14
Standar Satuan Harga Kegiatan 2014 Pemerintah Provinsi DKI Jakarta EDIT HSKP Kode Komponen hspk.2324.18022014.01 Nama Komponen Satuan Harga zone 1 = 10.000.000 Komponen Penyusun Sub HSPK Tipe Nama Satuan Harga 1 Volume Total 1 PEKERJAAN ATAP 1M2, Penutup atap genteng metal :Atap genteng metal t 0,35mm m2 128.250 1,000000 128.250 1M2, Penutup atap genteng metal :Upah pasang genteng + alat bantu m2 15.000 1,000000 15.000 1M2, Pasang Roxul MPS Density 40Kg/m2 :Roxul MPS Density 40Kg/m2 m2 90.432 1,000000 90.432 1M2, Pasang Roxul MPS Density 40Kg/m3 :Upah pasang m2 5.000 1,000000 5.000 1M2, Pasang Woofen foil Ds :Pasang Woofen foil Ds m2 18.330 1,000000 18.330 1M2, Pasang Woofen foil Ds :Upah pasang m2 21.279 1,000000 21.279 Total PEKERJAAN ATAP 278.291 PEKERJAAN ELEVATOR :Pengadaan & pemasangan Lift Penumpang (Low Zone) unit 1.608.175.000 1,000000 1.608.175.000 :Pengadaan & pemasangan Lift Penumpang (HighZone) unit 2.122.854.000 1,000000 2.122.854.000 :Pengadaan & pemasangan Lift Service unit 1.608.175.000 1,000000 1.608.175.000 Total PEKERJAAN ELEVATOR 5.339.204.000 PEKERJAAN FASADE (TAMPAK LUAR) Dinding Type Sunglass 10mm, lengkap Spider Fitting + plat besi :Plat besi finish cat duco pengangan Routel bh 350.000 0,500000 175.000 Dinding Type Sunglass 10mm, lengkap Spider Fitting + plat besi :Glass Fitting Routel KEND P-03, diameter 36 bh 539.000 1,000000 539.000 Dinding Type Sunglass 10mm, lengkap Spider Fitting + plat besi :Upah Pasang dan Pabrikasi m2 167.848 1,000000 167.848 Harga Per M2 Pek pas Kaca Patri :Kaca Patri tebal 5 mm m2 341.000 1,000000 341.000 Harga Per M2 Pek pas Kaca Patri :upah Pemasangan oh 98.019 0,015000 1.470 HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_... 1 of 14 10/05/2014 21:07

HSKP 2013

Embed Size (px)

Citation preview

Page 1: HSKP 2013

Standar Satuan Harga Kegiatan 2014

Pemerintah Provinsi DKI Jakarta

EDIT HSKP

Kode Komponen hspk.2324.18022014.01

Nama Komponen

Satuan

Harga zone 1 = 10.000.000

KomponenPenyusun

Sub HSPK Tipe Nama Satuan Harga 1 Volume Total 1PEKERJAAN ATAP

1M2, Penutup atapgenteng metal :Atapgenteng metal t 0,35mm

m2 128.250 1,000000 128.250

1M2, Penutup atapgenteng metal :Upahpasang genteng + alatbantu

m2 15.000 1,000000 15.000

1M2, Pasang RoxulMPS Density 40Kg/m2:Roxul MPS Density40Kg/m2

m2 90.432 1,000000 90.432

1M2, Pasang RoxulMPS Density 40Kg/m3:Upah pasang

m2 5.000 1,000000 5.000

1M2, Pasang Woofenfoil Ds :Pasang Woofenfoil Ds

m2 18.330 1,000000 18.330

1M2, Pasang Woofenfoil Ds :Upah pasang m2 21.279 1,000000 21.279

Total PEKERJAAN ATAP 278.291PEKERJAAN ELEVATOR

:Pengadaan &pemasangan LiftPenumpang (Low Zone)

unit 1.608.175.000 1,000000 1.608.175.000

:Pengadaan &pemasangan LiftPenumpang (HighZone)

unit 2.122.854.000 1,000000 2.122.854.000

:Pengadaan &pemasangan Lift Service unit 1.608.175.000 1,000000 1.608.175.000

Total PEKERJAAN ELEVATOR 5.339.204.000PEKERJAAN FASADE (TAMPAK LUAR)

Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :Platbesi finish cat ducopengangan Routel

bh 350.000 0,500000 175.000

Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :GlassFitting Routel KENDP-03, diameter 36

bh 539.000 1,000000 539.000

Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :UpahPasang dan Pabrikasi

m2 167.848 1,000000 167.848

Harga Per M2 Pek pasKaca Patri :Kaca Patritebal 5 mm

m2 341.000 1,000000 341.000

Harga Per M2 Pek pasKaca Patri :upahPemasangan

oh 98.019 0,015000 1.470

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

1 of 14 10/05/2014 21:07

Page 2: HSKP 2013

Harga Per M2 Pek pasKaca Patri :Pekerja oh 115.457 0,150000 17.319

Harga Per M2 Pek pasKaca Patri :TukangKaca

oh 132.928 0,015000 1.994

Harga Per M2 Pek pasKaca Patri :KepalaTukang Kaca

oh 150.382 0,000750 113

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame :KacaLaminated Stopsol 6mm+ PVB 0,38 + Float6mm

m2 580.000 1 638.000

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Gosok Kaca tebal 8 mm

m' 9.000 4 39.600

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Kusen AluminiumPowder Coating 50 x150mm Vertical

m' 193.333 2 290.000

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Kusen AluminiumPowder Coating 50 x100mm Horizontal

m' 145.000 2 217.500

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Caping AluminiumPowder Coating 50 x50mm

m' 72.500 1,000000 72.500

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Perekat Kaca / Sealant

m' 12.000 4 52.800

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Rangka besi Penguatfinish cat MeniSincromate

kg 23.980 9 226.012

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Material Bantu(Bracket dll)

ls 80.000 1,000000 80.000

Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB

m2 242.462 1,000000 242.462

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

2 of 14 10/05/2014 21:07

Page 3: HSKP 2013

0,76 Clear, Frame :UpahPasang dan Pabrikasi

Cladding alumuniumcomposite panel :Acp exRenobound /Alucobound atau setara

m2 735.000 1 808.500

Cladding alumuniumcomposite panel :Waste

m2 735.000 0,150000 110.250

Cladding alumuniumcomposite panel:Rangka Standar

m2 330.000 1,000000 330.000

Cladding alumuniumcomposite panel:Mobilsasi

m2 85.000 1,000000 85.000

Cladding alumuniumcomposite panel :Sealant

tb 75.000 1,000000 75.000

Cladding alumuniumcomposite panel :Upahpemasangan

m2 90.000 1,000000 90.000

Cladding alumuniumcomposite panel :Alatbantu Scafolding

m2 45.000 1,000000 45.000

Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :KacaTempered Clear glasstebal 10 mm

m2 330.000 1 363.000

Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi:Gosok Kaca tebal 10mm

m' 11.000 1 15.775

Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi:Pengeboran kaca tebal10 mm

lbg 9.000 1,000000 9.000

Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi:Perekat Kaca / Sealant

m' 12.000 1 17.209

Total PEKERJAAN FASADE (TAMPAK LUAR) 5.051.350PEKERJAAN GENSET

:Testing include bahanbakar 13000 ltr

lot 124.100.000 1,000000 124.100.000

:Diesel Generating set unit 4.197.720.000 1,000000 4.197.720.000

:Panel kontrol Genset +AMF

set 609.375.000 1,000000 609.375.000

Bus duct 3.200 A / 3 P:Genset ke panel kontrolGenset

m' 36.983.000 5 184.915.000

:Kabel kontrol NYY 5 x2,5 mm²

m' 26.000 30 780.000

:Storage tank, kap.10.000 liter lengkaprangka besi siku

unit 31.200.000 1,000000 31.200.000

:Daily tank, kap. 3000liter lengkap denganrangka siku

unit 15.600.000 2 31.200.000

Pompa bahan bakar :-Pompa listrik kap = 40liter/menit

unit 16.415.000 2 32.830.000

Pompa bahan bakar :-Panel kontrol pompa

set 6.298.600 1,000000 6.298.600

Pompa bahan bakar:Kabel NYY 4 x 4mm² dari panel PH kepanel kontrol pompa

m 30.000 20 600.000

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

3 of 14 10/05/2014 21:07

Page 4: HSKP 2013

Pemipaan :Pipa bahanbakar lengkap denganfitting, valve dll (Bahan: Pipa black steel à ̧1")

lot 23.000.000 1,000000 23.000.000

Pemipaan :Pipa knalpot/ Pipa Gas buanglengkap dengan fitting,isolasi panas,penggantung dll. Bahan :Pipa black steel

lot 46.500.000 1,000000 46.500.000

Sound attenuator :-Discharge uk : 2,3 x 2,5x 2,5 m

unit 37.118.400 1,000000 37.118.400

Sound attenuator :-intake uk : 1,2 x 3 x 4 m

unit 42.517.440 1,000000 42.517.440

:Isolasi kedap suarapada dinding & langit-langit. Bahan Rock wooldencity 64 kg/m³dilapis wire mesh &glass cloth.

