Airports
Delhi Airport (PAX Cap. 60 mn, FY13 Traffic 34.37 mn)
Hyderabad Airport (PAX Cap. 12 mn, FY13 Traffic 8.38 mn)
Istanbul Sabiha Gokçen Airport (PAX Cap. 25 mn, FY13 Traffic 15.34 mn)
Power Generation, Transmission and
Coal Mine
Generation Assets in Operation: 1,136 MW, 7 Assets
Generation Assets Partially Operational: 350 MW out of 1,050 MW, 1 Asset
Generation Assets Under Construction: 2,318 MW, 3 Projects
Generation Asset (Coal based) Under exploration: 1,320 MW, 1 Project
Generation Assets (Hydro) Under exploration: 1,960 MW, 4 Projects
Transmission Lines in Rajasthan Under Construction: 350 km, 2 Projects
Coal Mines: Reserves of 1609 mn tons, 3 Assets
Highways
Assets in Operation (Annuity): 255 kms, 3 Assets
Assets in Operation (Toll): 411 kms, 4 Assets
Assets under Construction: 29 km, 1 Project
Others
Urban Infrastructure
At Delhi Airport 230 acres for Commercial Development
At Hyderabad Airport 1,000 acres for Commercial Development 250 acres Aviation SEZS 250 acres Logistics SEZ
Setting up Industrial Investment Region (IR) cluster of approx. 3000 acres at Tamil Nadu (Krishnagiri)
Multi Product Large Area Development of approx. 10000 acres at Andhra Pradesh (Kakinada)
EPC Division
GMR has been presented with the prestigious `Most Admired Infrastructure Company – Overall’ at the 5th KPMG Infrastructure Today Awards 2012-13
0
2
4
6
Operational Under Cons Total
1.98 2.62 4.60 0.04 1.06
1.09
CAPEX
To beIncurred
Incurred
5.69 3.67
$ bn
2.02
0
2 1.11
0.17 1.28 0.04 0.04
CAPEX
To beIncurred
1.31 0.20
$ bn
0
2
4
DIAL GHIAL SGIA Total
2.14 0.49 0.60
3.23 CAPEX $ bn
* CAPEX as of June 30, 2013; ** Exchange Rate – 1 USD = INR 60
GMR GROUP
3
Krishnagiri is the point where
Golden Quadrilateral &
North South Corridor meet
Equidistant from
East & West Coast
of India
Confluence of 3 southern states
Tamil Nadu
Karnataka Andhra Pradesh
Golden Quadrilateral
North – South Corridor
PA
GE |
3
Project Location プロジェクトの場所
Site 用地
Hosur, Krishnagiri Special Investment Region ホスル、クリシナギリ特別投資地域
Project Location プロジェクトの場所
NH 7
SH 17
SH 17
SH 85
SH 85
SHOOLAGIRI
RAYAKOTTAI
PA
GE |
4
Hosur | 25 km
ホスール・ロード | 25 km
Automotive and precision engineering base 自動車および精度エンジニアリング・ベース
Electronic City, Bangalore | 45 km
バンガロールのエレクトロニック・シティー | 45 Km Home for global IT majors and R&D facilities グローバルなITと研究開発施設の本拠地
Sriperumbudur | 245 km
スリペルブデュール 245 Km
Home for global Electronic & Automobile majors グローバル電子機器と自動車の本拠地
Chennai | 290 km
チェンナイ 290 km
Home for global Automobile majors グローバル自動車製造の本拠地
Bangalore バンガロール
Hosur ホスール
Unit 1 1号機
Unit 2 2号機
1500 Acres 1500 -- エーカー
2,800 Acres 2,800 エーカー
2,800 Acres 2,800 -- エーカー
Atibele アチベラ Hosur
ホスール
Bidadi ビダーヂィ
Existing Social Infrastructure ソシアル インフラ
Bangalore バンガロール
Golf Course Gグルフコース
Hospitals 病院
Restaurants レストラン
Int’l Schools Int’l 学校
Electronic City エレクトロニック・シティー
PA
GE |
5
Krishnagiri クリシュナ
Integrated Industrial / Services City
統合した産業 /サービス都市
Social Infrastructure ソシアル インフラ
1500 Acres 1500 -- エーカー
Unit 1 1号機
Unit 2 2号機
Project Vision プロジェクトのビジョン
Work
Live
Learn
Play
Cluster of world class players Shared resources & fostering innovation
ワールドクラスのプレーヤーの集団
共有資源と革新の促進
Assured world class infrastructure & utilities including Digital & Energy Services
世界最高を誇る、基本施設と諸設備
デジタルとエネルギーのサービスを含みます
Excellent multi-modal logistics connecting to domestic & regional markets
多数の優れたモデルのロジスティックス
地域と国内の市場につながる
Integration with education, research & incubation drawing on the high degree of skilled & talented HR
教育、研究、インキュベーションの統合
優秀な技術と才能のある人材
Social infrastructure of international standards improving work-life balance in the zone
国際的な標準の社会インフラストラクチャー(社会基盤)
地域でのワークライフバランスの向上
Integrated Industrial / Services City
統合した産業 /サービス都市
4,300 Acres / 4300 エーカー
PA
GE |
6
PA
GE |
8
INDIAN OPPORTUNITY IN ELECTRONICS
電気製品 インドでのビジネスチャンス
69.9
400
32.5
100
0
100
200
300
400
500
2012 2020
Demand Supply
25%+ Demand for electronics hardware
growing rapidly
電子ハードウェアの需要は急速に成長しています。
THE GAP
=好機
2011 – 12
