1/7
Algeria Oman Fertilizer Project
INSPECTION AND TEST PLAN
PO / SC No. :
EQUIPMENT / INSTALLATION :
VENDOR / SUBCONTRACTOR
LENGEND
H – Hold Point I – Inspection Point S – Surveillance
W – Witness Point R – Review
Activity No.
WORK ACTIVITY QUALITY CHARACTERISTIC TO BE VERIFIED
PROCEDURE REFERENCE
ACCEPTANCE CRITERIA CODE / STANDARD
INSPECTION LEVEL QUALITY RECORD DOC. No. CONST QC OWNER
1 Foundation
1-1
Check the orientation of 00,900,1800,2700
Drawing of Storage tank ±10 H W R
2 Anchor Bolt
2-1
Tightening & Leveling / Snug Tight / Orientation / Projection
Foundation Drawing API 650 H W S IR-T-001; (REFER TO METHOD STATEMENT)
2
2/7
Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN
PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :
Activity No.
WORK ACTIVITY QUALITY CHARACTERISTIC TO BE
VERIFIED REFERENCE PROCEDURES
ACCEPTANCE CRITERIA CODE / STANDARD
INSPECTION LEVEL QUALITY RECORD DOC. No. CONST QC OWNER
3 Material
3-1 Material Identification Drawing Drawing H H R IR-T-014
4 Bottom Plate
4-1 Check the orientation and layout Drawing Drawing H W R
4-3 Visual Inspection of welds API 650 Para. 7.2 API 650 Para. 7.2 H W R IR-T-008
4-4 Weld seam vacuum test API 650 Para 8.6 API 650 Para 8.6 H H W IR-T-005
3/7
Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN
PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :
Activity No.
WORK ACTIVITY QUALITY CHARACTERISTIC TO BE
VERIFIED REFERENCE
PROCEDURES ACCEPTANCE CRITERIA
CODE / STANDARD
INSPECTION LEVEL QUALITY RECORD DOC. No. CONST QC OWNER
5 Annular
5-1 Fit-up Inspection Drawing Drawing W W S
5-2 Weld seam – Visual Examination API 650 Para.7.2 API 650 Para.7.2 W W W IR-T-008
5.3 RT on Radial Joint ASME SEC.Ⅴ ASME SEC.Ⅴ - H R
6-0 Annular to Shell
6-1 Visual Inspection for fillet welds API 650 Para. 7.2 API 650 Para. 7.2 W W W IR-T-008
2
2
4/7
Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN
PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :
Activity
No. WORK ACTIVITY
QUALITY CHARACTERISTIC TO BE VERIFIED
REFERENCE PROCEDURES ACCEPTANCE CRITERIA
CODE / STANDARD INSPECTION LEVEL QUALITY RECORD
DOC. No. CONST QC OWNER
7 Shell
7-1 Check Nozzle Orientation Refer to Fabrication Drawing and Fabrication Procedure
Refer to Fabrication Drawing and Fabrication Procedure
H W W IR-T-003
7-2 Check the alignment of Vertical joints
Refer to API 650 7.2. Refer to API 650 7.2. H W W
7-3 Check the Projection of Horizontal Joints
Refer to API 650 7.2.3 Refer to API 650 7.2.3 H W W
7-4 Check the Roundness of inside diameter for 1st course shell
API 650 Para. 7.5.3 API 650 Para. 7.5.3 H W W IR-T-004
7-5 Check the Level of shell plate after assembling of 1, 3 and 5
Refer to Erection Procedure Refer to Erection Procedure H W W IR-T-002
5/7
Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN
PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :
Activity No. WORK ACTIVITY QUALITY CHARACTERISTIC TO BE
VERIFIED REFERENCE
PROCEDURES
ACCEPTANCE CRITERIA INSPECTION LEVEL QUALITY RECORD DOC.
No. CODE / STANDARD CONST QC OWNER
7-6 Check the Level of the Shell plate after assembling the top shell course
API 650 API 650 H W W IR-T-002
7-7 Check the Plumbness of Shell plate after assembling of 1, 3 and 5 of shell course
API 650 7.5.2 API 650 7.5.2 H W W IR-T-007
7-8 Check the Plumbness of Shell plate after assembling the top of the shell course
API 650 7.5.2 API 650 7.5.2 H W W IR-T-007
6/7
Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN
PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :
Activity No. WORK ACTIVITY QUALITY CHARACTERISTIC
TO BE VERIFIED REFERENCE PROCEDURES
ACCEPTANCE CRITERIA CODE / STANDARD
INSPECTION LEVEL QUALITY RECORD DOC.
