LLiisstt ooff PPrriioorriittyy
EExxtteerrnnaall LLooaannss aanndd GGrraannttss ((DDRRPPPPHHLLNN)) 22000088
MMiinniissttrryy ooff NNaattiioonnaall DDeevveellooppmmeenntt PPllaannnniinngg// NNaattiioonnaall DDeevveellooppmmeenntt PPllaannnniinngg AAggeennccyy
‐ i ‐
Foreword
In the context of endeavours to increase efficiency and effectiveness of the utilization of External Loans and Grants, the government of Indonesia has initiated various reforms in the process of the planning and preparation of projects that are funded by External Loans and Grants. One of such reforms is the annual compilation of the List of Planned Priority External Loans and Grants known (DRPPHLN), and also known as the Green Book.
The Green Book is one of the planning documents in the process of planning projects that are funded by external loans/grants, that comprise RKPLN (Borrowing Strategy), the DRPHLN‐JM (List of Project Proposal funded by External Loans/Grants for Medium‐Term), the DRPPHLN, and the RPK‐PHLN (Planned Implementation of External Loans/Grants Activities).
The Green Book contains the list of proposed projects that are eligible for being funded by external loans and/or grants. Thereby, the projects in the Green Book are the projects that are contained in the DRPHLN‐JM, that have already met most of the readiness criteria and that have already obtained the indicated commitment from the prospective development partners. The DRPPHLN is to become the guideline for preparing the subsequent Annual Government Work Plan.
The 2008 Green Book contains 139 proposed projects in the total amount of USD 4.97 billion, consisting of 56 proposed projects totalling USD 4.59 billion and 83 proposed technical assistance projects totalling USD 0.38 billion. These proposals originate from ministries/government agencies (128 projects), regional governments (5 projects), and state‐owned enterprises (6 projects). The prospective development partners that have already indicated their funding commitment comprise 23 prospective development partners, consisting of 7 prospective multilateral development partners, and 16 prospective bilateral development partners.
‐ ii ‐
It is expected that this 2008 Green Book can be used as a national development planning material, specifically for activities that are funded by external loans/grants. Thereby, it can optimise the utilization of various development funds that can thus enhance the welfare of the people.
State Minister for National Development Planning/ Chairman of the National Development Planning Agency.
Paskah Suzetta
‐ iii ‐
LIST OF PROJECT ASSISTANCE
Indonesian Maritime Safety and Security Agency 1. The Development of Command Center Base on Global Maritime Distress Safety
System (GMDSS) ..............................................................................................................................3
National Disaster Management Agency (NDMA) 2. Procurement of Equipment for Emergency Phase and Post Disaster Phase ............................7
National Narcotic Board 3. One Stop Center for Therapy and Rehabilitation for Drug Abuser ........................................11
Statistics Indonesia Agency (BPS) 4. Statistical Capacity Building Program (STATCAP) for Indonesia ..........................................17
National Search and Rescue (SAR) Agency (BASARNAS) 5. Procurement of Search and Rescue Aircraft Project ..................................................................21
Ministry of Home Affairs 6. National Programme for Community Empowerment in Rural Areas Project (IFAD
Support to PNPM) .........................................................................................................................25 7. National Programme for Community Empowerment in Rural Areas Project (PNPM
Rural) ...............................................................................................................................................27 8. Simeuleu Physical Infrastructure .................................................................................................29
Ministry of Marine Affairs and Fisheries 9. Development of the Inspection Boat System for Indonesian Fisheries (Phase I) ...................33
Ministry of Health 10. Improvement of H. Adam Malik Hospital .................................................................................37 11. Strengthening of Teaching Hospitals in Indonesia....................................................................39 12. Upgrading of Prof. Dr. R.D. Kandou Hospital, Manado ..........................................................41
List of Project Assistance
‐ iv ‐
Ministry of Finance 13. Indonesia Infrastructure Financing Facility (IIFF) .....................................................................45 14. Project for Indonesian Tax Administration Reform (PINTAR) ...............................................47
Ministry of Public Works
Directorate General of Highways 15. Additional Loan for Suramadu Brigde Construction Project...................................................51 16. Padang By Pass Capacity Expansion...........................................................................................52 17. National Programme for Community Empowerment in Urban Areas Project (PNPM
Urban)..............................................................................................................................................54
Directorate General of Human Settlements 18. Regional Solid Waste Development for Maminasata, South Sulawesi ...................................57 19. Rural Infrastructure Support for National Programme for Community Empowerment
Project (RIS‐PNPM) .......................................................................................................................59 20. National Programme for Community Empowerment in Urban Areas Project (Support
to PNPM).........................................................................................................................................61 21. Urban Water Supply and Sanitation Project...............................................................................63
Directorate General of Water of Water Resources 22. Countermeasure for Sediment in Wonogiri Multipurpose Dam Reservoir ...........................65 23. Dam Operation and Safety Improvement Project .....................................................................67 24. Integrated Citarum Water Resources Management Program (Trance I) ................................69 25. Non Structural Measures and Urgent Mitigation for Jakarta Flood Control .........................71 26. Urban Flood Control System Improvement in Selected Cities ................................................73
Ministry of National Education 27. Development and Upgrading of Sebelas Maret University (UNS) Project, Surakarta .........77 28. Development and Upgrading of State University of Semarang (UNNES) Project ...............79 29. Development and Upgrading of State University of Yogyakarta ...........................................81 30. Development of Bandung Institute of Technology ...................................................................83 31. Development of Centers for Medical Education and Medical Research in the Faculty
of Medicine University of Indonesia ...........................................................................................85 32. Development of Teaching Hospital of Andalas University .....................................................87
List of Project Assistance
‐ v ‐
Ministry of Transportation
Directorate General of Sea Transportation 33. Belawan Port Development ..........................................................................................................91 34. Improvement of Port Security System.........................................................................................93 35. Indonesia Ship Reporting System................................................................................................94 36. Vessel Traffic Services (VTS) System...........................................................................................96
Directorate General of Civil Aviation 37. Procurement of Airport Rescue and Fire Fighting Equipment ................................................98
Directorate General of Railway 38. Procurement of Railway Track Construction and Maintenance Machinery ........................100 39. Procurement of 1000 km Track Material and 200 Units Turn Out.........................................101 40. Railway Double Tracking on Java South Line Project (Phase II‐Stage III)............................103
Ministry of Defense 41. Improvement of Aeromedical Hospital ....................................................................................107 42. Procurement of Mobile Hospital and Hospital Equipment....................................................110
Ministry of Agricultural 43. Combating Avian Influenza in the Field of Veterinary Medicine .........................................115 44. Drip Irrigation Development for Horticultural Production through Shallow
Groundwater ................................................................................................................................117
Indonesian National Police 45. Integrated Trunking Radio Communication for Indonesian National Police......................121 46. Procurement of Hospital Equipment and Mobile Hospital....................................................123
Indonesian Institute of Science 47. Animal Husbandry Technology and Practice Improvement to Accelerate Meat and
Milk Production (Meat‐Milk Pro) ..............................................................................................127
National Resilience Institute 48. Strengthening the Capacity Building Program of National Resilience Institute .................133
List of Project Assistance
‐ vi ‐
Local Government of DKI Jakarta Province 49. Construction of Jakarta Mass Rapid Transit Project Phase I ..................................................137
Local Government of Riau Province 50. Southern Pekanbaru Water Supply Development Project .....................................................141
State Electricity Company (PT. PLN) 51. Additional Loan for Labuan Angin Coal Fired Power Plant 2x115 MW North
Sumatera .......................................................................................................................................145 52. Java Sumatera Transmission Line ‐ Engineering and Supervision Services ........................146 53. Kusan Hydro Electric Power Plant 63 MW ..............................................................................147 54. Parit Baru Steam Power Plant ....................................................................................................148 55. Takalar Steam Coal Power Plant (2 x 100 MW) in South Sulawesi .......................................150 56. Upper Cisokan Pumped Storage HEPP (1000 MW)................................................................151
‐ vii ‐
LIST OF TECHNICAL ASSISTANCE
National Disaster Management Agency (NDMA) 1. Disaster Information Sharing System for Emergency Response ........................................... 155 2. Emergency, and Humanitarian Program (E&HP)................................................................... 157 3. Enhanced Humanitarian Response ........................................................................................... 159
Assessment and Aplication of Technology Agency (BPPT) 4. Microturbine Cogeneration Technology Application Project................................................ 163
Statistics Indonesia Agency (BPS) 5. Capacity Building on Dissemination and Use of Small Area Statistics for 2010
Population Cencus in Indonesia ................................................................................................ 167
Ministry of Religius Affair 6. Supporting Islamic Leadership through Islamic Institutions of Higher Education
(SILE)............................................................................................................................................. 171
Ministry of Home Affairs 7. Support for Community Facilitator PNPM.............................................................................. 177 8. Support for PNPM Generasi ...................................................................................................... 179
Ministry of Energy and Mineral Resources 9. Barrier Removal to the Cost Effective Development and Implementation of Energy
Efficiency Standards and Labeling Project ............................................................................... 183 10. Development of Electrical Technician Competency Standards and Guidelines ................. 185 11. Energy Conservation and Efficiency Improvement................................................................ 187 12. The System Design and Establisment of Distribution Control System for
Optimizing Management in Semarang and Bekasi (Phase II) ............................................... 188
Ministry of Forestry 13. Comprehensive Approach for Conservation and Restoration of Ecosystems in
Protected Areas............................................................................................................................ 193 14. Strategy for Strengthening Biodiversity Conservation through Appropriate
National Park Management and Human Resources Development ...................................... 195
List of Technical Assistance
‐ viii ‐
Ministry of Marine Affairs and Fisheries 15. Assistance for Small and Medium Entreprises (SMEs) in Fish and Shrimp Industry.........199 16. Sustainable Indonesia Fisheries Product Competitiveness ....................................................201
