Standar Satuan Harga Kegiatan 2014
Pemerintah Provinsi DKI Jakarta
EDIT HSKP
Kode Komponen hspk.2324.18022014.01
Nama Komponen
Satuan
Harga zone 1 = 10.000.000
KomponenPenyusun
Sub HSPK Tipe Nama Satuan Harga 1 Volume Total 1PEKERJAAN ATAP
1M2, Penutup atapgenteng metal :Atapgenteng metal t 0,35mm
m2 128.250 1,000000 128.250
1M2, Penutup atapgenteng metal :Upahpasang genteng + alatbantu
m2 15.000 1,000000 15.000
1M2, Pasang RoxulMPS Density 40Kg/m2:Roxul MPS Density40Kg/m2
m2 90.432 1,000000 90.432
1M2, Pasang RoxulMPS Density 40Kg/m3:Upah pasang
m2 5.000 1,000000 5.000
1M2, Pasang Woofenfoil Ds :Pasang Woofenfoil Ds
m2 18.330 1,000000 18.330
1M2, Pasang Woofenfoil Ds :Upah pasang m2 21.279 1,000000 21.279
Total PEKERJAAN ATAP 278.291PEKERJAAN ELEVATOR
:Pengadaan &pemasangan LiftPenumpang (Low Zone)
unit 1.608.175.000 1,000000 1.608.175.000
:Pengadaan &pemasangan LiftPenumpang (HighZone)
unit 2.122.854.000 1,000000 2.122.854.000
:Pengadaan &pemasangan Lift Service unit 1.608.175.000 1,000000 1.608.175.000
Total PEKERJAAN ELEVATOR 5.339.204.000PEKERJAAN FASADE (TAMPAK LUAR)
Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :Platbesi finish cat ducopengangan Routel
bh 350.000 0,500000 175.000
Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :GlassFitting Routel KENDP-03, diameter 36
bh 539.000 1,000000 539.000
Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :UpahPasang dan Pabrikasi
m2 167.848 1,000000 167.848
Harga Per M2 Pek pasKaca Patri :Kaca Patritebal 5 mm
m2 341.000 1,000000 341.000
Harga Per M2 Pek pasKaca Patri :upahPemasangan
oh 98.019 0,015000 1.470
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
1 of 14 10/05/2014 21:07
Harga Per M2 Pek pasKaca Patri :Pekerja oh 115.457 0,150000 17.319
Harga Per M2 Pek pasKaca Patri :TukangKaca
oh 132.928 0,015000 1.994
Harga Per M2 Pek pasKaca Patri :KepalaTukang Kaca
oh 150.382 0,000750 113
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame :KacaLaminated Stopsol 6mm+ PVB 0,38 + Float6mm
m2 580.000 1 638.000
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Gosok Kaca tebal 8 mm
m' 9.000 4 39.600
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Kusen AluminiumPowder Coating 50 x150mm Vertical
m' 193.333 2 290.000
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Kusen AluminiumPowder Coating 50 x100mm Horizontal
m' 145.000 2 217.500
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Caping AluminiumPowder Coating 50 x50mm
m' 72.500 1,000000 72.500
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Perekat Kaca / Sealant
m' 12.000 4 52.800
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Rangka besi Penguatfinish cat MeniSincromate
kg 23.980 9 226.012
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB0,76 Clear, Frame:Material Bantu(Bracket dll)
ls 80.000 1,000000 80.000
Curtain Wall, KacaLaminated Sunergy LowE 6mm + Panasap DarkBlue 5mm + Film PVB
m2 242.462 1,000000 242.462
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
2 of 14 10/05/2014 21:07
0,76 Clear, Frame :UpahPasang dan Pabrikasi
Cladding alumuniumcomposite panel :Acp exRenobound /Alucobound atau setara
m2 735.000 1 808.500
