HSC development in Taiwan
Shiang-Yu Wang (王祥宇 )Institute of Astronomy and Astrophysics
Academia Sinica
Background• Instrumentation capability is one of the
major research topic in ASIAA
• Development of WIRCAM in CFHT successfully finished in 2005
• Long term relationship with Japan
• Promote collaborations in Asian region
• Discussion with Subaru began in 2006
Hyper SuprimeCam
HSC fits IAA’s interests both in the science and technical sides
Our Role in HSC
• Mechanical Shutter• Filter exchanger • CCD emulator?• Optical and Mechanical
components?
Tight space and weight limits of the HSC makes it challenging
Specifications for shutter
• Time Repeatability : 1%
• Time Accuracy : 0.01 s
• Shortest exposure time : 1s
• Maximum Speed : 800 mm/s
• Operation Temperature : -10 to 10C
• Weight ~25Kg
• 15mm thickness at shutter body and 120mm diameter of the drums
Major activities in IAA
• Extract system design and specifications form Subaru last June
• HSC team formed in IAA• ARL to be the major contractor for the two
systems • Fabric material purchased for strength test• Regular meeting with ARL
Aeronautical Research Lab. (ARL)
• Government funded Military research laboratory– Major jet fighter development center in
Taiwan
• Long term collaboration on the SMA project with good partner spirit.
• Main contractor carrying out the ALMA EA FEIC.
Shutter design
COVER
FRAME
SCREEN
DRUM
SHAFT
MOTORSUPPORT
COUPLING
SHUTTER DESIGN CONCEPT
SHIELD
ENCODER
ADAPTERSUPPORT
SUPPORT
TORQUE METER
NUT & WASHER
RETAINER
BEARING
HOUSING
SUPPORT
SHAFT
IDLE ROLLER
CAM FOLLOWER
RETAINER
SNAP RING
FRAME
Shutter weight estimation1 FRAME SH0012 1 AL 5.772 5.772
2 MOTOR HT3005 2 2.190 4.380
3 SHAFT SH0001 2 STEEL 1.209 2.418
4 SCREEN SH0016 1 FIBER 1.800 1.800
5 COVER SH0015 1 AL 1.349 1.349
6 ROLLER-IDLE SH0013 2 TEFLON 0.256 0.512
7 DRUM-UPPER SH0004 4 AL 0.212 0.848
8 COUPLING FAMM-L40 2 AL 0.13 0.260
9 TORQUE-METER QWLC-8M 2 STEEL 0.128 0.256
10 DRUM-RIGNT SH0003 2 AL 0.100 0.200
11 OTHER 1.342
TOTAL 19.137
Projected Milestones
• Shutter components ready in March
• Prototype of shutter system to be finished in May.
• Detailed interface defined in May.
• System fabrication starts in late 2008.