Ministry of Health 17. Health Policy Advisor .................................................................................................................205 18. Policy Analysis and Formulation in the Health Sector ...........................................................206 19. Strengthening Surveillance and Response to Avian and Pandemic Influenza ....................208
Ministry of Finance 20. Long Term Training (Tax Administration and Financial Accounting).................................213 21. Practical Knowledge of Foreign Affairs and International Cooperation ..............................214
Ministry of Communication and Information Technology 22. IT Expert Advisory Mission........................................................................................................217 23. Support PNPM Communication Strategy ................................................................................218
Ministry of Public Works
Agency for Research and Development 24. Capacity Development for River Basin Organizations (RBOs) in Practical Water
Resources Management and Technology .................................................................................223
Directorate General for Highways 25. Road Policy Advisor ....................................................................................................................225
Directorate General for Water Resources 26. Integrated Disaster Mitigation Management for Banjir Bandang..........................................226 27. Integrated Water Resources Management in Jabodetabek and Its Surrounding Area .......228 28. Water Resources Policy Advisor ................................................................................................230
Ministry of National Education 29. Delivering Better Education........................................................................................................235 30. Enhancement of Global Carbon Sequestration Potential from Indonesian Tropical
Forest (Phase II) ............................................................................................................................237 31. TA for Development of the Engineering Faculty of the Hasanuddin University................239
List of Technical Assistance
‐ ix ‐
Ministry of Trade 32. Increasing the Capability of Mastering Chinese Language for Small and Medium
Enterprises (SMEs) and Government Officials ........................................................................ 243 33. Multi Donor Facility (MDF) for Trade and Business Climate................................................ 244 34. Trade and Support Programme II ............................................................................................. 246
Ministry of Transportation
Directorate General of Land Transportation 35. Integrated Public Transportation Master Plan for the Bandung Metropolitan Area.......... 251 36. Program for Improvement of Transport System in Medium‐Sized Cities........................... 253
Directorate General of Sea Transportation 37. New Public Private Partnership Strategy for Port Developmnet and Management .......... 254 38. Port Security Management Project (Phase II)........................................................................... 256 39. Port Security System Improvement Project (Phase II) ............................................................ 258 40. Project for Improvement of Maritime Transport Safety ......................................................... 259 41. Project for Shipping and Sea Transportation Improvement (Phase‐2) ................................. 261 42. Strengthening Maritime Safety and Security Especially for Anti Piracy and Anti
Maritime Terrorism..................................................................................................................... 263
Directorate General of Civil Aviation 43. Introduction of New CNS/ATM System................................................................................... 264 44. Project for Strengthening Capacity on Ensuring Safe and Efficient Aircraft
Operations .................................................................................................................................... 265
Directorate General of Railways 45. Bandung Urban Railway Transport Development, Electrification Padalarang ‐
Cicalengka Line (Phase I: Engineering Services) ..................................................................... 266 46. Improvement of Railway Safety Management (Phase II)....................................................... 268 47. Improvement of Railway System in the East Jakarta Industrial Region .............................. 269
List of Technical Assistance
‐ x ‐
Ministry of Industry 48. Assesment of Indonesia Shipbuilding Industry.......................................................................273 49. Centre of Excellence for Food and Beverages Industry Development..................................274 50. Cooperation in Welding Sector ..................................................................................................275 51. Enhancing Capabiity of Mould and Dies Center .....................................................................277 52. Enhancing SME Competitiveness through Implementation of SME Product
Standardization ............................................................................................................................279 53. Implementing One Village One Product (OVOP) ...................................................................281 54. Strengthening Cluster of Small and Medium Enterprise in Indonesia .................................283 55. Support for Standardization of Electronic Products................................................................284
Ministry of Agriculture 56. Improvement of Contermeasure on the Productive Diseases of Dairy Cattle .....................289 57. Strengthening Plant Varietas Protection in Indonesia.............................................................291
Indonesian National Police 58. Project for Support Program for Reform of Indonesian National Police ..............................295
Indonesian Institute of Science 59. Assistance in Establishing Research Laboratory for Energy, Environment, and
Natural Substances ......................................................................................................................299
Policy Agency for Government Good/Service Procurement (LKPP) 60. Electronic Government Procurement Infrastructure Development Technical
Advisory........................................................................................................................................303
Ministry of Environment 61. Waste Management and Recycle for Building Resources Circulation Society.....................307
List of Technical Assistance
‐ xi ‐
Ministry of National Development Planning/ National Development Planning Agency (BAPPENAS)
62. Aid Information Management System ..................................................................................... 311 63. Capacity Building in Trade Liberazation Analysis ................................................................. 313 64. Decentralization Support Facility (DSF)................................................................................... 315 65. Delivery Improvement and Local Governance (DIALOG).................................................... 317 66. Enhancing Capacity for Better Aid Management (ECBAM).................................................. 319 67. Environmental Governance and Sustainable Livehoods Programme in Sulawesi,
Indonesia....................................................................................................................................... 321 68. Indonesia Slum Alleviation Policy and Action Plan (SAPOLA) ........................................... 323 69. Indonesia Water and Sanitation Policy and Action Planning Facility (Phase III) ............... 325 70. Innovation Policy Framework for Small and Medium Enterprises ...................................... 327 71. Long Term Finance Security for National Backbone Infrastructure Development ............ 330 72. Monitoring and Evaluation System .......................................................................................... 332 73. Planning and Bugeting Reform ................................................................................................. 334 74. Rice Fortification for the Poor .................................................................................................... 336 75. Strengthening Capacity to Improve Aid Effectiveness........................................................... 338 76. Support to Delivering Services to Poor Community .............................................................. 340 77. Support for Management Information System (MIS) PNPM ................................................ 342 78. Support on Implementation of Medium Term Expenditure Framework and
Performance Based Budgeting................................................................................................... 344 79. Support to Bappenas in Mainstreaming Climate Change Issue into Development
Plan................................................................................................................................................ 346 80. Support to Election 2009 ............................................................................................................. 348
Local Government of Maluku Province 81. Technical Support for Strengthening the Regional Based Education Management ........... 355
Local Government of South Sulawesi Province 82. Regional Development Policy Advisor in Sulawesi Region .................................................. 359 83. The Project for Water Supply Service Improvement in Mamminasata Metropolitan
Area ............................................................................................................................................... 360
PROJECT ASSISTANCE
P‐1
Indonesian Maritime Safety and Security Agency
P‐3
GB ID : GBP1‐07‐10601‐0800‐072001 1. Project Title : The Development of Command Center Base on Global Maritime
Distress Safety System (GMDSS) 2. Project Type : Project Assistance 3. Executing Agency : Indonesian Maritime Safety and Security (BAKORKAMLA) 4. Implementing Agency : Indonesian Maritime Safety and Security 5. Duration : 24 months 6. Location : DKI Jakarta 7. Objectives
The development of maritime surveillance integration goal for enhancing capability of maritime surveillance, safety and control system in Indonesia throughout: a. Upgrading National Picture Compilation (NPC) command center Bakorkamla through
integration all kind of maritime communication; b. Collecting rescue signal from shipwreck via regional coast station at Bakorkamla NPC
Command Center in Jakarta; c. Commanding the strategic operation to concerned maritime authorities for immediate
rescue action; d. More effective utilization of national facilities/property (vessel, communication system etc).
As well as know how diffused maritime authorities in Indonesia; e. Formulating regulation and know how on more effective and efficient rescue operations; f. Development of human resources capability on handling of integration maritime safety
handling in Indonesia 8. Scope of Projects
The development of the integrated maritime surveillance system consist : gathering of maritime intelligence such as detecting and monitoring of all vessels in certain area monitoring of previous vessels that have been detected, protecting marine resources, detecting of piracy, and take an action against piracy, detect and monitoring illegal fishing, illegal immigration, monitoring activity of foreign state port and execute certain action , detect and monitor oil spill and ships discharge, also take on action against marine distress or ships wreck situation. In order to enhance coordination ability at Bakorkamla so that more effective and efficient rescue shall be established urgently with the first priority, for achieve national goal and comply the international regulation and co ordinations. The high levels of sea accident are the reflection of the “missing link” on integration all sector that involve on maritime safety matter in Indonesia.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Study (for regulation and technology
assessment) b. Coordination with other related agencies c. Project implementation training d. Procurement e. Operation and maintenance
Indonesia and Japan
Secretariate of Indonesian Maritime Security Coordinating Board
P‐4
GB ID : GBP1‐07‐10601‐0800‐072001 10. Funding Source
Implementing Agency Foreign Funding(US $ 000)
Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Secretariate of Indonesian Maritime Security Coordinating Board
18,000 ‐ 18,000 Japan (JICA)
Total 18,000 ‐ 18,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 8,000 18,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐
ions Goods Trainings Others
a. Study 3,000
b. Coordination with other agencies
3,000
c. Project implementation training
2,000
d. Procurement 7,000
Total 3,000 7,000 2,000 3,000 13. Project References :
BB 2006 ‐ 2009 ID: P1‐07‐10601‐0202‐072001
P‐5
National Disaster Management Agency (NDMA)
P‐7
GB ID : GBP1‐03‐10301‐0800‐077004 1. Project Title : Procurement of Equipment for Emergency Phase and Post Disaster
Phase 2. Project Type : Project Assistance 3. Executing Agency : National Disaster Management Agency (NDMA) 4. Implementing Agency : National Disaster Management Agency 5. Duration : 48 months 6. Location : Nation Wide 7. Objectives
Procurement of equipment for emergency and post disaster phase in form the mobile water purification unit, car handling, mobile command center in order to avoid the lack of clean water supplies.
