Upload
khairmen-suardi
View
69
Download
2
Embed Size (px)
Citation preview
COMPANY PROFIL
E
WWW.EXATRA.CO. IDMARKET [email protected]. ID
PT. EXATRA ENJINERING
THE CEO BUILDING 12th FloorTB Simatupang Street No.18C South Jakarta – 12430 Indonesia
Phone: (+6221) – 3049 0205
COMPANY PROFILE - CONTENTS
PT. EXATRA ENJINERING
1 ABOUT COMPANY
2 SCOPE OF BUSINESS
4 SUCCESSFUL PROJECTS
3 SUPPORTING SOFTWARE
• OVERVIEW PT. EXATRA ENJINERING has set high standards for Integrity and Compliance. Our team culture is based on four Core Values:
1. Integrity - Integrity is the foundation for our individual and teams actions, all the team shall have the same integrity value when executing project and deliver the best, high quality of work and meet the target for our CLIENT satisfaction.
2. Teamwork – We are consist of engineers from different background and expertise, with team work we will be able to meet our target and deliver the best to our CLIENT’s.
3. Performance – Maintaining our performance on top will lead us to achieve our VISION.
4. Learning – Always learning a new thing will make us grow faster and fulfill our MISSION.
• VISIONTo be a competitive engineering consultant committed to excellence.
• MISSIONDedicated to the development of process & industrial plant, through innovative
application of engineering and technology delivering best values to CLIENTS.
• SECTOR OF FOCUSOil and Gas Industry, Petrochemical Plant and Power Generation Plant.
PT. EXATRA ENJINERING
ABOUT COMPANY
PT. EXATRA ENJINERING
ABOUT COMPANY
DIRECTOR
PROJECT MANAGER
PROJECT MANAGER
PROJECT MANAGER
DEPUTY DIRECTOR
PT. EXATRA ENJINERING
ABOUT COMPANY
PROJECT MANAGER
ENGINEERING TEAM
DESIGNER & DRAFTER
DOCUMENT CONTROL
DEPUTY PM
PT. EXATRA ENJINERING
LIST OF KEY PERSONNELNo Name Position Years of
Experience1 Ir. Khairmen Suardi Meng
IPMDirector/ PM 12+
2 Ir. Sugeng Widyantoro Vice Dir./ Lead Electrical Instrument
10+
3 Ir. B. Nurpatriawira PM/ Lead Mech 10+4 Ir. Lir Barliana, MT Lead Process &
Safety15+
5 Ir. T. Widyantoro Lead Civil/ Str 9+6. Ir. Etrismon Lead Plant
Design and Draft
18+
7. Ir. Advis Satria Lead Piping 12+8. Ir. Teguh Nugroho Lead Project
Control8+
9. Ir. Winda Wulandari Lead DCC 5+
PT. EXATRA ENJINERING
SCOPE OF BUSSINESSMulti-discipline
Capabilities
Deployment into various type of
business
In various sectors
PT. EXATRA ENJINERING
OUR CAPABILITIES1. Feasibility Study (Technical, Commercial, Social and Environmental)2. Front End Engineering Design (FEED)3. Detail Engineering Design (DED)4. Site survey study: Topography, Soil analysis, Sondir and Boring, Geolistrik5. Specific Study:
• Flow Assurance Analisys, • Material Selection Study • Corrosion Study• Failure Analysis • Thermal Design• Plant Assessment and Optimization• Existing Civil and Steel Structural Assessment
6. Project Management Consultancy (PMC)7. Vendor Management: Vendor Assement, Vendor selection, Vendor expediting, Vendor Inspection, FAT and SAT.8. Exchanger Cleaning, Repair, Resizing (refurbish), maintenance.
PT. EXATRA ENJINERING
SUPPORTING SOFTWAREWith refer to our experience, we have In-House engineering spreadsheet which covers:1.Pipeline thickness calculation2. Pressure Vessel Design Calcuation3. Atmospheric Tank Design Calculation3. Structural Calculation4. Etc.
