ITP FOR TANK FABRICATION & INSTALLATION

Citation preview

Page 1: Itp for Tank Fabrication & Installation Work1_rev02
Page 2: Itp for Tank Fabrication & Installation Work1_rev02

1/7

Algeria Oman Fertilizer Project 

INSPECTION AND TEST PLAN

PO / SC No. :

EQUIPMENT / INSTALLATION :

VENDOR / SUBCONTRACTOR

LENGEND

H – Hold Point I – Inspection Point S – Surveillance

W – Witness Point R – Review

Activity No.

WORK ACTIVITY QUALITY CHARACTERISTIC TO BE VERIFIED

PROCEDURE REFERENCE

ACCEPTANCE CRITERIA CODE / STANDARD

INSPECTION LEVEL QUALITY RECORD DOC. No. CONST QC OWNER

1 Foundation

1-1

Check the orientation of 00,900,1800,2700

Drawing of Storage tank ±10 H W R

2 Anchor Bolt

2-1

Tightening & Leveling / Snug Tight / Orientation / Projection

Foundation Drawing API 650 H W S IR-T-001; (REFER TO METHOD STATEMENT)

2

Page 3: Itp for Tank Fabrication & Installation Work1_rev02

2/7

Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN

PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :

Activity No.

WORK ACTIVITY QUALITY CHARACTERISTIC TO BE

VERIFIED REFERENCE PROCEDURES

ACCEPTANCE CRITERIA CODE / STANDARD

INSPECTION LEVEL QUALITY RECORD DOC. No. CONST QC OWNER

3 Material

3-1 Material Identification Drawing Drawing H H R IR-T-014

4 Bottom Plate

4-1 Check the orientation and layout Drawing Drawing H W R

4-3 Visual Inspection of welds API 650 Para. 7.2 API 650 Para. 7.2 H W R IR-T-008

4-4 Weld seam vacuum test API 650 Para 8.6 API 650 Para 8.6 H H W IR-T-005

Page 4: Itp for Tank Fabrication & Installation Work1_rev02

3/7

Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN

PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :

Activity No.

WORK ACTIVITY QUALITY CHARACTERISTIC TO BE

VERIFIED REFERENCE

PROCEDURES ACCEPTANCE CRITERIA

CODE / STANDARD

INSPECTION LEVEL QUALITY RECORD DOC. No. CONST QC OWNER

5 Annular

5-1 Fit-up Inspection Drawing Drawing W W S

5-2 Weld seam – Visual Examination API 650 Para.7.2 API 650 Para.7.2 W W W IR-T-008

5.3 RT on Radial Joint ASME SEC.Ⅴ ASME SEC.Ⅴ - H R

6-0 Annular to Shell

6-1 Visual Inspection for fillet welds API 650 Para. 7.2 API 650 Para. 7.2 W W W IR-T-008

2

2

Page 5: Itp for Tank Fabrication & Installation Work1_rev02

4/7

Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN

PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :

Activity

No. WORK ACTIVITY

QUALITY CHARACTERISTIC TO BE VERIFIED

REFERENCE PROCEDURES ACCEPTANCE CRITERIA

CODE / STANDARD INSPECTION LEVEL QUALITY RECORD

DOC. No. CONST QC OWNER

7 Shell

7-1 Check Nozzle Orientation Refer to Fabrication Drawing and Fabrication Procedure

Refer to Fabrication Drawing and Fabrication Procedure

H W W IR-T-003

7-2 Check the alignment of Vertical joints

Refer to API 650 7.2. Refer to API 650 7.2. H W W

7-3 Check the Projection of Horizontal Joints

Refer to API 650 7.2.3 Refer to API 650 7.2.3 H W W

7-4 Check the Roundness of inside diameter for 1st course shell

API 650 Para. 7.5.3 API 650 Para. 7.5.3 H W W IR-T-004

7-5 Check the Level of shell plate after assembling of 1, 3 and 5

Refer to Erection Procedure Refer to Erection Procedure H W W IR-T-002

Page 6: Itp for Tank Fabrication & Installation Work1_rev02

5/7

Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN

PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :

Activity No. WORK ACTIVITY QUALITY CHARACTERISTIC TO BE

VERIFIED REFERENCE

PROCEDURES

ACCEPTANCE CRITERIA INSPECTION LEVEL QUALITY RECORD DOC.