m² 168.000 282 47.376.000

Total PEKERJAAN GENSET 5.415.530.440PEKERJAAN GONDOLA

1M2, Pasang Woofenfoil Ds :GondolaPermanen TelescopicArm Panjang Arm max.8 Meter

Unit 975.000.000 1,000000 975.000.000

1M2, Pasang Woofenfoil Ds :Rel IWF 200 x100x5,5 x 8 Galvanized

Meter 1.782.733 224 399.332.267

1M2, Pasang Woofenfoil Ds :Manual DavitArm

Set 20.500.000 2 41.000.000

1M2, Pasang Woofenfoil Ds :Base Plate

Buah 900.000 28 25.200.000

1M2, Pasang Woofenfoil Ds :Kereta termasukSling dan Kabel + Motor

Unit 304.428.000 2 608.856.000

1M2, Pasang Woofenfoil Ds :Peralatan bantuSafety Body HarnessUntuk 2(dua) buahKereta

Unit 8.527.680 2 17.055.360

1M2, Pasang Woofenfoil Ds :Perijinan danTesting Commisioning

Ls 37.500.000 1,000000 37.500.000

Total PEKERJAAN GONDOLA 2.103.943.627PEKERJAAN PARTISI RUANGAN

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Rangka Besihollow 4x4 (double )

m2 6.250 9 58.875

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Gypsum Board t =9 mm

m2 22.222 2 44.444

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Paku dan Sekrup

kg 19.360 0,360000 6.970

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow

kg 25.000 0,500000 12.500

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

4 of 14 10/05/2014 21:07

Page 5: HSKP 2013

4x4 cm (Double ), Per 1m2 :- Kompon

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Pekerja

OH 98.019 0,300000 29.406

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Tukang Kayu

OH 115.457 0,500000 57.729

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Kepala Tukang

OH 132.928 0,500000 66.464

Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Mandor

OH 150.382 0,015000 2.256

Dinding Partisi KacaTempered Clear 10mmFrameless :KacaTempered Clear glasstebal 10 mm

m2 330.000 1 363.000

Dinding Partisi KacaTempered Clear 10mmFrameless :Gosok Kacatebal 10 mm

m' 11.000 4 48.400

Dinding Partisi KacaTempered Clear 10mmFrameless :Perekat Kaca/ Sealant

m' 12.000 4 52.800

Dinding Partisi KacaTempered Clear 10mmFrameless :Rangka besiPenguat finish cat MeniSincromate

kg 13.767 9 129.751

Dinding Partisi KacaTempered Clear 10mmFrameless :Glass FittingRoutel U Aluminium

m' 90.000 1 108.000

Dinding Partisi KacaTempered Clear 10mmFrameless :MaterialBantu (Bracket dll)

ls 80.000 1,000000 80.000

Dinding Partisi KacaTempered Clear 10mmFrameless :StickerSanblast Kaca

m2 125.000 1 137.500

Dinding Partisi KacaTempered Clear 10mmFrameless :Upah Pasangdan Pabrikasi

m2 195.488 1,000000 195.488

Dinding Partisi KacaTempered Clear 10mmFrameless :Alat bantu

ls 22.986 1,000000 22.986

Total PEKERJAAN PARTISI RUANGAN 1.416.568PEKERJAAN PELAPIS LANTAI DAN DINDING

Dinding Marmer sistembasah :Marmer60x60Cm

m2 980.000 1 1.078.000

Dinding Granit 60 x 60cm (System Basah):Semen PC (50 kg/zak)

zak 63.200 0,248800 15.724

Dinding Granit 60 x 60cm (System Basah) m3 249.780 0,025000 6.245

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

5 of 14 10/05/2014 21:07

Page 6: HSKP 2013

:Pasir pasang

Dinding Granit 60 x 60cm (System Basah) :MU- 408 ( Pengisi NatKeramik )

kg 12.500 0,500000 6.250

Dinding Granit 60 x 60cm (System Basah) :MU- 400 ( Perekat Keramikdinding )

