Kids of Kathmandu, our international and Nepali partners are rebuilding 50 government schools in response to the April 2015 earthquake

Citation preview

Page 1: Kids of Kathmandu - Rebuilding 50 Schools

1

AN INTERNATIONAL PARTNERSHIP FOR NEPAL

RebuildiNG 50 SCHOOLS FOR 10 ,000 KIDS

Page 2: Kids of Kathmandu - Rebuilding 50 Schools

4,962School Destroyed

16,370Classrooms Damaged

999,000Children Affected

Page 3: Kids of Kathmandu - Rebuilding 50 Schools

3

AFN has built over 80 schools in Nepal over the past 16 years. AFN’s longstanding relationship with the Nepali Ministry of Education and construction expertise paired with Kids of Kathmandu’s work with children enables our partnership to provide a complete 21st century educational experience for the students and teachers.

With our international partnerships and local Nepali staff, we are determined to raise the bar for public education in remote regions of Nepal and provide a model for others to follow as the necessary rebuilding of schools continues.

Our comprehensive plan ensures that the children and their communities will benefit from support systems that provide clean water, solar power, computers and internet access. These support systems will succeed through proper training for the kids, teachers, and families.

Our collective experience enables us to complete this task in a thoughtful and responsible way that ensures the children attending these 50 schools are given the opportunity to become productive and thoughtful individuals in an ever changing society.

Kids of Kathmandu and our Nepali/Japanese partners at Asian Friendship Network (AFN), have the privilege of rebuilding 50 public schools serving 10,000 kids in the areas hardest hit by the April 25th, 2015 earthquake in Nepal.

Gorkha

Dhading

Nuwakot

Rasuwa

Sindhupalchok

Kavre

(10 Schools)

(10 Schools)

(15 Schools)

(15 Schools)

7.8

7.3Ktm

Bpur

LautpurMakawanur

Dolakha

Ramechhap

Sindhuli Okhaldhunga

Nepal

Districts affected by earthquake

Districts AFN/Kids of KTM are buliding schools

Earthquake Epicenters & Magnitude

Page 4: Kids of Kathmandu - Rebuilding 50 Schools

4

In response to the earthquakes, our partnership funded, delivered, and assembled custom fabricated waterproof tents to function as classrooms soon after the earthquake. The tents were installed before monsoon in remote villages where our new school construction is taking place, and have been crucial to continuing the children’s education.

Kids of Kathmandu provided stationery, pencils, footballs, and whiteboards for 10,000 kids in the villages where we will be constructing schools. The school supplies help the children continue their learning without the added burden of replacing supplies lost in the earthquake. Sports equipment was also provided to give the children a chance to play and find a level of normalcy that has been missing since the earthquake.

The process of providing relief supplies has been instrumental in establishing a trusting relationship with the villages we are working with to build the schools.

Temporary School

Stationary & Pencils

RELIEF EFFORTS

Page 5: Kids of Kathmandu - Rebuilding 50 Schools

5

NEPAL WIRELESS

Overseeing and managing the construction of the 50 schools. Liaison between Rebuilding and government officials

Providing Community support systems. Water purification & Water harvesting (where needed). Solar Power system (where needed) Waste Management/toilets

Improving quality and access in education using interactive digital learning materials, along with offline digital library containing thousands of educational resources

Supplying textbooks and books to school and community library

Spearheading the collective efforts of an international team rebuilding 50 schools in devastated areas of Nepal. Outfitting of school interiors-furniture,computers, library, internet. Managing construction of schools and supporting systems.

Architects of record and engineering for each site. Overseeing contractors.

Establishing a network of cellular relay stations to provide internet to rural schools and villages.

Providing extensive first-aid supplies to schools and community

Designing prototypes for K through 12 public schools. Training manuals for construction techniques. Graphic representation and video of building techniques. Providing all designs and engineering online for other groups.

Providing 6,000 PackH2O water backpacks for safe water transportation and storage

Developing educational DVDs for a “Khan Academy” like learning experience to assist the children and teachers learn the national curriculum.