Cladding alumuniumcomposite panel :Waste
m2 735.000 0,150000 110.250
Cladding alumuniumcomposite panel:Rangka Standar
m2 330.000 1,000000 330.000
Cladding alumuniumcomposite panel:Mobilsasi
m2 85.000 1,000000 85.000
Cladding alumuniumcomposite panel :Sealant
tb 75.000 1,000000 75.000
Cladding alumuniumcomposite panel :Upahpemasangan
m2 90.000 1,000000 90.000
Cladding alumuniumcomposite panel :Alatbantu Scafolding
m2 45.000 1,000000 45.000
Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi :KacaTempered Clear glasstebal 10 mm
m2 330.000 1 363.000
Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi:Gosok Kaca tebal 10mm
m' 11.000 1 15.775
Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi:Pengeboran kaca tebal10 mm
lbg 9.000 1,000000 9.000
Dinding Type Sunglass10mm, lengkap SpiderFitting + plat besi:Perekat Kaca / Sealant
m' 12.000 1 17.209
Total PEKERJAAN FASADE (TAMPAK LUAR) 5.051.350PEKERJAAN GENSET
:Testing include bahanbakar 13000 ltr
lot 124.100.000 1,000000 124.100.000
:Diesel Generating set unit 4.197.720.000 1,000000 4.197.720.000
:Panel kontrol Genset +AMF
set 609.375.000 1,000000 609.375.000
Bus duct 3.200 A / 3 P:Genset ke panel kontrolGenset
m' 36.983.000 5 184.915.000
:Kabel kontrol NYY 5 x2,5 mm²
m' 26.000 30 780.000
:Storage tank, kap.10.000 liter lengkaprangka besi siku
unit 31.200.000 1,000000 31.200.000
:Daily tank, kap. 3000liter lengkap denganrangka siku
unit 15.600.000 2 31.200.000
Pompa bahan bakar :-Pompa listrik kap = 40liter/menit
unit 16.415.000 2 32.830.000
Pompa bahan bakar :-Panel kontrol pompa
set 6.298.600 1,000000 6.298.600
Pompa bahan bakar:Kabel NYY 4 x 4mm² dari panel PH kepanel kontrol pompa
m 30.000 20 600.000
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
3 of 14 10/05/2014 21:07
Pemipaan :Pipa bahanbakar lengkap denganfitting, valve dll (Bahan: Pipa black steel à ̧1")
lot 23.000.000 1,000000 23.000.000
Pemipaan :Pipa knalpot/ Pipa Gas buanglengkap dengan fitting,isolasi panas,penggantung dll. Bahan :Pipa black steel
lot 46.500.000 1,000000 46.500.000
Sound attenuator :-Discharge uk : 2,3 x 2,5x 2,5 m
unit 37.118.400 1,000000 37.118.400
Sound attenuator :-intake uk : 1,2 x 3 x 4 m
unit 42.517.440 1,000000 42.517.440
:Isolasi kedap suarapada dinding & langit-langit. Bahan Rock wooldencity 64 kg/m³dilapis wire mesh &glass cloth.
m² 168.000 282 47.376.000
Total PEKERJAAN GENSET 5.415.530.440PEKERJAAN GONDOLA
1M2, Pasang Woofenfoil Ds :GondolaPermanen TelescopicArm Panjang Arm max.8 Meter
Unit 975.000.000 1,000000 975.000.000
1M2, Pasang Woofenfoil Ds :Rel IWF 200 x100x5,5 x 8 Galvanized
Meter 1.782.733 224 399.332.267
1M2, Pasang Woofenfoil Ds :Manual DavitArm
Set 20.500.000 2 41.000.000
1M2, Pasang Woofenfoil Ds :Base Plate
Buah 900.000 28 25.200.000
1M2, Pasang Woofenfoil Ds :Kereta termasukSling dan Kabel + Motor
Unit 304.428.000 2 608.856.000
1M2, Pasang Woofenfoil Ds :Peralatan bantuSafety Body HarnessUntuk 2(dua) buahKereta
Unit 8.527.680 2 17.055.360
1M2, Pasang Woofenfoil Ds :Perijinan danTesting Commisioning
Ls 37.500.000 1,000000 37.500.000
Total PEKERJAAN GONDOLA 2.103.943.627PEKERJAAN PARTISI RUANGAN
