3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
FLOW CHART OF REGISTRATION OF COMPANY
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
1
1. Choose and register with secretary companies.
Step 1: Get and fill form 13A to find the company names. Then, submitted this form to SSM (Syarikat Suruhanjaya Malaysia) to get the approval letter.
Step 2: New Incorporation:Form Memorandum and Articles of Association ( M&A)Form 48A – must be signed by the directorForm 6 – declaration of compliance for secretary companyAll of the form above must be submitted to SSM to get the form 9Form 48F – Company secretary declaration. This form do not used to submit to SSM, it only will keep by the secretary company.
Step 3: Post in Corporation:the company numbers will be find in form 9Form 24 – Return of Allotment of SharesForm 49 – Return giving particulars and register of director’s managers and secretaries and change of particulars. Form 44 – notice of situation of registered office and office hours and particulars of changesAll of this form must be submitted to SSM.
2. Make a saving account in bank:The company secretary will send a letter to bank including the director’s name. The
directors will be accepted to sign the cheque.
3. Register the company with KWSP and PERKESO- Register the employee and staff.
4. Register with PKK (Pusat Khidmat Kontraktor)- Fill the PKK/1/98/PIN5 form
5. Register with CIDB (Construction Industry Development Board)- Fill the R1/95(Pin.2/01) form
REGISTRATION OF COMPANY
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
REGISTRATION OF COMPANY
1.0 SECRETARY COMPANIES
INTRODUCTION
Before we register our company, we have to submit the required
registration documents and fees payable to the Commission. Our company shall
have:
1. At least two directors (the director and promoter can be the same
person)
2. A company secretary who is member of a professional body
prescribed by the Minister or is licensed by the Commission.
Both the director and company secretary must have their principal or only place
of residence within Malaysia.
PROCEDURE FOR REGISTRATION
1. Conduct a name search
Before proposing a name for incorporation of company, a name search
has to be done to determine whether the name can be used to register the
company. The steps are:
a) Complete Form 13 A
b) Pay RM 50.00 fee for each name applied. The name if approved ,
shall be reserved for three months from the date of approval
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
2
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
2. New in Corporation
Submit the following document:
1. Memorandum and Article of Association:
a) Original copy stamped at any stamp office with an RM100.00 stamp
in the memorandum and another RM100.00 stamp in the articles.
b) The first director and secretaries are named in the memorandum
and articles of association in front of a witness.
A company having a share capital may be registered as a private
company if the memorandum and articles:
a) Restricts the right to transfer its share ;
b) Limits the number of its members to not more than fifty;
c) Prohibits any invitation to the public to subscribe any share or
debenture of the company ; and
d) Prohibits any invitation to the public to deposit money with the
company for fixed period.
2. Form 48A – Statutory Declaration by a director or promoter before
appointment. The director or promoter declares under oath that
a) He/she is not a bankrupt ; and
b) He/she has not been convicted of an offence and sentenced by
the Court.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
3
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
This declaration should be signed in front of any one of the following
persons of authority
1. commissioner of Oaths ;
2. President of the sessions Court ;
3. Magistrate ; or
4. Those empowered under the statutory declaration Act 1960.
3. Form 6 – Declaration of Compliance
This declaration state that all the requirement of the companies Act 1965
has been complied with. It must be signed by the company secretary who
handles the registration and is named in the Memorandum and Articles of
Association.
a. Original copy of Form 13A
b. A copy of the approving the name
c. A copy of the Identity Card of each director and company secretary.
Registration fees for share capital:
Authorized Share Capital (RM) Fees (RM)
Up to 100,000 1,000
100,001 - 500,000 3,000
500,001 - 1 million 5,000
1,000,001 – 5 million 8,000
5,000,001 – 10 million 10,000
10,000,001 – 25 million 20,000
25,000,001 – 50 million 40,000
50,000,001 – 100 million 50,000
100,000,001 and above 70,000
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
4
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Issue of Certificate of Incorporation
The following certificate will be issued when all document for registration are in
order:
1. Form 8 – Certificate of incorporation for a public company
2. Form 9 – Certificate of Incorporation for a private company
3. Post in Corporation
The company number will be finding in form 8 or 9. The company number is
important to register the company with the PKK (Pusat Khidmat Kontraktor)
and CIDB (Construction Industry Development Board).
After get the Form 9- Certificate of Incorporation for Private Company, fill up
the another form from secretary:
1. Form 24 – Return of Allotment of Shares
2. Form 49 – Return Giving Particulars In Register of Directors Managers
and Secretaries and Change of Particulars.
3. Form 44 – Notice of Situation of Registered Office and Office Hours
and Particulars of Changes
Required Documents
Register Application Form (PNA.40)
To register, we have to fill in this form completely. This form also stated
the registration payment which is RM 30.00 for own name, RM 60.00 for
partnership, RM 20.00 for changes registration and RM 5.00 for every branch.
