KEMITRAAN MULTIPIHAK PENCIPTAAN AKSES AIR BERSIH BAGI MASYARAKAT DESA LINGKAR TAMBANG DI KAB. MINAHASA UTARA PROP. SULAWESI UTARA KERJASAMA DITJEN CIPTAKARYA - PEMKAB MINUT PT MSM Disampaikan oleh; Ir. Terkelin Purba, SH, MM - Presiden Direktur PT Meares Soputan Mining Dalam Acara ; RAKORNAS ASOSIASI PENGELOLAAN SPAM PEDESAAN Semarang, 23 Mei 2018

KEMITRAAN MULTIPIHAK PENCIPTAAN AKSES AIR BERSIH - …new.pamsimas.org/download/Asosiasi/Bahan_Rakornas_2018/Presentasi... · • MOU Program ditandatangani tanggal 26 Mei 2017 •

Embed Size (px)

Citation preview

KEMITRAAN MULTIPIHAK PENCIPTAAN AKSES AIR BERSIHBAGI MASYARAKAT DESA LINGKAR TAMBANG

DI KAB. MINAHASA UTARA – PROP. SULAWESI UTARA

KERJASAMA DITJEN CIPTAKARYA - PEMKAB MINUT – PT MSM

Disampaikan oleh;

Ir. Terkelin Purba, SH, MM - Presiden Direktur PT Meares Soputan MiningDalam Acara ; RAKORNAS ASOSIASI PENGELOLAAN SPAM PEDESAAN

Semarang, 23 Mei 2018

2

100%

5% 5%

95% 95%

PT. Meares Soputan Mining (Indonesia)

PT. Tambang Tondano Nusajaya(Indonesia)

Archipelago Resources Pte Ltd(Singapore)

PT. Archi Indonesia(Indonesia)

Presiden Komisaris : Bambang SetiawanWakil Komisaris Utama : Hendra SuryaKomisarisKomisaris

: Bert Adrian Supit: Bekto Suprapto

Presiden Direktur : Terkelin PurbaDirektur : Rudi SuhendraDirektur : Terrence Neil Holohan

Profil

3

• Dua Kontrak Karya (KK) : 39,805 ha• PT MSM – Generasi Ke-4/1986• PT TTN – Generasi Ke-6/1997• Izin Operasi Produksi 2011 - 2041

• Aset• Sumber Daya: >2,5 juta Oz di 1,2

gram Au/ton• Cadangan: >1,5 juta Oz di 2,2 gram

Au/ton• Masa tambang 15 tahun

• Penambangan Bijih 12 tahun (2011-2023

• Pengolahan Bijih 15 tahun (2011 –2026)

• Pascatambang 5 tahun (2026-2031)• Karyawan : 1.709 orang (Per Mei 2018)

• Kontraktor: 1049 orang• MSM/TTN : 660 orang• >70% Karyawan berasal dari

Sulawesi Utara

Profil

CSR GRAND STRATEGY

VISI & MISI PT MSM – PT TTN – PT ARCHI INDONESIA

ECONOMICDEVELOPMENT

HEALTH IMPROVEMENT

SOCIAL CONTRIBUTION

DONATION

LOCAL WISDOM &

CULTURE PROGRAM

IINFRASTRUCTURE

DEVELOPMENT

NETWORKING

AGRIBUSINESS

SMALL & MEDIUM ENTERPRENEURSHIP

ECHOTORISM

HEALT & NUTRITION

IMPROVEMENT

SANITATION

IMPROVEMENT

MSM & TTN LEGACY(SUSTAINABLY POST MINING LIVELIHOOD)

SUSTAINABLE LIVELIHOOD AND STAKEHOLDER APPROACH

EDUCATION

SCHOOL

IMPROVEMENT

SCHOLARSHIP

LIFE SKILL

ALUR PENYUSUNAN PROGRAM PEMBERDAYAAN & PENGEMBANGAN MASYARAKAT PERTAMBANGAN

Berdasarkan :Permen ESDM No 41 Tahun2016

Community Empowerment and Development Master Plan

PT MSM-TTN 2018-2033

MILESTONE 2018-2033 MAPALUSMAximizing PArtnership for

Livelihoods, Unity and Sustainability

PROGRAM MULTIPIHAK PENCIPTAAN AKSES AIR BERSIHDITJEN CIPTAKARYA – PEMKAB MINUT – PT MSM

• MOU Program ditandatangani tanggal 26 Mei 2017• Perjanjian Kerjasama ditandatangani tanggal 29 Agustus 2017• Skema Program menggunakan Pendekatan PAMSIMAS

Wisata

CLEAN WATER CLEAN WATER

CLEAN WATER

CLEAN WATER

CLEAN WATER

CLEAN WATER

CLEAN WATER

LOKASI PROJECT

PUMPING TEST

PUMPING TEST

AREAPENAMBANGAN

PT.MSM – PT. TTN

DESAPROYEKSI 10 Tahun (Jiwa)

TARGET SUMBER SARANA Biaya

RINONDORAN 1003 2018 Sumur Bor Sumur Bor, Bak Air, Pipa Dist., SR IDR 1.850.000.000

RESETTLEMENT 315 2018 Sumur Bor Pemenuhan 100% IDR 127.000.000

KALINAUN 337 2018 Sumur Bor Sumur Bor, Bak Air, Pipa Dist., Tangki Harian, Kran Umum

IDR 1.030.000.000

MARINSOUW 853 2018 Sumur Bor Renovasi Menara Air, Bak Air Baru, Pipa Dist dan SR

IDR 650.000.000

PULISAN 510 2018 Sumur Bor Sumur Bor, Menara Air, Pipa Dist. dan SR

IDR 1.550.000.000

PINENEK 810 2018 Sumur Bor Sumur Bor, Bak Air, Pipa Dist. dan SR

IDR 1.400.000.000

KINUNANG 354 2018 Sumur Bor Bak Air, Pipa Dist. dan SR

DALAM PERENCANAAN DENGAN PERKIRAAN BIAYAIDR 5.000.000.000

WINURI 1413 2018 Air Sungai Pipa Dist. dan SR

MAEN 1376 2018Air Sungai Pipa Dist. dan SR

WINERU 1226 2018Air Sungai Pipa Dist. dan SR

TOTAL IDR 11.607.000.000