Facilitating the design process between international and local architects

Overseeing structural engineering. Consulting with architects and contractors in Nepal and U.S.

Contributing Luci inflatable solar lights so the children can study safely at home.

Customizing Research and Monitoring software system (REMO) to facilitate oversight of building installation and related activities.

INtERNAtIONAL PARTNERS (Nepali Led)

Page 6: Kids of Kathmandu - Rebuilding 50 Schools

6

NEPAL WIRELESS

Each school will be outfitted with computers for the children and the community. The computers and connected internet will allow the school children and the villagers to become participants in the greater world community. Our partner OLE Nepal will provide each school with an offline digital library and extensive lesson plans developed with the Nepali ministry of education for the students and teachers.

e-Education is creating a series of DVDs with grade 10 lessons to help the older students pass the all important School Leaving Certificate (SLC.) Passing the SLC for grade 10 boys and girls is essential towards continuing with their future education.

Oversight of the construction of the 50 schools is crucial to assuring that the engineering and safety features of the designs are strictly adhered to during construction. With Rooster Logic’s REMO project management software, our partners, funders and most importantly the students can be assured that the schools are built to exceed the most stringent building codes in Nepal.

Nepal Wireless will provide internet to every viable school through their network of repeaters and relay stations providing quality connectivity and services to a much neglected communities throughout rural Nepal.

The longer term plans for Nepal Wireless include telemedicine, overseas calls, agricultural cooperatives, e-banking and e-commerce services.

Computer

tHE TECHNOLOGy

Digital Lessons Project Management

Internet Connectivity

Page 7: Kids of Kathmandu - Rebuilding 50 Schools

7

Smart Paani is installing Biosand filters to purify water for schools in all 50 schools. The effects of purified water for the children and community are immediate and long lasting.

The system will provide surplus water for the students to take home to their families. Where there is no reliable water source, we will provide water harvesting for the schools and community.

The benefits of electricity to the learning experience are numerous and with the introduction of computers and internet connectivity crucial. At schools not presently served by community hydro-power stations, One Planet Solution will provide solar power to the school.

The benefits of purified water will be extended to the community through the use of the PackH2O. We will be distributing 5,000 PackH2Os to the students to transport purified water from school to home. The ergonomic and safe storage offered by the Pack will help women and children minimize the time spent collecting and storing purified water.

Mpowerd will be providing Luci inflatable solar lights to students so they can walk home safely and study after sunset.

SuPPORt SySTEMS

Water Purification

Solar Energy

Water Transport

Individual Solar Lights

Page 8: Kids of Kathmandu - Rebuilding 50 Schools

8

As important as the school building and support systems are to improving the education of the children, we feel that teacher training is essential to providing a true 21st century education to the children. Kids of Kathmandu and Asian Friendship Network will be working with a variety of groups to provide progressive training to the entire staff of the schools. The details of this project are still in process.

As each permanent school comes on line, we will provide WaSH, health, and hygiene training as well as basic first aid to the teacher and students. There are numerous misconceptions about basic health and hygiene that ultimately keep the children away from school that can be resolved with health education.

Teacher’s Training

Hygiene, WaSH, basic first aid training & eye exams and glasses

tRAININg | HEALTH AND HyGIENE

Page 9: Kids of Kathmandu - Rebuilding 50 Schools

9

Kids of Kathmandu and our many partners have done a great deal of work to ensure that the 50 schools we rebuild in rural Nepal will be safe and affordable. Our design and engineering work allows us and other groups to maximize our donors’ dollars to provide a 21st century educational experience to prepare the children for their future in this ever evolving country.

