28
© Copyright 2010 Hewlett-Packard Development Company, L.P. 1 © Copyright 2010 Hewlett-Packard Development Company, L.P. 1 HP Auto COE EIT teams Mr. Alan Hui – HP WW Auto CoE Manager Mr. Guo Jia – HP BAS CHINA EIT Team Leader HP Engineering IT Transformation COE Introduction For 神龙汽车

HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 1 © Copyright 2010 Hewlett-Packard Development Company, L.P. 1

HP Auto COE EIT teams

Mr. Alan Hui – HP WW Auto CoE Manager

Mr. Guo Jia – HP BAS CHINA EIT Team Leader

HP Engineering IT Transformation COE Introduction For 神龙汽车

Page 2: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 2

HP GLOBAL AUTOMOTIVE CENTER OF EXCELLENCE

Page 3: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 3

HP Automotive CoE Solution profilio

SAP eWM Eng. IT

Transformation

PLM

Ready to Collaborate

© Copyright 2010 Hewlett-Packard Development Company, L.P.13

HP HAS ALL YOU NEED - (1/2)

Content & Partner Management

Purchases … … -anywhere …

… -anytime … … -spontaneous

Ringtones

Ticketing (Cinema,

theatre, ...)

Information

(articles, …)

Betting

Pictures

Gambling

Tangible goods

(books, CDs,..)

Vending machines

Public

Transportation

Music

Download

Navigation

Routing

Parking

News

(events,wheather, traffic, ...)

Mobile payment & billing

M2M communication

App Store & Portal Solution

Telematic IT Provision

Mobile device & WebOS

Cloud based

CRM/DMS

Intelligent

Mobility

Automotive

MES

Customers

OEM

Retail

cloud

Contact center

Product Development

SCM, Mfg, MES Sales, After Market and Intelligent Mobility

Page 4: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 4

AGENDA

Current Market Situation

CAD/CAE Current Challenge

HP EIT Solution Overview

Reference Case(Automotive Industry

Proposed Solution Demo Q&A

Page 5: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 5

AGENDA

Current Market Situation

CAD/CAE Current Challenge

HP EIT Solution Overview

Reference Case(Automotive Industry

Proposed Solution Demo Q&A

Page 6: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 6

FY 2012 计划

– 2011年,神龙公司产品结构进一步优化,新产品投放不断加快。继2010年投放东风雪铁龙

C5和东风标致408之后,7月10日,东风标致首款进军中高级车型市场的旗舰产品——东风

标致508在杭州荣耀上市。10月20日,高品质风尚中级车东风标致308在上海隆重上市。东

风标致产品系列全面迈入了“8时代”。另外,C5、世嘉、新爱丽舍、408、307、207分别推

出了年型款或改型款。公司两个品牌的产品布局更加均衡,产品竞争力进一步增强。双品牌

未来的新车型项目、EC5、EC8、EP6、EP8等新动力总成项目均按预定项目节点顺利推进;

自主品牌的相关研究工作全面展开,自主品牌项目正式纳入公司整体产品规划,先期两个车

型已开始整车造型设计。同时,研发设施投入不断加大,自主创新和自主研发能力不断提升

,重点专业领域的能力不断增强。2011年,神龙公司获中国汽车工业科技进步奖1项、武汉

市重大成果转化贡献奖1项,武汉市科技进步奖1项,东风公司科技进步奖16项,省、市企业

管理现代化创新成果奖17项,国家专利授权奖37项。公司连续第六年雄踞东风研发体系技术

创新工作评价第一名。

6

神龙公司未来计划

Page 7: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 7

CAD areas:

7

神龙目前EIT环境一览

Current 3D Catia, 260 users 8 hours per day

Current 2D AutoCad, 100 users

CAE areas: Current 3D hw11.0,abaqus11.0,nastra

n10.0,adams;

Nodes and Users 7nodes+1manage+1analytics+3flexlm

Running OS Redhat5.4 ,Redhat hpc 5.4 NAS and SAN

HW areas: Desktop 12 CAEworkstaion(HP XW9400,HP Compaq8170W,HP XW4600 ,HP

Z400,Lenovo Thinkstation D20,Lenovo Thinkstation S20); 260 CADworkstation(HP XW 4400,HP XW 4600,HP

HPC Pool IBM for HPC; FC for SAN

Page 8: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 8

工程设计正影响着汽车行业

目前行业对于工程设计的要求

– Collaboration offers

opportunities for reduced costs, faster time-to-market, improved

customer satisfaction, strategic thinking and quicker problem solving.

