Upload
mohd-hassby-mohd-sidek
View
561
Download
4
Embed Size (px)
Citation preview
CURRICULUM VITAE
PERSONAL PARTICULARS
NameMOHD HASSBY BIN MOHD SIDEK
NationalityMALAYSIAN
NRIC820211-11-5283
Address173B KG LAK LOK 22000, JERTEH BESUT TERENGGANU, MALAYSIA
Status MARRIED
Spouse Address BLOK B NO.4, TINGKAT 2, FLAT SEKOLAH RENDAH DELIMA 1, JLN MANGGIS 1,BB4713 , BRUNEI DARUSSALAM
ContactMobile : +60109180782 ( Malaysia)Email : [email protected]
Current EmploymentCATHODIC PROTECTION SUPERVISOR AT PETRONAS PENAPISAM MELAKA
Previous Employment(2008-2015)SENIOR PROJECT COORDINATOR AT MACH3 ENGINEERING SDN BHD- Based In Brunei.
Certificate1) NACE CP LEVEL 2 CATHODIC PROTECTION TECHNICIAN # 250662) NACE CP LEVEL 1 CATHODIC PROTECTION TESTER # 250663) CORROSION TECHNICIAN4) BASIC CORROSION 5) BOSIET / OPITO
Education DIPLOMA OF ENGINEERING (MECHANICAL)UTMKL
WORKING EXPERIENCES & PROJECT INVOLVED ( From 2008 till Present)
Power Plant Industry Project:
1. Kapar Energy Venture - Sultan Salahuddin Abdul Aziz Power Station (Selangor)
Transformer rectifier trouble shooting Install Pt-Ti anode for steel pile (Impressed Current Cathodic
Protection System) MMO anode fabrication and assembly Maintenance job for Cathodic Protection System
2. Taisei Corporation – Jimah Power Plant (Negeri Sembilan) Installation supervision for Denso Seashield 2000FD & 100 HDPE
jackets for West Mooring Dolphin Steel Piles Conducted ICCP system maintenance procedure training for Jimah
Power Plant personnel
3. Prai Power Station – CP System Design, fabrication and supply Cathodic Protection zinc reference
electrode spare part and mixed metal oxide anode
4. West Mooring Dolphin at 2 x 700MW Coal-Fired Power Plant, Jimah, Negeri Sembilan (Client : Shriro (Malaysia) Sdn Bhd)
Installation supervision of 2000FD SeaShield Jacket onto steel piles QA/QC & Preparation of reports
5. Panglima CCGT Power Plant – Cathodic Protection System Inspection (Client: Powertek Berhad)
Cathodic Protection system inspection during shutdown/turnaround period
Transformer rectifier unit check, anodes efficiency & visual check, junction box junction box check & pipeline potential check
Internal surface corrosion check on condenser water box, cooling water intake/outlet pipeline & drum screen
Project management, planning, scheduling & coordination QA/QC & preparation of comprehensive inspection reports
Oil & Gas Industry Project:
1. White Nile Petroleum Operating Company (WNPOC), SUDAN Surveyor for Cathodic protection system audit survey- Well heads,
trunkline and export pipeline from Tar Jath to Sudan Port QA/QC & Preparation of documentation
2. PS Pipeline, Maintenance Services of Cathodic Protection System from MRPP to KVDT
Surveyor for Impressed Current Cathodic Protection System including DCGV, CIPS and maintenance survey.
Project Management, Planning, and Scheduling QA/QC & Preparation of documentation Revamps of non-functioning System
3. Petronas Carigali Sdn Bhd – Onshore Gas Terminal Plant, CP System Surveyor for Cathodic Protection Evaluation, Maintenance & Audit of
CP System Engineering design, documentation & QA/QC document preparation
4. TCOT / OSC Cathodic Protection System Surveyor for Cathodic Protection Evaluation, Maintenance & Audit of
CP System Engineering design, documentation & QA/QC document preparation TRU check, anode groundbed check, potential survey, insulating
flange check for Terengganu Crude Oil Terminal Plant and Onshore Slug catcher.
5. Petronas Carigali Sdn Bhd- Miri Crude Oil Terminal Surveyor to carry out Cathodic Protection System-TRU check and
troubleshooting.
