4.5)65520.0511875Cruzado (4x4.5)20920.0163472656FORTIFICACIONESmLunareaUS$/mLHundimiento44470.0347392188Nivel de Produccin100m4x4.5974Acceso3264Nivel de Transporte100m5x5123222kmTOTAL200TIPOUnidadesu/m2Ch. Inyeccion120.000094Ch. Extraccion100.000078OP160.000125

TIPOMETROSm/m2Nivel de transporte (5x5)Galeria correa34430.026898TIPOUnidadesu/m2Piques de traspaso4080.003188Nivel de transportePiques de traspaso (D=4.5)110.000086Reduccion secundaria (3.6x3.6)Galeria8250.0064453125martillos picadoresPiques de traspaso7140.005578125Reduccion secundaria (3.6x3.6)Piques de traspaso (D=4.5))160.000125Piques de traspaso (D=4.5))

TiemposTiempos de Desarrollos

ACCESOSmLUS$/mLDasAosRENDIMIENTO HOR. DEV150m/mesAcceso Principal (Entrada y Salida)32647200h6531.81RENDIMIENTO VER.DEV2.5m/daAcceso Nivel Hundimiento2002880h400.11das por ao360Acceso Nivel Produccin3004500h600.17das por mes30Acceso Nivel de Transporte4004200h800.22mes por ao12Sub nivel Ventilacin5002160h1000.28TOTAL4664ExcHabSUBNIVEL DE VENTILACINmLUS$/mLProduction Shaft3.81.9Chimenea de extraccin1007320v400.11Exhaust Shaft4.22.94Chimenea de Inyeccin2007320v800.22Galera de inyeccin2002160h400.11Galera de extraccin2002160h400.11Cruzados2002160h400.11TOTAL0NIVEL DE HUNDIMIENTOmLUS$/mLCruzados1001920h200.06Galeras de Hundimiento1001720h200.06Chimenea de Ventilacin1002000v400.11Perforacin de Hundimiento10021TOTAL4447NIVEL DE PRODUCCINmLUS$/mLGalera Produccin53683500h10742.98Calles (Cruzados)17332520h3470.96Galeras de Zanja65522520h13103.64Chimenea Piloto (Bateas)1003200v400.11Desquinche Cruce Calle/Zanja Fortificado10025000h200.06Zanjas (Bateas)3086v120.03Desquinche Area Martillos1000h200.06Parrillas1003250h200.06TOTAL14083

Puntos de Extraccin82120000NIVEL DE TRANSPORTEmLUS$/mLGalerias con Correas1003240h200.06Piques de Traspaso1004080v400.11TOTALFORTIFICACIONESmLUS$/mLNivel de Produccin100974Nivel de Transporte1001232TOTAL

Ingresos

Periodo-5-4-3-2-10123456789101112131415Ao201120122013201420152016201720182019202020212022202320242025202620272028202920302031

ProduccinProduccin (kton/ao)00000010772526451364758292900290129008901190089007663326891675262Produccin (ton/da)000000299370161253517987230342500725034250222503125023250191842674694654728

Leyes Ley Cobre (%)0000001.30971.41121.40051.36771.21231.1061.08591.01730.90041.00860.78860.61390.79820.83190.5031Ley Molibdeno (%)0000000.05510.06240.06470.06150.05920.0690.06850.06940.06440.07510.06030.04220.04370.03030.0147Ley Arsnico (g/t)000000466.8747.93709.72624.59507.15562.15669.65803.51724.25863.18630.32441.01608.04542.79365.5Ley concentrado Cobre 00000033%33%33%33%33%33%33%33%33%33%33%33%33%33%33%Ley concentrado Molibdeno 00000054%54%54%54%54%54%54%54%54%54%54%54%54%54%54%

RecuperacinRecuperacin Cobre000000898989898990899089898988899090Recuperacin Molibdeno000000606060606060606060606060606060

ConcentradoProduccin Concentrado Cobre (Kton/ao)000000389617123927127026524922024619110858384Produccin Concentrado Molibdeno (Kton/ao)00000066175324442545690686695645752603311131564

IngresosIngresos por Concentrado Cobre (KUS$)00000033,06383,547148,150207,328235,184234,127229,912215,496190,509212,953165,61794,02149,99832,8023,116Ingresos por Concentrado Molibdeno (KUS$)000000776,1562,060,4863,817,3445,206,6166,418,2608,121,3458,071,4518,173,3257,587,3328,845,2107,100,8183,659,9001,536,359663,67650,374