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Rangka Besihollow 4x4 (double )
m2 6.250 9 58.875
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Gypsum Board t =9 mm
m2 22.222 2 44.444
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Paku dan Sekrup
kg 19.360 0,360000 6.970
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow
kg 25.000 0,500000 12.500
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
4 of 14 10/05/2014 21:07
4x4 cm (Double ), Per 1m2 :- Kompon
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Pekerja
OH 98.019 0,300000 29.406
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Tukang Kayu
OH 115.457 0,500000 57.729
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Kepala Tukang
OH 132.928 0,500000 66.464
Pek Pas partisi GypsumT = 9mm ( 2 muka )Rangka Besi Hollow4x4 cm (Double ), Per 1m2 :- Mandor
OH 150.382 0,015000 2.256
Dinding Partisi KacaTempered Clear 10mmFrameless :KacaTempered Clear glasstebal 10 mm
m2 330.000 1 363.000
Dinding Partisi KacaTempered Clear 10mmFrameless :Gosok Kacatebal 10 mm
m' 11.000 4 48.400
Dinding Partisi KacaTempered Clear 10mmFrameless :Perekat Kaca/ Sealant
m' 12.000 4 52.800
Dinding Partisi KacaTempered Clear 10mmFrameless :Rangka besiPenguat finish cat MeniSincromate
kg 13.767 9 129.751
Dinding Partisi KacaTempered Clear 10mmFrameless :Glass FittingRoutel U Aluminium
m' 90.000 1 108.000
Dinding Partisi KacaTempered Clear 10mmFrameless :MaterialBantu (Bracket dll)
ls 80.000 1,000000 80.000
Dinding Partisi KacaTempered Clear 10mmFrameless :StickerSanblast Kaca
m2 125.000 1 137.500
Dinding Partisi KacaTempered Clear 10mmFrameless :Upah Pasangdan Pabrikasi
m2 195.488 1,000000 195.488
Dinding Partisi KacaTempered Clear 10mmFrameless :Alat bantu
ls 22.986 1,000000 22.986
Total PEKERJAAN PARTISI RUANGAN 1.416.568PEKERJAAN PELAPIS LANTAI DAN DINDING
Dinding Marmer sistembasah :Marmer60x60Cm
m2 980.000 1 1.078.000
Dinding Granit 60 x 60cm (System Basah):Semen PC (50 kg/zak)
zak 63.200 0,248800 15.724
Dinding Granit 60 x 60cm (System Basah) m3 249.780 0,025000 6.245
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
5 of 14 10/05/2014 21:07
:Pasir pasang
Dinding Granit 60 x 60cm (System Basah) :MU- 408 ( Pengisi NatKeramik )
kg 12.500 0,500000 6.250
Dinding Granit 60 x 60cm (System Basah) :MU- 400 ( Perekat Keramikdinding )
kg 5.440 0,350000 1.904
Dinding Granit 60 x 60cm (System Basah):Pekerja
O/H 98.019 1 127.425
Dinding Granit 60 x 60cm (System Basah):Tukang
O/H 115.457 0,650000 75.047
Dinding Granit 60 x 60cm (System Basah):Kepala Tukang
O/H 132.928 0,065000 8.640
Dinding Granit 60 x 60cm (System Basah):Mandor
O/H 150.382 0,065000 9.775
Dinding Granit 60 x 60cm (System Basah):Steigher, dll
Ls 6.000 1,000000 6.000
Dinding Granit 60 x 60cm (System Basah):Poles + Coating 6Muka
Ls 105.000 1,000000 105.000
Dinding Marmer sistembasah :Perekat m2 112.091 1,000000 112.091
Dinding Granit 60 x 60cm (System Basah):Upah Handling
Ls 53.500 1,000000 53.500
Dinding Granit 60 x 60cm (System Kering):Granit New Imperialred
m2 1.500.000 1 1.590.000
Dinding Granit 60 x 60cm (System Kering):Rangka Besi Galfanish+ Angkur
