Perhitungan Kapasitas Tampungan Aktif Waduk Metode : Simulasi Kapasitas Tampungan Dicoba : 155.00 Bulan Inflow Outflow Volume Ke- (m3/det.bln) (m3/det.bln) (m3/det.bln) 1 136.80 66.80 225.00 2 106.30 66.20 195.10 3 78.70 65.50 168.20 4 86.60 57.20 184.40 5 67.10 60.30 161.80 6 67.20 62.20 160.00 7 64.10 59.00 160.10 8 52.20 55.20 152.00 9 40.60 46.80 145.80 10 39.30 48.10 137.00 11 45.10 64.80 117.30 12 81.80 74.40 124.70 13 69.70 66.80 127.60 14 95.40 66.20 156.80 15 158.80 65.50 248.30 16 89.40 57.20 187.20 17 65.00 60.30 159.70 18 42.60 62.20 135.40 19 77.80 59.00 154.20 20 52.20 55.20 151.20 21 37.30 46.80 141.70 22 34.30 48.10 127.90 23 40.20 64.80 103.30 24 68.10 74.40 97.00

Kap Waduk Simulasi 5

Embed Size (px)

DESCRIPTION

makalah

Citation preview

Page 1: Kap Waduk Simulasi 5

Perhitungan Kapasitas Tampungan Aktif Waduk ( C )Metode : SimulasiKapasitas Tampungan Dicoba : 155.00

Bulan Inflow Outflow VolumeKe- (m3/det.bln) (m3/det.bln) (m3/det.bln)

1 136.80 66.80 225.00 2 106.30 66.20 195.10 3 78.70 65.50 168.20 4 86.60 57.20 184.40 5 67.10 60.30 161.80 6 67.20 62.20 160.00 7 64.10 59.00 160.10 8 52.20 55.20 152.00 9 40.60 46.80 145.80

10 39.30 48.10 137.00 11 45.10 64.80 117.30 12 81.80 74.40 124.70 13 69.70 66.80 127.60 14 95.40 66.20 156.80 15 158.80 65.50 248.30 16 89.40 57.20 187.20 17 65.00 60.30 159.70 18 42.60 62.20 135.40 19 77.80 59.00 154.20 20 52.20 55.20 151.20 21 37.30 46.80 141.70 22 34.30 48.10 127.90 23 40.20 64.80 103.30 24 68.10 74.40 97.00

Page 2: Kap Waduk Simulasi 5

25 61.30 66.80 91.50 26 63.20 66.20 88.50 27 80.40 65.50 103.40 28 86.70 57.20 132.90 29 65.80 60.30 138.40 30 66.80 62.20 143.00 31 55.30 59.00 139.30 32 49.10 55.20 133.20 33 40.60 46.80 127.00 34 45.60 48.10 124.50 35 43.40 64.80 103.10 36 97.40 74.40 126.10 37 85.40 66.80 144.70 38 105.60 66.20 184.10 39 100.30 65.50 189.80 40 76.30 57.20 174.10 41 71.80 60.30 166.50 42 62.70 62.20 155.50 43 49.20 59.00 145.20 44 42.30 55.20 132.30 45 42.90 46.80 128.40 46 36.90 48.10 117.20 47 47.40 64.80 99.80 48 99.70 74.40 125.10 49 80.90 66.80 139.20 50 180.00 66.20 253.00 51 95.40 65.50 184.90 52 96.40 57.20 194.20 53 98.40 60.30 193.10 54 68.70 62.20 161.50

Page 3: Kap Waduk Simulasi 5

55 61.10 59.00 157.10 56 51.50 55.20 151.30 57 47.10 46.80 151.60 58 43.30 48.10 146.80 59 60.50 64.80 142.50 60 51.20 74.40 119.30 61 107.40 66.80 159.90 62 71.20 66.20 160.00 63 52.00 65.50 141.50 64 56.00 57.20 140.30 65 58.10 60.30 138.10 66 45.30 62.20 121.20 67 43.50 59.00 105.70 68 38.50 55.20 89.00 69 30.30 46.80 72.50 70 30.80 48.10 55.20 71 41.20 64.80 31.60 72 62.40 74.40 19.60 73 84.40 66.80 37.20 74 73.10 66.20 44.10 75 69.40 65.50 48.00 76 74.70 57.20 65.50 77 49.10 60.30 54.30 78 50.40 62.20 42.50 79 42.10 59.00 25.60 80 42.10 55.20 12.50 81 31.60 46.80 (2.70)82 39.60 48.10 (11.20)83 54.60 64.80 (21.40)84 95.30 74.40 20.90