The architectural plans have taken into consideration the need for natural light, ventilation, community space, construction, and material transportation costs. Because of the different needs of Primary schools versus Secondary schools, SHoP Architects, along with engineering from Big Future Group, have designed two similar, but unique building systems for the two school types.

tHE SCHOOL BUILDINGS

Page 10: Kids of Kathmandu - Rebuilding 50 Schools

10

School Buildings

School Furniture

Teacher Training Toilets Web base teaching

WaSH Program

Eye Exam

Water Harvesting Water Purification

Solar Power/Micro Grid Emergency Communication

Health TrainingInternet & Internet Training

Library

Water Transportation Telemedicine

Job Creation

School Community

BENEFItS FOR KIDS & COMMUNITy

Page 11: Kids of Kathmandu - Rebuilding 50 Schools

+550

+710

+300

+0

TOIETSBELOW

EDGE OF ROOF ABOVE

EDGE OF ROOF ABOVEEDGE OF ROOF ABOVE

30

UP

DNDN

UP

COOKING/MEALS AREA

LIBRARY

BOY'S TOILET

GIRL'STOILET

1ST FLOOR

GROUND FLOOR

CLASSROOM CLASSROOMCLASSROOMCLASSROOMMUSIC/

DRAWING ROOM

CLASSROOMCLASSROOMCOVERED

OPEN SPACE

STO

RA

GE

CLASSROOM

PRINCIPAL'S ROOM/

ACCOUNT ROOM

TEACHERS'ROOM

STO

RA

GE

CHILDREN'S DEVELOPMENT

ROOMCLASSROOMCLASSROOMCLASSROOM

STO

RA

GE

EXPLANSION JOINT EXPLANSION JOINT

CLASSROOMCLASSROOM CLASSROOM CLASSROOMCOMPUTER ROOM

CLASSROOMCLASSROOM

STO

RA

GE

30

STO

RA

GE

EDGE OF BALCONY ABOVE

3030

300325 325

300

525

525

500

500

525

525

500

500

500

500

525

525

500

500

500500

500 500

650

650

175 400 600

400 600175

650

650

200 175

175200

300

300

175

175

650

650

650

175

175

300

300

1600

1600

320

320

650

650

320

320

225 200

200225

225

225

350

350

650

650

205

205

10930

10930

700

1100

+550

+665+690

+0

+300

EXPANSION JOINT

OPEN TO BELOW

TOIETSBELOW

EXPANSION JOINT

EDGE OF ROOF ABOVE EDGE OF ROOF ABOVEEDGE OF BALCONY ABOVEEDGE OF ROOF ABOVE

UP D

N

UP D

N

1ST FLOOR

MUSIC/ DRAWING

ROOM

STORAGE

GROUND FLOOR

STORAGE

CLASSROOM

CLASSROOM

BOY'S TOILET

GIRL'STOILET

CLASSROOM

STORAGE

COOKING/MEALS AREA

TEACHER'S ROOM

PRINCIPAL'S ROOM/

ACCOUNT ROOM

CLASSROOM

CLASSROOM

CLASSROOM

CHILDREN'S DEVELOPMENT

ROOM

CLASSROOMCLASSROOM CLASSROOM CLASSROOM LIBRARYCOMPUTER ROOM

CLASSROOM

CLASSROOM

STORAGE

CLASSROOM CLASSROOM CLASSROOMCLASSROOMCOVERED

OPEN SPACE

STORAGE

30 30 30

325 325

650

175175 175175 525525525 525 500500 500500 650 650650650 175175

175

175

500

500

500

500

325

650

325

175

175

175

175

650

350

225

500

500

225

350

650

525

525

10001000 650650

175145350

200

175

175

200

650

650

175

175

300

300

650

650

500

500

200

225

350

350

225

200

400 175 175175175400 600600

3925

3925

42554255

700

1100

+550

+665+690

+0

+300

EXPANSION JOINT

OPEN TO BELOW

TOIETSBELOW

EXPANSION JOINT

EDGE OF ROOF ABOVE EDGE OF ROOF ABOVEEDGE OF BALCONY ABOVEEDGE OF ROOF ABOVE

UP D

N

UP D

N

1ST FLOOR

MUSIC/ DRAWING

ROOM

STORAGE

GROUND FLOOR

STORAGE

CLASSROOM

CLASSROOM

BOY'S TOILET

GIRL'STOILET

CLASSROOM

STORAGE

COOKING/MEALS AREA

TEACHER'S ROOM

PRINCIPAL'S ROOM/

ACCOUNT ROOM

CLASSROOM

CLASSROOM

CLASSROOM

CHILDREN'S DEVELOPMENT

ROOM

CLASSROOMCLASSROOM CLASSROOM CLASSROOM LIBRARYCOMPUTER ROOM

CLASSROOM

CLASSROOM

STORAGE

CLASSROOM CLASSROOM CLASSROOMCLASSROOMCOVERED

OPEN SPACE

STORAGE

30 30 30

325 325

650

175175 175175 525525525 525 500500 500500 650 650650650 175175