Desarrollo

Periodo-5-4-3-2-10123456789101112131415Area incorporada o Hundir(m2)192001920016800128001280012000920084006400640048000000Nivel de produccinCruzados2092Calle produccion (ml)797.295797.30697.6531.5531.5498.3382.0348.8265.8265.8199.30000Bateas (unidad)32312721212015141010800000Calle zanja(ml)982.8982.8860.0655.2655.2614.3470.9430.0327.6327.6245.70000

Nivel de hundimientoCruzados1831Galeras667.0667.0583.6444.7444.7416.9319.6291.8222.3222.3166.70.00.00.00.00.0

Nivel de reduccion (martillos)piques traspaso714Galeras825

Nivel de transportepiques traspaso408Galeras3443

Nivel de VentilacinGaleras Inyeccin 242Galeras Extraccin 220Piques Inyeccin580Piques Extraccin1215

AccesosAcceso Principal (Entrada y Salida)3264Acceso Nivel Hundimiento200Acceso Nivel Produccin300Acceso Nivel de Transporte400Sub nivel Ventilacin500

NivelDesarrollo Pre-ProduccinDesarrollo ProduccinNivel de produccinml CPml CZPiques de traspaso

Nivel de hundimientoZanjas (m2)Galeras

Nivel de VentilacinGaleras Inyeccin Galeras Extraccin Piques InyeccinPiques Extraccin

RESUMENTIPOMETROSm/m2Produccin (4x4.5)53150.0415257812Zanja (4x4.5)65520.0511875Cruzado (4x4.5)20920.0163472656Bateas (un)2090.0016328125Hundimiento44470.0347392188Acceso326422km

TIPOUnidadesu/m2Ch. Inyeccion120.000094Ch. Extraccion100.000078OP160.000125

TIPOMETROSm/m2Nivel de transporte (5x5)Galeria correa34430.026898Piques de traspaso4080.003188Reduccion secundaria (3.6x3.6)Galeria19250.0064453125martillos picadoresPiques de traspaso7140.005578125

TIPOUnidadesu/m2Nivel de transportePiques de traspaso (D=4.5)110.000086

Reduccion secundaria (3.6x3.6)Piques de traspaso (D=4.5))160.000125

ACCESOSmLunareaUS$/mLAcceso Principal (Entrada y Salida)3264m6x67200Acceso Nivel Hundimiento200m3.6x3.62880Acceso Nivel Produccin300m4x4,54500Acceso Nivel de Transporte400m4x44200Sub nivel Ventilacin500m4x42160TOTAL4664

SUBNIVEL DE VENTILACINmLunareaUS$/mLChimenea de extraccin242m3m diam7320Chimenea de Inyeccin220m3 m diam.7320Galera de inyeccin580m4x42160Galera de extraccin1215m4x42160TOTAL

NIVEL DE HUNDIMIENTOmLunareaUS$/mLCruzados1831m3.6 x 3.61920Galeras de Hundimiento4447m3.6 x 3.61720Chimenea de Ventilacin323.0m1.8 m diam2000TOTAL4447

NIVEL DE PRODUCCINmLunareaUS$/mLGalera Produccin5368m4.5 x 43500Calles (Cruzados)2092m4.5 x 42520Galeras de Zanja6552m4.5 x 42520Chimenea Piloto (Bateas)100m1.5 m diam3200Zanjas (Bateas)209un15000Desquinche Area Martillos60mParrillas100un8x24 pulg.3250TOTAL14041

NIVEL DE TRANSPORTEmLunareaUS$/mLGalerias con Correas3443m5x53240Piques de Traspaso408m3.6 m diam.4080TOTAL3851

NIVEL DE TRASPASOmLunareaUS$/mLGalerias825m3.6x3.62880Piques de traspaso714m4.5m diam.5100TOTAL

FORTIFICACIONESmLunareaUS$/mLNivel de Produccin100m4x4.5974Nivel de Transporte100m5x51232TOTAL200

Inversion DesarrolloPeriodoSeccion-4-3-2-10123456789101112131415ACCESOSmLunareaUS$/mLArea incorporada o Hundir(m2)192001920016800128001280012000920084006400640048000000Acceso Principal (Entrada y Salida)3264m6x67200Nivel de produccinCruzados4.5 x 4652.51440Acceso Nivel Hundimiento200m3.6x3.62880Acceso4.5 x 3300.0Acceso Nivel Produccin300m4x4,54500Calle produccion (ml)4.5 x 4797.3797.3697.6531.5531.5498.3382.0348.8265.8265.8199.30.0000Acceso Nivel de Transporte400m4x44200Bateas (unidad)32312721212015141010800000Sub nivel Ventilacin500m4x42800Calle zanja(ml)4.5 x 4982.8982.8860.0655.2655.2614.3470.9430.0327.6327.6245.70000TOTAL4664