No. CONST QC OWNER
8 Top Angle / Compression Ring
Curvature and Distortion Refer to Fabrication Drawing and Fabrication Procedure
Refer to Fabrication Drawing and Fabrication Procedure
W W W IR-T-013
9 Roof
9-1 Visual Inspection of Welds API650 8.5 API650 8.5 W W R IR-T-008
9-2 Fillet Welds, Soap Bubble (100% of weld)
H H W IR-T-006
11 Temporary Bracket Fillet Weld – MT or PT (100%) 6423DA060-00-01300 6423DA060-00-01300 ‘- H W
12 Permanent Bracket and Pad
Fillet Weld – MT or PT (100%) 6423DA060-00-01300 6423DA060-00-01300 ‘- H W
13 Wind Girder Dimensional and Visual inspection
Drawing - API 650 8.5
-Drawing - API 650 8.5
W W S
7/7
Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN
PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :
Activity No. WORK ACTIVITY QUALITY CHARACTERISTIC
TO BE VERIFIED REFERENCE PROCEDURES ACCEPTANCE CRITERIA
CODE / STANDARD INSPECTION LEVEL QUALITY
RECORD DOC. No.
CONST QC OWNER
14 Wind Girder and Stiffening Ring
Fillet welds MT or PT (100%)
H R
15 Platform and Ladder Dimensional and Visual inspection
Drawing of Storage tank Drawing of Storage tank W W S IR-T-009
16 Hydrotest Weld Joints Soundness API 650 7.3.6. API 650 7.3.6 H H H IR-T-010
17 Settlement Inspection Settlement report API 650 7.3.6.6
Settlement report API 650 7.3.6.6
W W S IR-T-011
Note: When the contractor requested inspection to AOA as per this ITP, and Inspection is not performed in scheduled time, it is considered to waive AOA’s inspection.
2
Attachment 1
IR‐T‐001
INSPECTION REPORT FOR ANCHOR BOLT ORIENTATION
Project Name : AOFP Name of Equipment : _________________ Item No. : __________________________ Location : ___________________________ I.R. No. : ____________________________
Anchor Bolt No.
Design Orientation
Actual Orientation
Diff. Remarks Design
Projection Design
Projection Diff. Remarks
Accepted by: Construction : QA/QC : Owner : ______________________ ____________________ __________________ Name / Signature/Date Name / Signature/Date Name / Signature/Date
8-M30 ANCHOR BOLT & NUTS
0O
270O
180O
90O
45O TYP
22.5O
ANCHOR BOLT ORIENTATION
2
H
ANCHOR BOLT PROJECTION
Attachment 2
IR‐T‐002INSPECTION REPORT
FOR LEVEL OF SHELL PLATES Project Name : AOFP Name of Equipment : ______________ Item No. : _______________ Location : _______________ I.R. No. : ________________
Check Point Measured Dimension
Difference Remarks Check point Measured Dimension
Difference Remarks
11.25 º 191.25 º
22.50 º 202.50 º 33.75 º 213.75 º 45 º 225 º
56.25 º 236.25 º 67.50 º 247.50 º
78.75 º 258.75 º 90 º 270 º
101.25 º 281.25 º 112.50 º 292.50 123.50 º 303.75 º
135 º 315 º 146.25 º 326.25 º 157.60 º 337.50 º 168.75 º 348.75 º 180 º 360 º
INSPECTION METHOD
Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
0º
90º
180º
270º
Shell Plate
Measuring Scale Level
Attachment 3 IR‐T‐003
INSPECTION REPORT FOR TANK NOZZLE ORIENTATION
Project Name : AOFP
Name of Equipment : _________________
Item No. : _________________
Location : _________________
I.R. No. : __________________
Nozzle No.
Size Part Name
DRAWING POSITION INSPECTION ITEMRemarks ORIENTN.