No. CODE / STANDARD CONST QC OWNER

7-6 Check the Level of the Shell plate after assembling the top shell course

API 650 API 650 H W W IR-T-002

7-7 Check the Plumbness of Shell plate after assembling of 1, 3 and 5 of shell course

API 650 7.5.2 API 650 7.5.2 H W W IR-T-007

7-8 Check the Plumbness of Shell plate after assembling the top of the shell course

API 650 7.5.2 API 650 7.5.2 H W W IR-T-007

Page 7: Itp for Tank Fabrication & Installation Work1_rev02

6/7

Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN

PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :

Activity No. WORK ACTIVITY QUALITY CHARACTERISTIC

TO BE VERIFIED REFERENCE PROCEDURES

ACCEPTANCE CRITERIA CODE / STANDARD

INSPECTION LEVEL QUALITY RECORD DOC.

No. CONST QC OWNER

8 Top Angle / Compression Ring

Curvature and Distortion Refer to Fabrication Drawing and Fabrication Procedure

Refer to Fabrication Drawing and Fabrication Procedure

W W W IR-T-013

9 Roof

9-1 Visual Inspection of Welds API650 8.5 API650 8.5 W W R IR-T-008

9-2 Fillet Welds, Soap Bubble (100% of weld)

H H W IR-T-006

11 Temporary Bracket Fillet Weld – MT or PT (100%) 6423DA060-00-01300 6423DA060-00-01300 ‘- H W

12 Permanent Bracket and Pad

Fillet Weld – MT or PT (100%) 6423DA060-00-01300 6423DA060-00-01300 ‘- H W

13 Wind Girder Dimensional and Visual inspection

Drawing - API 650 8.5

-Drawing - API 650 8.5

W W S

Page 8: Itp for Tank Fabrication & Installation Work1_rev02

7/7

Algeria Oman Fertilizer Project INSPECTION AND TEST PLAN

PO / SC No. VENDOR / SUBCONTRACTOR : EQUIPMENT / INSTALLATION :

Activity No. WORK ACTIVITY QUALITY CHARACTERISTIC

TO BE VERIFIED REFERENCE PROCEDURES ACCEPTANCE CRITERIA

CODE / STANDARD INSPECTION LEVEL QUALITY

RECORD DOC. No.

CONST QC OWNER

14 Wind Girder and Stiffening Ring

Fillet welds MT or PT (100%)

H R

15 Platform and Ladder Dimensional and Visual inspection

Drawing of Storage tank Drawing of Storage tank W W S IR-T-009

16 Hydrotest Weld Joints Soundness API 650 7.3.6. API 650 7.3.6 H H H IR-T-010

17 Settlement Inspection Settlement report API 650 7.3.6.6

Settlement report API 650 7.3.6.6

W W S IR-T-011

Note: When the contractor requested inspection to AOA as per this ITP, and Inspection is not performed in scheduled time, it is considered to waive AOA’s inspection.

2

Page 9: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 1  

                                                                                                                                       IR‐T‐001 

INSPECTION REPORT FOR ANCHOR BOLT ORIENTATION 

              Project Name : AOFP Name of Equipment :  _________________ Item No. :   __________________________ Location :  ___________________________ I.R. No. :  ____________________________   

   

Anchor Bolt No. 