Beside that, RM 10.00 for business information, RM 10.00 for certificate, RM
5.00 for copy registration form have been prove, RM 1.00 not been prove and fail
checking.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
5
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Application for Business Name Approval Form (PNA.42)
This form is used by applier to propose their business name to the SSM.
Then SSM will choose the suitable name for them. If the application does not
fulfill the conditions, it will be reject. The conditions are:
a. The business name does not suitable with the business
b. They apply the same name with other application.
c. Use the words that controlled by Registration.
d. Use the name which is not the real name.
The name that has been approved can not be change or add and it cannot be
transfer to other person.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
6
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
2.0 MAKE A SAVING ACCOUNT IN BANK
Before register with PKK (Pusat Khidmat Kontraktor) or CIDB
(Construction Industry Development Board), the company must make the saving
account in bank first. The company must submit the copy of financial statement
to PKK and CIDB.
The company secretary will prepared an application letter to the bank to
make the saving account from the bank. This letter contains the director’s name,
which will be accepted to sign the cheque. This director had been chosen and
agrees from all the board of directors.
After fill all the form, it will be submit to the bank include the copy of
identity card the directors who accepted to sign the cheque.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
7
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
3.0 REGISTER THE COMPANY WITH KWSP AND PERKESO
KWSP
Register the Employee
All employees must register with KWSP form KWSP 1. This form must
attach together with Form 49 or Business Certificate Registration in 7 days from
date employee paid salary for their staffs. After registration, the employee will get
the reference numbers. This reference numbers is able to use in every KWSP
affair. The employee’s also will get these documents:
a) Form KWSP 6 (Form A) – to pay monthly payment to KWSP
b) Form KWSP 3 – to register the staffs as members
c) Employee Registration Certificate – this certificate must show in
employee’s premise.
d) Employee Guide’s Book.
The employee can apply to register more than one employee’s numbers to
make the affair of monthly payment be easier.
Form KWSP 6 (Form A)
Every month, KWSP Form 6 will supply to the employee. This form
contains the data’s such as KWSP membership numbers, NK (nombor kawalan),
NIRC and name of staffs who register with KWSP. All of these data will be
printed by KWSP computers.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
8
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Form KWSP 6 will supply to employee at the end of the month to pay the
payment to KWSP for the next month. When KWSP form 6 (Form A) received,
make sure all the numbers, name and employee address on this form is right.
The employee not supposed to attach the hand written, typed or photocopy of
Form KWSP 6 (Form A). The employee also not allowed using the empty Form
KWSP 6 (Form A) to print the member’s data with their own computers.
PERKESO
Form 1 used to register employee. For the private limited company, these
forms needed:
1. Form 9 (Akta Syarikat 1965)
2. Borang 49 (Companies Act 1965)
3. Form 13 (Company change the name)
(PREPARE 2 COPIES EACH 1)
Form 2 used to register the staff. The form 2 must filled in two copies of
original form with the staff information. Every single of Form 1 and Form 2 must
have the company chop. After finished the form, the applicant is embolden to
submit by hand or pos to PERKESO address:
PERTUBUHAN KESELAMATAN SOSIAL,
WISMA PERKESO, NO.83 JALAN HOSPITAL,
30450 IPOH, PERAK DARUL RIDZUAN.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
9
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
4.0 REGISTER WITH PKK (PUSAT KHIDMAT KONTRAKTOR)
First, the applicant must fill the Contractor of Civil and Electrical Works
Application Form (PKK/1/98/PIN.5). Then, the form will be send to PKK with fee
process, RM 100.00 for the class A contractor’s. The fee must be paid to
Manager of PKK using bank draft. The other way of payment will not acceptance.
The address to send the application form including the fee process is:
Pengarah,
Pusat Khidmat Kontarktor,
Kementerian Pembangunan Usahawan,
Tingkat 15 & 16, Medan MARA,
Jalan Raja Laut,
50652, Kuala Lumpur.
The applicant must inform what the type of class they want to apply. The
register contractor’s allowed to join the tender depend on their class. For class A,
the financial limit is more than RM 10,000,000.00. The class A contractor allowed
to operation around the country (Malaysia). The applicant also must inform the
type of ‘Header’ and ‘Sub-Header’ they want to apply. There are six type headers
exist in PKK, such as:
Header I – Civil engineering works
Header II – Building works
Header III – Mechanical, Sanitary and water engineering works
Header IV – Other specialist civil engineering works
Header V – Quarrying metal and earth supply, cartage and transport
Header VI – Forest and land development
Header VII – Telecommunication works
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
10
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Registration condition
The company must register with Suruhanjaya Syarikat Malaysia (SSM)
first. The applicant must inform the company capitals. For class A contractor’s,
the minimum capital is RM 600,001.00. The company should have at least one of
their boards of director, shareholders or staff that have technical qualification. For
class A contractor’s, a relevance degree or diploma with the application domains
is needed. The degree or diploma must be recognized from government. If the
company has the experienced board directors, shareholders or staff, they must
show the evidence of their experience.