kg 5.440 0,350000 1.904

Dinding Granit 60 x 60cm (System Basah):Pekerja

O/H 98.019 1 127.425

Dinding Granit 60 x 60cm (System Basah):Tukang

O/H 115.457 0,650000 75.047

Dinding Granit 60 x 60cm (System Basah):Kepala Tukang

O/H 132.928 0,065000 8.640

Dinding Granit 60 x 60cm (System Basah):Mandor

O/H 150.382 0,065000 9.775

Dinding Granit 60 x 60cm (System Basah):Steigher, dll

Ls 6.000 1,000000 6.000

Dinding Granit 60 x 60cm (System Basah):Poles + Coating 6Muka

Ls 105.000 1,000000 105.000

Dinding Marmer sistembasah :Perekat m2 112.091 1,000000 112.091

Dinding Granit 60 x 60cm (System Basah):Upah Handling

Ls 53.500 1,000000 53.500

Dinding Granit 60 x 60cm (System Kering):Granit New Imperialred

m2 1.500.000 1 1.590.000

Dinding Granit 60 x 60cm (System Kering):Rangka Besi Galfanish+ Angkur

m2 220.000 1,000000 220.000

Dinding Granit 60 x 60cm (System Kering):Perekat Granit / Sealant

m' 15.000 2 33.000

Dinding Granit 60 x 60cm (System Kering):Pekerja

O/H 98.019 1 117.623

Dinding Granit 60 x 60cm (System Kering):Tukang

O/H 115.457 0,850000 98.138

Dinding Granit 60 x 60cm (System Kering):Kepala Tukang

O/H 132.928 0,085000 11.299

Dinding Granit 60 x 60cm (System Kering):Mandor

O/H 150.382 0,085000 12.782

Dinding Granit 60 x 60cm (System Kering):Steigher, dll

Ls 6.000 1,000000 6.000

Dinding Granit 60 x 60cm (System Kering):Poles + Coating 6Muka

Ls 105.000 1,000000 105.000

Dinding Marmer sistembasah :Upah pasang

m2 210.369 1,000000 210.369

Dinding Granit 60 x 60cm (System Kering):Upah Handling

Ls 53.500 1,000000 53.500

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

6 of 14 10/05/2014 21:07

Page 7: HSKP 2013

Plint Dinding Granit 60x 60 cm (SystemKering) :Granit NewImperial red

m2 1.500.000 0,110000 165.000

Plint Dinding Granit 60x 60 cm (SystemKering) :Pekerja

O/H 98.019 0,200000 19.604

Plint Dinding Granit 60x 60 cm (SystemKering) :Rangka BesiGalfanish + Angkur

m2 220.000 0,110000 24.200

Plint Dinding Granit 60x 60 cm (SystemKering) :Tukang

O/H 115.457 0,141667 16.356

Plint Dinding Granit 60x 60 cm (SystemKering) :Perekat Granit/ Sealant

m' 15.000 0,220000 3.300

Plint Dinding Granit 60x 60 cm (SystemKering) :Kepala Tukang

O/H 132.928 0,014167 1.883

Plint Dinding Granit 60x 60 cm (SystemKering) :Mandor

O/H 150.382 0,014167 2.130

Lantai floor hardener5kg/m2 / m2 : :Floorhardener non metalic

kg 8.800 5 44.000

Lantai floor hardener5kg/m2 / m2 : :Pekerja

O/H 98.019 0,120000 11.762

Lantai floor hardener5kg/m2 / m2 : :Tukang O/H 115.457 0,120000 13.855

Lantai floor hardener5kg/m2 / m2 : :KepalaTukang

O/H 132.928 0,012000 1.595

Lantai marmer sistembasah :marmer

m2 980.000 1 1.127.000

Lantai floor hardener5kg/m2 / m2 : :Mandor O/H 150.382 0,006000 902

Lantai floor hardener5kg/m2 / m2 : :Trowel,Mistar, Waterpass, dll

Ls 5.000 1,000000 5.000

Pasangan Bata RinganTebal 10 cm, :BataRingan 10x20x60

m3 847.500 0,110000 93.225

Pasangan Bata RinganTebal 10 cm, :SemenMU

sak 144.000 0,110000 15.840

Pasangan Bata RinganTebal 10 cm, :Upahpasang

m2 42.416 1,000000 42.416

Pasangan Bata RinganTebal 10 cm, :Langsirmaterial

m2 5.000 1,000000 5.000

Pasangan Bata RinganTebal 10 cm, :Alat bantu ls 15.648 1,000000 15.648

Lantai marmer sistembasah :Perekat kg 112.091 1,000000 112.091

Lantai marmer sistembasah :screed

m2 78.064 1 85.871

Lantai marmer sistembasah :Upah pasang

m2 210.369 1,000000 210.369

Dinding Granit 60 x 60cm (System Basah):Granit New Imperialred

m2 1.500.000 1 1.590.000

Dinding Granit 60 x 60cm (System Basah):Angkur

bh 15.000 3 45.045

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

7 of 14 10/05/2014 21:07

Page 8: HSKP 2013

Total PEKERJAAN PELAPIS LANTAI DAN DINDING 7.715.403PEKERJAAN PENGECATAN

Cat Epoxy :PlamirTembok

kg 13.000 0,125000 1.625

Cat Epoxy :Cat dasar kg 46.286 0,120000 5.554

Cat Epoxy :Cat Epoxiex Dulux kg 206.500 0,312000 64.428

Cat Epoxy :Pekerja O/H 98.019 0,020000 1.960 Cat Epoxy :Tukang O/H 115.457 0,063000 7.274