Nivel de hundimientoCruzados3.6 x 3.6331.01500.0SUBNIVEL DE VENTILACINmLunareaUS$/mLAcceso3.6 x 3.6200.0Chimenea de extraccin242m3m diam7320Galeras3.6 x 3.6667.0667.0583.6444.7444.7416.9319.6291.8222.3222.3166.70.00.00.00.00.0Chimenea de Inyeccin220m3 m diam.7320Chimenez ventilacion1.8 m diam80.880.880.880.8Galera de inyeccin580m4x47000Galera de extraccin1215m4x47000Nivel de reduccion (martillos)piques traspasoD=4.5 m285.6214.2214.2TOTALAccesoGaleras3.6x3.61322603NIVEL DE HUNDIMIENTOmLunareaUS$/mLCruzados1831m3.6 x 3.61920Nivel de transportepiques traspaso3.6 m diam.81.6163.281.681.6Galeras de Hundimiento4447m3.6 x 3.61720Accesos400Chimenea de Ventilacin323.0m1.8 m diam2000Galeras5x51100150067811151050TOTAL4447

Nivel de VentilacinChimenea de extraccinD=4 m121121NIVEL DE PRODUCCINmLunareaUS$/mLChimenea de InyeccinD=4 m110110Galera Produccin5368m4.5 x 43500Accesos500Calles (Cruzados)2092m4.5 x 42520Galera de inyeccin 6x61225Galeras de Zanja6552m4.5 x 42520Galera de extraccin6x61215Chimenea Piloto (Bateas)209un1.5 m diam3200Zanjas (Bateas)209un20000AcesosAcceso Principal (Entrada y Salida)6x616321632Desquinche Area Martillos60mParrillas11un8x24 pulg.3250TOTAL14041COSTOS DESARROLLOPeriodoSeccion-4-3-2-10123456789101112131415NIVEL DE TRANSPORTEmLunareaUS$/mLNivel de produccinCruzados4.5 x 401.63.600000000000Galerias con Correas3443m5x54600Acceso4.5 x 31.35Piques de Traspaso408m3.6 m diam.4080Calle produccion (ml)4.5 x 40002.82.82.41.91.91.71.31.20.90.90.7TOTAL3851Bateas (unidad)0000.70.70.60.50.50.50.30.30.20.20.2Calle zanja(ml)4.5 x 40002.52.52.21.71.71.51.21.10.80.80.6NIVEL DE TRASPASOmLunareaUS$/mLGalerias825m3.6x3.62880Nivel de hundimientoCruzados3.6 x 3.600.62.8800000000000Piques de traspaso714m4.5m diam.5100Acceso3.6 x 3.600.576000000000000TOTALGaleras3.6 x 3.60001.11.11.00.80.80.70.50.50.40.40.3Chimenea ventilacion1.8 m diam0000.20.00.20.00.20.00.20000FORTIFICACIONESmLunareaUS$/mLNivel de Produccin14259.8m4x4.5974Nivel de reduccion (martillos)piques traspasoD=4.5 m0001.460.001.090.001.09Nivel de Transporte3843.0m5x51232Acceso0001.200.000.900.000.90Accesos3264Galeras3.6x3.603.8001.7000TOTAL200Nivel de transportepiques traspaso3.6 m diam.000.30.70.00.30.30Accesos1.680000000Galeras5x55.066.93.1188005.1294.830

Nivel de VentilacinChimenea de extraccinD=4 m0000.890.89Chimenea de InyeccinD=4 m000.810.810Accesos4x401.4000Galera de inyeccin 6x608.8000Galera de extraccin6x6008.700

AcesosAcceso Principal (Entrada y Salida)6x611.750411.7504TOTAL018.490436.8819.512.339.7613.859.936.924.473.583.132.372.371.79145.4

COSTOS DESARROLLO VERTICALPeriodoSeccion-4-3-2-10123456789101112131415Nivel de hundimientoChimenea ventilacion1.8 m diam0000.20.00.20.00.20.00.2

Nivel de reduccion (martillos)piques traspasoD=4.5 m0001.460.001.090.001.090.000.00

Nivel de transportepiques traspaso3.6 m diam.000.3329280.66585600.3329280.332928000Nivel de VentilacinChimenea de extraccinD=4 m0000.890.8900000Chimenea de InyeccinD=4 m000.810.81000000TOTAL000.001.13.970.891.590.331.2539200.16159.33