175

175

500

500

500

500

325

650

325

175

175

175

175

650

350

225

500

500

225

350

650

525

525

10001000 650650

175145350

200

175

175

200

650

650

175

175

300

300

650

650

500

500

200

225

350

350

225

200

400 175 175175175400 600600

3925

3925

42554255

700

1100

11

Incorporating concrete slab foundations, resilient earth brick walls, and steel truss roof systems, the new school buildings are designed from the ground up to survive future quakes intact. The design of the schools also forefronts the creation of an environment that supports learning and community engagement with classrooms arranged to provide ample light and air.

Each school will also contain a purpose-built library and kitchen, available to the community as well in times of need. Sheltered spaces for gathering are created by the broad overhangs of the angled roof, and all exterior walls are left purposefully smooth and blank to encourage the vibrant local tradition of mural art.

SCHOOL DESIGN

Light, Air, & Peace of Mind

Page 12: Kids of Kathmandu - Rebuilding 50 Schools

12

Page 13: Kids of Kathmandu - Rebuilding 50 Schools

13

Page 14: Kids of Kathmandu - Rebuilding 50 Schools

14

The design is a comprehensive solution to a variety of community needs, is a flexible “kit-of-parts” that is adaptable to the different, and often extreme, conditions across the many sites. As construction will involve local volunteer labor, overseen by hired contractors, architects and engineers, the system is explained using easy to read assembly diagrams along with the technical drawings.

All of the partner’s designs, engineering and construction management processes will be posted online for free for other individuals or groups, with assistance from a local architect, to build one of our designs without incurring the cost of design development or engineering. The Nepali Ministry of Education has approved our designs and engineering allowing other groups an expedited approval process when submitting their plans for approval. The time and cost savings will allow groups to build more schools, in a shorter period of time, for the foreseeable future

An accompanying online manual will layout the materials and tools needed to build a school as well as the step by step process on proper fabrication techniques to erect the school building using trained contractors and local residents.

OPEN SOuRCE DESIgNS AND ENGINEERING

Page 15: Kids of Kathmandu - Rebuilding 50 Schools

15

Earth brick construction is a proven and inexpensive method to create structures which are both safe and can be built quickly. Along with earth brick and rebar, we will be using steel trusses for the roof and supports where needed. This chosen building technique has evolved over time to provide earthquake resistant, comfortable structures that best make use of local volunteer labor, enabling members of each community to participate in the building of its school.

WALL SECTION (TYP.)BUILDING SECTION

24ga. CORRUGATED METAL SHEET

8" DEEP PURLINS,36" O.C. MIN.

CEILING HANGER RODSTIED TO PURLINS

HANGING FURNITURE SYSTEM

PRESSED EARTH BRICK WALL, 2 WYTHES;24x15x10cm MODULES W/ MORTAR

PREFAB ALUMINIUM OPENING

20"x20" REINFORCED PRESSED EARTHBRICK COLUMN BEYOND

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR &3/8" (10mm) TIES @ 12" O.C.

CONCRETE FOOTING

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR & 3/8" (10mm) TIES @ 12" O.C.

VERTICAL REINFORCEMENT,24" O.C. MIN.