Cat Epoxy :KepalaTukang O/H 132.928 0,006300 837

Cat Epoxy :Mandor O/H 150.382 0,002500 376 Cat Epoxy :Steigher, dll Ls 2.000 1,000000 2.000

Total PEKERJAAN PENGECATAN 84.055PEKERJAAN PLAFOND

Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Akustik Tile60 x 120 cm

lbr 92.000 2 138.000

Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :RangkaPlafond + Penggantung

m2 67.500 1,000000 67.500

Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Pekerja

O/H 98.019 0,100000 9.802

Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Tukang

O/H 115.457 0,100000 11.546

Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :KepalaTukang

O/H 132.928 0,010000 1.329

Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Mandor

O/H 150.382 0,005000 752

Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Steigher, dll

Ls 6.000 1,000000 6.000

Plafond Calsiboard 6mm:Calsiboard 6 mm lbr 92.900 0,381944 35.483

Plafond Calsiboard 6mm:Rangka Plafond +Penggantung

m2 43.500 1,000000 43.500

Plafond Calsiboard 6mm:Compond, Tape dll m2 18.000 1,000000 18.000

Plafond Calsiboard 6mm:Sekrup bh 450 16 7.200

Plafond Calsiboard 6mm:Pekerja O/H 98.019 0,100000 9.802

Plafond Calsiboard 6mm:Tukang O/H 115.457 0,050000 5.773

Plafond Calsiboard 6mm:Kepala Tukang

O/H 132.928 0,005000 665

Plafond Calsiboard 6mm:Mandor

O/H 150.382 0,005000 752

Plafond Calsiboard 6mm:Steigher, dll

Ls 8.000 1,000000 8.000

Plafond Gypsum Board9mm :Gypsum Board120 x 240 cm tebal 9mm

lbr 74.000 0,381944 28.264

Plafond Gypsum Board9mm :Rangka Plafond +Penggantung

m2 43.500 1,000000 43.500

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

8 of 14 10/05/2014 21:07

Page 9: HSKP 2013

Plafond Gypsum Board9mm :Compond, Tapedll

m2 18.000 1,000000 18.000

Plafond Gypsum Board9mm :Sekrup bh 450 16 7.200

Plafond Gypsum Board9mm :Pekerja O/H 98.019 0,100000 9.802

Plafond Gypsum Board9mm :Tukang O/H 115.457 0,050000 5.773

Plafond Gypsum Board9mm :Kepala Tukang

O/H 132.928 0,005000 665

Plafond Gypsum Board9mm :Mandor

O/H 150.382 0,005000 752

Plafond Gypsum Board9mm :Steigher, dll

ls 8.000 1,000000 8.000

Total PEKERJAAN PLAFOND 486.058PEKERJAAN SANITAIR

Closet duduk Toto typeCW 420J / unit : :Toiletbowl CW 420J

bh 2.652.000 1,000000 2.652.000

Closet duduk Toto typeCW 420J / unit : :Upahpasang closed duduk

bh 110.000 1,000000 110.000

Closed jongkok Tototype CE7 / unit : :Closedjongkok Toto type CE7

bh 2.708.883 1,000000 2.708.883

Closed jongkok Tototype CE7 / unit : :Upahpasang closed jongkok

bh 471.103 1,000000 471.103

Wastafel Toto type L521 V1A / unit ::Counter top lavatory 2tap holes L521V1A

bh 1.698.883 1,000000 1.698.883

Wastafel Toto type L521 V1A / unit : :Upahpasang wastafel

bh 286.104 1,000000 286.104

Wastafel Ex. TOTOType L 237 VI B:Lavatory L237 VIB

bh 1.361.800 1,000000 1.361.800

Wastafel Ex. TOTOType L 237 VI B :Upahpasang wastafel

bh 110.000 1,000000 110.000

Urinoir Toto type U 57M/ unit : :Urinoir Tototype U 57M

bh 2.255.000 1,000000 2.255.000

Urinoir Toto type U 57M/ unit : :Upah pasangurinoir

bh 110.000 1,000000 110.000

Sekat urinoir Toto typeA100 / bh : :Sekaturinoir Toto type A100

bh 915.000 1,000000 915.000

Sekat urinoir Toto typeA100 / bh : :Upahpasang

bh 50.000 1,000000 50.000

Floor drain Toto typeTX 1 BN / bh : :Floordrain Toto type TX 1BN

bh 359.700 1,000000 359.700

Floor drain Toto typeTX 1 BN / bh : :Upahpasang floor drain

bh 15.000 1,000000 15.000

Jet spyray TX403SPIV /bh : :Jet spyrayTX403SPIV

bh 585.000 1,000000 585.000

Jet spyray TX403SPIV /bh : :Upah pasang jetspray

bh 15.000 1,000000 15.000

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

9 of 14 10/05/2014 21:07

Page 10: HSKP 2013

Shower head Toto typeTX402SZ / bh : :Showerhead Toto typeTX402SZ

bh 750.000 1,000000 750.000

Shower head Toto typeTX402SZ / bh : :Upahpasang shower head

bh 15.000 1,000000 15.000

Kran Tembok Ex. TOTOType T 23 B 13 :KranEx. TOTO Type T 23 B13

bh 188.000 1,000000 188.000

Kran Tembok Ex. TOTOType T 23 B 14 :Upahpasang kran dinding

bh 20.000 1,000000 20.000

Kran leher angsa Tototype T 30 AR13V7N /bh : :Kran leher angsaToto type T 30AR13V7N

bh 550.000 1,000000 550.000

Kran leher angsa Tototype T 30 AR13V7N /bh : :Upah pasang kranleher angsa

bh 15.000 1,000000 15.000

Paper holder Toto typeTS 116 R / bh : :Paperholder Toto type TS 116R

bh 365.200 1,000000 365.200

Paper holder Toto typeTS 116 R / bh : :Upahpasang paper holder

bh 25.000 1,000000 25.000

Soap dispencer Tototype TS 126 AR / bh ::Soap dispencer Tototype TS 126 AR

bh 108.900 1,000000 108.900

Soap dispencer Tototype TS 126 AR / bh ::Upah pasang dispencer

bh 15.000 1,000000 15.000

Shower room doorhandle Toto type TX10B/ bh : :Shower roomdoor handle Toto typeTX10B