8. Scope of Projects
Procurement of equipment 9. Activities
Activities Implementation Locations Project Implementation Units a. Need Assessment b. Procurement of equipment c. Training d. Monitoring and evaluation
Central and Province NDMA
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
NDMA 10,000 ‐ 10,000 Hongaria Total 10,000 ‐ 10,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,500 3,500 3,500 1,500 10,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Need Assessment 780 b. Procurement of equipment 400 1,400 7,280 c. Training d. Monitoring and evaluation 140
Total 1,180 1,400 7,280 140 13. Project References :
BB 2006 ‐ 2009 ID No: P1‐03‐10301‐0302‐077004
P‐9
National Narcotic Board
P‐11
GB ID : GBP1‐05‐06600‐0700‐062013 1. Project Title : One Stop Center for Therapy and Rehabilitation for Drug Abuser 2. Project Type : Project Assistance 3. Executing Agency : National Narcotic Board 4. Implementing Agency : National Narcotic Board 5. Duration : 24 months 6. Location : Nation Wide 7. Objectives
a. To help someone undo himself from drug abuse dependence; b. To avoid the consume drug abuse habit; c. To avoid the physic and psychological bother that increasing quality of life; d. To increasing staff knowledge and skill about treatment and rehabilitation; e. To increasing efficiency and effectiveness of treatment and rehabilitation services as follow
of treatment and rehabilitation trend; f. To actualize a free Indonesia from drug abuse and illegal distribution at 2015.
8. Scope of Projects The problem of Drug Abuse in Indonesia show increasing trend, be apprehensive and threaten among the citizen, nation and state of Indonesia. Now, Indonesia dissimilar as a place of drug abuse transit, but had become drug abuse producer. A prevention and effort to eliminate the drug abuse and illegal distribution in Indonesia needs a serious attention and real effort. To rehabilitate drug abuser, the Government of Indonesia by means of National Narcotic Board (BNN) has a plan to develop Center of Rehabilitation of Drug Abuser at Lido, West Java. The Development of Center of Rehabilitation adopts treatment and rehabilitation methods to solve the nature and behavior Drug Abuser from substantial perspective, treatment method and victim age classification.
9. Activities
Activities Implementation Locations Project
Implementation Units
a. Supply of Mini‐Lab. Equipment b. Narcotics laboratory Information System,
BNN Head quarter data center & 17 Sites c. NLIS software system d. NLIS Web system Construction e. NLIS Hardware system
BNN Headquarter, Jakarta, Surabaya, Medan, Semarang, Bandung, Makassar, Manado, Denpasar, Batam, Jayapura, Ambon, Banjarmasin, Pontianak, Samarinda Palembang, Banda Aceh
f. Procurement of laboratory equipment for drug profiling to support law enforcement
Nation Wide
National Narcotic Board
P‐12
GB ID : GBP1‐05‐06600‐0700‐062013
Activities Implementation Locations Project
Implementation Units
g. Development of security system whish consist of connectivity monitoring center between INP and BNN
National Narcotic Board and Indonesian National Police
h. Centralized Operation Center i. Backbone networks j. Desktop PCs
Nation Wide
k. Design l. Assisting the PEA in prepa m. ration and evaluation of bidding
documents n. Preparation of the various reports
including completion report o. Assisting the Project Management Unit p. Supervision & other consulting services
Nation Wide BNN Headquarter, Jakarta, Surabaya, Medan, Semarang, Bandung, Makassar, Manado, Denpasar, Batam, Jayapura, Ambon, Banjarmasin, Pontianak, Samarinda Palembang, Banda Aceh
National Narcotic Board
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
National Narcotic Board
14,000 2,650 16,650 Korea (ODCF)
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
4,500 6,650 5,500 16,650 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct
ions Goods Trainings Others
a. Procurement of medical equipment , security and operation system
10,847
b. Project management : Management support and Factory inspection
2,286
P‐13
GB ID : GBP1‐05‐06600‐0700‐062013
Categories (US $ 000) Detail of Activities
Services Construct
ions Goods Trainings Others
c. Installation & Training : System installation and Training
1,553
d. Operation & Maintenance support : 2 years operation and maintenance support
1,439
e. Consultant fee, contingency cost, Service charge
525
Total 2,286 12,286 1,553 525 13. Project References :
BB 2006 ‐ 2009 ID No: P‐05‐06600‐0703‐062013
P‐15
Statistics Indonesia Agency (BPS)
P‐17
GB ID : GBP1‐03‐05401‐0800‐074009 1. Project Title : Statistical Capacity Building Program (STATCAP) for Indonesia 2. Project Type : Technical Assistance 3. Executing Agency : Statistics Indonesia Agency (BPS) 4. Implementing Agency : Statistics Indonesia Agency 5. Duration : 60 months 6. Location : Nation Wide 7. Objectives
a. To improve the accuracy of statistics produced by BPS; b. To improve data consistency between collections; c. To improve the confidence of users in the statistics produced by BPS; d. To improve the productivity of BPS staff through better information and communication
technology; e. To improve the skills and professionals of BPS staff.
8. Scope of Projects
a. Improvement of data collection, compilation and dissemination. b. Investment in ICT infrastructure and information management. c. Human resource capacity development. d. Project management and administration support.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Improving Statistical Quality b. Analysis, Quality Assurance and
Methodological Innovations c. Dissemination, User Engagement and
Communication Strategy d. Data Warehouse Development and Network
Improvement e. Aplication of Geospatial Technology f. Corporate Information Systems Management g. Upgrading of ICT Capabilities in Selected
Model BPS Field Offices h. Technical Training on Human Resource
Capacity Development i. Building Profesional Exxelence j. Project Management and Adminsitration
Support
Nation Wide Statistical Indonesia Agency (BPS)
P‐18
GB ID : GBP1‐03‐05401‐0800‐074009 10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
BPS 45,000 8,635 53,635 World Bank Total 45,000 8,635 53,635
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
9,409.5 9,663.0 11,028.8 13,147.2 10,386.5 53,635
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
a. Improving Statistical Quality 6,824.2 ‐ 630.5 746.0 1,160.4
b. Analysis, Quality Assurance and Methodological Innovations
1,624.5 ‐ ‐ ‐ 927.5
c. Data warehouse development and network improvement
85.0 ‐ ‐ 38.7 21‐
d. Data Warehouse Development and Network Improvement
2,762.8 ‐ 18,057.0 267.9 ‐
e. Aplication of Geospatial Technology
463.4 ‐ 4,03‐ 328.9 ‐
f. Corporate Information Systems Management
735.0 ‐ ‐ ‐ ‐
g. Upgrading of ICT Capabilities in Selected Model BPS Field Offices
1,865.7 ‐ 1,00‐ ‐ ‐
h. Technical Training on Human Resource Capacity Development
1,024.4 ‐ ‐ 4,375.0 ‐
i. Building Profesional Exxelence
832.0 ‐ 466.7 ‐ 663.5
j. Project Management and Adminsitration Support
‐ ‐ ‐ ‐ 3,376.0
Total 16,217.0 ‐ 24,184.2 5,756.4 6,337.4 13. Project References :
BB 2006 ID: T‐06‐05500‐0101‐068482
P‐19
National Search and Rescue (SAR) Agency (BASARNAS)
P‐21
GB ID : GBP1‐03‐02200‐0800‐066331‐07 1. Project Title : Procurement of Search and Rescue Aircraft Project 2. Project Type : Project Assistance 3. Executing Agency : National Search and Rescue Agency (BASARNAS) 4. Implementing Agency : National Search and Rescue Agency 5. Duration : 24 months 6. Location : DKI Jakarta 7. Objectives
a. To improve National SAR Agency capability to response and carry out the save and rescue operations for flight and shipping accidents with a sufficient equipments.
b. To strengthen the skill and capability of the rescue team in operating the aircraft and helicopter for the rescue operation.
8. Scope of Projects
Procurement of aircraft and helicopter
9. Activities Activities Implementation Locations Project Implementation Units
Procurement of aircraft and helicopter
DKI Jakarta National Search and Rescue (SAR) Agency (BASARNAS)
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
BASARNAS 42,500 7,500 50,000 Commercial Loan
Total 42,500 7,500 50,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
20,000 30,000 50,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Procurement of aircraft and helicopter
50,000
Total 50,000 13. Project References :
BB 2006 ‐ 2009 ID No: P1‐03‐10301‐0302‐077004
P‐23
Ministry of Home Affairs
P‐25
GB‐ID : GBP1‐01‐01005‐0801‐073011 1. Project Title : National Programme for Community Empowerment in Rural
Areas Project (IFAD Support to PNPM) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Home Affairs (MoHA) 4. Implementing Agency : Directorate General of Community and Village Empowerment,
Ministry of Home Affairs 5. Duration : 60 months 6. Location : Provinces of West Sulawesi, Central Sulawesi, North Sulawesi,
North Molluccas, Mollucas, Papua, and West Papua 7. Objectives
To empower Indonesia’s diverse rural communities to be actively participated in development through identifying their own needs and how to fulfill them with the resources they have to improve their welfare.