6. Petrofac E&C Sdn Bhd- Mobile offshore Production unit (MOPU) SEPAT ICCP system installation for conductors Engineering design, documentation & QA/QC document preparation
7. TOTAL E&P Brunei BV Cathodic protection system audit survey- 6” Condensate pipeline to
SCOT, OPP underground utilities (tank, fire hydrant pipelines ) Surveyor - DCVG for 6” condensate line. AC interference datalogging Final report & QA/QC document preparation
8. Petrofac E&C Sdn Bhd- Mobile offshore Production unit (MOPU) WEST DESARU
ICCP system installation and commissioning for rig leg. Engineering design, documentation & QA/QC document preparation
9. TOTAL E&P Myanmar Cathodic protection system audit survey- 36” Yadana Onshore
Pipeline from KP 25 to KP 50. Surveyor - DCVG for 36” Yadana Onshore Pipeline from KP25 to KP
Final report & QA/QC document preparation
10.BRUNEI SHELL PETROLEUM Cathodic protection system audit survey- 30 Nos of pipelines –
Emphasize on redbanded pipeline Surveyor - DCVG & CIPS survey Final report & QA/QC document preparation
11.PETRONAS PENAPISAN MELAKA Total Plant Cathodic Protection Rejuvenation Melaka Refinary TOTAL Plant Shutdown
Water & Infrastructure:
1. Bukit Barun to Terunjing New pipeline- Cathodic protection system Project coordination & execution Liaison with Owner and client QA/QC & Preparation of final document Main focal person at site
2. Bukit Barun Stage 4 & 5, Brunei- Cathodic Protection system Project coordination & execution Liaison with Owner and client QA/QC & Preparation of final document Main focal person at site
3. Brunei Naval Base, Brunei Overview of progress, schedule, costing, procurement, coordination
and execution Liaison with project Owner and client Installation supervision of 2000FD SeaShield & SeaShield 100 Jackets
onto steel piles Supervision of concrete tuner underwater inspection, underwater I-
beam cutting, seabed inspection, piles inspection and air-lift of mud at seabed level
Project management, planning, scheduling & coordination QA/QC & Preparation of final document
4. Cathodic Protection Audit Survey at KLIA GDC Twin Chilled Water Pipelines (Client: GDC KLIA Sdn. Bhd)
Hot spot Cathodic Protection system at SCBC Isolating flange check of chilled water supply and return line at
chamber E6 Project management, planning, scheduling & coordination QA/QC & Preparation of final document Surveyor for DCVG and CIPS survey
5. Tanah Jambu, Brunei- Test point relocation work Project coordination & execution Liaison with Owner and client
QA/QC & Preparation of final document Main focal person at site
WORKING EXPERIENCES & PROJECT INVOLVED ( From 2003 till 2008)
Oct 2002 to Mar 2003Company: BP Chemical (M) Sdn Bhd Position: Maintenance Technician (Industrial Traning)Activities: waste water treatment area maintenance, utility area maintenance and involve in other maintenance job (pump, gear box, valve)
June 2003 to July 2003 Client: Petronas Gas Berhad(GPP3)Position: AWL (Authorised Work Leader)Activities: Unfired pressure Vessel Servicing (Plant Turnaround)Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.Main contractor: TECHNOTEST ENG. SDN BHD
Sept 2003-October 2003 Client: BASF Petronas ChemicalsPosition: supervisorActivities: Unfired pressure Vessel Servicing (plant Turnaround)Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.Main Contractor: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD
Nov 2003-December 2003Client: Cryovac (M) Sdn BhdPosition: SupervisorActivities: Unfired pressure Vessel Servicing (Plant Turnaround)Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.Main Contractor : GREAT TERMINAL ENGINEERING & SERVICES SDN BHD
Dec 2003-Jan 2004 Client: Kaneka ( M) Sdn BhdPosition: Site SupervisorActivities: Rotating Machinery activities (Plant Shutdown)Company: GREAT TERMINAL ENGINEERING & SERVICES SDN BHD.Main Contractor: Semambu Engineering Sdn Bhd
Jan 2004-Nov 2004 Position: Site SupervisorActivities: Scaffolding erectionCompany: BAKTICON ENGINEERING SDN BHD
Main contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD
April 2005 – May 2005 Client: BP Chemical Sdn BhdPosition: SupervisorActivities: installation of stiffener ring for PTA(pure terephthalic acid) DryerCompany: BAKTICON ENGINEERING SDN BHDMain contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD
Sept 2005-Nov 2005 Client: BASF PETRONAS CHEMICAL SDN BHDPosition: Site SupervisorActivities: OXO debottlenecking for syngas package(installation of Compressor)Company: BAKTICON ENGINEERING SDN BHDMain contractor: WARGA HIKMAT KEJURUTERAAN SDN BHD
March 2006-April 2006Client: BP Chemicals (M) Sdn BhdPosition: Site SupervisorActivities: Baca RebaggingCompany: BAKTICON ENGINEERING SDN BHDMain Contractor: BAKTICON ENGINEERING SDN BHD
May 2006-August 2006 Client: BP Chemicals (M) Sdn BhdPosition: Site SupervisorActivities: Supply and construction of works and installation of 11kv cables
for installation of new transformer(132kV Substation)Company: BAKTICON ENGINEERING SDN BHDMain contractor: RANHILL WORLEY
May 2007 – Apr 2008Client: Jabatan Kerja Raya (JKR Daerah Besut, Terengganu)Position: Site AgentActivities: Membina Dan Menyiapkan Satu Blok Bangunan Dua Tingkat Pusat
Aktiviti Perpaduan Daerah Besut, Terengganu.
Jun 2008 – PresentPosition: Senior Project CoordinatorCompany : Mach3 Engineering Sdn BhdNature of bussines: Cathodic Protection System Services
May 2015 – PresentPosition: Cathodic ProtectionSupervisorCompany : FIRCROFT TANJUNG SDN BHDWorking Place: PETRONAS PENAPISAN MELAKA
Current Salary: RM12K
EQUIPMENT / TOOLS / DEVICE AND MATERIAL INVOLVED
1) DCVG MACHINE- PCS 200 / DCVG2) CIPS QUANTUM DATALOGGER3) DATALOGGER FOR AC / DC INTERFERENCE4) HOLIDAY DETECTOR5) RD 8000 PIPE LOCATOR6) SOIL RESISTANCE METER / SOIL BOX7) AG/AgCl / CuCuSo4 / Zinc REFERENCE ELECTRODE8) DENSO COATING9) PCS COATING10) YBM DRILLING MACHINE FOR SOIL INVESTIGATION11) GPS DEVICE12) PORTABLE TRANSFORMER RECTIFIER UNIT13) CADWELDING14) RADIO FREQUENCY INSULATION TESTER15) MEGGER TESTER16) MULTIMETER / AC/DC CLAMPMETER17) CURRENT INTERRUPTER- DCVG , MC MILLER, TINKER & RASOR
References
1) Ahmad Shamiri Bin WahabTechnical ManagerMach3 Engineering Sdn BhdContact No: +60192251570
2) Calvin Kok KeongManagerISBNContact No: +60127085338