The company, who already had their own plant or appliance, must show
the purchase receipt, registration book of vehicles or any document can used to
proof that the plant and appliance is their own. If the company has the rental
plant or appliance, they need to show the authentic document from the rental
agencies. The agency right from suppliers must be attaching for the mechanical
works.
If the shareholders have shared more than 5% or RM 50,000.00 in the
other company, their application will never attend. The application will not
deliberate if the board of director or staff already has a post in the other
company, which that company already registers with PKK.
When the company application passes, they will get the information from
the registration offer letters. The letter also obtains the registration class, header
and sub-header. The letters also tell the amount the registration fee. For class A
contractor’s, the registration fee is RM 5,000.00. The registration fee must being
paid between 30 days from the date of the offer latter’s. The payment must paid
by Bank Draft or Pos Order to MANAGER, PUSAT KHIDMAT KONTRAKTOR.
The other way of payment will not acceptance.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
11
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
The authentic period is two years. The applicant can renew the application
3 months before the expired date of registration. After the expired date, the
registration not considers anymore and if the company still wants to register, they
need to make a new registration application.
Bumiputra Recognition
There are a few rules if the company wants to apply the Bumiputra
Recognition. The rule was written in ‘surat Pekeliling Perbendaharaan Bil.4
Tahun 1995’.
i. Share of the company must majority or more than 51% owned to
Bumiputra shareholders.
ii. There are majorities or more than 51% Bumiputra board of director’s in the
company.
iii. There are majorities or more than 51% Bumiputra staff’s in the company.
iv. Executive, Director or Manager or others key post in the company is
Bumiputra.
v. Organization chart must shown the managing of the company is fully
control by the Bumiputra; and
vi. Financial managing controlled by the Bumiputra.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
12
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
The Others Document Must Be Attach with the Application is:
i. NIRC copy’s (passport copy’s if foreigner) of board of director,
shareholders, officers and staffs.
ii. Copy’s of KWSP statement (Form A) last 3 months with resist copy’s.
iii. Authentic certificate copy’s of board of directors, shareholders, officers
and staffs.
iv. Permit copy’s from Jabatan Tenaga Rakyat or Jabatan Imegresen if have
foreigner board of directors.
v. Authentic experience document’s from board of directors, officers and
staffs.
vi. Authentic bank or others money institution documents about financial
facilities.
vii. Bank statement copy’s for current account after 3 months.
viii. Authentication of plants/machineries rental and registration of company’s
vehicles copies.
ix. Authentication document of plants/equipment/vehicles.
x. Authentication documents copy’s of materials credit facilities.
xi. Letter of acceptance, Works Order copy’s for finished projects if the
applicants main contractor.
xii. Stamped and authentic Sub-Contracts agreement between main contactor
and sub-contactors copy’s, including the Letter of Acceptance copy’s and
work finished certificate from client to main contactor if the applicant is
sub-contactor.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
13
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
For private limited company, these documents must be attached together with
the application:
i. Copy’s of Form 9 and Memorandum and Articles of Association.
ii. Authentication copy’s by Suruhanjaya Syarikat Malaysia (SSM):
a. The last Annual Return Of A Company Having A Share Capital letter
and Form 24 (Return of Allotment of Shares) for addition share after
that Annual Return, OR
b. All of Form 24 (Return of Allotment of Shares) AND all of stamped
Form 32A copies if had change in share properties.
c. The last Form 49 (Return Giving Particulars in Register of Directors.
Managers and Secretaries and Changes of Particulars).
iii. If the company share’s owned to others company, attach the
authentication by Suruhanjaya Syarikat Malaysia copy of ‘Annual Return
Of A Company Having A Share Capital’ and copy’s of Form 24.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
14
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
3G Construction Sdn. Bhd. work is shown below:
Header Sub-Header
Header I Sub-Header 1
Civil engineering work
Header II Sub-Header 1
Construction work not including
reinforcement concrete structure.
Sub-Header 2
(a) Not exceeding 4 level
reinforcement concrete building
(b) Exceeding 4 level
reinforcement concrete building.
Sub-Header 3
Pre-cast timber building
Sub-Header 4
Pre-cast concrete building
Sub-Header 5
Steel structure building
Sub-Header 6
Pattern roof works
Sub-Header 8
(b) Re-paint and repair building works
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
15
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
5.0 REGISTERION CIDB
The new construction company must be registering under Construction
Industry Development Board (CIDB) before undertake to execute and complete
any construction works in Malaysia.