8. Scope of Projects
a. To support the National Program for Community Empowerment (PNPM)‐rural in community development, local institutional building and gender.
b. To develop analytical capacity for formulation of pro‐poor policies and approaches in the implementing agency.
c. To support livelihood improvement and facilitation in Papua and West Papua 9. Activities
Activities Implementation Locations Project Implementation Units a. Provision of block grant to
the community Central and districts level
b. Community Empowerment and provision of facilitators
All kecamatans
Central and provincial level
c. Goods, consultants services, training, & workshops
All level (central, province, districts, & subdistricts)
Central level
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Counterpart Funding
(US $ 000) Total of Funding
(US $ 000) Remarks
DG. Community & Village Empowerment, MoHA
68,531 ‐ 68,531 IFAD
Total 68,531 68,531 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
60,000 2,531 2,000 2,000 2,000 68,531
P‐26
GB‐ID : GBP1‐01‐01005‐0801‐073011 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Provision of block grant to the community
21,161.1
b. Community Empowerment and provision of facilitators
29,896.2
c. Goods, consultants services, training, & workshops
17,073.7
d. Increamental operating costs 400.0
Total 29,896.2 21,161.1 17,073.7 400.0 13. Project References :
BB 2006 ‐ 2009 ID: P1‐01‐01005‐1190‐073011
P‐27
GB‐ID : GBP1‐01‐01005‐0802‐073011 1. Project Title : National Programme for Community Empowerment in Rural
Areas Project (PNPM Rural) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Home Affairs (MoHA) 4. Implementing Agency : Directorate General of Community and Village Empowerment,
Ministry of Home Affairs 5. Duration : 24 months 6. Location : Nation Wide 7. Objectives
To empower Indonesia’s diverse rural communities to be actively participated in development through identifying their own needs and how to fulfill them with the resources they have to improve their welfare.
8. Scope of Projects
a. To promote community participation in development planning and management. b. To fill infrastructure gap as well as to promote more efficient delivery of services to the
rural communities. c. To develop local government capacities in the formulation and implementation of pro‐poor
policies and approaches. 9. Activities
Activities Implementation Locations Project Implementation Units a. Provision of block grant to
the community Central and districts level
b. Community Empowerment and provision of facilitators
All kecamatans
Central and provincial level
c. Goods, consultants services, training, & workshops
All level (central, province, districts, & subdistricts)
Central level
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Counterpart Funding
(US $ 000) Total of Funding
(US $ 000) Remarks
DG. Community & Village Empowerment, MoHA
334,000 ‐ 334,000 World Bank
Total 334,000 ‐ 334,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
33,400 66,800 66,800 66,800 100,200 334,000
P‐28
GB‐ID : GBP1‐01‐01005‐0802‐073011 12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Provision of block grant to the community
b. Community Empowerment and provision of facilitators
c. Goods, consultants services, training, & workshops
d. Increamental operating costs
Total *) Data not available
13. Project References :
BB 2006 ‐ 2009 ID: P1‐01‐01005‐1190‐073011
P‐29
GB‐ID : GBP1‐03‐01002‐0800‐067490 1. Project Title : Simeuleu Physical Infrastructure 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Home Affairs (MoHA) 4. Implementing Agency : Local Government of Simeulue District 5. Duration : 36 months 6. Location : Simeuleu, Nangroe Aceh Darussalam 7. Objectives
a. To increase human resources mastering general knowledge and technology for plantation farmer community.
b. To increase the facilities and infrastructure as the motivator for the growth of plantation/agriculture and trading sector.
c. To strengthen the structure of plantation/agriculture and trading sector in order to boost the economic growth.
d. To create the business atmosphere conducive in the development of plantation/agriculture and trading sector.
e. To increase sense of competition of plantation/agriculture and trading sector to face the global market.
f. To ensure the smoothness of service and items in plantation/agriculture and trading sector either in or outside the country.
8. Scope of Projects
a. Civil works 1) Palm Plantation 2) Palm Oil Factory
b. Equipment for palm oil factory c. Furniture d. Consultancy (Project Design Supervision Consultant/PDSC and Financial Auditor) e. PMU
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Civil works b. Equipment for palm oil factory c. Furniture d. Consultant e. PMU
Simeulue District, NAD Province
Local Government of Simeulue District
P‐30
GB‐ID : GBP1‐03‐01002‐0800‐067490 10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Local Government of Simeulue District
15,000 ‐ 15,000 IDB
Total 15,000 ‐ 15,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,084 6,105 5,447 13,636 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Civil works
Palm Plantation 3,976 Palm Oil Factory 3,210
b. Equipment for palm oil factory 5,676
c. Furniture 43
d. Consultant PSDC 637 Financial Auditor 50
e. PMU equipment 44
f. Contingency 1,364
Total 687 7,186 5,763 1,364 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐01002‐0106‐067490
P‐31
Ministry of Marine Affairs and Fisheries
P‐33
GB‐ID : GBP1‐04‐03200‐0800‐065102‐07 1. Project Title : Development of the Inspection Boat System for Indonesian
Fisheries (Phase I) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Marine Affairs and Fisheries 4. Implementing Agency : Directorate General for Marine and Fisheries Resources
Surveillance and Controlling, Ministry of Marine Affairs and Fisheries
5. Duration : 24 months 6. Location : Nation Wide 7. Objectives
a. To establish the facilities and infrastructures for surveillance and control of marine resources and fisheries (fishing inspection vessels which have the capability to support law enforcement in fishery) ;
b. To optimize surveillance and control of marine resources and fisheries; c. To improve endeavor of combating Illegal, Unreported, and Unregulated (IUU) fishing
effectively. 8. Scope of Projects
In order to achieve the above mentioned object, the activities of the project will be focused on the following: a. Survey, analysis data and information relating to the project; b. Development of 4 (four) units Inspection Boat type A (size 57‐60 metres); c. Supervisor; d. Training; e. Technology transfer to local shipyard f. Project administration
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Survey, analysis data and information b. Development of 12 units inspection boats type A c. Supervisor d. Training e. Technology transfer to local shipyard f. Project administration
DKI Jakarta Directorate of Surveillance Facility and Infrastructure
P‐34
GB‐ID : GBP1‐04‐03200‐0800‐065102‐07 10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Marine and Fisheries Resources Surveillance and Controlling, Ministry of Marine Affairs and Fisheries
77,000 10,000 87,000 Commercial Loan
Total 77,000 10,000 87,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
21,000 57,000 78,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
Survey, analysis data and information 60 a. Development of 12 units inspection
boats type A 500 72,400 500
b. Supervisor 100 c. Training 300 d. Technology transfer to local shipyard 160 e. Project administration 100 180 1,800
Total 1,660 72,400 680 460 1,800 13. Project References :
BB 2006 ‐ 2009 ID: P1‐04‐03200‐0504‐065102‐07
P‐35
Ministry of Health
P‐37
GB‐ID : GBP1‐05‐02400‐0700‐08‐061128 1. Project Title : Improvement of H. Adam Malik Hospital 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Health 4. Implementing Agency : RSUP H. Adam Malik Medan 5. Duration : 36 months 6. Location : RSUP. H. Adam Malik Medan 7. Objectives
Improvement and development of service capacities RSUP H. Adam Malik in providing service of certifiable health, totally, and reached for all society
8. Scope of Projects a. Building construction b. Procurement of hospital equipment
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Construction b. Procurement of hospital equipment
RSUP H. Adam Malik Medan
RSUP H. Adam Malik Medan
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
RSUP H. Adam Malik Medan
30,000 7,802 37,802 Korea
Total 30,000 7,802 37,802 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
18,901 18,901 37,802 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Consultant employee 710
b. Medical equipment 20,912
c. Installation of medical equipment
1,098
d. Non medical equipment 5,000
e. Training of medical equipment 1,083
f. Project management 120
P‐38
GB‐ID : GBP1‐05‐02400‐0700‐08‐061128
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others g. Operation and maintenance 300
h. Construction of building 4,400
i. Tax and duties 2,982
j. Contigency 1,166
k. Service charge 30
Total 830 5,498 25,912 1,083 4,478 13. Project References :
BB 2006 – 2009 ID: P‐05‐02400‐0703‐061128
P‐39
GB‐ID : GBP1‐05‐02400‐0700‐08‐061124 1. Project Title : Strengthening of Teaching Hospitals in Indonesia 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Health 4. Implementing Agency : Directorate General for Medical Care (DGMC), Ministry of
Health 5. Duration : 36 months 6. Locations :
a. Dr.Zainoel Abidin Hospital, Aceh, b. H. Adam Malik Hospital, Medan, c. Dr. Mohammad Hoesin Hospital,
Palembang, d. RSAB Harapan Kita, Jakarta, e. Jantung Harapan Kita Hospital, Jakarta, f. Persahabatan Hospital, Jakarta,
g. Dr. Ciptomangunkusumo Hospital, Jakarta,
h. Dr. Soeradji Tirtonegoro Hospital, Klaten,
i. Sanglah Hospital, Denpasar, j. Dr. Prof. R.D. Kandou Hospital,
Manado, k. Andi Makkasau Hospital, Pare‐Pare
7. Objectives
To strengthen the operating theater and intensive care in 11 teaching hospitals to become units that provides quality care in the region.
8. Scope of Projects The scope of the project is to provide adequate medical equipment and train doctors for improving targeted hospitals in Indonesia. The scope consists of the following: a. procurement of equipment and materials, installation of the equipment and materials,
testing and commissioning b. training; c. operation and maintenance;
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Procurement of medical equipment ,installation
of the equipment and materials, testing and commissioning
b. Training c. Operation and maintenance;
11 Teaching Hospitals
Directorate General for Medical Care (DGMC)
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
DGMC 14,000 3,500 17,500 Finland Total 14,000 3,500 17,500
P‐40
GB‐ID : GBP1‐05‐02400‐0700‐08‐061124 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 4,000 3,500 17,500 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Procurements of
Medical Equipment 12,600
b. Renovation of Hospital Facilities
3,500
c. Trainings program 560
d. Maintenances 840
Total 840 3,500 12,600 560 13. Project References :
BB 2006 – 2009 ID: P‐05‐02400‐0703‐061124
P‐41
GB‐ID : GBP1‐05‐02400‐0800‐061126 1. Project Title : Upgrading of Prof. Dr. R.D. Kandou Hospital, Manado 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Health 4. Implementing Agency : Prof. Dr. R.D. Kandou Hospital, Manado 5. Duration : 36 months 6. Location : North Sulawesi 7. Objectives
In general is to increase the capability of Prof. Dr. R.D. Kandou hospital as a central referral hospital for North Sulawesi province and its surrounding provinces. Specifically, to upgrade central medical unit to Manado hospital to perform its capability as appropriate class B referral hospital; to improve its quality assurance program in terms of medical services; to promote healthy life style for North Sulawesi people and its surrounding; and to prepare this hospital towards Asian Free Trade Area (AFTA).