bh 825.000 1,000000 825.000

Shower room doorhandle Toto type TX10B/ bh : :Upah pasangshower room doorhandle

bh 50.000 1,000000 50.000

Kitchen sink 1 lubang /bh : :Kitchen sink 1lubang

bh 650.000 1,000000 650.000

Kitchen sink 1 lubang /bh : :Upah kitchen sink

bh 100.000 1,000000 100.000

Meja wastafel finishgranit / m' : :Beton sitemix 1 : 2 : 3

m3 519.344 0,070000 36.354

Meja wastafel finishgranit / m' : :Bekistingcaping beam

m3 618.525 0,070000 43.297

Meja wastafel finishgranit / m' : :Besi beton250kg/m3

m3 2.239.536 0,070000 156.768

Meja wastafel finishgranit / m' : :Granitimpor

m2 975.000 0,900000 877.500

Meja wastafel finishgranit / m' : :Perekatmortar

m2 22.066 0,900000 19.859

Meja wastafel finishgranit / m' : :Grouting m2 1.838 0,900000 1.654

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

10 of 14 10/05/2014 21:07

Page 11: HSKP 2013

mortar

Meja wastafel finishgranit / m' : :Upah pingul

m' 15.000 2 30.000

Meja wastafel finishgranit / m' : :Upahpasang + poles

m2 175.000 0,900000 157.500

Meja wastafel finishgranit / m' : :Lubangwastafel

bh 75.000 1,000000 75.000

Meja kitchen finishkeramik / m' : :Betonsite mix 1 : 2 : 3

m3 519.344 0,070000 36.354

Meja kitchen finishkeramik / m' : :Bekistingcaping beam

m3 618.525 0,070000 43.297

Meja kitchen finishkeramik / m' : :Besibeton 250kg/m3

m3 2.239.536 0,070000 156.768

Meja kitchen finishkeramik / m' : :Lantaikeramik 20x20cm

m2 65.670 1 91.938

Meja kitchen finishkeramik / m' : :Perekatmortar

m2 22.066 1 30.892

Meja kitchen finishkeramik / m' : :Groutingmortar

m2 1.838 1 2.573

Total PEKERJAAN SANITAIR 19.140.327PEKERJAAN STRUKTUR

:Pekerjaan Pembetonanmutu K 300 slump 12

m3 1.059.503 1,000000 1.059.503

:Pekerjaan Pembetonanmutu K 325 slump 12

m3 1.145.922 1,000000 1.145.922

:Pekerjaan Pembetonanmutu K 350 slump 12

m3 1.156.099 1,000000 1.156.099

:Pekerjaan PembesianPolos/Ulir

kg 11.645 1,000000 11.645

:Pekerjaan BekistingPondasi bh 238.665 1,000000 238.665

:Pekerjaan BekistingSloof m2 256.842 1,000000 256.842

:Pekerjaan BekistingKolom m2 389.291 1,000000 389.291

:Pekerjaan BekistingBalok m2 400.198 1,000000 400.198

:Pekerjaan BekistingLantai

m2 421.291 1,000000 421.291

:Pekerjaan BekistingTangga

m2 352.711 1,000000 352.711

:Pekerjaan Rangka AtapBaja WF

kg 26.470 1,000000 26.470

Total PEKERJAAN STRUKTUR 5.458.637PEKERJAAN TANAH PONDASI

:Mobilisasi peralatandan Alat Berat ls 66.500.000 1,000000 66.500.000

:De Mobilisasi peralatandan Alat Berat ls 66.500.000 1,000000 66.500.000

:Boor pile Ø 50 PondasiTC (Pengeboran) m' 237.500 80 19.000.000

:Boor pile Ø 50 PondasiTC (Beton K300 slump16-18 cm)

m3 1.019.300 15 15.202.860

:Boor pile Ø 50 PondasiTC (Besi U39) kg 11.380 1.853 21.092.302

:Boor pile Ø 50 PondasiTC (Bobok kepala boredpile)

ttk 285.870 4 1.143.480

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

11 of 14 10/05/2014 21:07

Page 12: HSKP 2013

:Boor pile Ø 50 PondasiTC (Buang tanah expengeboran)

m3 55.000 20 1.122.550

:Boor pile Ø 50 PondasiTC (Galian tanah PileCap TC)

m3 67.100 27 1.837.198

:Boor pile Ø 50 PondasiTC (Urugan pasir)

m3 197.450 1 270.309

:Boor pile Ø 50 PondasiTC (Lantai kerja) m3 903.450 0,684500 618.412

:Boor pile Ø 50 PondasiTC (Beton K350 pilecaps)

m3 1.019.300 18 18.729.638

:Boor pile Ø 50 PondasiTC (Besi U39)

kg 11.380 2.297 26.138.438

:Boor pile Ø 50 PondasiTC (Bekisting pas.Batako)