m2 220.000 1,000000 220.000
Dinding Granit 60 x 60cm (System Kering):Perekat Granit / Sealant
m' 15.000 2 33.000
Dinding Granit 60 x 60cm (System Kering):Pekerja
O/H 98.019 1 117.623
Dinding Granit 60 x 60cm (System Kering):Tukang
O/H 115.457 0,850000 98.138
Dinding Granit 60 x 60cm (System Kering):Kepala Tukang
O/H 132.928 0,085000 11.299
Dinding Granit 60 x 60cm (System Kering):Mandor
O/H 150.382 0,085000 12.782
Dinding Granit 60 x 60cm (System Kering):Steigher, dll
Ls 6.000 1,000000 6.000
Dinding Granit 60 x 60cm (System Kering):Poles + Coating 6Muka
Ls 105.000 1,000000 105.000
Dinding Marmer sistembasah :Upah pasang
m2 210.369 1,000000 210.369
Dinding Granit 60 x 60cm (System Kering):Upah Handling
Ls 53.500 1,000000 53.500
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
6 of 14 10/05/2014 21:07
Plint Dinding Granit 60x 60 cm (SystemKering) :Granit NewImperial red
m2 1.500.000 0,110000 165.000
Plint Dinding Granit 60x 60 cm (SystemKering) :Pekerja
O/H 98.019 0,200000 19.604
Plint Dinding Granit 60x 60 cm (SystemKering) :Rangka BesiGalfanish + Angkur
m2 220.000 0,110000 24.200
Plint Dinding Granit 60x 60 cm (SystemKering) :Tukang
O/H 115.457 0,141667 16.356
Plint Dinding Granit 60x 60 cm (SystemKering) :Perekat Granit/ Sealant
m' 15.000 0,220000 3.300
Plint Dinding Granit 60x 60 cm (SystemKering) :Kepala Tukang
O/H 132.928 0,014167 1.883
Plint Dinding Granit 60x 60 cm (SystemKering) :Mandor
O/H 150.382 0,014167 2.130
Lantai floor hardener5kg/m2 / m2 : :Floorhardener non metalic
kg 8.800 5 44.000
Lantai floor hardener5kg/m2 / m2 : :Pekerja
O/H 98.019 0,120000 11.762
Lantai floor hardener5kg/m2 / m2 : :Tukang O/H 115.457 0,120000 13.855
Lantai floor hardener5kg/m2 / m2 : :KepalaTukang
O/H 132.928 0,012000 1.595
Lantai marmer sistembasah :marmer
m2 980.000 1 1.127.000
Lantai floor hardener5kg/m2 / m2 : :Mandor O/H 150.382 0,006000 902
Lantai floor hardener5kg/m2 / m2 : :Trowel,Mistar, Waterpass, dll
Ls 5.000 1,000000 5.000
Pasangan Bata RinganTebal 10 cm, :BataRingan 10x20x60
m3 847.500 0,110000 93.225
Pasangan Bata RinganTebal 10 cm, :SemenMU
sak 144.000 0,110000 15.840
Pasangan Bata RinganTebal 10 cm, :Upahpasang
m2 42.416 1,000000 42.416
Pasangan Bata RinganTebal 10 cm, :Langsirmaterial
m2 5.000 1,000000 5.000
Pasangan Bata RinganTebal 10 cm, :Alat bantu ls 15.648 1,000000 15.648
Lantai marmer sistembasah :Perekat kg 112.091 1,000000 112.091
Lantai marmer sistembasah :screed
m2 78.064 1 85.871
Lantai marmer sistembasah :Upah pasang
m2 210.369 1,000000 210.369
Dinding Granit 60 x 60cm (System Basah):Granit New Imperialred
m2 1.500.000 1 1.590.000
Dinding Granit 60 x 60cm (System Basah):Angkur
bh 15.000 3 45.045
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
7 of 14 10/05/2014 21:07
Total PEKERJAAN PELAPIS LANTAI DAN DINDING 7.715.403PEKERJAAN PENGECATAN
Cat Epoxy :PlamirTembok
kg 13.000 0,125000 1.625
Cat Epoxy :Cat dasar kg 46.286 0,120000 5.554
Cat Epoxy :Cat Epoxiex Dulux kg 206.500 0,312000 64.428
Cat Epoxy :Pekerja O/H 98.019 0,020000 1.960 Cat Epoxy :Tukang O/H 115.457 0,063000 7.274
Cat Epoxy :KepalaTukang O/H 132.928 0,006300 837