8. Scope of Projects a. Building construction b. Procurement of medical and non medical equipment
9. Activities
Activities Implementation Locations Project Implementation
Units a. Construction b. Procurement of medical and non
medical equipment
Prof. Dr. R.D. Kandou Hospital, Manado
Prof. Dr. R.D. Kandou Hospital, Manado
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Prof. Dr. R.D. Kandou Hospital, Manado
28,900 7,703 36,603 Korea
Total 28,900 7,703 36,603 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th Total
11.751 17.531 7.321 36,603
P‐42
GB‐ID : GBP1‐05‐02400‐0800‐061126 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Consulting 750
b. Medical equipment 18,001
c. Installation of medical equipment
1,768
d. Non medical equipment 5,750
e. Training of medical equipment
1,450
f. Project Management 294
g. Operation and Maintenance
578
h. Construction 4,100
i. Tax and Duties 2,731
j. Contigency 1,152
k. Service charge 29
Total 1,044 5,868 23,751 1,450 4,490 13. Project References :
BB 2006 – 2009 ID: P‐05‐02400‐0703‐061126
P‐43
Ministry of Finance
P‐45
GB‐ID : GBP1‐02‐01510‐0800‐074015 1. Project Title : Indonesia Infrastructure Financing Facility (IIFF) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Finance 4. Implementing Agency : Directorate of State Asset Management, Ministry of Finance 5. Duration : 12 months 6. Location : DKI Jakarta 7. Objectives
a. Offer particular financial products and advisory services; b. Overcome the current gaps in the financial sector; c. Undertake risk analysis and classify and allocate risk appropriately; d. Complement the role of the existing non‐bank financial institutions and banks; e. Attract private long term funds into infrastructure project; f. Apply an allocation and evaluation system that is transparent, consistent, and efficient; g. Promote the development of long term local bond market; h. Develop expertise in a structured infrastructure financing; i. Develop partnership between the Government and private sector in ownership and
management; j. Assist the Government in undertaking policy reforms; k. Create a pool of talent that is specialized in infrastructure financing; l. Catalyze private sector financing to commercially viable infrastructure project.
8. Scope of Projects
The IIFF is a financing institution established particularly for financing commercially viable infrastructure projects. Various types of financing that can be done by IIFF include: a. Loan and debt financing; b. Re‐financing; c. Credit enhancement; d. Subordinated debt; e. Swap facilities; f. Equity financing. Project and policy advisory services; g. Other activities maybe necessary and demanded by the market.
9. Activities
Activities Implementation Locations Project Implementation Units Sub ordinated Loan DKI Jakarta Directorate of State Asset Management
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
100,000 ‐ 100,000 World Bank
Directorate of State Asset Management 100,000 ‐ 100,000 ADB
Total 200,000 ‐ 200,000
P‐46
GB‐ID : GBP1‐02‐01510‐0800‐074015 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
200,000 200,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Sub ordinated Loan 200,000
Total 200,000 13. Project References :
BB 2006 – 2009 ID: P1‐02‐01510‐0409‐074015
P‐47
GB‐ID : GBP1‐02‐01504‐0800‐074016 1. Project Title : Project for Indonesian Tax Administration Reform (PINTAR) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Finance 4. Implementing Agency : Directorate of State Asset Management, Ministry of Finance 5. Duration : 24 months 6. Location : DKI Jakarta 7. Objectives
Enhanced the effectiveness of tax collection administration/overall DGT productivity, increase the accuracy of data collected and reported to MOF, increase revenue, strengthen complienced and widen the tax base.
8. Scope of Projects
The Project for Indonesian Tax Administration Reform (PINTAR) is a four years enhancement designed to enhance taxpayer services, increase revenue by improving on Registration, electronically auditing all inbound tax returns, improving accountability and accounting performance by incorporating a national tax ledger, improve electronic document handiling, implementing a completely automated audit subsystem capable of improving taxpayer compliance and accountability, and enhancing enforced collections. Human resources management and the ability to manage, train, provide incentives, promote, and improve individual accountability shall be a key component of the continued modernization of the tax system. The DGT shall build an internal capability for continued business process and system improvement, in order to respond quickly to change. This will allow tax administration to position the organization to take advantage of technological advanced, without having to require large protected investment and project improvement plans spread over years. The program has three pillars a. an immediate improvements pillar defined as series of small efforts that address short term
problems that can enhance revenue. Improvement in Audit and Collection strategy are in scope in the near term.
b. Sustainability Pillar defined as adopting those small programs that can be continued with little investment to sustain revenue gains, such as cleaning the register in support of improved compliance techniques
c. The Strategic Project – PINTAR, which has four major components: A. Core Tax Administration Enhancement (composed of Registration, Return Processing, Document Management, Accounts and Infrastructure enhancements), B. Human Resource Management (personnel, payroll, and training enhancements), C. Compliance Enhancements (composed of audit and collection automation) and D. Oversight and improving systems management
9. Activities
Activities Implementation Locations Project Implementation
Units a. PINTAR Strategic Project
Activities DKI Jakarta DGT Project
Implementation Units
P‐48
GB‐ID : GBP1‐02‐01504‐0800‐074016 10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
DGT 147,961 2,500 150,461 World Bank Total 147,961 2,500 150,461
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
452 30,585 81,466 29,820 3,474 145,797 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others GOI 36,448 IBRD 37,270 48,506 6,544
Total 73,718 48,506 6,544 13. Project References :
BB 2006 – 2009 ID: P1‐02‐01504‐0409‐074016
P‐49
Ministry of Public Works
P‐51
Directorate General of Highways GB‐ID : GBP1‐03‐03304‐0800‐076017 1. Project Title : Additional Loan for Suramadu Brigde Construction Project 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Highways, Ministry of Public Works 5. Duration : 24 months 6. Location : Madura Strait, East Java 7. Objectives
To complete the construction of 2,162 meters Suramadu Bridge consisting of Approach Bridge (2x672m) and Main Bridge (818 m) with additional work and new item work with concern safety and security during bridge operation and for bridge maintenance.
8. Scope of Projects
a. Additional work for construction of deep foundation and steel box girder for main structure and new work item;
b. Supporting facilities for safety, security, and navigation i.e. monitoring system, lighting system, and building;
9. Activities
Activities Implementation Locations Project Implementation Units Civil work Surabaya Directorate General of Highways
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Counterpart Funding
(US $ 000) Total of Funding
(US $ 000) Remarks
Directorate General of Highways
68,900 68,000 136,900 China
Total 68,900 68,000 136,900 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th 6th
Total
85,675 51,225 136,900 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Suramadu Brigde Construction 136,900
Total 136,900 13. Project References :
BB 2006 ‐ 2009 ID: P1‐03‐03304‐0407‐076017
P‐52
GB‐ID : GBP1‐03‐03304‐0800‐076020 1. Project Title : Padang By Pass Capacity Expansion 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Highways, Ministry of Public Works 5. Duration : 24 months 6. Location : Padang, West Sumatera Province 7. Objectives
a. To anticipate regional development along with operation of Minangkabau International airport and Bingkuang Regional Terminal and Teluk Bayur Development Plan;
b. To accommodate the traffic growth in Padang; c. To accelerate social and economic activity; d. To provide evacuation line that is easy, safe, and fat in order to anticipate the emergency
condition due to natural disasters; e. To provide better accessibility for the road user to reach Padang City; f. To provide additional two lanes of the existing 2 lanes two ways carriage.
8. Scope of Projects
a. Improving roads capacity through road capacity improvement from two lanes two ways road two lanes and for ways road;
b. Constructing the Duku Fly Over; c. Total road improvement plan is 34 km length.
9. Activities
Activities Implementation Locations Project Implementation Units a. Civil works b. Consulting services
Padang (West Sumatera) Directorate General of Highways
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Highways
27,200 7,658 34,858 Korea (ODCF)
Total 27,200 7,658 34,858 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
17,000 17,858 34,858
P‐53
GB‐ID : GBP1‐03‐03304‐0800‐076020 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Road capacity improvement and construction of flyover
32,760
Consulting Services 2,098 Total 2,098 32,760
13. Project References
BB 2006 ‐ 2009 ID: P1‐03‐03304‐0407‐076020
P‐54
GB‐ID : GBP1‐01‐03300‐0801‐063228 1. Project Title : National Programme for Community Empowerment in Urban
Areas Project (PNPM Urban) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Human Settlement, Ministry of Public
Works 5. Duration : 24 months 6. Location : Nation Wide 7. Objectives
To empower Indonesia’s diverse rural communities to be actively participated in development through identifying their own needs and how to fulfill them with the resources they have to improve their welfare.
8. Scope of Projects
a. To support the National Program for Community Empowerment (PNPM)‐rural in community development, local institutional building and gender.
b. To develop analytical capacity for formulation of pro‐poor policies and approaches in the implementing agency.
c. To support livelihood improvement and facilitation in Papua and West Papua 9. Activities
Activities Implementation Locations Project Implementation Units a. Provision of block grant to
the community Central and districts level
b. Community Empowerment and provision of facilitators
All kecamatans
Central and provincial level
c. Goods, consultants services, training, & workshops
All level (central, province, districts, & subdistricts)
Central level
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Counterpart Funding
(US $ 000) Total of Funding
(US $ 000) Remarks
DG. Community & Village Empowerment, MoHA
110,700 ‐ 110,700 World Bank
Total 110,700 ‐ 110,700 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
11,070 16,605 16,605 22,140 44,280 110,700
P‐55
GB‐ID : GBP1‐01‐03300‐0801‐063228 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Provision of block grant to the community
81,980.1
b. Community Empowerment and provision of facilitators
15,249.3 2,901.7 5,498.3
c. Goods, consultants services, training, & workshops
5.043.7
Total 20,293.0 81,980.1 2,901.7 5,498.3 13. Project References :
BB 2006 ‐ 2009 ID: P‐01‐03300‐1190‐063228
P‐57
Directorate General of Human Settlements GB‐ID : GBP1‐03‐03305‐0800‐076032 1. Project Title : Regional Solid Waste Development for Maminasata, South
Sulawesi 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agencies : a. Directorate General of Human Settlement, Ministry of Public
Works b. Local Government of Maminasata
5. Duration : 60 months 6. Location : Maminasata, South Sulawesi Province 7. Objectives
a. To construct a regional solid waste infrastructure in accordance with the national standard; b. To have better environment by managing the final disposal sites as sanitary landfill; c. To have better quality solid waste management.