STRAY/HAY INSULATION LAYER OVERCORRUGATED METAL PANEL CEILING

OPTIONAL ATTACHMENT LOCATION FOR GUTTER

PRESSED EARTH BRICKSHEAR WALL BEYOND

MIN. 2% GRADE

STONE/GRAVEL SWALE

6" STONE PLINTH

ROOF TRUSS,3" DIA. PIPE;SUPPORTED ON EARTHBRICK COLUMNS

CONNECTIONS TO BE DESIGNED FOR 25 psf UPLIFT FORCE

1'-7 1/2" 1'-7 1/2"19'-8"6'-6 1/2" 6'-6 1/2"

9'-1

0"10

"3'

-3 1

/2"

9'-1

0"

3'-0

"4'-1

"5'

-9"

37'-2 1/2"

CORRUGATED METAL PANEL OPERABLE TRANSPARENT OPENING

WALL SECTION (TYP.)BUILDING SECTION

24ga. CORRUGATED METAL SHEET

8" DEEP PURLINS,36" O.C. MIN.

CEILING HANGER RODSTIED TO PURLINS

HANGING FURNITURE SYSTEM

PRESSED EARTH BRICK WALL, 2 WYTHES;24x15x10cm MODULES W/ MORTAR

PREFAB ALUMINIUM OPENING

20"x20" REINFORCED PRESSED EARTHBRICK COLUMN BEYOND

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR &3/8" (10mm) TIES @ 12" O.C.

CONCRETE FOOTING

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR & 3/8" (10mm) TIES @ 12" O.C.

VERTICAL REINFORCEMENT,24" O.C. MIN.

STRAY/HAY INSULATION LAYER OVERCORRUGATED METAL PANEL CEILING

OPTIONAL ATTACHMENT LOCATION FOR GUTTER

PRESSED EARTH BRICKSHEAR WALL BEYOND

MIN. 2% GRADE

STONE/GRAVEL SWALE

6" STONE PLINTH

ROOF TRUSS,3" DIA. PIPE;SUPPORTED ON EARTHBRICK COLUMNS

CONNECTIONS TO BE DESIGNED FOR 25 psf UPLIFT FORCE

1'-7 1/2" 1'-7 1/2"19'-8"6'-6 1/2" 6'-6 1/2"

9'-1

0"10

"3'

-3 1

/2"

9'-1

0"

3'-0

"4'-1

"5'

-9"

37'-2 1/2"

CORRUGATED METAL PANEL OPERABLE TRANSPARENT OPENING

SINgLE StORy PRIMARy SCHOOL

Page 16: Kids of Kathmandu - Rebuilding 50 Schools

16

Page 17: Kids of Kathmandu - Rebuilding 50 Schools

17

WALL SECTION (TYP.) BUILDING SECTION

OPTIONAL ATTACHMENT LOCATION FOR GUTTER

CROSS BEAM @ COLUMN GRIDLINES

STEEL EMBED AT TIE BEAM

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR &3/8" (10mm) TIES @ 12" O.C.

8" STEEL CHANNELFLOOR BEAMS, 4'-0" O.C. MIN.

1-1/2" CONCRETE TOPPING ON1-1/2" METAL DECKINGW/ DOWEL CONNECTION TO TIE BEAM FOR LATERAL LOAD TRANSFER

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR & 3/8" (10mm) TIES @ 12" O.C.

20"x20" REINFORCED PRESSED EARTHBRICK COLUMN BEYOND

HANGING FURNITURE SYSTEM

6" STONE PLINTH

OPTIONAL ATTACHMENT LOCATION FOR GUTTER

1 1/2" BAR GRATING @ BALCONYON 2"x6" STEEL CHANNELS

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR &3/8" (10mm) TIES @ 12" O.C.

PREFAB ALUMINIUM OPENING

VERTICAL REINFORCEMENT,24" O.C. MIN.

PRESSED EARTHBRICK WALL, 1 WYTHE;24x24x10cm MODULES W/ MORTAR

REINFORCED PRESSED EARTHBRICK COLUMN BEYOND

CONCRETE FOOTING

8" DEEP PURLINS,36" O.C. MIN.