We also able to provide licensed software if it is required by CLIENT depend on project requirements.
Most of engineering software used are as follow:2.CAESAR II 9. AutoCAD3.Bentley Autopipe 10. PDMS4.COADE PV Elite 11. STAAD Pro5.COADE Tank 12. HTRI6.E-Tank 13. Etc.7.COMPRESS8.SACS9.HYSIS
PT. EXATRA ENJINERING
SUPPORTING SOFTWARE
PV ELITE
STAAD III
PT. EXATRA ENJINERING
LIST SUCCESSFUL PROJECTNo Project Type of
ServiceService Fluid
Client End User
1 3 Skid Water treatment system Package(2011)
-Design Eng-Vendor Mngment-Procure.
Water PT MPS Petrochina Jabung
2 Helifuel Refuelling System(2011)
-Design Eng-Vendor Mngment
HC Avtur Mc Pec Marine Offshore
Chevron Vietnam
3 South Payao Gas Plant and 6 Onshore Pipeline (2012)
-Design Eng-Vendor Mngment
Oil & Gas
PT ICG Petrochina Bermuda (Papua)
4 FEED Micro LNG Wunut (2013)
-Design Eng
Gas PT NAE PT BTS
LIST SUCCESSFUL PROJECTNo Project Type of
ServiceService Fluid
Client End User
5 DED Micro LNG Wunut(2013-2014)
-Design Eng: LNG, Power Gen, Utilities-Vendor Mngment
Gas PT NAE
PT BTS
6 FEED MDK Offshore Subsea Pipeline (2015)
-Design Eng Gas PT RPE HCML
7 CP21A Manyar Off Take Station(2015)
-Detail Design Eng: Metering, Power Gen, Utilities-Vendor Mngment
Gas JO PP-PPE-Yuan
PT PGN
8 Diesel Storage Terminal and onshore Pipeline (2015)
-PMC for Main Cont DED
HC Diesel
PT Mc Connel Dowel
PT Petro Storindo Energi
No Project Type of Service
Service Fluid
Client End User
9 Water Treatment Skid Package (2015)
-Design Eng
Water PT Bening Khatulistiwa
PT PHE ONWJ
10 Gas and Diesel Engine Skid Package (2015)
-Design Eng
Gas and Diesel
PT Dwipa Konektra
PT PHE WMO
11 FS and FEED Jabung Pipe Line and Offtake Station (2016)
-FS & FEED for Offtake Station, CNG and PLTMG
Gas PT Cipta Niaga Gemilang
PT Cipta Niaga Gemilang
12 Site Survey and Study Jabung Pipe Line and Offtake Station (2016)
-Topo-Sondir-Soil Analysis-Geolistrik
Gas PT Indo Cipta Gemilang
PT Cipta Niaga Gemilang
LIST SUCCESSFUL PROJECT
No Project Type of Service
Service Fluid
Client End User
11 Detail Engineering Design Jabung Pipe Line and Offtake Station (2016)
-Detail Design Eng for Pipeline and Offtake Station
Gas PT Indo Cipta Gemilang
PT Cipta Niaga Gemilang
LIST SUCCESSFUL PROJECT
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT1. South West Betara – Water Treatment Package (2010 – 2011)Client: PT Mitra Palma SejahteraEnd User: PetroChina International (Jabung) Ltd.
Background:
The system package was designed to treat produced water for well injection to increase the well production. The unit were also capable to operating with high turndown to maximum flow rate of 5000 bwpd with capability to run 24 hours per day and 7 days per weeks. The system are consist of Raw Water Filter, Cartridge Filter and Iron Filter.
Scope of Supply and Work:
1. Package Equipment Design Engineering.2. Supply of equipments such as Pumps, XV Valves, PG, PDI, PDT,
LG, Internals for Pressure Vessels.3. Fabrication Inspection during System Integration on Fabricator
Work Shop.4. Pre Commissioning, Commissioning and Start Up (SAT).