Design Orientation 

Actual Orientation 

Diff.  Remarks Design 

Projection Design 

Projection Diff.  Remarks 

         

         

         

         

         

         

         

         

           

           

           

           

           

           

           

           

           

           

           

   Accepted by:    Construction :                                                QA/QC :                                               Owner :    ______________________                         ____________________                  __________________     Name / Signature/Date                             Name / Signature/Date                     Name / Signature/Date   

8-M30 ANCHOR BOLT & NUTS

0O

270O

180O

90O

45O TYP

22.5O

ANCHOR BOLT ORIENTATION

2

H

ANCHOR BOLT PROJECTION

Page 10: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 2  

   IR‐T‐002INSPECTION REPORT 

FOR LEVEL OF SHELL PLATES  Project Name : AOFP Name of Equipment : ______________ Item No. : _______________ Location : _______________ I.R. No. : ________________ 

 

Check Point Measured Dimension 

Difference  Remarks  Check point Measured Dimension 

Difference  Remarks 

11.25 º       191.25 º       

22.50 º        202.50 º       33.75 º        213.75 º       45 º      225 º  

56.25 º      236.25 º  67.50 º      247.50 º  

78.75 º      258.75 º  90 º      270 º  

101.25 º        281.25 º       112.50 º        292.50       123.50 º        303.75 º       

135 º        315 º       146.25 º        326.25 º       157.60 º      337.50 º  168.75 º      348.75 º  180 º      360 º  

INSPECTION  METHOD  

Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date     

90º

180º

270º

Shell Plate

Measuring Scale Level

Page 11: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 3                                                                                                                                                         IR‐T‐003

INSPECTION REPORT FOR TANK NOZZLE ORIENTATION 

Project Name : AOFP 

Name of Equipment : _________________

Item No. : _________________ 

Location : _________________ 

I.R. No. : __________________ 

 

Nozzle     No. 

Size Part      Name 

DRAWING POSITION INSPECTION ITEMRemarks ORIENTN. 

(Deg) ELEV.     (H) 

DIST.     (D) 

ORIENTN.   (CHECK) 

ELEV.      (CHECK) 

DIST.       (CHECK) 

WELD VISUAL 

                                                                                                                                                                                                                                                         

Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date       

H

H

D

D

Page 12: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 4  IR‐T‐004 

INSPECTION REPORT FOR ROUNDNESS OF 1st COURSE SHELL PLATE 

Project  Name :   AOFP Name of Equipment : _____________________ Item No. : _________________ Location : _________________ I.R. No. : __________________ 

Check Point Measured  Radius 

Difference  Remarks  Check Point Measured   Radius 

Difference  Remarks 

11.25 º     191.25 º  22.50 º        202.50 º       33.75 º        213.75 º       45 º      225 º  

56.25 º      236.25 º  67.50 º        247.50 º       78.75 º        258.75 º       90 º      270 º  

101.25 º        281.25 º      112.50 º        292.50       123.50 º        303.75 º       135 º      315 º  

146.25 º        326.25 º       157.60 º        337.50 º       168.75 º        348.75 º       180 º      360 º  

INSPECTION METHOD : 

      Max. Diameter : 

      Min. Diameter : 

      Actual Difference : 

 Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date    

0º 45º 

90º 

135º 180º 

225º 

270º 

315º

Level

Shell Plate

Page 13: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 5  IR‐T‐005 

INSPECTION REPORT FOR BOTTOM VACUUM TEST 

Project  Name :  AOFP Name of Equipment :  _________________ Item No. :  ______________ Location :  ______________ I.R. No. :  _______________ 

CHECK ITEM VACUUM TEST

RESULT VACUUM METHOD 

PRESSURE REMARK

S 1st  2nd 1.  Bottom Plate Welding Joint 

           

2.  Bottom to Annular Welding Joint 

           

3.   Annular Plate Welding Joint 

           

  

           

                 Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date     

Bottom to Bottom Plate Weld Joint

Annular to Bottom Plate Weld Joint

Annular to Annular Plate Weld Joint

Page 14: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 6  IR‐T‐006 

INSPECTION REPORT FOR ROOF VACUUM TEST 

Project  Name :  AOFP Name of Equipment :  _________________ Item No. :  ______________ Location :  ______________ I.R. No. :  _______________ 

CHECK ITEM VACUUM TEST

RESULT VACUUM METHOD 

PRESSURE  REMARKS 1st  2nd 

1. Roof Plate Welding Joint             

2. Roof Plate To Compression Ring Welding Joint 

           

             

  

           

                 Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date 

Page 15: Itp for Tank Fabrication & Installation Work1_rev02

Attachment 7  IR‐T‐007 

INSPECTION REPORT FOR PLUMBNESS OF SHELL PLATE 

Project Name :  AOFP Name of Equipment :______________ Item No. :  ___________ Location :  ___________ I.R. No. :  ____________ 

 

Check Point 

Measured Dimension  Max.     Diff. 