Cat Epoxy :Mandor O/H 150.382 0,002500 376 Cat Epoxy :Steigher, dll Ls 2.000 1,000000 2.000
Total PEKERJAAN PENGECATAN 84.055PEKERJAAN PLAFOND
Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Akustik Tile60 x 120 cm
lbr 92.000 2 138.000
Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :RangkaPlafond + Penggantung
m2 67.500 1,000000 67.500
Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Pekerja
O/H 98.019 0,100000 9.802
Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Tukang
O/H 115.457 0,100000 11.546
Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :KepalaTukang
O/H 132.928 0,010000 1.329
Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Mandor
O/H 150.382 0,005000 752
Plafond Acoustic Tile 60x 120 cm2 ( LayinTegular ) :Steigher, dll
Ls 6.000 1,000000 6.000
Plafond Calsiboard 6mm:Calsiboard 6 mm lbr 92.900 0,381944 35.483
Plafond Calsiboard 6mm:Rangka Plafond +Penggantung
m2 43.500 1,000000 43.500
Plafond Calsiboard 6mm:Compond, Tape dll m2 18.000 1,000000 18.000
Plafond Calsiboard 6mm:Sekrup bh 450 16 7.200
Plafond Calsiboard 6mm:Pekerja O/H 98.019 0,100000 9.802
Plafond Calsiboard 6mm:Tukang O/H 115.457 0,050000 5.773
Plafond Calsiboard 6mm:Kepala Tukang
O/H 132.928 0,005000 665
Plafond Calsiboard 6mm:Mandor
O/H 150.382 0,005000 752
Plafond Calsiboard 6mm:Steigher, dll
Ls 8.000 1,000000 8.000
Plafond Gypsum Board9mm :Gypsum Board120 x 240 cm tebal 9mm
lbr 74.000 0,381944 28.264
Plafond Gypsum Board9mm :Rangka Plafond +Penggantung
m2 43.500 1,000000 43.500
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
8 of 14 10/05/2014 21:07
Plafond Gypsum Board9mm :Compond, Tapedll
m2 18.000 1,000000 18.000
Plafond Gypsum Board9mm :Sekrup bh 450 16 7.200
Plafond Gypsum Board9mm :Pekerja O/H 98.019 0,100000 9.802
Plafond Gypsum Board9mm :Tukang O/H 115.457 0,050000 5.773
Plafond Gypsum Board9mm :Kepala Tukang
O/H 132.928 0,005000 665
Plafond Gypsum Board9mm :Mandor
O/H 150.382 0,005000 752
Plafond Gypsum Board9mm :Steigher, dll
ls 8.000 1,000000 8.000
Total PEKERJAAN PLAFOND 486.058PEKERJAAN SANITAIR
Closet duduk Toto typeCW 420J / unit : :Toiletbowl CW 420J
bh 2.652.000 1,000000 2.652.000
Closet duduk Toto typeCW 420J / unit : :Upahpasang closed duduk
bh 110.000 1,000000 110.000
Closed jongkok Tototype CE7 / unit : :Closedjongkok Toto type CE7
bh 2.708.883 1,000000 2.708.883
Closed jongkok Tototype CE7 / unit : :Upahpasang closed jongkok
bh 471.103 1,000000 471.103
Wastafel Toto type L521 V1A / unit ::Counter top lavatory 2tap holes L521V1A
bh 1.698.883 1,000000 1.698.883
Wastafel Toto type L521 V1A / unit : :Upahpasang wastafel
bh 286.104 1,000000 286.104
Wastafel Ex. TOTOType L 237 VI B:Lavatory L237 VIB
bh 1.361.800 1,000000 1.361.800
Wastafel Ex. TOTOType L 237 VI B :Upahpasang wastafel
bh 110.000 1,000000 110.000
Urinoir Toto type U 57M/ unit : :Urinoir Tototype U 57M
bh 2.255.000 1,000000 2.255.000
Urinoir Toto type U 57M/ unit : :Upah pasangurinoir
bh 110.000 1,000000 110.000
Sekat urinoir Toto typeA100 / bh : :Sekaturinoir Toto type A100
bh 915.000 1,000000 915.000
Sekat urinoir Toto typeA100 / bh : :Upahpasang
bh 50.000 1,000000 50.000
Floor drain Toto typeTX 1 BN / bh : :Floordrain Toto type TX 1BN