Demand - 需要 $69.9 bn
$32.5 bn
$37.4 bn GAP – 好機
2020
Demand -需要 $400 bn
Supply -供給 $100 bn
$300 bn GAP – 好機
Supply -供給
SEZ, NMIZ and EMC - Overview
National Manufacturing and Investment Zones (NMIZ)
• An area would be specifically delineated for the establishment of manufacturing facilities for domestic and export led production, along with the associated services and infrastructure
• Will be combination of production units, public utilities, logistics, environmental protection mechanisms, residential areas and administrative services
• NMIZ will have a processing area • Where the manufacturing facilities, along with associated logistics and other services and required
infrastructure will be located
• Processing area may include SEZs, Industrial Parks & Warehousing Zones, Export Oriented Units, DTA units duly notified under the relevant Central or State legislation or policy
• NMIZ will have a Non- processing area • Residential, Commercial and other Social and Institutional infrastructure
9
Difference between NMIZs and SEZs Scale of operation SEZs could be a smaller entity within the NMIZs
and would be governed by the SEZ Act EMC can be set up within NMIZs NMIZs will be much larger in size For NMIZ, the government will aggregate land
to create manufacturing zones
Electronic Manufacturing Cluster (EMC) EMC is a scheme under National Policy on
Electronics 2011 Objective is to increase self dependency in
Electronics Sector EMC can be set up within NMIZs Land - applicable to area applied for 29 identified Electronics and related Products Policy available upto Nov 2017
PROJECT OBJECTIVES プロジェクトの目的
where components, parts & equipment manufacturers / assemblers can achieve global competitiveness & reduction in cost コンポーネント、部品や機器メーカー/アセンブラーは国際競争力と経費削減を達成することができます。
Promote ENTREPRENEURIAL FIRMS & facilitate START-UPS 起業会社を推進して、スタートアップを 促進する。
Provide AN EFFICIENT ECOSYSTEM
効率的な商用環境を供給すること
to enhance the value of Electronics manufactured in India CLUSTER INNOVATION CENTER FOR ELECTRONICS & ICT インドで製造された電子機器の価値を高めるために。 エレクトロニクス·ICTのクラスター革新の中心。
Facilitate R&D AND INNOVATION R&Dと技術革新を促進すること
which would enable domain specific training schools to train the existing & new talent to meet the needs of the industry
当該固有の訓練学校は業界のニーズを満たすために既存と新しい才能を育成するようになります。
Formalize VOCATIONAL TRAINING 職業訓練を形式化する。
PA
GE |
10
Electronic Manufacturing Cluster 電子機器製造クラスタ
UNIT 2
PA
GE |
11
Electronic Manufacturing Cluster 電子機器製造クラスタ
• MANUFACTURING • 製造
• R&D and DESIGN FACILITIES • R&Dと設計施設
• CLUSTER INNOVATION CENTER • クラスター革新の中心。
• INCUBATION • 生成領域。
• TESTING LABS & CERTIFICATION • 試験的研究と認証。
• SKILL DEVELOPMENT CENTRE • 技能 開発センター 。
• MANUFACTURING SUPPORT SERVICES • 製造支援サービス。
• COMMON FACILTIES • 共用施設
• TRANSPORT & LOGISTIC HUB • 輸送とロジスティクスハブ。
• NON PROCESSING AREA • 不処理領域
Concept MASTER PLAN マスタープランの概要
鉄道線路
Proposed Pipeline Alignment from
Kelavarapalli Reservoir
ケラバラパリ貯水池からのパイプラインの確保を提案しています。
Dual Circuit 230 kV Transmission Line
二元的回路 230 kVの伝送路。
National Grid 400 kV Sub-Station
ナショナルグリッド400KV変電所
TNEB Sub-station, Hosur
TNEB変電所、ホスール
In Zone Dedicated 230 kV Sub-Station
専用の230 kV変電所地帯。
SITE – Utilities
サイトユーティリティ
Water + Power
水+ 電気 P
AG
E |
12
Hosur ホスール
Bangalore バンガロール
Water 水
Unit 1 1号機
Unit 2 2号機
E M C OFFERS E M C 提供
PA
GE |
13
Shovel Ready Leveled Land with 平地と平らな土地 通り
Roads - 道路 Drainage - 下水道 Sewerage - 排液 Water - 水道 Power - 電源
Digital Infra - デジタルインフラ
connections upto the site boundary as
Common infra 共通インフラとしての
敷地境界までのコネクション
with
Common facilities 一般的な設備で
Center of Excellence 卓越した研究拠点.
Testing & Certification Facilities 試験と認定施設。
Logistic Park ロジスティックパーク。
Social Infrastructure 社会インフラ。
Incubator Center 恒温器センター
Manufacturing Support Facilities 製造支援施設。
Government Incentives 政府による支援
SUBSIDY ON CAPITAL INVESTMENT 設備投資への助成金
Special Economic Zones 特別な経済地帯
Non Special Economic Zones 一般的な経済地帯。
20 %
25 %
Reimbursement of 以下への返済
• Countervailing Duty (CVD) or •相殺関税 (CVD) と • Excise duty for capital equipment •主要機材に伴う消費税