Page 4: Kap Waduk Simulasi 5

85 84.60 66.80 38.70 86 100.90 66.20 73.40 87 110.70 65.50 118.60 88 80.30 57.20 141.70 89 56.60 60.30 138.00 90 52.20 62.20 128.00 91 45.40 59.00 114.40 92 47.30 55.20 106.50 93 43.00 46.80 102.70 94 39.10 48.10 93.70 95 43.40 64.80 72.30 96 65.90 74.40 63.80

Kesimpulan :1 Waduk penuh pada awal simulasi2 Volume Aktif Rencana, dicoba-coba sebesar (juta) :3 Banyak Data analisis adalah : 8 x 12 bulan :4 Probabilitas kegagalan direncanakan 5 % :5 Hasil Analisis menunjukkan C Rencana masih terlalu besar,

N Waduk kosong = 3 Bln < 5 Bln

Page 5: Kap Waduk Simulasi 5

Perhitungan Kapasitas Tampungan Aktif Waduk ( C )

(m3/det.bln)

Pelimpahan Keterangan(m3/det.bln)

70.00 Penuh 40.10 Penuh 13.20 Penuh 29.40 Penuh 6.80 Penuh 5.00 Penuh 5.10 Penuh

1.80 Penuh 93.30 Penuh 32.20 Penuh 4.70 Penuh

Page 6: Kap Waduk Simulasi 5

29.10 Penuh 34.80 Penuh 19.10 Penuh 11.50 Penuh 0.50 Penuh

98.00 Penuh 29.90 Penuh 39.20 Penuh 38.10 Penuh 6.50 Penuh

Page 7: Kap Waduk Simulasi 5

2.10 Penuh

4.90 Penuh 5.00 Penuh

KosongKosongKosong

Page 8: Kap Waduk Simulasi 5

Volume Aktif Rencana, dicoba-coba sebesar (juta) : 402 M^3

Banyak Data analisis adalah : 8 x 12 bulan : 96 Bln

Probabilitas kegagalan direncanakan 5 % : 5 Bln

Hasil Analisis menunjukkan C Rencana masih terlalu besar,

Page 9: Kap Waduk Simulasi 5

Perhitungan Kapasitas Tampungan Aktif Waduk ( C )Metode : SimulasiKapasitas Tampungan dicoba : 140.00 (m3/det.bln)

Bulan Inflow Outflow Volume PelimpahanKe- (m3/det.bln) (m3/det.bln) (m3/det.bln) (m3/det.bln)

1 136.80 66.80 210.00 70.00 2 106.30 66.20 180.10 40.10 3 78.70 65.50 153.20 13.20 4 86.60 57.20 169.40 29.40 5 67.10 60.30 146.80 6.80 6 67.20 62.20 145.00 5.00 7 64.10 59.00 145.10 5.10 8 52.20 55.20 137.00 9 40.60 46.80 130.80

10 39.30 48.10 122.00 11 45.10 64.80 102.30 12 81.80 74.40 109.70 13 69.70 66.80 112.60 14 95.40 66.20 141.80 1.80 15 158.80 65.50 233.30 93.30 16 89.40 57.20 172.20 32.20 17 65.00 60.30 144.70 4.70 18 42.60 62.20 120.40 19 77.80 59.00 139.20 20 52.20 55.20 136.20 21 37.30 46.80 126.70 22 34.30 48.10 112.90

Page 10: Kap Waduk Simulasi 5

23 40.20 64.80 88.30 24 68.10 74.40 82.00 25 61.30 66.80 76.50 26 63.20 66.20 73.50 27 80.40 65.50 88.40 28 86.70 57.20 117.90 29 65.80 60.30 123.40 30 66.80 62.20 128.00 31 55.30 59.00 124.30 32 49.10 55.20 118.20 33 40.60 46.80 112.00 34 45.60 48.10 109.50 35 43.40 64.80 88.10 36 97.40 74.40 111.10 37 85.40 66.80 129.70 38 105.60 66.20 169.10 29.10 39 100.30 65.50 174.80 34.80 40 76.30 57.20 159.10 19.10 41 71.80 60.30 151.50 11.50 42 62.70 62.20 140.50 0.50 43 49.20 59.00 130.20 44 42.30 55.20 117.30 45 42.90 46.80 113.40 46 36.90 48.10 102.20 47 47.40 64.80 84.80 48 99.70 74.40 110.10 49 80.90 66.80 124.20