bh 359.700 1,000000 359.700
Floor drain Toto typeTX 1 BN / bh : :Upahpasang floor drain
bh 15.000 1,000000 15.000
Jet spyray TX403SPIV /bh : :Jet spyrayTX403SPIV
bh 585.000 1,000000 585.000
Jet spyray TX403SPIV /bh : :Upah pasang jetspray
bh 15.000 1,000000 15.000
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
9 of 14 10/05/2014 21:07
Shower head Toto typeTX402SZ / bh : :Showerhead Toto typeTX402SZ
bh 750.000 1,000000 750.000
Shower head Toto typeTX402SZ / bh : :Upahpasang shower head
bh 15.000 1,000000 15.000
Kran Tembok Ex. TOTOType T 23 B 13 :KranEx. TOTO Type T 23 B13
bh 188.000 1,000000 188.000
Kran Tembok Ex. TOTOType T 23 B 14 :Upahpasang kran dinding
bh 20.000 1,000000 20.000
Kran leher angsa Tototype T 30 AR13V7N /bh : :Kran leher angsaToto type T 30AR13V7N
bh 550.000 1,000000 550.000
Kran leher angsa Tototype T 30 AR13V7N /bh : :Upah pasang kranleher angsa
bh 15.000 1,000000 15.000
Paper holder Toto typeTS 116 R / bh : :Paperholder Toto type TS 116R
bh 365.200 1,000000 365.200
Paper holder Toto typeTS 116 R / bh : :Upahpasang paper holder
bh 25.000 1,000000 25.000
Soap dispencer Tototype TS 126 AR / bh ::Soap dispencer Tototype TS 126 AR
bh 108.900 1,000000 108.900
Soap dispencer Tototype TS 126 AR / bh ::Upah pasang dispencer
bh 15.000 1,000000 15.000
Shower room doorhandle Toto type TX10B/ bh : :Shower roomdoor handle Toto typeTX10B
bh 825.000 1,000000 825.000
Shower room doorhandle Toto type TX10B/ bh : :Upah pasangshower room doorhandle
bh 50.000 1,000000 50.000
Kitchen sink 1 lubang /bh : :Kitchen sink 1lubang
bh 650.000 1,000000 650.000
Kitchen sink 1 lubang /bh : :Upah kitchen sink
bh 100.000 1,000000 100.000
Meja wastafel finishgranit / m' : :Beton sitemix 1 : 2 : 3
m3 519.344 0,070000 36.354
Meja wastafel finishgranit / m' : :Bekistingcaping beam
m3 618.525 0,070000 43.297
Meja wastafel finishgranit / m' : :Besi beton250kg/m3
m3 2.239.536 0,070000 156.768
Meja wastafel finishgranit / m' : :Granitimpor
m2 975.000 0,900000 877.500
Meja wastafel finishgranit / m' : :Perekatmortar
m2 22.066 0,900000 19.859
Meja wastafel finishgranit / m' : :Grouting m2 1.838 0,900000 1.654
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
10 of 14 10/05/2014 21:07
mortar
Meja wastafel finishgranit / m' : :Upah pingul
m' 15.000 2 30.000
Meja wastafel finishgranit / m' : :Upahpasang + poles
m2 175.000 0,900000 157.500
Meja wastafel finishgranit / m' : :Lubangwastafel
bh 75.000 1,000000 75.000
Meja kitchen finishkeramik / m' : :Betonsite mix 1 : 2 : 3
m3 519.344 0,070000 36.354
Meja kitchen finishkeramik / m' : :Bekistingcaping beam
m3 618.525 0,070000 43.297
Meja kitchen finishkeramik / m' : :Besibeton 250kg/m3
m3 2.239.536 0,070000 156.768
Meja kitchen finishkeramik / m' : :Lantaikeramik 20x20cm
m2 65.670 1 91.938
Meja kitchen finishkeramik / m' : :Perekatmortar
m2 22.066 1 30.892
Meja kitchen finishkeramik / m' : :Groutingmortar
m2 1.838 1 2.573
Total PEKERJAAN SANITAIR 19.140.327PEKERJAAN STRUKTUR
:Pekerjaan Pembetonanmutu K 300 slump 12
m3 1.059.503 1,000000 1.059.503
:Pekerjaan Pembetonanmutu K 325 slump 12
m3 1.145.922 1,000000 1.145.922