COSTOS DESARROLLO HORIZONTALPeriodoSeccion-4-3-2-10123456789101112131415Nivel de produccinCruzados4.5 x 401.63.600000000000Acceso4.5 x 41.35Calle produccion (ml)4.5 x 40002.82.82.41.91.91.71.31.20.90.90.7Bateas (unidad)0000.70.70.60.50.50.50.30.30.20.20.2Calle zanja(ml)4.5 x 40002.52.52.21.71.71.51.21.10.80.80.6Nivel de hundimientoCruzados3.6 x 3.600.62.8800000000000Acceso3.6 x 3.600.576000000000000Galeras3.6 x 3.60001.11.11.00.80.80.70.50.50.40.40.3Nivel de reduccion (martillos)Acceso3.6 x 3.60001.200.000.900.000.90000000Galeras3.6x3.603.8001.7000000000Nivel de transporteAccesos5x51.680000000000000Galeras5x55.066.93.1188005.1294.830000000Nivel de VentilacinAccesos4x401.4000000000000Galera de inyeccin 6x608.8000000000000Galera de extraccin6x6008.700000000000AccesoAcceso Principal (Entrada y Salida)6x611.750411.75TOTAL018.490436.88345418.37568.356336468.8702564612.26765440259.593477645.663117644.47301028753.42157455383.13110720122.370138822.370138821.78920411500000136.06145.39