Page 11: Kap Waduk Simulasi 5

50 180.00 66.20 238.00 98.00 51 95.40 65.50 169.90 29.90 52 96.40 57.20 179.20 39.20 53 98.40 60.30 178.10 38.10 54 68.70 62.20 146.50 6.50 55 61.10 59.00 142.10 2.10 56 51.50 55.20 136.30 57 47.10 46.80 136.60 58 43.30 48.10 131.80 59 60.50 64.80 127.50 60 51.20 74.40 104.30 61 107.40 66.80 144.90 4.90 62 71.20 66.20 145.00 5.00 63 52.00 65.50 126.50 64 56.00 57.20 125.30 65 58.10 60.30 123.10 66 45.30 62.20 106.20 67 43.50 59.00 90.70 68 38.50 55.20 74.00 69 30.30 46.80 57.50 70 30.80 48.10 40.20 71 41.20 64.80 16.60 72 62.40 74.40 4.60 73 84.40 66.80 22.20 74 73.10 66.20 29.10 75 69.40 65.50 33.00 76 74.70 57.20 50.50

Page 12: Kap Waduk Simulasi 5

77 49.10 60.30 39.30 78 50.40 62.20 27.50 79 42.10 59.00 10.60 80 42.10 55.20 (2.50)81 31.60 46.80 (17.70)82 39.60 48.10 (26.20)83 54.60 64.80 (36.40)84 95.30 74.40 20.90 85 84.60 66.80 38.70 86 100.90 66.20 73.40 87 110.70 65.50 118.60 88 80.30 57.20 141.70 89 56.60 60.30 138.00 90 52.20 62.20 128.00 91 45.40 59.00 114.40 92 47.30 55.20 106.50 93 43.00 46.80 102.70 94 39.10 48.10 93.70 95 43.40 64.80 72.30 96 65.90 74.40 63.80

Kesimpulan :1 Waduk penuh pada awal simulasi2 Volume Aktif Rencana, dicoba-coba sebesar (juta) :3 Banyak Data analisis adalah : 8 x 12 bulan :4 Probabilitas kegagalan direncanakan 5 % :5 Hasil Analisis menunjukkan C Rencana sudah mendekati rencana

N Waduk kosong = 4 Bln < 5 Bln

Page 13: Kap Waduk Simulasi 5

Keterangan

PenuhPenuhPenuhPenuhPenuhPenuhPenuh

PenuhPenuhPenuhPenuh

Page 14: Kap Waduk Simulasi 5

PenuhPenuhPenuhPenuhPenuh

Page 15: Kap Waduk Simulasi 5

PenuhPenuhPenuhPenuhPenuhPenuh

PenuhPenuh

Page 16: Kap Waduk Simulasi 5

KosongKosongKosongKosong

363 M3

96 Bln

5 Bln

Hasil Analisis menunjukkan C Rencana sudah mendekati rencana

Page 17: Kap Waduk Simulasi 5

Perhitungan Kapasitas Tampungan Aktif Waduk ( C )

Metode : SimulasiKapasitas Tampungan dicoba : 130.00 (m3/det)Bulan Inflow Outflow Volume Pelimpahan

Ke- (m3/det) (m3/det) (m3/det) (m3/det)(1) (2) (3) (4) (5)

1 136.80 66.80 200.00 70.00 2 106.30 66.20 170.10 40.10 3 78.70 65.50 143.20 13.20 4 86.60 57.20 159.40 29.40 5 67.10 60.30 136.80 6.80 6 67.20 62.20 135.00 5.00 7 64.10 59.00 135.10 5.10 8 52.20 55.20 127.00 9 40.60 46.80 120.80

