PROJECT OVERVIEW

Building type: Office building

Location: Bangalore, India

Area: 3,00,000 sq.ft

Floors: Ground floor + 16Floors

Cooling Load: 352TR

Design occupancy: 3584 People

Comfort condition: 77º F with 50% RH

Building operating schedule:12x5

Air distribution system: VAV single duct

3D VIEW OF BUILDING

TYPICAL FLOOR PLAN

HEAT LOAD REPORT

AIR DISTRIBUTION SYSTEM

Comfort condition 77º F with 50% RH

ADP is 54º F & CFM is 9200

Chilled water inlet 8º C & outlet is 15ºC

VCD are placed at the beginning of each

duct.

Backward curved aero-foil blade

centrifugal fan for AHU

Inline centrifugal fan is selected for

exhaust air

29

00

Bo

tto

m o

f fa

lse

ceil

ing

34

00

Bo

tto

m o

f d

uct

DUCT PRESSURE DROP ANALYSIS

Pressure drop is due

to bends and head

Static pressure for critical

path is 31.8pa

Based on the static pressure

in the critical path AHU fan is

selected

DUCT PRESSURE LOSS REPORT

Total building load 352TR

Water cooled screw chillers 2

quantities 175TR+ 175TR

Counter flow Induced draft

cooling tower is selected

Approach is 3°C and Range is 5°C

CHILLER PLANT

ELECTRICAL SYSTEM

Ladder type cables are used

Cables are selected based on current flow

2100

Bott

om

of

lighti

ng f

ixtu

re

PLUMBING

1:100 Slope for sanitary pipes

No 90˚bends, only Y fittings

45˚ bends are taken

P- Trap

BO

P 3

200

3D MEP FLOOR PLAN

FIRE FIGHTING SYSTEM

Fire fighting system is designed as per NBC standards for commercial building

Pipes are sized based on number of sprinklers

Sprinklers are placed effectively to cover entire area of the building

TOP FLOOR

FALSE CEILING

Bo

tto

m o

f sp

rinkle

r

28

44

Bo

tto

m o

f p

ipe

30

00

BOTTOM FLOOR

CO-ORDINATION OF ALL FLOORS

INTERFERENCE CHECK

Interference check between MEP systems is performed

Clashes are highlighted by ID

CLASH OF FIRE FIGHTING PIPE,

LIGHTING FIXTURE, CABLE TRAY

CLASH SOLVED BY MOVING FIRE

FIGHTING PIPE AND DUCT

CLASH DETECTION AND SOLUTION

ANNOTATION

CO-ORDINATED SECTIONAL

VIEWLabels are created to annotate

duct size, flow rate and BOD

BO

L 2

10

0

BO

F 2

90

0

BO

P 3

00

0

BO

C 3

10

0

BO

D 3

40

0

BOL – Bottom of Lighting fixture

BOF – Bottom of false ceiling

BOP – Bottom of Pipe

BOC – Bottom of Cable tray

BOD – Bottom of Duct

DRAFTING ON A1 SHEET

CREATION OF FAMILIES

Designing of AHU with specified duct sizes and pipe connectors

BILL OF QUANTITIES