Requerimiento de equiposPeriodoSeccion-4-3-2-10123456789101112131415TotalEquipo Valor (US$)JumbosRendArea incorporada o Hundir(m2)192001920016800128001280012000920084006400640048000000128000Jumbo de Avance450000Jumbo de Avance3,500m/ao x jumboNivel de produccinCruzados + acceso4.5 x 4952.514402392.45Jumbos radiales500000Calle produccion (ml)4.5 x 4797.3797.3697.6531.5531.5498.3382.0348.8265.8265.8199.30.00005315.3Raise Borer 850000Rendimiento Jumbo radial16000m2/aoBateas (unidad)32312721212015141010800000209Ambulancia45000Factor de Preparacin5mb/m2Calle zanja(ml)4.5 x 4982.8982.8860.0655.2655.2614.3470.9430.0327.6327.6245.700006552Ventilador Inyeccin600000Jumbo Radial80000mb/aoVentilador Eyeccin600000PrecioNivel de hundimientoCruzados + Acceso3.6 x 3.6531.01500.02031Costo adquisicionGaleras3.6 x 3.6667.0667.0583.6444.7444.7416.9319.6291.8222.3222.3166.70.00.00.00.00.04446.62Correa Transportadora Principal (US$/m)4200Jumbo de Avance15001,200,000Chimenea ventilacion1.8 m diam80.880.880.880.8323Jumbo Empernador0.6un/jumbo av.650,000Correas Secundarias (US$/m)3200Jumbo Radial1,500,000Nivel de reduccion (martillos)piques traspasoD=4.5 m285.6214.2214.2714Jumbo Apernador 650000Martillo Picador300,000Galeras + accesos3.6x3.613226031925Martillos Picador movil 78000Raise Borer 720ml/ao1000000Equipos de PreparacinPrecioNivel de transportepiques traspaso3.6 m diam.81.6163.281.681.6408Rendimiento LHD5000ml/ao1,400,00013 yds3Galeras + acceso5x515001500678111510505843Accesos InicialesSeccin (m2)Costo Unitario US$/mRendimiento LHD5000ml/ao8000006-7yds3Acceso a Nivel de Produccin 6x64500Equipos de ProduccinNivel de VentilacinChimenea de extraccinD=4 m121121242Tunel para correa Transportadora (Acceso a N. Transporte)6x64200Rendimiento LHD4514t/da1,400,00013 yds3Chimenea de InyeccinD=4 m110110220Rampa Nivel Produccin a Nivel Hundimiento 4X42200Cinta Transportadora6000US$/mlGalera de inyeccin + acceso6x617251725Rampa NP-Subnivel Ventilacion4X42200Galera de extraccin6x612151215Rampa Nivel Produccin a Nivel de Transporte4x42200LHD 13yd3Piques de Marina3.6 m diam.106.2338.32135.9624.259.1616.3242.8400000000000Nivel de HundimientoCosto Unitario US$/mCAPACIDAD BALDE9.88m3Cabecera Norte (m)3x31800ESPONJAMIENTO60%%AcesosAcceso Principal (Entrada y Salida)6x6163216323264Cabecera N-S (m)3x31800FACTOR DE LLENADO90%%34709.37Cruzados E-O(m)3x31800DENSIDAD2.6t/m3Calles del Nvel de Hundimiento (m)3x31800CAPACIDAD BALDE13.9tLABORES HORIZONTALES _ JUMBO DE AVANCENivel de ProduccinCosto Unitario US$/mVELOCIDAD PROMEDIO8km/hrPeriodo-4-3-2-10123456789101112131415Cabecera Norte 3x31900TIEMPO CARGA0.5minJumbos de Avance - Nivel HundimientoCabecera N-S3x31900TIEMPO DESCARGA0.2minMetros a desarrollar (m)531.01500.0667.0667.0583.6444.7444.7416.9319.6291.8222.3222.3166.70.00.00.00.00.06477.6Calles de produccin3x31900DISTANCIA DE ACARREO150mRendimiento Equipo (m/ao)150015001500150015001500150015001500150015001500150015001500150015001500Cruzados E-O (m)3x31900Dotacin Equipos1111111111111100000Programa Adquisicin Equipos (vida util 7aos)1000000010000000000Costo Unitario US$/UnidadTIEMPO DE VIAJE2.25minValor Adquisicin (MUS$)0.4500000000.450000000000Embudos10m de diametro.12450CICLO2.95minParrllas8"x24"3250PRDIDAS0.6minJumbos de Avance - Nivel de ProduccinNivel de VentilacinCosto Unitario US$/mCICLO TOTAL3.5minMetros a desarrollar (m)952.514401780.11780.11557.61186.71186.71112.6853.0778.8593.4593.4445.00.00.00.00.00.014259.8Pique de ExtraccinD=63500RENDIMIENTO HOR.235.1t/hrRendimiento Equipo (m/ao)150015001500150015001500150015001500150015001500150015001500150015001500Pique de InyeccinD=63500Dotacin Equipos112221111111100000Galeras de Inyeccin3x32000UTILIZACIN80%Programa de adquisicin Equipos (Vida Util 7 aos)10010000001000Galeras de Extraccin3x32000RENDIMIENTO (ton/da)4514Valor Adquisicin (MUS$)0.45000.450000000.45000Costo Unitario US$/UnidadChimenea de Inyeccin (cantidad)D=1,51550Jumbos de Avance- Tunel de AccesoChimenea de Extraccin (cantidad)D=1,51550Metros a perforar (m)163216323264.0Nivel de TransporteCosto Unitario US$/mRendimiento Equipo (m/ao)1500150015001500150015001500150015001500150015001500Galeras de N. Transporte3.5x3.51680Dotacin Equipos2200000000000TOTALPrograma de Adquisicin Equipo (VU=7aos)20000000000000Requerimiento de Fortificaciones de NivelesCosto Unitario US$/mValor Adquicicin (MUS$)0.90000000000000Nivel Produccin1200Nivel Transporte850Jumbo de Avance - Correa CintaMetros a perforar (m)15001500678111510505843.0ACCESOSmLunareaUS$/mLAccesosunareaUS$/mLRendimiento Equipos (m/ao)1500150015001500150015001500Acceso Principal (Entrada y Salida)3264m6x67200Portal Acceso Principal100000Dotacion Equipos 1110011Acceso Nivel Hundimiento200m3.6x3.62880 Correa Principal de Transportem6 x 64800Programa de Adquisicion Eq (VU=7)10100000Acceso