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT1. South West Betara – Water Treatment Package (2010 – 2011)
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT2. Bien Dong - Helifuel (Refueling) System Package (2010 )Client: McPEC Marine & Offshore EngineeringEnd User: Chevron Vietnam
Background:
Develop Mechanical Package Equipment for Helicopter Refueling System. The package are consist of 2x100% Refueling Package complete with Dispensing Unit and 2x100% Portable ISO Tank.
Scope of Supply and Work:
1. Package Equipment Design Engineering.2. Fabrication Inspection during System Integration on Fabricator
Work Shop.
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT2. Bien Dong - Helifuel (Refueling) System Package (2010 )
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT3. South Payao – Engineering Consultant for Gas Plant Development (2012 – 2013)Client: PT Indo Cipta GemilangEnd User: PetroChina International (Bermuda) Ltd.
Background:
PetroChina International (Bermuda) Ltd. Plans to develop South Payao-1 Wellhead located in South Payao Field, Sorong – West Papua. This wellhead expected to produce 0.8 ~ 4.5 MMSCFD of associated gas. The associated gas from South Payao-1 Wellhead will be delivered to Walio Power Plant as a Fuel Gas.
The project consisted of development of South Payao pipe line from South Payao well site to South Payao Receiving Terminal consist of 11 km pipeline; and Receiving terminal. The receiving Terminal consisted of Launcher, Receiver, Gas Scrubber and Dehydration Package, all associated piping, electrical and instrumentation.
Scope of Supply and Work:
1. Detail Engineering Design for overall New Gas Plant covering the process, mechanical, piping, structural/ civil and Electrical & Instrumentation Design.
2. Fabrication Inspection during System Integration on Fabricator Work Shop.3. Site Survey, Pre Commissioning, Commissioning and Start Up (SAT).
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT3. South Payao – Engineering Consultant for Gas Plant Development (2012 – 2013)
SUCCESSFUL PROJECT3. South Payao – Engineering Consultant for Gas Plant Development (2012 – 2013)
LIST SUCCESSFUL PROJECT3. South Payao – Engineering Consultant for Gas Plant Development (2012 – 2013)
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT4. South Payao – Engineering Consultant for 11 km Gas Flowline (2012 – 2013)Client: PT Indo Cipta GemilangEnd User: PetroChina International (Bermuda) Ltd.
Background:
PetroChina International (Bermuda) Ltd. Plans to develop South Payao-1 Wellhead located in South Payao Field, Sorong – West Papua. This wellhead expected to produce 0.8 ~ 4.5 MMSCFD of associated gas. The associated gas from South Payao-1 Wellhead will be delivered to Walio Power Plant as a Fuel Gas.
The Project were develop 6 Onshore flowlines located in Klalin Field, Sorong - West Papua. The project consisted of development of 6 pipe line from Klalin 14 (1 km), North Klalin2 (11.5 km), North Klalin 3 (3.5 km), South East Walio (1 km), and South Payao well site to South payao Receiving terminal consist of 11 km pipeline; and Receiving terminal. The onshore pipeline consist of above ground pipe line, under ground pipe line, River Crossing and Road Crossing.
Scope of Supply and Work:
1. Detail Engineering Design for overall New Gas Plant covering the process, pipeline, structural/ civil and Instrumentation Design.
2. Fabrication Inspection on Fabricator Work Shop.3. Site Survey, Pre Commissioning, Commissioning and Start Up (SAT).
SUCCESSFUL PROJECT4. South Payao – Engineering Consultant for 11 km Gas Flowline (2012 – 2013)
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT5. Micro LNG – FEED (Front End Engineering Design) for Utilities Plant (2013 – 2014)Client: PT Noortech Asia EngineeringEnd User: PT Bumi Tangguh Selaras
Background:
The project is to develop 5 MMSCFD capacity of Micro LNG facility in Wunut -Sidoarjo, East Java. The purpose of this facility is process a 5.2 MMSCFD of feed gas to become Fuel Gas and an LNG (Liquified Natural Gas) at 83 Ton/day and sell to various end user.
