Landshut biomass power plant
Client: Müllverbrennungsanlage Landshut GmbH Treatment: 2009 bis 2011 Facts and figures: • Reuse of line 3 of the Landshut waste
incinerator for biomass utilization: - Wood waste - wood cuttings (from landscaping, forest logging remains)
• Further use of existing plant components, buildings, infrastructure (as much as possible)
• Examination of various scenarios: - Further use of existing boiler no. 3, with no increase in performance/efficiency - Further use of existing boiler no. 3, with no increase in performance/efficiency - new construction of furnace line
• Structured comparison of scenarios, development of an initial basis of decision-making for possible further use of the plant
Study for further use of the Landshut waste incineration plant as a biomass power plant Rytec services: Location analysis, site evaluation of the plants, assessment of the usability of wood fuels, creation of alternative concepts, economic viability analysis Facts: • Current waste utilization of the waste
incinerator: 36,000 metric tons per year • Three furnace lines (existing) – only one of
these lines is in service. Fuel requirement wood cuttings): approx. 63,000 metric tons per year
• Electricity feed-in according to the 2009 German Renewable Energy Act
• Construction of a district heat network, gradual expansion