Check Point 

Measured Dimension  Max.    Diff. Bot  2nd  3rd  4th  5th  6th  Bot.  2nd  3rd  4th  5th  6th 

11.25 º           191.25 º      22.50 º                202.50 º               33.75 º                213.75 º               45 º                225 º               

56.25 º            236.25 º      67.50 º                247.50 º               78.75 º                258.75 º               90 º            270 º      

101.25 º            281.25 º      112.50 º                292.50               123.50 º                303.75 º               135 º            315 º      

146.25 º                326.25 º              157.60 º                337.50 º               168.75 º                348.75 º               180 º            360 º      

INSPECTION METHOD     Tolerance :   <h/200 Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date     

Plumb Bob

Shell Plate

Bottom Plate

0 º

90 º

180 º

270 º

Page 16: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 8  IR‐T‐008 

INSPECTION REPORT TANK WELDING SEAM 

Project Name :  AOFPName of Equipment : ______________ Item No. : ______________ Location : ______________ I.R. No. : _______________ 

Part Name  Location Check Date Result Remarks

Bottom Plates Bottom to Bottom Lap Weld  Bottom to Annular Lap Weld       

         

Annular Plates Annular to Annular Butt Weld  Annular to Shell Fillet Weld       

         

Shell Plates 

1st Shell Vertical Weld   1st to 2nd Shell Horizontal Weld       2nd Shell Vertical  Weld       2nd To 3rd Shell Horizontal Weld  3rd Shell Vertical Weld       3rd To 4th Shell Horizontal Weld       4th Shell Vertical Weld   4th To 5th Shell Horizontal Weld       5th Shell Vertical Weld       5th To 6th Shell Horizontal Weld  7th Shell Vertical Weld       7th To Top Angle Horizontal Weld       

     

Roof Plates Roof To Roof Lap Weld       Roof To Top Angle Lap Weld       

     Shell Nozzles  Nozzle Neck & Reinforcing Pad Weld       Roof Nozzles  Nozzle Neck & Reinforcing Pad Weld                     

Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date       

Page 17: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 9                                                                                                                                                                            IR‐T‐009 

INSPECTION REPORT FOR TANK PLATFORM & LADDER 

PART NAME  POSITION INSPECTIN ITEM 

REMARKS INSTALL RESULT  WELDING RESULT 

STAIRWAY  1st Ladder       

  2nd Ladder       

  3rd Ladder       

  1st Platform       

  2nd Platform       

  Top Platform       

  1st Bracket       

  2nd Bracket       

  3rd Bracket       

  4th Bracket       

  5th Bracket       

  6th Bracket       

  7th Bracket       

  8th Bracket       

  9th Bracket       

  10th Bracket       

  11th Bracket       

  12th Bracket       

  Ladder Handrail       

  Roof Handrail       

Accepted by :  Construction :                                     QA/QC :                                             Owner :    _____________________               _______________________          _____________________ Name / Signature / Date                     Name / Signature / Date                Name / Signature / Date  

Page 18: Itp for Tank Fabrication & Installation Work1_rev02

  Attachment 10 

         

              

  

 

HYDROTEST REPORT  

IR‐T‐010 

Report No.: 

Location and Item Under Test   

Date of Test :                

Design Data:            Type of Tank : Dome Roof Tank            Fluid :            Design Temp. :            Design Pressure :            Hydrotest Pressure : 

Hydrotesting Fluid : 

Water Filling Filling Time 

Holding Time  Visual Inspection  Daewoo  OWNER Start  Stop 

25% Full             

50% Full             

75% Full             

100% Full             

    Remarks :                  

25 % Water Level

50 % Water Level

75 % Water Level

100 % Water Level

Page 19: Itp for Tank Fabrication & Installation Work1_rev02

 Attachment 11          

   

 

                                                      

Foundation Settlement Report  

IR‐T‐011 

Report No.: 

Tank Description :  Tag No. 