8. Scope of Projects
a. Strengthening the human resources b. Strengthening the institutions c. Construction of a sanitary landfill d. Promoting the 3R concept e. Community empowerment
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Strengthening the human resources
involved in solid waste management; b. Strengthening the institutions
involved; c. Construction of a sanitary landfill; d. Promoting the 3R concept; e. Community empowerment.
Maminasata, South Sulawesi Province
Directorate General of Human Settlement, Ministry of Public Works Local Government of Maminasata
10. Funding Source
Implementing Agencies Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
a. Directorate General of Human Settlements, Ministry of Public Works
b. Local Government of Maminasata
27,800 ‐ 27,800 Japan (JBIC)
Total 27,800 ‐ 27,800
P‐58
GB‐ID : GBP1‐03‐03305‐0800‐076032 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,390 4,170 9,730 9,730 2,780 27,800 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Strengthening the human
resources involved in solid waste management;
1,000
b. Strengthening the institutions involved;
500
c. Construction of a sanitary landfill;
15,000 10,000
d. Promoting the 3R concept; 500 e. Community empowerment. 500
Total 1,000 15,000 10,000 1,500 13. Project References :
BB 2006 ‐ 2009 ID: P1‐03‐03305‐0502‐076032
P‐59
GB‐ID : GBP1‐01‐03300‐0801‐063228 1. Project Title : Rural Infrastructure Support for National Programme for
Community Empowerment Project (RIS‐PNPM) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Human Settlement, Ministry of Public
Works 5. Duration : 24 months 6. Location : Nation Wide 7. Objectives
To empower Indonesia’s diverse rural communities to be actively participated in development through identifying their own needs and how to fulfill them with the resources they have to improve their welfare.
8. Scope of Projects
a. To promote community participation in development planning and management. b. To fill the gap of infrastructure in general and rural infrastructure in particular as well as to
promote more efficient delivery of services to the rural communities 9. Activities
Activities Implementation Locations Project Implementation Units a. Block grant for rural
infrastructure improvement Rural Central and districts level
b. Community facilitation and monbilization
Kecamatans and rural Central and provincial level
c. Audit, studies, & surveys All level (central, province, districts, & subdistricts)
Central level
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Counterpart Funding
(US $ 000) Total of Funding
(US $ 000) Remarks
Directorate General of Human Settlement
50,000 ‐ 50,000 ADB
Total 50,000 ‐ 50,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
30,000 5,000 5,000 5,000 5,000 50,000
P‐60
GB‐ID : GBP1‐01‐03300‐0801‐063228 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Block grant for rural infrastructure improvement
45,950
b. Community facilitation and mobilization
2,630
c. Audit, studies, & surveys 1,420
Total 4,050 45,950 13. Project References :
BB 2006 ‐ 2009 ID: P‐01‐03300‐1190‐063228
P‐61
GB‐ID : GBP1‐01‐03300‐0802‐063228 1. Project Title : National Programme for Community Empowerment in Urban
Areas Project (Support to PNPM) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Human Settlement, Ministry of Public
Works 5. Duration : 24 months 6. Location : Nation Wide 7. Objectives
To empower Indonesia’s diverse rural communities to be actively participated in development through identifying their own needs and how to fulfill them with the resources they have to improve their welfare.
8. Scope of Projects
a. To support the National Program for Community Empowerment (PNPM)‐rural in community development, local institutional building and gender.
b. To develop analytical capacity for formulation of pro‐poor policies and approaches in the implementing agency.
c. To support livelihood improvement and facilitation in Papua and West Papua 9. Activities
Activities Implementation Locations Project Implementation Units a. Provision of block grant to
the community Central and districts level
b. Community Empowerment and provision of facilitators
All kecamatans
Central and provincial level
c. Goods, consultants services, training, & workshops
All level (central, province, districts, & subdistricts)
Central level
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Counterpart Funding
(US $ 000) Total of Funding
(US $ 000) Remarks
DG. Community & Village Empowerment, MoHA
76,900 ‐ 76,900 IDB
Total 76,900 ‐ 76,900 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
15,000 10,300 10,300 10,550 30,750 76,900
P‐62
GB‐ID : GBP1‐01‐03300‐0802‐063228 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Provision of block grant to the community
53,976.6
b. Community Empowerment and provision of facilitators
11,503.9 1,934.4 3,665.6
c. Goods, consultants services, training, & workshops
5,833.9
Total 17,337.8 53,976.6 1,934.4 3,665.6 13. Project References :
BB 2006 ‐ 2009 ID: P‐01‐03300‐1190‐063228
P‐63
GB‐ID : GBP1‐03‐03300‐0700‐08‐066216 1. Project Title : Urban Water Supply and Sanitation Project 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agencies : a. Directorate General of Human Settlements, Ministry of Public
Works b. Government of Bogor City c. Government of Kapuas District d. Government of Muara Enim District
5. Duration : 36 months 6. Location : Bogor City, Kapuas Regency, and Muara Enim District 7. Objectives
The objective of the project is to improve and expand water supply services and to strengthen local water utilities to become operationally efficient and financially sustainable.
8. Scope of Projects
a. Technical improvements Improved service reliability, improved water quality, reduced non‐revenue water, and greater operating efficiency;
b. Commercial orientation Improved management, customer orientation, expansion of sales, improved billing and collection, cost recovery tariffs, and overall financial viability.
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Evaluate the performance of existing
assets, technically and personal human resources.
b. Analyze the needs to improve the assets performance.
c. Recommend financing plan to improve the assets performance and expansion of PDAM services
d. Prepare Detailed Engineering Design for recommended physical works
Bogor City, Kapuas Regency, and Muara Enim District
Government of Bogor City, Government of Kapuas District, and Government of Muara Enim District
e. Development of IKK System in 23 Kecamatans
Kapuas Regency, and Muara Enim District
Directorate General of Human Settlements, Ministry of Public Works
P‐64
GB‐ID : GBP1‐03‐03300‐0700‐08‐066216 10. Funding Source
Implementing Agencies Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
a. Directorate General of Human Settlements, Ministry of Public Works
5,619 2,107 7,726
b. Government of Bogor City 8,400 1,500 9,900
c. Government of Kapuas District 5,100 1,000 6,100
d. Government of Muara Enim District 7,100 2,100 9,200
World Bank
Total 26,219 6,707 32,926 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 12,926 10,000 32,926 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Evaluate the performance of
existing assets, technically and personal human resources.
4,900
b. Analyze the needs to improve the assets performance.
4,900
c. Recommend financing plan to improve the assets performance and expansion of PDAM services
d. Prepare Detailed Engineering Design for recommended physical works
3,426
e. Development of IKK System in 23 Kecamatans
19,700
Total 13,226 19,700 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐03300‐0603‐066216
P‐65
Directorate General of Water of Water Resources GB‐ID : GBP1‐03‐03306‐0800‐076037 1. Project Title : Countermeasure for Sediment in Wonogiri Multipurpose Dam
Reservoir 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Water of Water Resources (DGWRD),
Ministry of Public Works 5. Duration : 48 months 6. Location : Wonogiri, Central Java Province 7. Objectives
a. Reduce the soil loss in the Keduang watershed (from 4,778 thousand tons to 2,973 thousand tons annually) by formation/upgrading of terraces and related structures with vegetative measures.
b. Alleviate poverty in economically depressed rural areas in the Keduang watershed by increasing agricultural productivity through introduction of improved soil/agricultural technology and agro forestry development.
Implementation of the watershed conservation will be carried out by means of community‐based management, encouraging the local farmers to improve their current land use practices by increasing farm income and improvement of life quality thereof. This comprehensive approach for the watershed conservation will significantly contribute poverty alleviation through providing stabilization of the farmer’s economic situation
8. Scope of Projects
a. Implementation of soil conservation measures consisting of : 1) the bench terrace improvement and construction works; 2) improvement of waterway and drop structures; 3) improvement of side ditch in the settlement area; 4) stabilization for lip and terrace riser by vegetative measures; and 5) hedge row at fringe of housing yard;
b. Introduction of improved farming technology and agro‐forestry development by introducing perennial estate and fruit and trees.
c. Support programs for promoting water conservation project consisting of : 1) support programs for community development such as village action plan for soil
conservation, establishment of implementation committee, guidance of village grant fund and education program;
2) support program for soil and water conservation measures such as farmer and farmer groups empowerment package program, package program for operation and implementation of conservation measures, and field staff empowerment program;
3) support programs for land management and agricultural promotion measures such as technology development program, demonstration program, pilot demonstration field of tree crops/trees and farmer and farmer group training program, farming support programs, palawija seed production program and strengthening of logistic support for extension activities.