m² 143.600 21 3.015.600

:Dewatering 5 titik 8bulan

ls 106.502.900 1,000000 106.502.900

Pondasi Bored Pile Ø100 cm s/d elevasi -8.80:a. Pengeboran

m1 550.000 2.400 1.320.000.000

Pondasi Bored Pile Ø100 cm s/d elevasi -8.81:b. Beton K300 slump16-18 cm

m3 986.300 1.332 1.313.786.402

Pondasi Bored Pile Ø100 cm s/d elevasi -8.82:c. Besi U39

kg 11.380 141.171 1.606.527.976

Pondasi Bored Pile Ø100 cm s/d elevasi -8.83:d. Bobok kepala boredpile

ttk 285.870 80 22.869.600

Pondasi Bored Pile Ø100 cm s/d elevasi -8.84:e. Blind boring diisidengan tanah

m3 156.250 553 86.393.798

Pondasi Bored Pile Ø80 cm s/d elevasi -8.80:a. Pengeboran

m1 485.000 1.260 611.100.000

Pondasi Bored Pile Ø80 cm s/d elevasi -8.81:b. Beton K300 slump16-18 cm

m3 986.300 448 441.432.231

Pondasi Bored Pile Ø80 cm s/d elevasi -8.82:c. Besi U39

kg 11.380 55.757 634.518.015

Pondasi Bored Pile Ø80 cm s/d elevasi -8.83:d. Bobok kepala boredpile

ttk 183.000 42 7.686.000

Pondasi Bored Pile Ø80 cm s/d elevasi -8.84:e. Blind boring diisidengan tanah

m3 156.250 186 29.028.316

Pondasi Bored Pile Ø80 cm s/d elevasi -7.40:a. Pengeboran

m1 437.500 120 52.500.000

Pondasi Bored Pile Ø80 cm s/d elevasi -7.41:b. Beton K300 slump16-18 cm

m3 986.300 43 42.041.165

Pondasi Bored Pile Ø80 cm s/d elevasi -7.42:c. Besi U39

kg 11.380 5.634 64.119.344

Pondasi Bored Pile Ø80 cm s/d elevasi -7.43:d. Bobok kepala bored

ttk 183.000 4 732.000

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

12 of 14 10/05/2014 21:07

Page 13: HSKP 2013

pile

Pondasi Bored Pile Ø80 cm s/d elevasi -7.44:e. Blind boring diisidengan tanah

m3 156.250 15 2.324.779

Pondasi Bored Pile Ø80 cm s/d elevasi -5.30:a. Pengeboran

m1 437.500 30 13.125.000

Pondasi Bored Pile Ø80 cm s/d elevasi -5.31:b. Beton K300 slump16-18 cm

m3 986.300 11 10.510.291

Pondasi Bored Pile Ø80 cm s/d elevasi -5.32:c. Besi U39

kg 11.380 1.526 17.360.614

Pondasi Bored Pile Ø80 cm s/d elevasi -5.33:d. Bobok kepala boredpile

ttk 183.000 1,000000 183.000

Pondasi Bored Pile Ø80 cm s/d elevasi -5.34:e. Blind boring diisidengan tanah

m3 156.250 3 424.115

Soldier pile Ø 80 cm :a.Pengeboran

m1 437.500 3.540 1.548.750.000

Soldier pile Ø 80 cm :b.Beton K300 slump16-18 cm

m3 986.300 1.779 1.755.020.325

Soldier pile Ø 80 cm :c.Besi U39 kg 11.380 291.401 3.316.144.790

Soldier pile Ø 80 cm :d.Bobok kepala Soldierpile

ttk 183.000 177 32.391.000

:Pembuangan tanah expengeboran m3 80.000 4.369 349.485.846

:Loading Test tekanbored pile Ø 100kapasitas 2x325 ton