The scope of work was divided into 2 (two) main EPC:1. ISBL – Scope of work by LNG Licensor consist of all main equipment for LNG
Process.2. OSBL – Scope of work by Local EPC consist of all utilites such as water cooling
system, fire water system, fuel gas system, power generation system, drain system, vent and flare system, structural & civil & building system, pressurize air system.
Scope of Supply and Work:
3. FEED for OSBL Scope of Work (Process, Mechanical, Piping, Civil/ Structural, Electrical and Instrumentation System Design).
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT6. Micro LNG – DED (Detailed Engineering Design) for Utilities Plant (2014)Client: PT Noortech Asia EngineeringEnd User: PT Bumi Tangguh Selaras
Background:
The project is to develop 5 MMSCFD capacity of Micro LNG facility in Wunut -Sidoarjo, East Java. The purpose of this facility is process a 5.2 MMSCFD of feed gas to become Fuel Gas and an LNG (Liquified Natural Gas) at 83 Ton/day and sell to various end user.
The scope of work was divided into 2 (two) main EPC:1. ISBL – Scope of work by LNG Licensor consist of all main equipment for LNG
Process.2. OSBL – Scope of work by Local EPC consist of all utilites such as water cooling
system, fire water system, fuel gas system, power generation system, drain system, vent and flare system, structural & civil & building system, pressurize air system.
Scope of Supply and Work:
3. DED for OSBL Scope of Work (Process, Mechanical, Piping, Civil/ Structural, Electrical and Instrumentation System Design).
4. Develop RFQ for VENDOR tendering stage.5. Review VENDOR documentation and VENDOR Selection.
SUCCESSFUL PROJECT5 and 6. Micro LNG – FEED and DED 5 MMSCFD gas to 83 ton/day LNG Liquid
PLOT PLAN MICRO LNG 5 MMSCFD GAS
SUCCESSFUL PROJECT5 and 6. Micro LNG – FEED and DED 5 MMSCFD gas to 83 ton/day LNG Liquid
LNG MODULES PACKAGES EQUIPMENT
SUCCESSFUL PROJECT5 and 6. Micro LNG – FEED and DED 5 MMSCFD gas to 83 ton/day LNG Liquid
3D MODEL COMPLETE LNG PLANT (ISBL AND OSBL)
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT7. MDK Subsea Pipeline – FEED (Front End Engineering Design) (2015)Client: PT Reka Patria Ekaguna (PT RPE)End User: HUSKY-CNOOC Madura Ltd.
Background:
The project is to develop new 1.73 km of 10” Subsea Gas Export Pipeline from new MDK WHP to tie-in at MDA WHP to MBH WHP 20” Gas Pipeline.
The scope of work are:1. Develop Corrosion Study and Material Selection Report.2. Develop Pipeline Design Specification and Pipeline Installation Specification.3. Pipeline Design Calculation including Wall Thickness Calculation, Tie-In Study
Report, On-Bottom Analysis, Free Span Analysis, End Expansion Analysis and Riser & Dogleg Design Report.
4. Develop Pipeline Equipment Data Sheet, Design and Routing Drawing, MTO and RFQ.
8. CP21A Manyar Offstake Station for Gas Plant Development (2015)Client: PT Pacific Process Engineering - PPEnd User: PT PGN
Background:
PGN plans to develop a new gas distribution pipeline from Gresik – Lamongan – Tuban to the new buyer in the Gresik area. The gas will be tapped from 12” Existing Line near the Desa Suci and using 24” line the pipeline will be routed and end up at the Desa Sembayat. The distance from Desa Suci to Desa Sembayat is approximately 11.5 km.An Offtake Station will be provided at 7 km from Desa Suci at Manyar area. The Manyar Offtake Station will be design to receive a 100 MMSCFD of natural gas through the 16” branch line. The Manyar Offtake Station shall be designed with provision for the future connection line and associated piping and instrumentation system.The natural gas received at Manyar Offtake Station shall be measured and regulated to the required pressure. Manyar Offtake Station shall consist of shutdown system, filtering system, metering system, regulating system, utility system (Diesel Fuel, Utility & Instrument Air, Utility & Fire Water), Fire & Gas System and other necessary ancillaries.