:Pekerjaan Pembetonanmutu K 350 slump 12
m3 1.156.099 1,000000 1.156.099
:Pekerjaan PembesianPolos/Ulir
kg 11.645 1,000000 11.645
:Pekerjaan BekistingPondasi bh 238.665 1,000000 238.665
:Pekerjaan BekistingSloof m2 256.842 1,000000 256.842
:Pekerjaan BekistingKolom m2 389.291 1,000000 389.291
:Pekerjaan BekistingBalok m2 400.198 1,000000 400.198
:Pekerjaan BekistingLantai
m2 421.291 1,000000 421.291
:Pekerjaan BekistingTangga
m2 352.711 1,000000 352.711
:Pekerjaan Rangka AtapBaja WF
kg 26.470 1,000000 26.470
Total PEKERJAAN STRUKTUR 5.458.637PEKERJAAN TANAH PONDASI
:Mobilisasi peralatandan Alat Berat ls 66.500.000 1,000000 66.500.000
:De Mobilisasi peralatandan Alat Berat ls 66.500.000 1,000000 66.500.000
:Boor pile Ø 50 PondasiTC (Pengeboran) m' 237.500 80 19.000.000
:Boor pile Ø 50 PondasiTC (Beton K300 slump16-18 cm)
m3 1.019.300 15 15.202.860
:Boor pile Ø 50 PondasiTC (Besi U39) kg 11.380 1.853 21.092.302
:Boor pile Ø 50 PondasiTC (Bobok kepala boredpile)
ttk 285.870 4 1.143.480
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
11 of 14 10/05/2014 21:07
:Boor pile Ø 50 PondasiTC (Buang tanah expengeboran)
m3 55.000 20 1.122.550
:Boor pile Ø 50 PondasiTC (Galian tanah PileCap TC)
m3 67.100 27 1.837.198
:Boor pile Ø 50 PondasiTC (Urugan pasir)
m3 197.450 1 270.309
:Boor pile Ø 50 PondasiTC (Lantai kerja) m3 903.450 0,684500 618.412
:Boor pile Ø 50 PondasiTC (Beton K350 pilecaps)
m3 1.019.300 18 18.729.638
:Boor pile Ø 50 PondasiTC (Besi U39)
kg 11.380 2.297 26.138.438
:Boor pile Ø 50 PondasiTC (Bekisting pas.Batako)
m² 143.600 21 3.015.600
:Dewatering 5 titik 8bulan
ls 106.502.900 1,000000 106.502.900
Pondasi Bored Pile Ø100 cm s/d elevasi -8.80:a. Pengeboran
m1 550.000 2.400 1.320.000.000
Pondasi Bored Pile Ø100 cm s/d elevasi -8.81:b. Beton K300 slump16-18 cm
m3 986.300 1.332 1.313.786.402
Pondasi Bored Pile Ø100 cm s/d elevasi -8.82:c. Besi U39
kg 11.380 141.171 1.606.527.976
Pondasi Bored Pile Ø100 cm s/d elevasi -8.83:d. Bobok kepala boredpile
ttk 285.870 80 22.869.600
Pondasi Bored Pile Ø100 cm s/d elevasi -8.84:e. Blind boring diisidengan tanah
m3 156.250 553 86.393.798
Pondasi Bored Pile Ø80 cm s/d elevasi -8.80:a. Pengeboran
m1 485.000 1.260 611.100.000
Pondasi Bored Pile Ø80 cm s/d elevasi -8.81:b. Beton K300 slump16-18 cm
m3 986.300 448 441.432.231
Pondasi Bored Pile Ø80 cm s/d elevasi -8.82:c. Besi U39
kg 11.380 55.757 634.518.015
Pondasi Bored Pile Ø80 cm s/d elevasi -8.83:d. Bobok kepala boredpile
ttk 183.000 42 7.686.000
Pondasi Bored Pile Ø80 cm s/d elevasi -8.84:e. Blind boring diisidengan tanah
m3 156.250 186 29.028.316
Pondasi Bored Pile Ø80 cm s/d elevasi -7.40:a. Pengeboran
m1 437.500 120 52.500.000
Pondasi Bored Pile Ø80 cm s/d elevasi -7.41:b. Beton K300 slump16-18 cm
m3 986.300 43 42.041.165
Pondasi Bored Pile Ø80 cm s/d elevasi -7.42:c. Besi U39
kg 11.380 5.634 64.119.344
Pondasi Bored Pile Ø80 cm s/d elevasi -7.43:d. Bobok kepala bored
ttk 183.000 4 732.000
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
12 of 14 10/05/2014 21:07
pile
Pondasi Bored Pile Ø80 cm s/d elevasi -7.44:e. Blind boring diisidengan tanah
m3 156.250 15 2.324.779