STONE/GRAVEL SWALE

MIN. 2% GRADE

6" TUBE STEEL POST

METAL GUARDRAIL

PRESSED EARTH BRICKSHEAR WALL BEYOND

PRESSED EARTH BRICK WALL, 2 WYTHES;24x15x10cm MODULES W/ MORTAR

24ga. CORRUGATED METAL SHEET

CONNECTIONS TO BE DESIGNED FOR 25 psf UPLIFT FORCE

CEILING HANGER RODSTIED TO PURLINS

ROOF TRUSS,3" DIA. PIPE;SUPPORTED ON EARTHBRICK COLUMNS

STEEL ANGLE SUPPORTFOR FURNITURE RACK

STRAY/HAY INSULATION LAYER OVERCORRUGATED METAL PANEL CEILING

OPERABLE WINDOW LOUVER W/ LOCK

6'-6 1/2"6'-6 1/2" 19'-8" 1'-7 1/2"1'-7 1/2"

3'-3

1/2

"

8'-2

1/2

"9'

-10"

4'-1

"8'

-2 1

/2"

4'-0

"

3'-0

"

9'-1

0"

38'-3 1/2"

CORRUGATED METAL PANEL OPERABLE TRANSPARENT OPENINGOPERABLE TRANSPARENT OPENINGCORRUGATED METAL PANEL

tWO StORy SECONDARy SCHOOL

WALL SECTION (TYP.) BUILDING SECTION

OPTIONAL ATTACHMENT LOCATION FOR GUTTER

CROSS BEAM @ COLUMN GRIDLINES

STEEL EMBED AT TIE BEAM

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR &3/8" (10mm) TIES @ 12" O.C.

8" STEEL CHANNELFLOOR BEAMS, 4'-0" O.C. MIN.

1-1/2" CONCRETE TOPPING ON1-1/2" METAL DECKINGW/ DOWEL CONNECTION TO TIE BEAM FOR LATERAL LOAD TRANSFER

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR & 3/8" (10mm) TIES @ 12" O.C.

20"x20" REINFORCED PRESSED EARTHBRICK COLUMN BEYOND

HANGING FURNITURE SYSTEM

6" STONE PLINTH

OPTIONAL ATTACHMENT LOCATION FOR GUTTER

1 1/2" BAR GRATING @ BALCONYON 2"x6" STEEL CHANNELS

CONCRETE TIE-BEAM w/ 5/8" (16mm) Dia. REBAR &3/8" (10mm) TIES @ 12" O.C.

PREFAB ALUMINIUM OPENING

VERTICAL REINFORCEMENT,24" O.C. MIN.

PRESSED EARTHBRICK WALL, 1 WYTHE;24x24x10cm MODULES W/ MORTAR

REINFORCED PRESSED EARTHBRICK COLUMN BEYOND

CONCRETE FOOTING

8" DEEP PURLINS,36" O.C. MIN.

STONE/GRAVEL SWALE

MIN. 2% GRADE

6" TUBE STEEL POST

METAL GUARDRAIL

PRESSED EARTH BRICKSHEAR WALL BEYOND

PRESSED EARTH BRICK WALL, 2 WYTHES;24x15x10cm MODULES W/ MORTAR

24ga. CORRUGATED METAL SHEET

CONNECTIONS TO BE DESIGNED FOR 25 psf UPLIFT FORCE

CEILING HANGER RODSTIED TO PURLINS

ROOF TRUSS,3" DIA. PIPE;SUPPORTED ON EARTHBRICK COLUMNS

STEEL ANGLE SUPPORTFOR FURNITURE RACK

STRAY/HAY INSULATION LAYER OVERCORRUGATED METAL PANEL CEILING

OPERABLE WINDOW LOUVER W/ LOCK

6'-6 1/2"6'-6 1/2" 19'-8" 1'-7 1/2"1'-7 1/2"

3'-3

1/2

"

8'-2

1/2

"9'

-10"

4'-1

"8'

-2 1

/2"

4'-0

"

3'-0

"

9'-1

0"

38'-3 1/2"

CORRUGATED METAL PANEL OPERABLE TRANSPARENT OPENINGOPERABLE TRANSPARENT OPENINGCORRUGATED METAL PANEL

Page 18: Kids of Kathmandu - Rebuilding 50 Schools

For additional information please visit www.kidsofkathmandu.org

For Information,partnerships or donations, contact Andrew Raible at [email protected]

Kids of Kathmandu is a registered 501(c)3. All donations are tax deductible