Krishna Riviera Heights 1205 Raj Nagar Extension Ghaziabad. Project Details. Building Elevations. Human Eye View. Bird/ Ariel Eye View. Night View. Site Layouts. Floor Plans. Type A. Super Built Up Area: 1120 sq ft. Type B. Super Built Up Area: 1085 sq ft. Type C. - PowerPoint PPT Presentation
Citation preview
Krishna Riviera Heights1205 Raj Nagar Extension
Ghaziabad
Project Details
Building Elevations
Human Eye View
Bird/ Ariel Eye View
Night View
Site Layouts
Floor Plans
Type A
Super Built Up Area: 1120 sq ft
Type B
Super Built Up Area: 1085 sq ft
Type C
Super Built Up Area: 1035 sq ft
Type D
Super Built Up Area: 1480 sq ft
Common Amenities• Club • 24x7 Security Service • Intercom & CCTV Camera Surveillance • Under Ground Water Tank • 24x7 Uninterrupted Running Water Supply • Open & Covered Parking
Specifications• Structure Earthquake resistant RCC framed structure• Wall Finish• - Living/Dining/ Bedrooms Painted in pleasing shades and Designs and prints of oil Bound. • - Lift lobbies Selected Marble / Granite Dado / Oil Bond.• -External Combinations of Stone /Textured Paint finish.• Flooring• -Living/Dining/ Bedrooms MB Wooden Flooring / Vitrified Tiles All over the Unit.• - Lift Lobbies Selected Granite / Marble.• - Balcony Anti Skid Ceramic Tiles / Marble Tiles.• - Terrace Terracotta Tiles.• Kitchen• - Flooring Vitrified Tiles / Marble.• - Platform Board Granite Counter with Stainless Steel Sink.• - Walls 2 feet Ceramic Tiles dado• - Fittings Standard C.P. Fittings.• - Wood Work *Modular Kitchen• Toilets• - Flooring Anti Skid Ceramic Tiles / Marble Tiles.• - Fitting White sanitary Fixtures & CP Fittings standard Make.• - Walls Ceramic Tiles up to 7 feet.• Electrical Works Electrical installation in concealed conduit with copper wire.• Doors Seasoned hardwood frame, molded finished doors.• Windows Seasoned hardwood frames with glass• Power Back Up On Paid Basis.• Fire Fighting Arrangements As per prescribed norms.• Open Area Ultra Modern lighting system to beautify and illuminate.• Water Supply Filtered water supply through centralized filtration plant.• Safety & Security Round the clock. CCTV camera surveillance in common area.•On special request or paid basis
Specs may change
Features• Herbal Green Lawns for the fresh air• Firefighting system• Sewerage Treatment Plant • Rain Water Harvesting System• Garbage Disposal & Waste Management System• IIT Approved earthquake Resistant Structural• Environment Friendly• Beautifully Designed Boundary Wall • Beautiful Huge Entrance Gate• Surrounded By All Townships• Pollution Free Environment• Rich Quality Of Materials Used In Construction & Development
Surrounding (Existing)• Raj Kr. Goel Engineering College – 500 meter
• G.D. Goenka Public School – 2 km
• DPS – 3 KM
• Yashoda hospital – 4 km
• National Highway 58
• Other Housing Society
Surrounding (Proposed)• 30 & 24 Meter Wide Road Near The Project
• Metro Connectivity • Rapid Rail Transit System (High Speed Train) • Amusement Park (In 14 Acre) • Power Grid Station
• Golf Course • Community Centre
PlansPayment Stage / Time Period BSP Product & Other Charges
At the time of booking 10% ………..
Within 45 days of booking 80% 100% PLC + 50% Of other charges
At the time of possession 10% 50% of other charges +Stamp Duty+Govt.Charges
Down Payment (D.P.)
PlansPayment Stage / Time Period BSP Product & Other Charges
At the time of Booking 10% -----
Within 45 Days of Booking 10% -----
On Casting of Raft/Foundation 10% -----
On casting of 1st Floor Slab 10% 20% Other Charges
On casting of 2nd Floor Slab 10% 15% Other Charges
On casting of 5th Floor Slab 7.5% 15% Other Charges+50% of PLC
On casting of 8th Floor Slab 7.5% 10% Other Charges+50% of PLC
On start of Brick Work 7.5% 10% Other Charges
On Start Of Plumbing Work 7.5% 10% Other Charges
On Start of Flooring Work 10% 10% Other Charges
On Intimation of Possession 10% 10% Other Charges+Stamp Duty+Govt. Charges
Construction Link Plan (CLP)
PlansPayment Stage / Time Period BSP Product & Other Charges
At the time of booking 10% ---
Within 45 Days 30% ---
Casting of Raft/Foundation 10% 25% Other Charges + 25% PLC
Casting of 3rd Floor Slab 10% 25% Other Charges + 25% PLC
Casting of 6th Floor Slab 10% 25% Other Charges + 50% PLC
Casting of 10th Floor Slab 10% 25% Other Charges
External Plaster 5% ---
Flooring Tiles 5% ---
At the Time of Possession 10% Stamp Duty + Govt. Charges
Flexi Plan (F.P.)
Price ListFLOOR D.P. FLEXI CLP
11 1700 1800 1900
10 1725 1825 1925
9 1750 1850 1950
8 1775 1875 1975
7 1800 1900 2000
6 1825 1925 2025
5 1850 1950 2050
4 1875 1975 2075
3 1900 2000 2100
2 1925 2025 2125
1 1950 2050 2150
Price ListOTHER CHARGES AMOUNT
ADC/SQ.FT. 120
EDC/SQ.FT. 35
FFC/SQ.FT. 35
OPEN PARKING MANATORY 125000
COVERED PARKING 175000
STILT PARKING 200000
POWER BACK UP/KVA 20000
CLUB MEMBERSHIP 30000
Thank You