3GENERATION CONSRUCTION SDN.BHD AS0272087-M FLOW CHART OF REGISTRATION OF COMPANY LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWAN TEL: 05-3272244 FAX: 05-3272288 1 1. Choose and register with secretary companies. Step 1: Get and fill form 13A to find the company names. Then, submitted this form to SSM (Syarikat Suruhanjaya Malaysia) to get the approval letter. Step 2: New Incorporation: Form Memorandum and Articles of Association ( M&A) Form 48A – must be signed by the director Form 6 – declaration of compliance for secretary company All of the form above must be submitted to SSM to get the form 9 Form 48F – Company secretary declaration. This form do not used to submit to SSM, it only will keep by the secretary company. Step 3: Post in Corporation: the company numbers will be find in form 9 Form 24 – Return of Allotment of Shares Form 49 – Return giving particulars and register of director’s managers and secretaries and change of particulars. Form 44 – notice of situation of registered office and office hours and particulars of changes All of this form must be submitted to SSM. 2. Make a saving account in bank: The company secretary will send a letter to bank including the director’s name. The directors will be accepted to sign the cheque. 3. Register the company with KWSP and PERKESO - Register the employee and staff. 4. Register with PKK (Pusat Khidmat Kontraktor) - Fill the PKK/1/98/PIN5 form 5. Register with CIDB (Construction Industry Development Board) - Fill the R1/95(Pin.2/01) form REGISTRATION OF COMPANY

Flow Chart

Embed Size (px)

Citation preview

Page 1: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

FLOW CHART OF REGISTRATION OF COMPANY

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

1

1. Choose and register with secretary companies.

Step 1: Get and fill form 13A to find the company names. Then, submitted this form to SSM (Syarikat Suruhanjaya Malaysia) to get the approval letter.

Step 2: New Incorporation:Form Memorandum and Articles of Association ( M&A)Form 48A – must be signed by the directorForm 6 – declaration of compliance for secretary companyAll of the form above must be submitted to SSM to get the form 9Form 48F – Company secretary declaration. This form do not used to submit to SSM, it only will keep by the secretary company.

Step 3: Post in Corporation:the company numbers will be find in form 9Form 24 – Return of Allotment of SharesForm 49 – Return giving particulars and register of director’s managers and secretaries and change of particulars. Form 44 – notice of situation of registered office and office hours and particulars of changesAll of this form must be submitted to SSM.

2. Make a saving account in bank:The company secretary will send a letter to bank including the director’s name. The

directors will be accepted to sign the cheque.

3. Register the company with KWSP and PERKESO- Register the employee and staff.

4. Register with PKK (Pusat Khidmat Kontraktor)- Fill the PKK/1/98/PIN5 form

5. Register with CIDB (Construction Industry Development Board)- Fill the R1/95(Pin.2/01) form

REGISTRATION OF COMPANY

Page 2: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

REGISTRATION OF COMPANY

1.0 SECRETARY COMPANIES

INTRODUCTION

Before we register our company, we have to submit the required

registration documents and fees payable to the Commission. Our company shall

have:

1. At least two directors (the director and promoter can be the same

person)

2. A company secretary who is member of a professional body

prescribed by the Minister or is licensed by the Commission.

Both the director and company secretary must have their principal or only place

of residence within Malaysia.

PROCEDURE FOR REGISTRATION

1. Conduct a name search

Before proposing a name for incorporation of company, a name search

has to be done to determine whether the name can be used to register the

company. The steps are:

a) Complete Form 13 A

b) Pay RM 50.00 fee for each name applied. The name if approved ,

shall be reserved for three months from the date of approval

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

2

Page 3: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

2. New in Corporation

Submit the following document:

1. Memorandum and Article of Association:

a) Original copy stamped at any stamp office with an RM100.00 stamp

in the memorandum and another RM100.00 stamp in the articles.

b) The first director and secretaries are named in the memorandum

and articles of association in front of a witness.

A company having a share capital may be registered as a private

company if the memorandum and articles:

a) Restricts the right to transfer its share ;

b) Limits the number of its members to not more than fifty;

c) Prohibits any invitation to the public to subscribe any share or

debenture of the company ; and

d) Prohibits any invitation to the public to deposit money with the

company for fixed period.