Scope Of Registerion
The first, the construction company must know the registration categories and
namely,
1. Civil Engineering Construction
2. Building Construction
3. Mechanical and electrical
Which are further classified into various specialization group in the table below
Grade Tendering Capacity (RM)
G1 Not exceeding 100,000
G2 Not exceeding 500,000
G3 Not exceeding 1 Million
G4 Not exceeding 3 Million
G5 Not exceeding 5 Million
G6 Not exceeding 10 Million
G7 No Limit
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
16
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Application Details
A new local firm or companies or locally incorporated companies and local
firms or companies currently engaged in construction activities shall apply for
registration using Form CIDB R1/95.(PIN 1/99) from CIDB Perak Office, Lot 5.02,
5th floor, Bangunan KWSP, Jalan Greentown, 30450 Ipoh, Perak.
The processing Fees shall be accompanied by payment of RM50.00.
Processing fees can be in the form of cash or postal order or money order or
company’s cheque made payable to ‘”Construction Industry Development Board
Malaysia”
Processing Time and Certificates of Registration
Under Normal circumstances, if the submission are complete and in order,
applicants will be informed of the outcome not later than 2 months from date of
submission of applications.
Qualified local construction firms or companies or locally incorporated
companies shall be registered with CIDB and shall be issued Certificates of
Registration which authorize the firms to undertake and complete construction
works within the scope of their grades and categories long as the certificates are
still valid. The validity of registration shall be valid for minimum of one year and
not more than three year.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
17
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Categories, specialization and grades of registration
Qualified applicants shall be registered in the appropriate grades,
appropriate categories and appropriate specialization and will be issued the
relevant registration certificates. The table is registration category and the
specialization for our company (3G Construction Sdn.Bhd)
Category Specialization Description
Civil
engineering
Construction
(CE)
CE01
Road and pavement
construction
CE08
Slope Protection System
CE11
Concrete Repairs
CE12
Soil Investigation and
Stabilisation
Construction of road and road
reinstatement, pavement, bus
bays, open car parks and
related works such as kerbs
and footways.
Slope protection works
Reinforcement of structures by
way of pressure grouting.
Services include sampling,
investigation and testing
services to determine soil
classification, strength and
composition. Also includes soil
stabilization works such as
micro piling, ground anchoring,
sand drains and ground
grouting.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
18
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Category Specialization Description
Civil
engineering
Construction
(CE)
Building
Construction
(B)
CE14
Landscaping
CE21
General Civil Engineering
Works
B01
Prefabricated Building and
Industrial Industrial plant.
B02
Steel Framed Buildings and
Industrial Plant
B03
Restoration and Conservation
B04
General Buildings and
Maintenance
Provision of landscaping
services including tree planting
and turfing.
General civil engineering
works, including earthworks,
sub-soil drainage.
Construction of building and
Industrial plant using
prefabricated components and
systems.
Construction of steel framed
buildings and industrial plant
Building restoration and
conservation
General building works,
including fixing partitions,
roofing and general
maintenance of buildings
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
19
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Category Specialization Description
Building
Construction
(B)
B05
Piling
B06
Concrete Repairs
B07
Interior Decoration
B08
Waterproofing Installation
B09
Landscaping
B10
Plumbing
Installation of all types of
piling-sheet piles, driven
precase reinforced and
prestressed concrete piles.
Reinforcement of structure by
way of pressure grouting,
guniting, etc.
Interior design, planning and
the decoration of building. This
includes ceiling panels.
Waterproofing of basement,
roofs and walls.
Provision of landscaping
services including tree planting
and turfing.
Installation, repairs and
servicing of water and gap
pipes, sanitary works,
plumbing fixtures and mains.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
20
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Category Specialization Description
Building
Construction
(B)
B11
Signcraft Installation
B12
Aluminium /metal and glass
works
B13
Tiles installation and
bricklaying works
B14
Paint works
B15
Roof installation and metal
‘cladding’
B16
Construction and pool
equipment system
B17
‘Prestressing’ and ‘post-
tensioning’ works
Installation of an integrated
sign posting system for
complexes, airport, shopping
centres, etc. Also includes
setting up of exhibition stands.
Aluminium /metal and glass
works.
Tiles installation and
bricklaying works.
Paint works.
Roof installation and metal
‘cladding’.
Construction and pool
equipment system.
‘Prestressing’ and ‘post-
tensioning’ works.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
21
3GENERATION CONSRUCTION SDN.BHD
AS0272087-M
Category Specialization Description
Building
Construction
(B)
B18
Metal work
B19
‘Formwork’ system
specialization
Metal work.
‘Formwork’ system
specialization.
LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288
22