Les Lee, Controls Strategy/Global Sigma Program Leader

– Ford Motor Company Ltd

8

在快速增长的经济情况下,如何在最低成本与安全可靠下,快速与高效的改变自动化组装及生产,是企业成功的关键因素

Page 9: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 9

AGENDA

Current Market Situation

CAD/CAE Current Challenge

HP EIT Solution Overview

Reference Case(Automotive Industry

Proposed Solution Demo Q&A

Page 10: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 10

传统的CAD/CAE环境的挑战

安全与报障问题如数据与硬件的

丢失

• 现在的桌面局限于用户与/

或地点,所以很难灵活的调

用或充分利用桌面的可用性

• 桌面产生的热气&噪音以

及占用了办公室空间

• 缺少规范的系统管

理员或(操作系统与

应用系统)管理 • 因为报错或者灾难性的桌

面问题所引起的烦恼

• HPC资源对于

OS的局限性 • 准备工作与远程支

持需求的挑战

• 无效率的HPC

资产使用率

Page 11: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 11

AGENDA

Current Market Situation

CAD/CAE Current Challenge

HP EIT Solution Overview

Reference Case(Automotive Industry

Proposed Solution Demo Q&A

Page 12: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 12

EIT方案的目标

减少固定资产成本

减少运行成本

增加企业透明度 集中式管理带来的安全与知识产权的安全性 简单的一站式管理与部署 企业可以及时运行云方案

Page 13: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 13

典型CAD/CAE变革所带来的价值

可衡量的 • 调动服务器资源(因服务器没有被充分的使用)减少

15%的固定资产

• 虚拟技术(如HYPER-V)可以启动多用户进程/刀片桌面,可以进一步减少15%的固定资产

• 启动灵活的OS双-启动桌面机(Linux 或者 Windows)与虚拟(一般来讲设计工程师不会拥有2台桌面机)进一步减少15%的固定资产

• 支持按-需求的远程地点需求(提供RGS)可以有10%固定资产使用率的改善

• 充分使用电脑的使用率达到90%或以上

• 对于软件许可证的固定资产使用率有更加好的扩展性,20%的固定资产使用率的改善

• 最少减少40%的能耗与制冷的使用,以及减少整体每用户二氧化氮的使用痕迹

无形的 • 登入桌面甚至不再需要在一个电脑或是实际的办

公场所,可以提供在任何地方,任何时间,任何设备

• 在任何时间&任何地方登入到应用系统与数据,并拥有更加方便,持续与可以容许灾难恢复能力

• 对于敏感数据管理在安全可靠的数据中心环境中,会有着更加好的安全与标准规范。系统高级管理员会有完全的桌面图像与数据的控制能力

• 使得在公司内部或远程中心的桌面部署,管理和维护更方便,更快捷

• SLA-驱动的动态资源和工作负载分配

• 在可以调配的资源分配管理下,管理多种跨平台计算机工作环境

• 更加容易管理资源能力的计划与扩展

Page 14: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 14

Client

• 合并用户的HPC环境,变成一个共享的资源池,提供多种操作系统的支持。Consolidation of customers’ HPC environment (compute node) into a shared resource pool, for a mixed OS environment.

• 使用户的3D图形应用都运行在数据中心,提高了安全性,方便管理和运维。Consolidation and pooling of customers’ frontend workstation into the Data Center providing better security, administration and maintenance.

• 优化资源利用,使共享资源池能够同时提供3D图形应用和HPC应用。Optimization of visualization node by leveraging them for HPC workloads.

• 融合HPC节点资源和图形工作站资源,转化成以“云”为基础的环境。Enabling of compute node and visualization node into a cloud based environment.