2. Form 48A – Statutory Declaration by a director or promoter before

appointment. The director or promoter declares under oath that

a) He/she is not a bankrupt ; and

b) He/she has not been convicted of an offence and sentenced by

the Court.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

3

Page 4: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

This declaration should be signed in front of any one of the following

persons of authority

1. commissioner of Oaths ;

2. President of the sessions Court ;

3. Magistrate ; or

4. Those empowered under the statutory declaration Act 1960.

3. Form 6 – Declaration of Compliance

This declaration state that all the requirement of the companies Act 1965

has been complied with. It must be signed by the company secretary who

handles the registration and is named in the Memorandum and Articles of

Association.

a. Original copy of Form 13A

b. A copy of the approving the name

c. A copy of the Identity Card of each director and company secretary.

Registration fees for share capital:

Authorized Share Capital (RM) Fees (RM)

Up to 100,000 1,000

100,001 - 500,000 3,000

500,001 - 1 million 5,000

1,000,001 – 5 million 8,000

5,000,001 – 10 million 10,000

10,000,001 – 25 million 20,000

25,000,001 – 50 million 40,000

50,000,001 – 100 million 50,000

100,000,001 and above 70,000

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

4

Page 5: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Issue of Certificate of Incorporation

The following certificate will be issued when all document for registration are in

order:

1. Form 8 – Certificate of incorporation for a public company

2. Form 9 – Certificate of Incorporation for a private company

3. Post in Corporation

The company number will be finding in form 8 or 9. The company number is

important to register the company with the PKK (Pusat Khidmat Kontraktor)

and CIDB (Construction Industry Development Board).

After get the Form 9- Certificate of Incorporation for Private Company, fill up

the another form from secretary:

1. Form 24 – Return of Allotment of Shares

2. Form 49 – Return Giving Particulars In Register of Directors Managers

and Secretaries and Change of Particulars.

3. Form 44 – Notice of Situation of Registered Office and Office Hours

and Particulars of Changes

Required Documents

Register Application Form (PNA.40)

To register, we have to fill in this form completely. This form also stated

the registration payment which is RM 30.00 for own name, RM 60.00 for

partnership, RM 20.00 for changes registration and RM 5.00 for every branch.

Beside that, RM 10.00 for business information, RM 10.00 for certificate, RM

5.00 for copy registration form have been prove, RM 1.00 not been prove and fail

checking.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

5

Page 6: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Application for Business Name Approval Form (PNA.42)

This form is used by applier to propose their business name to the SSM.

Then SSM will choose the suitable name for them. If the application does not

fulfill the conditions, it will be reject. The conditions are:

a. The business name does not suitable with the business

b. They apply the same name with other application.

c. Use the words that controlled by Registration.

d. Use the name which is not the real name.

The name that has been approved can not be change or add and it cannot be

transfer to other person.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

6

Page 7: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

2.0 MAKE A SAVING ACCOUNT IN BANK

Before register with PKK (Pusat Khidmat Kontraktor) or CIDB

(Construction Industry Development Board), the company must make the saving

account in bank first. The company must submit the copy of financial statement

to PKK and CIDB.

The company secretary will prepared an application letter to the bank to

make the saving account from the bank. This letter contains the director’s name,

which will be accepted to sign the cheque. This director had been chosen and

agrees from all the board of directors.

After fill all the form, it will be submit to the bank include the copy of

identity card the directors who accepted to sign the cheque.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

7

Page 8: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

3.0 REGISTER THE COMPANY WITH KWSP AND PERKESO

KWSP

Register the Employee

All employees must register with KWSP form KWSP 1. This form must

attach together with Form 49 or Business Certificate Registration in 7 days from

date employee paid salary for their staffs. After registration, the employee will get

the reference numbers. This reference numbers is able to use in every KWSP

affair. The employee’s also will get these documents:

a) Form KWSP 6 (Form A) – to pay monthly payment to KWSP

b) Form KWSP 3 – to register the staffs as members

c) Employee Registration Certificate – this certificate must show in

employee’s premise.

d) Employee Guide’s Book.

The employee can apply to register more than one employee’s numbers to

make the affair of monthly payment be easier.