Nivel Produccin300m4x4,54500Acceso Principalm7 x 65000Valor de Adquisicion (MUS$)0.4500.4500000Acceso Nivel de Transporte400m4x44200Acceso Nivel Inyeccin Cota Nivel m5 x 54200Sub nivel Ventilacin500m4x42160Accesos Nivel Extraccin Cota Nivel m5 x 54200Jumbos de Avance -VentilacinTOTAL4664Conexin rea de Servicio Nivel m5.5 x 5.54500Metros a perforar (m)222512153440.0Rampa Conexin NH y NP Nivel m4 x 43900Rendimiento Equipo (m/ao)15001500SUBNIVEL DE VENTILACINmLunareaUS$/mLConexiones Galerias Acceso con Galeras Corream5 x 54200Dotacin Equipos21Chimenea de extraccin242m3m diam7320Acceso Nivel de Chancado Nivel m5.5 x 5.54500Programa de Adquis Equpo (VU:7aos)100Chimenea de Inyeccin220m3 m diam.7320Acceso Ventilacin (Extraccin)m5.5 x 5.54500Valor Adqu (MUS$)0.4500Galera de inyeccin580m4x42160Acceso Ventilacin (Inyeccin)m5.5 x 5.54500Galera de extraccin1215m4x42160Jumbos de Avance -ReduccionTOTALNivel de Inyeccin Metros a perforar (m)13226031925.0Collar10000Rendimiento Equipo (m/ao)1500150015001500NIVEL DE HUNDIMIENTOmLunareaUS$/mLChimenea de Inyeccinm6 m diam.6000Dotacin Equipos1001Cruzados1831m3.6 x 3.61920Adit de Inyeccinm6 x 64800Programa de Adquis Equpo (VU:7aos)00010Galeras de Hundimiento4447m3.6 x 3.61720Cruzados Inyeccinm5 x 54200Valor Adqu (MUS$)0000.450Chimenea de Ventilacin323.0m1.8 m diam200035209.4TOTAL4447Nivel de Extraccin LABORES HORIZONTALES DE PREPARACION _ LHDCollar10000Periodo-4-3-2-10123456789101112131415NIVEL DE PRODUCCINmLunareaUS$/mLChimenea de extraccinm6 m diam.6000Metros lineas 6-7yds30.01853.01500.0667.01270.0583.6444.7444.7416.9319.6291.8222.3222.3166.7Galera Produccin5368m4.5 x 43500Adit de extraccinm6 x 64800Metros lineas 13 yds33132.06309.53333.01780.11780.12672.62236.71186.71112.6853.0778.8593.4593.4445.0Calles (Cruzados)2092m4.5 x 42520Cruzados de extraccinm5 x 54200Dotacin Equipos 6-7yds301111111111111Galeras de Zanja6552m4.5 x 42520Programa de Adquis Equpo (VU:6aos) 6-7yds310000001000000Chimenea Piloto (Bateas)209un1.5 m diam3200Nivel de Correa de Transporte Valor Adqu (MUS$)0.80000000.8000000Zanjas (Bateas)209un20000Galerias con Correasm6 x 65000Dotacin Equipos 13 yds3012111111111111Desquinche Area Martillos60mCmaras de Chancado4160000Programa de Adquis Equpo (VU:6aos) 13 yds3100000010000001Parrillas11un8x24 pulg.3250Transferencias2080000Valor Adqu (MUS$)1.40000001.40000001.4TOTAL14041Piques de Traspasom2.4 m diam.12000Nivel de Chancadom5.5 x 5.54500PRODUCCION _ LHD 13 yds3NIVEL DE TRANSPORTEmLunareaUS$/mLPeriodo-4-3-2-10123456789101112131415Galerias con Correas3443m5x53240Produccion (TPD)299370161253517987230342500725034250222503125023250191842674694654728Piques de Traspaso408m3.6 m diam.4080rea de Serviciom5.5 x 5.55000Dotacin Equipos 13 yds30123466666665221TOTAL3851Programa de Adquis Equpo (VU:6aos) 13 yds31111200111110000NIVEL DE HUNDIMIENTOValor Adqu (MUS$)1.41.41.41.42.8001.41.41.41.41.40000NIVEL DE TRASPASOmLunareaUS$/mLGaleras Cabecerasm4.0 x 3.62500Galerias825m3.6x3.62880Galeras de Comunicacinm4 x 3.63000Dotacin Equipos 6-7yds30000111111111111100000Piques de traspaso714m4.5m diam.5100Galeras de Hundimientom3.6 x 3.62200Dotacin Equipos 13 yds30001211234577777765221TOTALRampas de Accesom4.0 x 3.62200Chimenea de Ventilacinm1.8 m diam2000LABORES HORIZONTALES _ JUMBO RADIALFORTIFICACIONESmLunareaUS$/mLPiques de Marinam2.4 m diam13000Periodo-4-3-2-10123456789101112131415Nivel de Produccin14259.8m4x4.5974Perforacin de Hundimientomb21Jumbos de Radiales - Nivel HundimientoNivel de Transporte3843.0m5x51232Tronadura de Hundimientom246Metros a hundir(m2)192001920016800128001280012000920084006400640048000000Accesos3264Rendimiento Equipo (m/ao)160001600016000160001600016000160001600016000160001600016000160001600016000NIVEL DE PRODUCCINDotacin Equipos222111111110000TOTAL200Cabecerasm4.5 x 43500Programa Adquisicin Equipos (vida util 7aos)2000000010000000Calles (Cruzados)m4.5 x 43500Valor Adquisicin (MUS$)300000001.50000000Galeras de Zanjam4.5 x 42800Chimenea Piloto (Bateas)un1.5 m diam3200REDUCCION_MARTILLOS PICADORESZanjas (Bateas)unPeriodo-4-3-2-10123456789101112131415Puntos de Extraccinun25000Jumbos de Radiales - Nivel HundimientoChimeneas Inyeccin de Ventilacinm1.8 m diam2000Puntos de reduccion56111111111111111111Chimeneas extraccin de Ventilacinm1.8 m diam2000Programa Adquisicin Equipos (vida util 5 aos)1.51.800001.51.800000Perforacin de Zanjasmb21Valor Adquisicin (MUS$)1.51.800001.51.800000Tronadura de Zanjasun13Desquinche Cruce Calle/Zanja Fortificadoun25000JUMBO APERNADORPuntos de Extraccinun20000Periodo-4-3-2-10123456789101112131415Jumbos de Radiales - Nivel HundimientoDotacion Equipos0.03.03.02.02.03.03.02.02.02.02.02.02.02.02.00.00.00.00.00.0Programa Adquisicin Equipos (vida util 7 aos)30000000200000000Valor Adquisicin (MUS$)1.9500000001.300000000000