Pondasi Bored Pile Ø80 cm s/d elevasi -5.30:a. Pengeboran
m1 437.500 30 13.125.000
Pondasi Bored Pile Ø80 cm s/d elevasi -5.31:b. Beton K300 slump16-18 cm
m3 986.300 11 10.510.291
Pondasi Bored Pile Ø80 cm s/d elevasi -5.32:c. Besi U39
kg 11.380 1.526 17.360.614
Pondasi Bored Pile Ø80 cm s/d elevasi -5.33:d. Bobok kepala boredpile
ttk 183.000 1,000000 183.000
Pondasi Bored Pile Ø80 cm s/d elevasi -5.34:e. Blind boring diisidengan tanah
m3 156.250 3 424.115
Soldier pile Ø 80 cm :a.Pengeboran
m1 437.500 3.540 1.548.750.000
Soldier pile Ø 80 cm :b.Beton K300 slump16-18 cm
m3 986.300 1.779 1.755.020.325
Soldier pile Ø 80 cm :c.Besi U39 kg 11.380 291.401 3.316.144.790
Soldier pile Ø 80 cm :d.Bobok kepala Soldierpile
ttk 183.000 177 32.391.000
:Pembuangan tanah expengeboran m3 80.000 4.369 349.485.846
:Loading Test tekanbored pile Ø 100kapasitas 2x325 ton
ttk 185.000.000 1,000000 185.000.000
:Loading Test tekanbored pile Ø 80kapasitas 2x250 ton
ttk 154.000.000 1,000000 154.000.000
:Loading Test tarikbored pile Ø 100kapasitas 100 ton
ttk 112.500.000 1,000000 112.500.000
:Capping beam (BetonK400)
m3 1.044.100 92 95.723.088
:Capping beam (BesiU39)
kg 11.380 15.586 177.364.128
:Capping beam(Bekisting)
m2 178.140 356 63.403.589
:Galian tanah Basement,Pile Cap, m3 58.400 20.548 1.200.013.766
:Urugan pasir di bawahPelat Basement, PC m3 197.450 192 37.908.631
:Lantai kerja di bawahPelat Basement, PC m3 874.550 96 83.952.883
Pile Caps PC1A :a.Beton K400 m3 1.044.100 10 9.923.126
Pile Caps PC1A :b. BesiU39
kg 11.380 2.513 28.602.099
Pile Caps PC1A :cBekisting pas. bata
m2 141.700 32 4.489.056
Pile Caps PC1B :a.Beton K400
m3 1.044.100 4 4.510.512
Pile Caps PC1B :b. BesiU39
kg 11.380 1.104 12.567.864
Pile Caps PC1B :cBekisting pas. bata
m2 141.700 14 2.040.480
HSKP 2013 http://managedki.net/eharga/skpd/edit_hspk.php?act=view&komponen_...
13 of 14 10/05/2014 21:07
Pile Caps PC2 :a. BetonK400 m3 1.044.100 93 97.474.044
Pile Caps PC3 :b. BesiU39
kg 11.380 15.687 178.513.926
Pile Caps PC4 :cBekisting pas. bata
m2 141.700 149 21.151.559
Pile Caps PC2A :a.Beton K400
m3 1.044.100 79 82.993.421
Pile Caps PC2A :b. BesiU39
kg 11.380 15.036 171.104.652
Pile Caps PC2A :cBekisting pas. bata
m2 141.700 94 13.297.128
Pile Caps PC2B :a.Beton K400
m3 1.044.100 10 10.374.178
Pile Caps PC2B :b. BesiU39 kg 11.380 2.222 25.281.666
Pile Caps PC2B :cBekisting pas. bata m2 141.700 14 1.955.460
Pile Caps PC3 :a. BetonK400 m3 1.044.100 218 227.164.539
Pile Caps PC4 :b. BesiU39 kg 11.380 24.319 276.747.306
Pile Caps PC5 :cBekisting pas. bata
m2 141.700 342 48.503.910
Pile Caps PC3A :a.Beton K400
m3 1.044.100 12 12.061.181
Pile Caps PC3A :b. BesiU39
kg 11.380 2.155 24.528.076
Pile Caps PC3A :cBekisting pas. bata
m2 141.700 29 4.041.993
Pile Caps PC4 :a. BetonK400
m3 1.044.100 49 50.814.256
Pile Caps PC5 :b. BesiU39
kg 11.380 8.266 94.062.717
Pile Caps PC6 :cBekisting pas. bata
m2 141.700 32 4.497.232
Pile Caps PC14 :a.Beton K400 m3 1.044.100 145 151.810.845
Pile Caps PC15 :b. BesiU39 kg 11.380 14.532 165.371.325
Pile Caps PC16 :cBekisting pas. bata m2 141.700 66 9.416.248
Total PEKERJAAN TANAH PONDASI 17.469.293.181