Form KWSP 6 (Form A)

Every month, KWSP Form 6 will supply to the employee. This form

contains the data’s such as KWSP membership numbers, NK (nombor kawalan),

NIRC and name of staffs who register with KWSP. All of these data will be

printed by KWSP computers.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

8

Page 9: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Form KWSP 6 will supply to employee at the end of the month to pay the

payment to KWSP for the next month. When KWSP form 6 (Form A) received,

make sure all the numbers, name and employee address on this form is right.

The employee not supposed to attach the hand written, typed or photocopy of

Form KWSP 6 (Form A). The employee also not allowed using the empty Form

KWSP 6 (Form A) to print the member’s data with their own computers.

PERKESO

Form 1 used to register employee. For the private limited company, these

forms needed:

1. Form 9 (Akta Syarikat 1965)

2. Borang 49 (Companies Act 1965)

3. Form 13 (Company change the name)

(PREPARE 2 COPIES EACH 1)

Form 2 used to register the staff. The form 2 must filled in two copies of

original form with the staff information. Every single of Form 1 and Form 2 must

have the company chop. After finished the form, the applicant is embolden to

submit by hand or pos to PERKESO address:

PERTUBUHAN KESELAMATAN SOSIAL,

WISMA PERKESO, NO.83 JALAN HOSPITAL,

30450 IPOH, PERAK DARUL RIDZUAN.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

9

Page 10: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

4.0 REGISTER WITH PKK (PUSAT KHIDMAT KONTRAKTOR)

First, the applicant must fill the Contractor of Civil and Electrical Works

Application Form (PKK/1/98/PIN.5). Then, the form will be send to PKK with fee

process, RM 100.00 for the class A contractor’s. The fee must be paid to

Manager of PKK using bank draft. The other way of payment will not acceptance.

The address to send the application form including the fee process is:

Pengarah,

Pusat Khidmat Kontarktor,

Kementerian Pembangunan Usahawan,

Tingkat 15 & 16, Medan MARA,

Jalan Raja Laut,

50652, Kuala Lumpur.

The applicant must inform what the type of class they want to apply. The

register contractor’s allowed to join the tender depend on their class. For class A,

the financial limit is more than RM 10,000,000.00. The class A contractor allowed

to operation around the country (Malaysia). The applicant also must inform the

type of ‘Header’ and ‘Sub-Header’ they want to apply. There are six type headers

exist in PKK, such as:

Header I – Civil engineering works

Header II – Building works

Header III – Mechanical, Sanitary and water engineering works

Header IV – Other specialist civil engineering works

Header V – Quarrying metal and earth supply, cartage and transport

Header VI – Forest and land development

Header VII – Telecommunication works

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

10

Page 11: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Registration condition

The company must register with Suruhanjaya Syarikat Malaysia (SSM)

first. The applicant must inform the company capitals. For class A contractor’s,

the minimum capital is RM 600,001.00. The company should have at least one of

their boards of director, shareholders or staff that have technical qualification. For

class A contractor’s, a relevance degree or diploma with the application domains

is needed. The degree or diploma must be recognized from government. If the

company has the experienced board directors, shareholders or staff, they must

show the evidence of their experience.

The company, who already had their own plant or appliance, must show

the purchase receipt, registration book of vehicles or any document can used to

proof that the plant and appliance is their own. If the company has the rental

plant or appliance, they need to show the authentic document from the rental

agencies. The agency right from suppliers must be attaching for the mechanical

works.

If the shareholders have shared more than 5% or RM 50,000.00 in the

other company, their application will never attend. The application will not

deliberate if the board of director or staff already has a post in the other

company, which that company already registers with PKK.

When the company application passes, they will get the information from

the registration offer letters. The letter also obtains the registration class, header

and sub-header. The letters also tell the amount the registration fee. For class A

contractor’s, the registration fee is RM 5,000.00. The registration fee must being

paid between 30 days from the date of the offer latter’s. The payment must paid

by Bank Draft or Pos Order to MANAGER, PUSAT KHIDMAT KONTRAKTOR.

The other way of payment will not acceptance.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

11

Page 12: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

The authentic period is two years. The applicant can renew the application

3 months before the expired date of registration. After the expired date, the

registration not considers anymore and if the company still wants to register, they

need to make a new registration application.