• 采用远程图像传输技术,使用瘦客户端。可以在本地或远端使部署和管理3D图形应用更快、更方便、效率更高。Adoption of remote access technologies and thin clients for faster, simpler and more efficient workstation deployment, management and maintenance in local, satellite or remote sites.

EIT方案的介绍

Page 15: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 15

Workstations or HPC

resources using

WS460c and/or SL390

EIT方案 (在极小的空间中实现)

Moab (orchestrator)

HP OO, other resource mgr and

tools

Workstation Allocation and Advanced

HPC Job Scheduling

• 用户可以通过服务目录远程访问所需资源。Users access

resources remotely using access devices via a service catalog

portal

• Moab、HP OO和其他资源管理工具用来调度和动态部署和管理

任务、OS和基础架构资源。Moab with HP OO and other

resources managers/tools, will help to orchestrates,

dynamically provision and manage the various jobs, OS and

infrastructure resources

• 可以通过虚拟化技术,提供多种操作系统的支持 Resources

can be virtualized and running on multiple OS

Viewpoint, NICE, etc ..

Web Portal

HDX, RGS, DCV remote graphic type software

Access Device

(Thin Client, laptop or PC)

Citrix, HYPER, NICE, etc

Virtualization tool

Page 16: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 16

Orchestrator (Moab)

Workload Management

Adaptive Resource Orchestration

Load Balancing Optimization Policy Enforcement Fault

Tolerance

Billing and Reporting provides and accounting system in which invoices can be provided and billed upon.

Dynamic Compute Environment

Service Catalog (VIEWPOINT)

Request for environment or

simple application request

Inventory Monitor of HW config,

health, workload, etc ….

HP SL6500 Scalable System to run customer’s High Performance Cluster environment

HP Blade Workstations WS460C or SL390 for full HW acceleration fin2D/3D graphics and Blade Server BL460CG7 to

host various software solutions.

Thin Client

CAD Blade CAE Blade

Clie

nt

Acc

ess

Lay

er

(In

tern

et o

r In

tran

et)

Thin Client

Laptops Remote Graphic Software

to display, capture, compress & encrypt video via network

Active Directory Authentication and Single Sign On

Resource Manager

HP iLO, allow remote mgt to HP

servers

TORQUE controls batch jobs and

distribute compute nodes for Linux OS

HP OO is a scalable & auditable process

automation platform

MS HPC Server

controls batch jobs and distribute

compute nodes for MS OS

CAE

CAD

USER END DC

Engineering IT – 方案效果图

User Admin

Workload

Page 17: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 17

3种CAD可行的方案

– 根据当前技术和实际需求,我们提供3种不同的解决方案。According to current

Technology and Real Requirements, we have 3 CAD Technology Approach for

EIT

Hyper-V + RGS

Hyper-V + RGS

XenServer + HDX

Hyper-V + RGS

NICE + DVC

Page 18: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 18 18

收益Benefits: •提高了IT设备的利用率Improve IT asset utilization •Increase Throughput of Organization •提高了投资回报率Increase the Return of Investment •全面简化了工程方面的IT管理和部署Simplify Overall Engineering IT Management and deployment •为企业构建了云架构Bring Cloud Readiness to Organization

特性Features:

•服务目录和工程应用远程可视化Service catalog & Engineering client visualization

•HPC节点OS切换(多重启动)HPC Node OS Switching(Dual Boot)

•HPC和图形工作站快速切换(白天/夜晚模式)HPC & CAD Workstation

Switching(DAY/Night Model)

•节约能源Green Mode Power Saving

•智能任务调度Intelligent Job scheduling

•计费机制Billing Mechanism

特性与收益FEATURES & BENEFITS

Page 19: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 19

AGENDA

Current Market Situation

CAD/CAE Current Challenge

HP EIT Solution Overview

Reference Case(Automotive Industry

Proposed Solution Demo Q&A

Page 20: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 20 20

Compare with Traditional CAD/CAE ENV, EIT Solution has 31.78% Cost Saving. OPAX Cost is much decreased by EIT solution, Compare with Traditional ENV, Power Cost is only 42% . CAPEX cost is also much decreased, Different sub-solution has different data. Save 18% Hardware Investment at least.