Scope of Supply and Work:
1. Detail Engineering Design for overall New Gas Plant covering the process, mechanical, piping, structural/ civil and Electrical & Instrumentation Design.
2. Fabrication Inspection during System Integration on Fabricator Work Shop.3. Site Survey, Pre Commissioning, Commissioning and Start Up (SAT).
SUCCESSFUL PROJECT
PT. EXATRA ENJINERING
SUCCESSFUL PROJECT
PT. EXATRA ENJINERING
CURRENT PROJECT
PT. EXATRA ENJINERING
9. Gas pipeline, gas offtake station, CNG Plant and Power Plant ProjectClient or End User: PT GJE (Gemilang Jabung Energy) Jambi
Background:
PT GJE plans to develop new 5 MMSCFD gas pipeline and gas offtake station at West Tanjung Jabung area. The offtake gas will be allocated with approximately 3 MMSCFD for power plant, and a maximum of 2 MMSCFD for future allocation. The facility will consists of 2.751 km pipeline, independent Shutdown Valve, 1x100% Gas Filter, 2x100% Three (3) MMSCFD Gas Metering Package and 2x100% Two (2) MMSCFD Gas Metering Package. The provision of online Gas Sampling System (i.e. online Gas Chromatograph) shall be provided for future connection. The expected gas operating condition from BGP is 400 Psig @ 150 deg. F (at tie-in point), this gas will flow through the 2.751 km pipeline and received at GJE gas offtake station. After the gas filtered in gas filter package, the gas will be divided into three (3) stream. First stream to 3 MMSCFD gas metering package, second stream to 2 MMSCFD gas metering package and third stream will be blocked and blinded for future connection. The provision of additional line for future metering package shall be provided, completed with block and bleed valve and blinded.The utilities such as utility water system and power generation system shall be provided to support daily activities of the new facilities.The safety and fire protection system shall be selected and assure the optimum protection of the facilities.
CURRENT PROJECTPHASE 1Scope of Supply and Work:
1. Feasibility Study2. Sondir, Geolistrik, Soil analysis and Topography3. Front End Engineering Design4. Detail Engineering Design for overall New Offtake Station Gas Plant covering
the process, mechanical, piping, structural/ civil and Electrical & Instrumentation Design.
5. Fabrication Inspection during System Integration on Fabricator Work Shop.6. Site Survey, Pre Commissioning, Commissioning and Start Up (SAT).
PHASE 2 and 3Scope of Supply and Work:
1. Feasibility Study2. Front End Engineering Design3. Detail Engineering Design for overall CNG Plant, Power Plant covering the
process, mechanical, piping, structural/ civil and Electrical & Instrumentation Design.
4. Fabrication Inspection during System Integration on Fabricator Work Shop.5. Site Survey, Pre Commissioning, Commissioning and Start Up (SAT).
PT. EXATRA ENJINERING
CURRENT PROJECT
3d Plant Modeling: Tie in with ESDV System, Pipeline, and Offtake Station
CURRENT PROJECT
3d Plant Modeling: Tie in with ESDV System
CURRENT PROJECT
3d Plant Modeling: Offtake Station: Metering Plant, CNG Plant andUtility Plant
CURRENT PROJECT
3d Plant Modeling: Metering Station Plant
CURRENT PROJECT
PT. EXATRA ENJINERING
PT EXATRA TEAM FOR SONDIR, GEOLISTRIK, SOIL ANALYSIS and TOPOGRAPHY