Bumiputra Recognition

There are a few rules if the company wants to apply the Bumiputra

Recognition. The rule was written in ‘surat Pekeliling Perbendaharaan Bil.4

Tahun 1995’.

i. Share of the company must majority or more than 51% owned to

Bumiputra shareholders.

ii. There are majorities or more than 51% Bumiputra board of director’s in the

company.

iii. There are majorities or more than 51% Bumiputra staff’s in the company.

iv. Executive, Director or Manager or others key post in the company is

Bumiputra.

v. Organization chart must shown the managing of the company is fully

control by the Bumiputra; and

vi. Financial managing controlled by the Bumiputra.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

12

Page 13: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

The Others Document Must Be Attach with the Application is:

i. NIRC copy’s (passport copy’s if foreigner) of board of director,

shareholders, officers and staffs.

ii. Copy’s of KWSP statement (Form A) last 3 months with resist copy’s.

iii. Authentic certificate copy’s of board of directors, shareholders, officers

and staffs.

iv. Permit copy’s from Jabatan Tenaga Rakyat or Jabatan Imegresen if have

foreigner board of directors.

v. Authentic experience document’s from board of directors, officers and

staffs.

vi. Authentic bank or others money institution documents about financial

facilities.

vii. Bank statement copy’s for current account after 3 months.

viii. Authentication of plants/machineries rental and registration of company’s

vehicles copies.

ix. Authentication document of plants/equipment/vehicles.

x. Authentication documents copy’s of materials credit facilities.

xi. Letter of acceptance, Works Order copy’s for finished projects if the

applicants main contractor.

xii. Stamped and authentic Sub-Contracts agreement between main contactor

and sub-contactors copy’s, including the Letter of Acceptance copy’s and

work finished certificate from client to main contactor if the applicant is

sub-contactor.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

13

Page 14: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

For private limited company, these documents must be attached together with

the application:

i. Copy’s of Form 9 and Memorandum and Articles of Association.

ii. Authentication copy’s by Suruhanjaya Syarikat Malaysia (SSM):

a. The last Annual Return Of A Company Having A Share Capital letter

and Form 24 (Return of Allotment of Shares) for addition share after

that Annual Return, OR

b. All of Form 24 (Return of Allotment of Shares) AND all of stamped

Form 32A copies if had change in share properties.

c. The last Form 49 (Return Giving Particulars in Register of Directors.

Managers and Secretaries and Changes of Particulars).

iii. If the company share’s owned to others company, attach the

authentication by Suruhanjaya Syarikat Malaysia copy of ‘Annual Return

Of A Company Having A Share Capital’ and copy’s of Form 24.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

14

Page 15: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

3G Construction Sdn. Bhd. work is shown below:

Header Sub-Header

Header I Sub-Header 1

Civil engineering work

Header II Sub-Header 1

Construction work not including

reinforcement concrete structure.

Sub-Header 2

(a) Not exceeding 4 level

reinforcement concrete building

(b) Exceeding 4 level

reinforcement concrete building.

Sub-Header 3

Pre-cast timber building

Sub-Header 4

Pre-cast concrete building

Sub-Header 5

Steel structure building

Sub-Header 6

Pattern roof works

Sub-Header 8

(b) Re-paint and repair building works

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

15

Page 16: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

5.0 REGISTERION CIDB

The new construction company must be registering under Construction

Industry Development Board (CIDB) before undertake to execute and complete

any construction works in Malaysia.

Scope Of Registerion

The first, the construction company must know the registration categories and

namely,

1. Civil Engineering Construction

2. Building Construction

3. Mechanical and electrical

Which are further classified into various specialization group in the table below

Grade Tendering Capacity (RM)

G1 Not exceeding 100,000

G2 Not exceeding 500,000

G3 Not exceeding 1 Million

G4 Not exceeding 3 Million

G5 Not exceeding 5 Million

G6 Not exceeding 10 Million

G7 No Limit

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

16

Page 17: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Application Details

A new local firm or companies or locally incorporated companies and local

firms or companies currently engaged in construction activities shall apply for

registration using Form CIDB R1/95.(PIN 1/99) from CIDB Perak Office, Lot 5.02,

5th floor, Bangunan KWSP, Jalan Greentown, 30450 Ipoh, Perak.

