www.huawei.com HUAWEI TECHNOLOGIES CO., LTD.
Huawei Smart
PV-Plant Solution
References 2014/12
Europe
800MW
Germany Reden Greencells 8MW PV-Plant
Capacity 7.8MW
Location Germany Reden
Solar
Inverter SUN2000-20KTL
Time 2014 May
Net voltage 10kV
Customer
Value
High efficiency/ 3 path MPPT
achieve high electricity generation
48kg/unit,easy-install;
IP65,No fuse、No fan,reliable
and reduce working cost;
Smart string testing provide
elaborate management, fault time is
reduced by 80%
Germany Arneburg KS Solar 5.3MW PV-Plant
Capacity 5.3MW
Location Germany Arneburg
Solar
inverter SUN2000-20KTL
Time 2014 April
Net voltage 10kV
Customer
value
3 Path MPPT can match user
requirement more intellectively and
raise the electricity generation;
48kg/unit,easy-install;
IP65,No fuse、No fan,reliable
and reduce working cost;
Germany Simmersdorf 500kW Roof Capacity 500kW
Location Germany Simmersdorf
Solar
Inverter SUN2000-20KTL
Time 2014 January
Net volatge 400V
Customer
Value
3 Path MPPT can match user
requirement more intellectively and
raise the electricity generation
48kg/unit,easy-install;
IP65,No fuse、No fan,reliable
and reduce working cost;
Capacity 250 kWp
Location Toulouse ,FRANCH
Solar
Inverter Huawei SUN2000-20KTL
Time 2014 August
Net volatge 400 V
Customer
Value
High electricity generation, more
than original electricity station;
Smart Huawei Inverter can satisfy
smart install room requirement;
Sustain one phase MPPT, save the
cost by remove external box as UTE
require.
Franch Solveo 250kW Roof PV-Plant
Capacity 8.2MW
Location FRANCH
Solar inverter Huawei SUN2000-28KTL
Time 2014 November
Net voltage 20kV
Customer
value
3 path MPPT can adopt different
solar panel and other solar device;
48kg, which can satisfy FRANCH2
requirement, save install cost also.,
IP65, free-maintenance
FRANCH Amarenco 8.2MW PV-Plant
HUAWEI TECHNOLOGIES CO., LTD. Page 8
Japan
200MW
HUAWEI TECHNOLOGIES CO., LTD. Page 9
Capacity 98kW(2*49kW)
Location Gum,Japan
Solar
Inverter SUN2000-24.5KTL 4 units
Net voltage 210V
Customer
Value
Service for Tokyo Electric Power
Perfectly match low-voltage project
High electricity generation under 3 phase
MPPT
IP65、free-maintenance
Japan Gum PV-Plant
HUAWEI TECHNOLOGIES CO., LTD. Page 10
Capacity 220kW
Location Hiroshima,Japan
Solar
Inverter SUN2000-28KTL 8 units
Net voltage 6.6kV
Customer
Value
Multipath MPPT, reduce the influence from shadow and
obstacle
IP65, low reference on natural environment, no extra heat
sink device.
No DC converge box
Easy-maintenance
Japan Hiroshima 220kW PV-Plant
HUAWEI TECHNOLOGIES CO., LTD. Page 11
Capacity 500kW
Location Hiroshima,Japan
Solar
Inverter SUN8000-500KTL 1 unit
Net
voltage 6.6kV
Customer
Value
High efficiency
No air-condition
Remote monitor
Remote operation
Japan Hiroshima 500kW PV-Plant
HUAWEI TECHNOLOGIES CO., LTD. Page 12
Capacity 0.98MW
Location Nagasaki,Japan
Solar Inverter SUN2000-24.5KTL 40 units
Net voltage 210V
Customer
Value
High efficiency
Perfectly match low-voltage project
Remote monitor and free-maintenance
IP65
Japan Nagasaki 0.98MW PV-Plant
China
4,500MW
HUAWEI TECHNOLOGIES CO., LTD. Page 14
Jiaxing Zhejiang CGN 10MW Roof PV-Plant
Capacity 8.93MW
Location Zhejiang Jiaxing
Solar
Inverter SUN2000-20KTL
Time 2014 April
Net voltage 10kV
Customer
Value
Multipath MPPT achieve electricity
generation>10%;
48kg/unit,easy-install in roof;
IP65,adapt complex environment
around heat-engine plant/chemical
plant.
HUAWEI TECHNOLOGIES CO., LTD. Page 15
Shunde Media 8MW Roof PV-Plant
Capacity 7.8MW
Location Guangdong Shunde
Solar
Inverter SUN2000-28KTL
Time 2014 April
Net voltage 10kV
Customer
Value
Multipath MPPT achieve electricity
generation>10%;
48kg/unit,easy-install in roof;
IP65,free-maintenance
Aikang 2.2MW Roof
Background
Requirement
Huawei solution
Aikang solar project adapt Huawei SUN2000-
10KTL/ SUN2000-12KTL/ SUN2000-20KTL string
inverter, solar station adopt self-supply mode, with
2.2MW capacity.
Raise electricity generation;
Reduce fault time;
Enhance Roof station safety.
Raise electricity generation in 5~8%;
Smart string testing achieve elaborate manage,
reduce 80% of fault time;
No DC converge box, avoid DC transfer and
electric arc.
Shandong Linuo Zhoucheng 4MW
Background
Requirement
Huawei Solution
Shandong Linuo Zhoucheng solar project, adopt
Huawei SUN2000-20KTL string solar inverter, build
smart PV-Plant with “smart, efficiency, safe and
reliable”.
Raise electricity generation
Reduce building time of PV-Plant;
Save maintenance cost.
Compared with centre inverter solution, electricity
generation is raised>10%;
No need to build inverter house, reduce building
time;
Free-maintenance, save OPEX.
Zhejiang Tongjing 300MW PV-Agriculture
Background
Requirement
Huawei Solution
Zhejiang Tongjing solar project, adopt Huawei
SUN2000-28KTL string solar inverter, with Huawei 4G
LTE provide internal communication, build the biggest
ground smart PV-Plant in Huadong area.
Raise electricity generation
Reduce building time of PV-Plant;
Reduce fault time of inverter
Raise electricity generation in 20%-30%
Raise electricity generation in 3%(compared
with other company)
Easy-install;
6 path smart string testing, reduce 80% fault time
of location.
Germu 200MW PV-Plant
Background
Requirement
Huawei solution
Germu PV-Plant project adopt Huawei
SUN2000-28KTL/SUN2000-35KTL string solar
solution, build smart PV-Plant with “smart, efficiency,
safe and reliable”.
Raise electricity generation;
Reduce fault time;
Reduce feedback time of investment.
Electricity generation is raised>5%(compared
with other company);
6 path smart string testing, reduce 80% fault time
of location.
Reduce maintenance cost, raise electricity
generation, reduce feedback time of investment.
Copyright© 2014 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating
results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially
from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an
offer nor an acceptance. Huawei may change the information at any time without notice.
More
Yields
Always Available for Highest Yields
Easy
Maintenance
Continuous
Service