(Deg) ELEV. (H)
DIST. (D)
ORIENTN. (CHECK)
ELEV. (CHECK)
DIST. (CHECK)
WELD VISUAL
Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
H
H
D
D
Attachment 4 IR‐T‐004
INSPECTION REPORT FOR ROUNDNESS OF 1st COURSE SHELL PLATE
Project Name : AOFP Name of Equipment : _____________________ Item No. : _________________ Location : _________________ I.R. No. : __________________
Check Point Measured Radius
Difference Remarks Check Point Measured Radius
Difference Remarks
11.25 º 191.25 º 22.50 º 202.50 º 33.75 º 213.75 º 45 º 225 º
56.25 º 236.25 º 67.50 º 247.50 º 78.75 º 258.75 º 90 º 270 º
101.25 º 281.25 º 112.50 º 292.50 123.50 º 303.75 º 135 º 315 º
146.25 º 326.25 º 157.60 º 337.50 º 168.75 º 348.75 º 180 º 360 º
INSPECTION METHOD :
Max. Diameter :
Min. Diameter :
Actual Difference :
Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
0º 45º
90º
135º 180º
225º
270º
315º
Level
Shell Plate
Attachment 5 IR‐T‐005
INSPECTION REPORT FOR BOTTOM VACUUM TEST
Project Name : AOFP Name of Equipment : _________________ Item No. : ______________ Location : ______________ I.R. No. : _______________
CHECK ITEM VACUUM TEST
RESULT VACUUM METHOD
PRESSURE REMARK
S 1st 2nd 1. Bottom Plate Welding Joint
2. Bottom to Annular Welding Joint
3. Annular Plate Welding Joint
Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
Bottom to Bottom Plate Weld Joint
Annular to Bottom Plate Weld Joint
Annular to Annular Plate Weld Joint
Attachment 6 IR‐T‐006
INSPECTION REPORT FOR ROOF VACUUM TEST
Project Name : AOFP Name of Equipment : _________________ Item No. : ______________ Location : ______________ I.R. No. : _______________
CHECK ITEM VACUUM TEST
RESULT VACUUM METHOD
PRESSURE REMARKS 1st 2nd
1. Roof Plate Welding Joint
2. Roof Plate To Compression Ring Welding Joint
Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
Attachment 7 IR‐T‐007
INSPECTION REPORT FOR PLUMBNESS OF SHELL PLATE
Project Name : AOFP Name of Equipment :______________ Item No. : ___________ Location : ___________ I.R. No. : ____________
Check Point
Measured Dimension Max. Diff.
Check Point
Measured Dimension Max. Diff. Bot 2nd 3rd 4th 5th 6th Bot. 2nd 3rd 4th 5th 6th
11.25 º 191.25 º 22.50 º 202.50 º 33.75 º 213.75 º 45 º 225 º
56.25 º 236.25 º 67.50 º 247.50 º 78.75 º 258.75 º 90 º 270 º
101.25 º 281.25 º 112.50 º 292.50 123.50 º 303.75 º 135 º 315 º
146.25 º 326.25 º 157.60 º 337.50 º 168.75 º 348.75 º 180 º 360 º
INSPECTION METHOD Tolerance : <h/200 Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
Plumb Bob
Shell Plate
Bottom Plate
0 º
90 º
180 º
270 º
Attachment 8 IR‐T‐008
INSPECTION REPORT TANK WELDING SEAM
Project Name : AOFPName of Equipment : ______________ Item No. : ______________ Location : ______________ I.R. No. : _______________
Part Name Location Check Date Result Remarks
Bottom Plates Bottom to Bottom Lap Weld Bottom to Annular Lap Weld
Annular Plates Annular to Annular Butt Weld Annular to Shell Fillet Weld
Shell Plates
1st Shell Vertical Weld 1st to 2nd Shell Horizontal Weld 2nd Shell Vertical Weld 2nd To 3rd Shell Horizontal Weld 3rd Shell Vertical Weld 3rd To 4th Shell Horizontal Weld 4th Shell Vertical Weld 4th To 5th Shell Horizontal Weld 5th Shell Vertical Weld 5th To 6th Shell Horizontal Weld 7th Shell Vertical Weld 7th To Top Angle Horizontal Weld
Roof Plates Roof To Roof Lap Weld Roof To Top Angle Lap Weld
Shell Nozzles Nozzle Neck & Reinforcing Pad Weld Roof Nozzles Nozzle Neck & Reinforcing Pad Weld
Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
Attachment 9 IR‐T‐009
INSPECTION REPORT FOR TANK PLATFORM & LADDER
PART NAME POSITION INSPECTIN ITEM
REMARKS INSTALL RESULT WELDING RESULT
STAIRWAY 1st Ladder
2nd Ladder
3rd Ladder
1st Platform
2nd Platform
Top Platform
1st Bracket
2nd Bracket
3rd Bracket
4th Bracket
5th Bracket
6th Bracket
7th Bracket
8th Bracket
9th Bracket
10th Bracket
11th Bracket
12th Bracket
Ladder Handrail
Roof Handrail
Accepted by : Construction : QA/QC : Owner : _____________________ _______________________ _____________________ Name / Signature / Date Name / Signature / Date Name / Signature / Date
Attachment 10
HYDROTEST REPORT
IR‐T‐010
Report No.:
Location and Item Under Test
Date of Test :
Design Data: Type of Tank : Dome Roof Tank Fluid : Design Temp. : Design Pressure : Hydrotest Pressure :
Hydrotesting Fluid :
Water Filling Filling Time
Holding Time Visual Inspection Daewoo OWNER Start Stop
25% Full
50% Full
75% Full
100% Full
Remarks :
25 % Water Level
50 % Water Level
75 % Water Level
100 % Water Level
Attachment 11
Foundation Settlement Report
IR‐T‐011
Report No.:
Tank Description : Tag No.
Reference Point 0° 30° 60° 90° Daewoo OWNERTank Empty 25% Water Level 50% Water Level 75% Water Level 100% Water Level 100% Water Level (24Hrs)
Reference Point 120° 150° 180° 210° Tank Empty 25% Water Level 50% Water Level 75% Water Level 100% Water Level 100% Water Level (24Hrs)
Reference Point 240° 270° 300° 330° Tank Empty 25% Water Level 50% Water Level 75% Water Level 100% Water Level 100% Water Level (24Hrs) Note : 12 pcs Monitoring plate distributed around the tank Accepted by : Construction : QA/QC : Owner : Name : Name : Name : Signature : Signature : Signature : Date : Date : Date :
BM1
BM2
0°
90°
180°
270°
Attachment 12 IR‐T‐012
POSTWELD HEAT TREATMENT REPORT
Project Name : AOFP
Item Name : ________________
Item No. : __________________
Report No. : ____________ Date : ________________
COMPONENT TYPE : VESSEL TANK FURNACE PIPING STRUCTURE TYPE : _____________________ MATERIAL : _________________ THK.: _________________ CODE : _____________________ REQUIRED BY : SERVICE THK.
Starting Temperature
Heating Rate Holding Temperature Holding Time Cooling Rate Control Cooling To :
HEAT TREATMENT EQUIPMENT DATA
CALIBRATION : _____________________ THERMOCOUPLE : ____________________ TYPE : ___________________ NUMBER : __________________ THERMOCOUPLE LOCATION : NOTES : Accepted by : Construction : QA/QC : Owner : Name : Name : Name : Signature : Signature : Signature : Date : Date : Date :
Attachment 13 IR‐T‐013
INSPECTION REPORT FOR CURVATURE AND DISTORTION
Item Name : ________________________ Name of Equipment : _____________________
MEASURED POINT
MEASURED DIMENSION (A)
MEASURED POINT
MEASURED DIMENSION (B)
MEASURED DIAMETER
REMARKS
0˚
180˚
45˚
225˚
90˚
270˚
135˚
315˚
ARC LENGTH 30˚
45˚
Accepted by: Construction : QA/QC : Owner : Name : Name : Name : Signature : Signature Signature : Date : Date : Date :
Attachment 14 IR‐T‐014
INSPECTION REPORT FOR MATERIAL IDENTIFICATION
Project Name : AOFP Name of Equipment : Item No. : Location : I.R. No. : ____________________________
Heat NO. Erec’ No. Material Size(L*W) Thk’ Remarks
Accepted by: Construction : QA/QC : Owner : ______________________ ____________________ __________________ Name / Signature/Date Name / Signature/Date Name / Signature/Date
L
W
Thk’
PLATE