The processing Fees shall be accompanied by payment of RM50.00.

Processing fees can be in the form of cash or postal order or money order or

company’s cheque made payable to ‘”Construction Industry Development Board

Malaysia”

Processing Time and Certificates of Registration

Under Normal circumstances, if the submission are complete and in order,

applicants will be informed of the outcome not later than 2 months from date of

submission of applications.

Qualified local construction firms or companies or locally incorporated

companies shall be registered with CIDB and shall be issued Certificates of

Registration which authorize the firms to undertake and complete construction

works within the scope of their grades and categories long as the certificates are

still valid. The validity of registration shall be valid for minimum of one year and

not more than three year.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

17

Page 18: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Categories, specialization and grades of registration

Qualified applicants shall be registered in the appropriate grades,

appropriate categories and appropriate specialization and will be issued the

relevant registration certificates. The table is registration category and the

specialization for our company (3G Construction Sdn.Bhd)

Category Specialization Description

Civil

engineering

Construction

(CE)

CE01

Road and pavement

construction

CE08

Slope Protection System

CE11

Concrete Repairs

CE12

Soil Investigation and

Stabilisation

Construction of road and road

reinstatement, pavement, bus

bays, open car parks and

related works such as kerbs

and footways.

Slope protection works

Reinforcement of structures by

way of pressure grouting.

Services include sampling,

investigation and testing

services to determine soil

classification, strength and

composition. Also includes soil

stabilization works such as

micro piling, ground anchoring,

sand drains and ground

grouting.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

18

Page 19: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Category Specialization Description

Civil

engineering

Construction

(CE)

Building

Construction

(B)

CE14

Landscaping

CE21

General Civil Engineering

Works

B01

Prefabricated Building and

Industrial Industrial plant.

B02

Steel Framed Buildings and

Industrial Plant

B03

Restoration and Conservation

B04

General Buildings and

Maintenance

Provision of landscaping

services including tree planting

and turfing.

General civil engineering

works, including earthworks,

sub-soil drainage.

Construction of building and

Industrial plant using

prefabricated components and

systems.

Construction of steel framed

buildings and industrial plant

Building restoration and

conservation

General building works,

including fixing partitions,

roofing and general

maintenance of buildings

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

19

Page 20: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Category Specialization Description

Building

Construction

(B)

B05

Piling

B06

Concrete Repairs

B07

Interior Decoration

B08

Waterproofing Installation

B09

Landscaping

B10

Plumbing

Installation of all types of

piling-sheet piles, driven

precase reinforced and

prestressed concrete piles.

Reinforcement of structure by

way of pressure grouting,

guniting, etc.

Interior design, planning and

the decoration of building. This

includes ceiling panels.

Waterproofing of basement,

roofs and walls.

Provision of landscaping

services including tree planting

and turfing.

Installation, repairs and

servicing of water and gap

pipes, sanitary works,

plumbing fixtures and mains.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

20

Page 21: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Category Specialization Description

Building

Construction

(B)

B11

Signcraft Installation

B12

Aluminium /metal and glass

works

B13

Tiles installation and

bricklaying works

B14

Paint works

B15

Roof installation and metal

‘cladding’

B16

Construction and pool

equipment system

B17

‘Prestressing’ and ‘post-

tensioning’ works

Installation of an integrated

sign posting system for

complexes, airport, shopping

centres, etc. Also includes

setting up of exhibition stands.

Aluminium /metal and glass

works.

Tiles installation and

bricklaying works.

Paint works.

Roof installation and metal

‘cladding’.

Construction and pool

equipment system.

‘Prestressing’ and ‘post-

tensioning’ works.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

21

Page 22: Flow Chart

3GENERATION CONSRUCTION SDN.BHD

AS0272087-M

Category Specialization Description

Building

Construction

(B)

B18

Metal work

B19

‘Formwork’ system

specialization

Metal work.

‘Formwork’ system

specialization.

LOT 16940 GROUND FLOOR LEVEL, JALAN MAT SIRAT, 32300 BATU GAJAH, PERAK DARUL RIDZWANTEL: 05-3272244 FAX: 05-3272288

22