P‐66
GB‐ID : GBP1‐03‐03306‐0800‐076037 9. Activities
Activities Implementation Locations Project Implementation Units Construction Civil Works Wonogiri, Central Java Province DGWRD
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
DGWRD 56,800 1,900 58,700 Japan (JBIC)
Total 56,800 1,900 58,700 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th 6th
Total
10,000 15,000 20,000 13,700 58,700 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Construction Civil Works 58,700
Total 58,700 13. Project References :
BB 2006 ‐ 2009 ID: P1‐03‐03306‐0407‐076037
P‐67
GB‐ID : GBP1‐03‐03300‐0800‐066267 1. Project Title : Dam Operation and Safety Improvement Project 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Water of Water Resources (DGWRD),
Ministry of Public Works 5. Duration : 36 month 6. Location : Bengawan Solo River, Pemali – Juana River, Serayu River, Citarum
River, Cimanuk River 7. Objectives
a. Restore and/or improve dam and reservoir performance through operational and physical improvements of Ministry of Public Works (MPW)‐owned dams;
b. Initiate a medium‐term program to address watershed erosion and sedimentation impacts of MPW‐owned dams;
c. Promote Ministry of Public Works‐owned dam sustainability through a structured O&M program following general rehabilitation by ensuring adequate dam O&M funding and asset management programs by the national and provincial governments;
d. Establish sustainable institutional arrangements and programs for community participation in reservoir management and reservoir watershed management;
e. Ensure long‐term safety of Ministry of Public Works‐owned dams through remedial interventions where necessary; and
f. Consolidate and strengthen national dam safety assurance institutions and bring all public and privately owned dams their purview.
8. Scope of Projects
The activity will cover: civil works, equipment procurement, technical assistance consultant service, both foreign and national, engineering services, training and capacity building, and project management.
Four components and eight sub‐components are tentatively envisaged for DOISP as follows:
a. Dam operational and safety improvement works component 1) Dam rehabilitation, modification and remedial works, and 2) Dam safety assurance interventions.
b. O & M improvement and capacity building component 1) Dam O & M improvement, 2) Dam agency capacity building, and 3) Community participation in reservoir management.
c. Reservoir sedimentation mitigation component 1) Reservoir sedimentation surveys, 2) Reservoir sedimentation mitigation interventions, and 3) Reservoir watershed management pilot program.
d. Dam safety assurance institutional improvement component e. Project management component
P‐68
GB‐ID : GBP1‐03‐03300‐0800‐066267 9. Activities
Activities Implementation
Locations Project
Implementation Units a. Dam operational and safety works b. O & M improvement and capacity
building c. Reservoir sedimentation mitigation d. Dam safety assurance institutional
improvement e. Project management
Bengawan Solo River, Pemali – Juana River, Serayu River, Citarum River, Cimanuk River
DGWRD
10. Funding Source
Implementing Agencies
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
DGWRD 50,000 40,000 90,000 World Bank
Total 50,000 40,000 90,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 25,000 15,000 50,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Dam Operation and Safety Improvement Project
90,000
Total 90,000 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐03300‐0404‐066267
P‐69
GB‐ID : GBP1‐03‐03300‐0700‐08‐066263 1. Project Title : Integrated Citarum Water Resources Management Program
(Trance I) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Citarum River Basin Agency (Balai Besar Wilayah Sungai Citarum),
Directorate General of Water of Water Resources (DGWRD), Ministry of Public Works
5. Duration : 48 months 6. Location : West Java and DKI Jakarta Province 7. Objectives
a. Promote a national focus on water sector reform b. Foster the integrated management of Water resources c. Improve and expand the delivery of water service d. Foster the conservation of water and increase system efficiency e. Promote regional cooperation and increase the mutually beneficial use of share water
resources within and between countries f. Facilitate the exchange of water sector information and experience, and g. Improve governance
8. Scope of Projects
a. Program management of project implementation b. Institutional strengthening for Integrated Water Resources Management (IWRM) c. Water supply options and improve groundwater management for Bandung d. Rehabilitation of West Tarum Canal e. Roll‐out of System Rice Intensification in three districts f. Support for community and NGO‐driven initiatives for improve water supply and
sanitation g. Development and implementation of a basin river quality improvement strategy and action
plans h. Land and biodiversity conservation project (Phase I)
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Institutional strengthening of
IWRM DKI Jakarta & West Java Province
Citarum River Basin Balai Besar, DGWR, MPW
b. Water supply option and improve groundwater management for Bandung
Bandung District and Bandung City, West Java Province
DGWR of MPW and Ministry of Mines and Energy
c. Community rural water supply , sanitation, and health
West Java Province DGCD, Ministry of Health, and DG of settlement , MPW
P‐70
GB‐ID : GBP1‐03‐03300‐0700‐08‐066263
Activities Implementation
Locations Project Implementation
Units d. West Tarum Canal Rehabilitation West Java and DKI
Jakarta Provinces CRB Balai Besar, DGWR, MPW
e. Development and implementation of a basin water quality improvement strategy and action plan
CRB Balai Besar, DGWR, MPW and MOE/ BPLHD
f. Biodiversity management project
West Java Province
LRSF, Ministry of Forestry
g. Roll‐out of System Rice Intensification in three Districts
Cianjur, Karawang, and Bekasi Districts
AIAT, IAAR, DGLW, Ministry of Agriculture
h. Program preparation for Trance II CRB Balai Besar, DGWR, MPW
i. Roadmap and program management
DKI Jakarta and West Java Provinces
CRB Balai Besar, DGWR, MPW and BAPPENAS
10. Funding Source
Implementing Agencies
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
CRB Balai Besar,DGWR, MPW
50,000 26,600 76,600 ADB
Total 50,000 26,600 76,600 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
16,600 25,000 25,000 10,000 76,600 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Integrated Citarum Water Resources Management Program
5,000 40,000 20,000 5,000 6,600
Total 5,000 40,000 20,000 5,000 6,600 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐03300‐0404‐066263
P‐71
GB‐ID : GBP1‐03‐03306‐0800‐076038 1. Project Title : Non Structural Measures and Urgent Mitigation for Jakarta Flood
Control 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : Directorate General of Water of Water Resources (DGWRD), Ministry of
Public Works 5. Duration : 60 months 6. Location : DKI Jakarta 7. Objectives
The project is intended as part of a comprehensive program to reduce the economic and social cost of flooding by partially restoring the capacity of the city’s flood control system to its original design level of protection of 25 years. The project would prioritize flood mitigation in the most flood‐prone areas in DKI Jakarta. Most people living in these areas are poor and vulnerable to the immediate impacts of flooding including loss of income, medical costs, as well as the costs of infrastructure, business and home repairs. Activities are: a. To mitigate, in the short term, the impacts of annual floods in DKI Jakarta and its
surrounding areas through the rehabilitation of existing floodways, drains and retention basins.
b. To transfer technical expertise to strengthen the capacity of DKI Jakarta to operate and maintain its flood control system according to standards and practices needed for a metropolitan area of national importance.
8. Scope of Projects
a. Urgent maintenance dredging. This activity covers the urgent dredging of four floodways under the authority of MPW, namely Cakung Floodways, Sunter River, Cengkareng Floodway and West Banjir Canal. In addition, the project will finance the dredging of five major drains and five retention basins under DKI authority, located in flood‐prone areas close to Jakarta Bay, namely Krukut River, Sentiong‐Sunter, Ciliwung‐Gunung Sahari, Jelakeng‐Pakin, and K. Besar (major drains) and Waduk Pluit, Waduk North Sunter, Waduk South Sunter, Waduk East Sunter III and Waduk Melati (retention basins). This activity will also cover “National Importance” which includes Kamal, Tanjungan, Lower Angke, and Cideng‐Thamrin.
b. Construction of a disposal site for dredge spoils.
Site is required to absorb the dredged spoil arising from Component A, which is estimated at 6.7 million m3, of which 3.5 million m3 are to be removed from floodways under MPW responsibility.
c. Rehabilitation of river embankments.
This activity includes the rehabilitation of pumping stations and bar screens in retention basins.
P‐72
GB‐ID : GBP1‐03‐03306‐0800‐076038
d. Capacity building and project implementation support. This component is intended to benefit MPW and DKI staff and their contractors, and would be developed in close cooperation with Dutch TF WASAP‐Indonesia, ensuring that by the end of the project, the followings are achieved: (i) necessary legal, regulatory and institutional change, and (ii) fiscal arrangement for O&M financing, to allow MPW and DKI to manage and operate the city’s flood control system in a sustainable manner.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Urgent maintenance dredging b. Construction of a disposal site for dredge spoils c. Rehabilitation of river embankments d. Capacity building and project implementation
support
DKI Jakarta DGWRD
10. Funding Source
Implementing Agencies
Foreign Funding (US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
DGWRD 156,500 12,600 169,100 World Bank
Total 156,500 12,600 169,100 11. Disbursement Plan
Disbursement Plan (US $ 000) Total 1st 2nd 3rd 4th 5th 6th
8,455 25,365 59,185 59,185 16,910 169,100 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Non Structural Measures and Urgent Mitigation
169,100
Total 169,100 13. Project References :
BB 2006 ‐ 2009 ID: P1‐03‐03306‐0605‐076038
P‐73
GB‐ID : GBP1‐03‐03306‐0800‐076042 1. Project Title : Urban Flood Control System Improvement in Selected Cities 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Public Works 4. Implementing Agency : a. Sumatera III River Area Office
b. Sumatera V River Area Office c. Sumatera VI River Area Office d. Sumatera VIII River Area Office e. Brantas River Area Office f. Sulawesi I River Area Office g. Sulawesi II River Area Office h. Pompengan‐ Jeneberang River Area Office
5. Duration : 48 months 6. Location : Pekanbaru, Dumai, Rengat, Padang, Jambi, Palembang, Nganjuk,
Wonokromo, Manado, Gorontalo, and Makasar 7. Objectives
a. To review detailed design of flood control system; b. To protect the cities area from frequent flooding; c. To increase the economics activity through implementation of the project.
8. Scope of Projects
a. Review of engineering design; b. Construction.