Reference case (automotive industry) Power Cost Save 49%.

Hardware Investment Only stand

82%.

Page 21: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 21

AGENDA

Current Market Situation

CAD/CAE Current Challenge

HP EIT Solution Overview

Reference Case(Automotive Industry

Proposed Solution Demo Q&A

Page 22: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

Rendering Host Blade WorkStation SL390

Redhat6

Virtualization Layer

Application Host Windows 7

POC Environment Configuration Rendering Host (SL390 * 4 (2U)):

Hardware •CPU: 2x HexaCore Intel Xeon E5645

•RAM: 12x 4GB DDR3

•HDD: 146G 15K SAS

•GPU: 3G NVIDIA Quadro 6000 * 3 (each SL390)

Software •Redhat 6.1

•NICE DCV

Application Host (Virtual Machine): Hardware •CPU: 2x DualCore

•RAM: 12GB

•HDD: 40GB

Software •Windows 7

•Catia V5R18

•UG.NX 7.5.2

•NICE DCV & RealVNC Server

Service Portal: Hardware (Virtual Machine)

•CPU: 2x DualCore

•RAM: 12GB

•HDD: 40GB

Software •NICE EnginFrame

Application Host Windows 7

Application Host Windows 7

Serv

ice

Po

rtal

En

gin

fra

me

建议POC方案架构与下一步的工作

- 客户欢迎到我们惠普在上海的展示中心并有5个业务场景

- 通过SL G7系列,我方建议搭建一机柜SL390,做为客户现场的POC环境,里面放置4台2U的SL390机器,每台机器可以放入3组3G的NVIDIA显卡,并使用Nice and DCV方案来完成POC与单台工作站的对比

- 功率:在 Nice and DCV 方案, 这个组合可以最大推动 “30到40”个2D和3D用户数

* 备注:POC是建议使用本地硬盘存储

Page 23: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

1/2宽,2U高;每个4U机箱可容纳4个;

HP ProLiant SL390s G7 2U半宽型托架

4块热插拔小尺寸(2.5英寸)硬盘

SFP+万兆以太网接口

1个GPU模块, 位于2U机箱后端底部

2个GPU模块, 位于2U机箱上部

1GbE网络接口

iLO3 专用管理网络接口和2个USB端口

VGA

UID指示灯和按钮

状态指示灯

串口(RJ45)

电源按钮 QSFP (QDR IB) Infiniband

接口

2块非热插拔小尺寸(2.5英寸)硬盘

Page 24: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

24 24 8 July 2013

Rack Extension Kit – 800MM Deep (8”) Kit

• AF036A for 42U

• AF043A for 47U

– Replaces 600MM (6” Kit)

– Install to existing 10K Racks

• Ships in Flat Box

• Easy to assemble

• Bolts to Rear Frame

– HP Racks available with Rack Extension Kit pre-installed (1200MM Deep Racks)

Page 25: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

25

Integrated 1200MM (48”) Deep Racks

– 42U and 47U Models

– 100 square inches more perforations

for better airflow (no forced air

systems needed)

– 0U mounting capabilities

– High-density deployments

– Fully welded frame (not bolted)

– Supports:

• 3000 lbs of Static Load (at rest) on

Leveling Feet

• 2000 lbs of Dynamic Load (dock-to-dock) 42U and 47U

1200MM (48.5”) Deep

Page 26: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

26 HP Confidential - CDA Required

Front Views

Page 27: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

27

Agenda

Current Market Situation

CAD/CAE Current Challenge

HP EIT Solution Overview

Reference Case(Automotive Industry

Proposed Solution Demo Q&A

Page 28: HP Engineering IT Transformation COE 神龙汽车...SAP eWM Eng. IT Transformati on PLM Ready to Collaborate ... Les Lee, Controls Strategy/Global Sigma Program Leader – Ford Motor

© Copyright 2010 Hewlett-Packard Development Company, L.P. 28

Q&A

Contact:

Hui, Bun Alan

GLOBAL COE CHINA LEADER

[email protected]

Au, Nicholas

Principal Solution Architect

[email protected]

Guo, Jia

BAS CHINA EIT Team Leader

[email protected]