ttk 185.000.000 1,000000 185.000.000

:Loading Test tekanbored pile Ø 80kapasitas 2x250 ton

ttk 154.000.000 1,000000 154.000.000

:Loading Test tarikbored pile Ø 100kapasitas 100 ton

ttk 112.500.000 1,000000 112.500.000

:Capping beam (BetonK400)

m3 1.044.100 92 95.723.088

:Capping beam (BesiU39)

kg 11.380 15.586 177.364.128

:Capping beam(Bekisting)

m2 178.140 356 63.403.589

:Galian tanah Basement,Pile Cap, m3 58.400 20.548 1.200.013.766

:Urugan pasir di bawahPelat Basement, PC m3 197.450 192 37.908.631

:Lantai kerja di bawahPelat Basement, PC m3 874.550 96 83.952.883

Pile Caps PC1A :a.Beton K400 m3 1.044.100 10 9.923.126

Pile Caps PC1A :b. BesiU39

kg 11.380 2.513 28.602.099

Pile Caps PC1A :cBekisting pas. bata

m2 141.700 32 4.489.056

Pile Caps PC1B :a.Beton K400

m3 1.044.100 4 4.510.512

Pile Caps PC1B :b. BesiU39

kg 11.380 1.104 12.567.864

Pile Caps PC1B :cBekisting pas. bata

m2 141.700 14 2.040.480

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

13 of 14 10/05/2014 21:07

Page 14: HSKP 2013

Pile Caps PC2 :a. BetonK400 m3 1.044.100 93 97.474.044

Pile Caps PC3 :b. BesiU39

kg 11.380 15.687 178.513.926

Pile Caps PC4 :cBekisting pas. bata

m2 141.700 149 21.151.559

Pile Caps PC2A :a.Beton K400

m3 1.044.100 79 82.993.421

Pile Caps PC2A :b. BesiU39

kg 11.380 15.036 171.104.652

Pile Caps PC2A :cBekisting pas. bata

m2 141.700 94 13.297.128

Pile Caps PC2B :a.Beton K400

m3 1.044.100 10 10.374.178

Pile Caps PC2B :b. BesiU39 kg 11.380 2.222 25.281.666

Pile Caps PC2B :cBekisting pas. bata m2 141.700 14 1.955.460

Pile Caps PC3 :a. BetonK400 m3 1.044.100 218 227.164.539

Pile Caps PC4 :b. BesiU39 kg 11.380 24.319 276.747.306

Pile Caps PC5 :cBekisting pas. bata

m2 141.700 342 48.503.910

Pile Caps PC3A :a.Beton K400

m3 1.044.100 12 12.061.181

Pile Caps PC3A :b. BesiU39

kg 11.380 2.155 24.528.076

Pile Caps PC3A :cBekisting pas. bata

m2 141.700 29 4.041.993

Pile Caps PC4 :a. BetonK400

m3 1.044.100 49 50.814.256

Pile Caps PC5 :b. BesiU39

kg 11.380 8.266 94.062.717

Pile Caps PC6 :cBekisting pas. bata

m2 141.700 32 4.497.232

Pile Caps PC14 :a.Beton K400 m3 1.044.100 145 151.810.845

Pile Caps PC15 :b. BesiU39 kg 11.380 14.532 165.371.325

Pile Caps PC16 :cBekisting pas. bata m2 141.700 66 9.416.248

Total PEKERJAAN TANAH PONDASI 17.469.293.181

Kode Rekening Kode Nama PPN PPHRekening

Switch Switch

HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...

14 of 14 10/05/2014 21:07