10 39.30 48.10 112.00 11 45.10 64.80 92.30 12 81.80 74.40 99.70 13 69.70 66.80 102.60 14 95.40 66.20 131.80 1.80 15 158.80 65.50 223.30 93.30 16 89.40 57.20 162.20 32.20 17 65.00 60.30 134.70 4.70 18 42.60 62.20 110.40 19 77.80 59.00 129.20 20 52.20 55.20 126.20 21 37.30 46.80 116.70 22 34.30 48.10 102.90

Page 18: Kap Waduk Simulasi 5

23 40.20 64.80 78.30 24 68.10 74.40 72.00 25 61.30 66.80 66.50 26 63.20 66.20 63.50 27 80.40 65.50 78.40 28 86.70 57.20 107.90 29 65.80 60.30 113.40 30 66.80 62.20 118.00 31 55.30 59.00 114.30 32 49.10 55.20 108.20 33 40.60 46.80 102.00 34 45.60 48.10 99.50 35 43.40 64.80 78.10 36 97.40 74.40 101.10 37 85.40 66.80 119.70 38 105.60 66.20 159.10 29.10 39 100.30 65.50 164.80 34.80 40 76.30 57.20 149.10 19.10 41 71.80 60.30 141.50 11.50 42 62.70 62.20 130.50 0.50 43 49.20 59.00 120.20 44 42.30 55.20 107.30 45 42.90 46.80 103.40 46 36.90 48.10 92.20 47 47.40 64.80 74.80 48 99.70 74.40 100.10 49 80.90 66.80 114.20

Page 19: Kap Waduk Simulasi 5

50 180.00 66.20 228.00 98.00 51 95.40 65.50 159.90 29.90 52 96.40 57.20 169.20 39.20 53 98.40 60.30 168.10 38.10 54 68.70 62.20 136.50 6.50 55 61.10 59.00 132.10 2.10 56 51.50 55.20 126.30 57 47.10 46.80 126.60 58 43.30 48.10 121.80 59 60.50 64.80 117.50 60 51.20 74.40 94.30 61 107.40 66.80 134.90 4.90 62 71.20 66.20 135.00 5.00 63 52.00 65.50 116.50 64 56.00 57.20 115.30 65 58.10 60.30 113.10 66 45.30 62.20 96.20 67 43.50 59.00 80.70 68 38.50 55.20 64.00 69 30.30 46.80 47.50 70 30.80 48.10 30.20 71 41.20 64.80 6.60 72 62.40 74.40 (5.40)73 84.40 66.80 17.60 74 73.10 66.20 24.50 75 69.40 65.50 28.40 76 74.70 57.20 45.90

Page 20: Kap Waduk Simulasi 5

77 49.10 60.30 34.70 78 50.40 62.20 22.90 79 42.10 59.00 6.00 80 42.10 55.20 (7.10)81 31.60 46.80 (22.30)82 39.60 48.10 (30.80)83 54.60 64.80 (41.00)84 95.30 74.40 20.90 85 84.60 66.80 38.70 86 100.90 66.20 73.40 87 110.70 65.50 118.60 88 80.30 57.20 141.70 11.70 89 56.60 60.30 126.30 90 52.20 62.20 116.30 91 45.40 59.00 102.70 92 47.30 55.20 94.80 93 43.00 46.80 91.00 94 39.10 48.10 82.00 95 43.40 64.80 60.60 96 65.90 74.40 52.10

Kesimpulan :1 Waduk penuh pada awal simulasi2 Volume Aktif Rencana, dicoba-coba sebesar (juta) :3 Banyak Data analisis adalah : 8 x 12 bulan :4 Probabilitas kegagalan direncanakan 5 % :5 Hasil Analisis menunjukkan C Rencana sudah sesuai dg rencana

N Waduk kosong = 5 Bln

Page 21: Kap Waduk Simulasi 5

Keterangan

(6)

PenuhPenuhPenuhPenuhPenuhPenuhPenuh

PenuhPenuhPenuhPenuh

Page 22: Kap Waduk Simulasi 5

PenuhPenuhPenuhPenuhPenuh

Page 23: Kap Waduk Simulasi 5

PenuhPenuhPenuhPenuhPenuhPenuh

PenuhPenuh

Kosong

Page 24: Kap Waduk Simulasi 5

KosongKosongKosongKosong

Penuh

337 juta M3

96 Bln

5 Bln

Hasil Analisis menunjukkan C Rencana sudah sesuai dg rencana