RAISEBORERPeriodo-4-3-2-10123456789101112131415Metros verticales0.00.00.0106.2529.91536.5741.0916.6501.6715.0400.0380.8280.0200.0200.0160.0Dotacion Equipos0.00.01.01.03.02.02.01.01.01.01.01.01.01.01.0Programa Adquisicin Equipos (vida util 8 aos)001100000001000Valor Adquisicin (MUS$)001100000001000

CINTA TRANSPORTADORAPeriodo-4-3-2-10123456789101112131415CINTA TRANSP _ mlMetros lineales transporte1092.71092.71092.711151050

Programa Adquisicin Equipos (vida util 8 aos)Valor Adquisicin (MUS$)006.5566.5566.55606.696.30000000

INVERSION EN EQUIPOSEQUIPOS-4-3-2-10123456789101112131415Jumbo de Avance1.351.350.4500.900000.4500.4500000000Jumbos radiales0000300000001.50000000Raise Borer 00110000000100000000Ventilador Inyeccin1.2Ventilador Eyeccin1.2Correa Transportadora (US$/m)6.66.66.60.06.76.3Jumbo Apernador 1.9500000001.300000000000Martillos Picador 00001.51.800001.51.800000000LHD 6yds30.80000000.8000000000000LHD 13yds31.40001.41.41.42.82.8001.41.41.42.81.40000TOTAL005.51.358.0067.5614.5564.48.099.94.10.451.54.652.91.42.81.4000078.558

VentilacinProduccin (tpd)25,000Flujo de Aire Requerido (cfm)927,423

MinaTpdcfmTeniente126,0004,800,000DOZ43,0001,300,000Salvador25,000850,000Bingham 72,0001,500,000

Rend

JUMBO AVANCEIndices de eficienciaLargo perforacion3DF75%Factor eficiencia de avance0.7UE75%Disparos por da2EO85%Avance (m/min)2.6Indices de eficiencia48%Avance (m/ao)1512Avance (m/mes)126

LHDVelocidad167m/min10km/hProduccin (t/da)134400Capacidad10m313yd3Ciclos da16D Esponjada1.94ton/m3Preparacin (ml/ ao)5000F. Llenado0.9DistanciaVariablemetros

TiemposIda y RetornoVariableminutosManiobra0.2000minutos12segundosCarga0.6667minutos40segundosDescarga0.2283minutos13.7segundos

Tiempo de DescargaElevacin8segDescenso4segVolteo2segTotal14

Plan PFlujo Caja0123456789101112131415IngresosPrecio producto Cu (US$/lb)(MUS$)55.50140.25248.71348.05394.82393.04385.96361.76319.82357.49278.03157.8483.9355.075.23Precio subproducto Mo (US$/lb)(MUS$)12.5633.3561.7984.28103.90131.46130.66132.31122.82143.18114.9459.2424.8710.740.82CostosCosto Mina (US$/Ton)(MUS$)6.4615.1527.0838.8549.7554.0154.0754.0554.0754.0554.0439.8016.1310.051.57Costo Concentradora (US$/Ton)(MUS$)9.7022.7340.6158.2874.6381.0281.1181.0781.1081.0881.0659.7024.2015.082.36Costo de Inversion (US$/Ton)(MUS$)2.155.059.0312.9516.5818.0018.0218.0218.0218.0218.0113.275.383.350.52Costo Tratamiento Concentrado (US$/Ton conc)(MUS$)2.105.309.4013.1614.9214.8614.5913.6712.0913.5110.515.973.172.080.20Costo Refinacion (cUS$/lb Cu)(MUS$)6.8017.1830.4742.6448.3648.1547.2844.3239.1843.7934.0619.3410.286.750.64Costo Preparacion (US$/m2)(MUS$)38.438.433.625.625.62418.416.812.812.89.60000Penalidades (US$/100 ppm) - 0.25Impuesto efectivo total 45%-40.55-0.4470.62164.39237.23269.03290.04284.75270.14225.39280.63200.0486.9051.6631.331.28Flujo Caja por periodo(MUS$)-40.55-0.4438.8490.42130.48147.97159.52156.61148.58123.96154.35110.0247.8028.4217.230.70

