Hon. Eleanor Stein

October 29,2013

Page 3

Proposed Alternative 3 - 34.5 kV Alternative

PG continues to support the 34.5 kV alternative originally advanced by the Town of

Ghent and submits that NYSEG has not ca:ried its burden of demonstrating that the Town s 34.5kV alternative, which is different from the 34.5 kV alternative reviewed and rejected by NYSEG,

is unreasonable. PG continues to study the optimal configuration of a 34.5 kV altemative.

If there are any questions regarding the above, please do not hesitate to contact the

undersigned at any time.

Respectfu lly submitted,

GREENBERG TRAURIG, LLP

/s Wi[[ínmA.lturst

V/illiam A. Hurst

cc: Active Parties

(via Electronic Service)

Page 4: Hurst 10-29 Alts.pdf

8/14/2019 Hurst 10-29 Alts.pdf

http://slidepdf.com/reader/full/hurst-10-29-altspdf 4/4

284

Niver-ville

¡valkin Substation ¿CSX Rrght of Wayt

1

,l

I

 .

 i

:

I

II

II

Y 12X 84 USA¡n

ordham alatie, N.t

¿ *z@

@c hatham Center \

¿C SX Rrg ht of WaY. conttn u ed/\

trEffi -It a lat ie

Zóg)

FrD

t @

  r{ode ok rui. cdgc+q

¡q,l ,q FCo;¡ riir s t a t i o n

Inragery Date: 1tt,/7t 7ít1L 42É24 2