4

Click here to load reader

HFY3-3125-PIP-MTO-0001_0 Code-A

Embed Size (px)

Citation preview

Page 1: HFY3-3125-PIP-MTO-0001_0 Code-A

7/23/2019 HFY3-3125-PIP-MTO-0001_0 Code-A

http://slidepdf.com/reader/full/hfy3-3125-pip-mto-00010-code-a 1/4

3 MAY 15

Page 2: HFY3-3125-PIP-MTO-0001_0 Code-A

7/23/2019 HFY3-3125-PIP-MTO-0001_0 Code-A

http://slidepdf.com/reader/full/hfy3-3125-pip-mto-00010-code-a 2/4

Petrochina (Halfaya)

HALFAYA PROJECT

SURFACE FACILITY

PHASE THREE

DETAIL DESIGN DOC.NO.: HFY3-3125-PIP-MTO-0001 REV.: 0 PAGE 2 OF 4

CONTENTS

1. MTO………………………………………………………………………………………………………………..3

Page 3: HFY3-3125-PIP-MTO-0001_0 Code-A

7/23/2019 HFY3-3125-PIP-MTO-0001_0 Code-A

http://slidepdf.com/reader/full/hfy3-3125-pip-mto-00010-code-a 3/4

Page 4: HFY3-3125-PIP-MTO-0001_0 Code-A

7/23/2019 HFY3-3125-PIP-MTO-0001_0 Code-A

http://slidepdf.com/reader/full/hfy3-3125-pip-mto-00010-code-a 4/4

Petrochina (Halfaya)

HALFAYA PROJECT

SURFACE FACILITY

PHASE THREE

DETAIL DESIGN DOC.NO.: HFY3-3125-PIP-MTO-0001 REV.: 0 PAGE 4 OF 4

 Attachment-1

  Dwg. No. HFY3‐3125‐PRO‐DWG‐0331 (Security Defense for CPF3 Area: P&ID Rain Storm Collecting Pool) (1 page ) 

Doc. No. HFY3‐GEN‐PIP‐SP‐00005 (Specification for Piping Materials) (4 Pages)