Reference Point  0°   30°    60°    90°  Daewoo OWNERTank Empty                 25%     Water Level                 50%     Water Level                 75%      Water Level                 100%    Water Level                 100%    Water Level (24Hrs)                 

 

Reference Point  120°    150°    180°    210°   Tank Empty                 25%     Water Level                 50%     Water Level                 75%      Water Level                 100%    Water Level                 100%    Water Level (24Hrs)                 

Reference Point  240°    270°    300°    330°   Tank Empty                 25%     Water Level                 50%     Water Level                 75%      Water Level                 100%    Water Level                 100%    Water Level (24Hrs)                  Note : 12 pcs Monitoring plate distributed around the tank          Accepted by :  Construction :                                                           QA/QC :                                                    Owner :  Name :                                                                        Name :                                                      Name : Signature :                                                                  Signature :                                               Signature : Date :                                                                           Date :                                                        Date : 

BM1

BM2

90°

180°

270°

Page 20: Itp for Tank Fabrication & Installation Work1_rev02

          

Attachment 12                                                                                                                                                                       IR‐T‐012 

POSTWELD HEAT TREATMENT REPORT 

Project Name :    AOFP 

Item Name :  ________________ 

Item No. :  __________________ 

Report No. : ____________  Date :  ________________ 

COMPONENT TYPE :                                           VESSEL                              TANK                                            FURNACE                         PIPING                                            STRUCTURE TYPE : _____________________ MATERIAL : _________________  THK.: _________________ CODE : _____________________ REQUIRED BY :       SERVICE                         THK. 

Starting Temperature   

Heating Rate   Holding Temperature  Holding Time   Cooling Rate   Control Cooling To :  

HEAT TREATMENT EQUIPMENT DATA 

CALIBRATION :   _____________________  THERMOCOUPLE : ____________________     TYPE : ___________________  NUMBER : __________________  THERMOCOUPLE   LOCATION :       NOTES :  Accepted by :  Construction :                                                           QA/QC :                                                    Owner :  Name :                                                                        Name :                                                      Name : Signature :                                                                  Signature :                                               Signature : Date :                                                                           Date :                                                        Date :  

Page 21: Itp for Tank Fabrication & Installation Work1_rev02

 

   Attachment  13  IR‐T‐013 

INSPECTION REPORT FOR CURVATURE AND DISTORTION 

 Item Name : ________________________ Name of Equipment : _____________________  

MEASURED           POINT 

MEASURED DIMENSION (A) 

MEASURED           POINT 

MEASURED    DIMENSION (B) 

MEASURED    DIAMETER 

REMARKS 

0˚  

180˚  

45˚  

225˚      

90˚  

270˚  

135˚  

315˚      

ARC LENGTH 30˚

 

 

45˚          

     

         

     

         

     

         

Accepted by:  Construction :                                                       QA/QC :                                                    Owner :      Name :                                                                    Name :                                                      Name : Signature :                                                             Signature                                                  Signature : Date :                                                                      Date :                                                        Date :            

Page 22: Itp for Tank Fabrication & Installation Work1_rev02

Attachment  14   IR‐T‐014 

 

INSPECTION REPORT FOR MATERIAL IDENTIFICATION 

              Project Name : AOFP Name of Equipment :  Item No. :   Location :   I.R. No. :  ____________________________ 

Heat NO.  Erec’ No.  Material  Size(L*W)  Thk’  Remarks 

           

       

       

       

       

       

       

       

       

       

       

Accepted by:  Construction :                                                       QA/QC :                                                  Owner :         ______________________                              ____________________                      __________________           Name / Signature/Date                                   Name / Signature/Date                     Name / Signature/Date 

 

L

W

Thk’

PLATE