VAN 15%485.6

PreciosPrecio producto Cu (US$/lb)24409.2period123456789101112131415Precio subproducto Mo (US$/lb)1635273.6Area Real192001920016800128001280012000920084006400640048000000kt Real1077.42525.64512.76475.38292.39002.49012.49007.89011.29008.49006.86633.426891675.3262.1CostosProduccion (Tpd)299370161253517987230342500725034250222503125023250191842674694654728.0555555556Costo Mina (US$/Ton)6Ex. Area0008003600160001600056002240052001280028800760064002800Costo Concentradora (US$/Ton)9.00% CuT1.30971.41121.40051.36771.21231.1061.08591.01730.90041.00860.78860.61390.79820.83190.5031Costo de Inversion (US$/Ton)2% Mo0.05510.06240.06470.06150.05920.0690.06850.06940.06440.07510.06030.04220.04370.03030.0147 Costo Tratamiento Concentrado (US$/Ton conc)50g/t Au1.29461.3711.39431.51971.42391.33071.26471.27670.98161.11711.0040.70920.9411.25730.1074Costo Refinacion (cUS$/lb Cu)24.5540.1g/t Ag0.05550.06290.06510.06680.06840.07910.0780.08510.06920.08240.07940.05360.05420.04730.0032g/t As466.8747.93709.72624.59507.15562.15669.65803.51724.25863.18630.32441.01608.04542.79365.5Ley concentrado (%)30Act.Area1920038400552006800080000884008160074000748005880058400456001680092002800Ex.Vel t/(m2-day)0.15590.18270.22710.26450.28790.28290.30680.33810.33460.42560.42840.40410.44460.50580.26Recuperacin proceso% CuR898989898990899089898988899089.9643Recuperacin Molibdeno (%)60Wi kwh/tc13.29113.31813.19113.20513.13213.01313.00213.01113.08813.16613.00513.18613.44613.28313.187Recuperacin Concentrado (%)85Medido49.652.539.648.246.546.151.246.4354859.92910.847.40Indicado50.431.451.846.749.545.940.545.842.635.816.923.848.1300PenalidadesInferido016.18.65.13.97.98.27.822.416.223.247.241.222.6100periodArea incorporada (m2)kt RealProduccion (Tpd)Area agotada (m2)Ley CuT %Ley % MoLey CuT insitu %g/t Agg/t AsArea activa (m2)Velocidad de Extraccin t/(m2-day)Recuperacion (% CuR)Wi kwh/tcR.ProbadasR. ProbablesS/NValor As (US$/100 ppm)0.251192001077.4299301.30970.05511.29460.0555466.8192000.155989.211713.29149.650.40Sobre (ppm)20002192002525.6701601.41120.06241.3710.0629747.93384000.182789.249213.31852.531.416.1Recuperacin As (%)903168004512.71253501.40050.06471.39430.0651709.72552000.227189.250213.19139.651.88.64128006475.3179878001.36770.06151.51970.0668624.59680000.264589.132113.20548.246.75.1Caracteristicas bloque5128008292.32303436001.21230.05921.42390.0684507.15800000.287989.073613.13246.549.53.9Volumen (m3)72006120009002.425007160001.1060.0691.33070.0791562.15884000.282989.529113.01346.145.97.9792009012.425034160001.08590.06851.26470.078669.65816000.306889.445313.00251.240.58.2884009007.82502256001.01730.06941.27670.0851803.51740000.338189.535913.01146.445.87.8964009011.225031224000.90040.06440.98160.0692724.25748000.334689.397113.0883542.622.41064009008.42502352001.00860.07511.11710.0824863.18588000.425689.236713.1664835.816.21148009006.825019128000.78860.06031.0040.0794630.32584000.428488.777913.00559.916.923.21206633.418426288000.61390.04220.70920.0536441.01456000.404187.906113.1862923.847.21302689746976000.79820.04370.9410.0542608.04168000.444688.690213.44610.848.141.21401675.3465464000.83190.03031.25730.0473542.7992000.505889.610113.28347.43022.6150262.1728.055555555628000.50310.01470.10740.0032365.528000.2689.964313.18700100Total12800088192.11280001.03360.06251.19050.0721654.52514130.335889.158213.11344.739.316

Agotamiento91010101010121212111112131389999101212121111121313899999111211111113131312788888111212111113131312777777111211111113131312777777111211111113131312777777111211111113131412566666101111111114131411566666121212121215141155666612121212121514114566661212121212151411456666121212121215145666661212121212151456666612121212121514566666121212121215141266677710991012141412777777109991214121277777799991214121277777799991214121289999899991114121299999899991012129999989999101212999988999810

Hundimiento333333555569910333333555569910333333555569910722222255556991072222225555699107222222555569910722222255556991071111115555699107111111778881011711111177888101171111117788810117111111778881011111111778881011111111778881011111111778881011622222244446101162222224444611662222224444611662222224444611663333334444611663333334444666333333444466633333344446