Tugas: Utilitas ( Desain Rapid Sand Filter)
Soal !!!Buatlah desain rapid sand filter dengan kebutuhan 3 MLD. Dengan asumsi sebagai berikut:
Rate of filtration 5000/lit/hr/m2.
Dia. of perforation 13 mm.
Length =1.5 times the width.
The discharge of a rectangular flat bottom through is given by 1.376bd3/2. Where b = width and d = depth (u can add more assumption if needed)
Solution:
Asumsi: water required = 3MLD
Rate of filtration = 5000 lt/hr/ m2
Diameter of perforation = 13 mm
Length = 1,5 times the width -> L= 1,5 B
Discharge of rectangular flat bottom through = 1,376 bd3/2
Ammount of wash water = 0,2 -0,4 % -> we choose asumsi amount of wash water
= 0,3%
So, washing water = 0,009 MLD
Total amount of water needed = 3,009 MLD
Asumsi washing time dalam 1 hari adalah 40 menit (0,667 hr)
Filtration time = 23,33 hr
Ammount Q without washing time = 0,128 ML/hr
Area of filter bed = 25,6 m2
Asumsi jumlah unit yang digunakan = 1 unit
With area of filter bed is 25,6 m2 and know L=1,5B
So, we get width of filter bed (B) =4,13 m and length of filter bed (L)= 6,19 m
Design of laterals
With 0,2% of area filter we get total area of perforation = 0,051 m2
Asumsi c/c distance of laterals = 20 cm= 0,2 m
So, we get number of lateral = 30,95 -> 31 nos