9. Activities
Activities Implementation
Locations Project Implementation Units
a. Review of engineering design
b. Supervision c. Construction
Pekanbaru, Dumai, Rengat, Padang, Jambi, Palembang, Nganjuk, Wonokromo, Manado, Gorontalo, and Makasar
a. Sumatera III River Area Office b. Sumatera V River Area Office c. Sumatera VI River Area Office d. Sumatera VIII River Area Office e. Brantas River Area Office f. Sulawesi I River Area Office g. Sulawesi II River Area Office h. Pompengan‐ Jeneberang River Area Office
10. Funding Source
Implementing Agencies
Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
8 River Area Office 70,000 7,000 77,000 Japan (JBIC)
Total 70,000 7,000 77,000
P‐74
GB‐ID : GBP1‐03‐03306‐0800‐076042 11. Disbursement Plan
Disbursement Plan (US $ 000) Total 1st 2nd 3rd 4th 5th 6th
15,000 25,000 25,000 12,000 77,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Construction Civil Works 77,000
Total 77,000 13. Project References :
BB 2006 ‐ 2009 ID: P1‐03‐03306‐0505‐076042
P‐75
Ministry of National Education
P‐77
GB‐ID : GBP1‐05‐02300‐0800‐061292 1. Project Title : Development and Upgrading of Sebelas Maret University (UNS)
Project, Surakarta 2. Project Type : Project Assistance 3. Executing Agency : Ministry of National Education 4. Implementing Agency : University of Sebelas Maret (UNS) Surakarta 5. Duration : 36 months 6. Location : Surakarta, Central Java 7. Objectives
a. To develop new facility for the Faculty of Education and Teacher Training (FKIP); Faculty of Medicine (FK) including Educational University Hospital and Faculty of Agricultural (FP);
b. To construct a new main administration office, and conference room; c. To construct new buildings and facilities for UNS Community College Program; d. Adding and renovating practice equipment, laboratory, workshop, and other study media;
and e. To construct a new building and facilities for Training Center of Pabelan Campus (UNS
Center) including a tutorial center of Al Pabelan. 8. Scope of Projects
The Project will be designed to strengthen the development and upgrade of UNS in the field of medical education and medical services. The development is fully arranged to fulfill the objectives of Millenium Development Goals, especially in the field of global partnership and poverty eradication in Surakarta, through affordable and larger opportunities in higher education and medical services
9. Activities
Activities Implementation
Locations Project Implementation
Units To develop and reconstruct academic facilities
Surakarta, Central Java University of Sebelas Maret (UNS) Surakarta
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
University of Sebelas Maret (UNS) Surakarta
30,000 8,900 38,900 IDB
Total 30,000 8,900 38,900 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,700 20,285 13,615 3,300 38,900
P‐78
GB‐ID : GBP1‐05‐02300‐0800‐061292 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Civil Works 16,400
b. Procurement of equipment
16,000
c. Consultancy 1,183
d. PMU 120
e. Academic (curriculum) Development Program
300
f. Training Development 1,279
g. Financial Auditing 40
h. Start up workshop/ Mid‐term Review/ Familiarization
40
i. Contigency 3,538
Total 1,303 16,400 16,000 1,579 4,618 13. Project References :
BB 2006 ‐ 2009 ID: P‐05‐02300‐1006‐061292
P‐79
GB‐ID : GBP1‐05‐02304‐0800‐071050 1. Project Title : Development and Upgrading of State University of Semarang
(UNNES) Project 2. Project Type : Project Assistance 3. Executing Agency : Ministry of National Education 4. Implementing Agency : State University of Semarang (UNNES) 5. Duration : 48 months 6. Location : UNNES, Semarang ‐ Central Java Province 7. Objectives
General: The proposed project is to support UNNES mission in carrying out its function and accountability as an education institution (academic and professional), Science and Technology (S & T) Development, and as an institution rendering public service to the community. Specific: a. Improving the university facilities to meet high quality learning and teaching process; b. Improving the facilities for optimum community learning activities; c. Improving the facilities for building innovative and productive characters; d. Improving the facilities for generating skills for fresh graduate to be ready in workforce
competition; e. Improving the facilities for optimal student activities and arts class, and f. Improving research facilities, public facilities, as well as lecturers, and student service.
8. Scope of Projects a. Construction works b. Equipement c. Furniture and fixture d. Project Management Unit (PMU) e. Academic (curriculum) development program f. Fellowship training g. Auditing h. Start up workshop
9. Activities Activities Implementation Locations Project Implementation Units
To develop and reconstruct academic facilities
Semarang, Central Java UNNES
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
UNNES 36,025 8,910 44,935 IDB Total 36,025 8,910 44,935
P‐80
GB‐ID : GBP1‐05‐02304‐0800‐071050 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
4,494 17,974 13,480 8,987 44.935 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Construction works 26,534
b. Equipment 8,120
c. Furniture and fixture 3,000
d. Project Management Unit (PMU)
120
e. Academic (curriculum) development program
1,500
f. Fellowship training 2,000
g. Auditing 60
h. Start up workshop 15
Total 180 26,534 11,120 1,500 2,015 13. Project References :
BB 2006 ‐ 2009 ID: P1‐05‐02304‐1006‐071050
P‐81
GB‐ID : GBP1‐05‐02300‐0800‐061296 1. Project Title : Development and Upgrading of State University of Yogyakarta 2. Project Type : Project Assistance 3. Executing Agency : Ministry of National Education 4. Implementing Agency : State University of Yogyakarta 5. Duration : 48 months 6. Location : Yogyakarta 7. Objectives
General: The proposed project is to support UNY mission in carrying out its function and accountability as an education institution (academic and professional), S & T Development, and as an institution rendering public service to the community. Specific: a. Improving the university facilities to meet high quality learning and teaching process; b. Improving the facilities for optimum community learning activities; c. Improving the facilities for building innovative and productive characters; d. Improving the facilities for generating skills for fresh graduate to be ready in workforce
competition; e. Improving the facilities for optimal student activities and arts class, and f. Improving research facilities, public facilities, as well as lecturers, and student service.
8. Scope of Projects a. Construction works b. Equipement c. Furniture and fixture d. Project Management Unit (PMU) e. Academic (curriculum) development program f. Fellowship training g. Auditing h. Start up workshop.
9. Activities Activities Implementation Locations Project Implementation Units
To develop and reconstruct academic facilities
Yogyakarta State University of Yogyakarta
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
State University of Yogyakarta
25,000 9,000 34,000 IDB
Total 25,000 9,000 34,000
P‐82
GB‐ID : GBP1‐05‐02300‐0800‐061296 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
14,800 10,700 8,500 34,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Building and
infrastructure works 20,752
b. Furniture, fixture, and equipment
5,099
c. PMU 191
d. Academic development program
4,798
e. Auditing 50
f. Start up workshop 20
g. Contigency 3,090
Total 241 20,752 5,099 4,798 3,110 13. Project References :
BB 2006 ‐ 2009 ID: P‐05‐02300‐1006‐061296
P‐83
GB‐ID : GBP1‐05‐02300‐0800‐061302‐07 1. Project Title : Development of Bandung Institute of Technology 2. Project Type : Project Assistance 3. Executing Agency : Ministry of National Education 4. Implementing Agency : Bandung Institute of Technology (ITB) 5. Duration : 72 months 6. Location : Bandung, West Java 7. Objectives
a. Improving the internal and external efficiency; b. Improving the quality of educational processes and research activities toward international
standard; c. Pursuing advanced science & technologies in renewable energy & nanoscience,
biotechnology, information technology in industrial manufacturing technology; d. Strengthening the Faculty of Art & Design, and Faculty of Civil Engineering and
Environmental (water resources and built environment); e. Disseminating research results and community service programs through polytechnics
education system.
8. Scope of Projects a. Equipment furniture and books b. Fellowship c. Research grant d. University‐industry‐community linkage e. Consultant service and technical assistance
9. Activities
Activities Implementation Locations Project Implementation
Units To develop and reconstruct academic facility
Bandung, West Java Bandung Institute of Technology (ITB)
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Bandung Institute of Technology
53,500 19,429 72,929 Japan (JBIC)
Total 53,500 19,429 72,929 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th 6th
Total
1,146 19,869 17,580 16,868 11,999 5,477 72,929
P‐84
GB‐ID : GBP1‐05‐02300‐0800‐061302‐07 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Project Componet
b. Building Construction 22,779
c. Procurement 28,399
d. Staff Development 4,725
e. Research Grant 360
f. Technical assistance 240
g. Consulting Services
h. Engineering Services 4,133
i. Project Management Services
1,399
j. Price Escalation 1,558
k. Contigency 2,710
l. Tax 6,626
Total 5,772 22,779 28,399 4,725 11,254 13. Project References :
BB 2006 ‐ 2009 ID: P‐05‐02300‐1006‐061302
P‐85
GB‐ID : GBP1‐05‐02300‐0800‐061294‐07 1. Project Title : Development of Centers for Medical Education and Medical
Research in the Faculty of Medicine University of Indonesia 2. Project Type : Project Assistance 3. Executing Agency : Ministry of National Education 4. Implementing Agency : University of Indonesia 5. Duration : 24 months 6. Location : DKI Jakarta 7. Objectives
General Objectives To improve the quality of manpower in medical school and to enhance medical education this may lead in better education process. Specific Objectives
a. To improve the quality of the medical faculty members by promoting research training and other development programs;
b. To strengthen medical education program such as curriculum development, teaching methodology and improvement in education measurement;
c. Benchmarking of medical education with international standard; d. Internationalization of medical education in medical school of selected university in
Indonesia.
8. Scope of Projects a. Restructuring and modernization of the existing curriculum to be intergrated with
technological content; b. Establishment of university hospital (including Center for Medical Instrumentation
Technology), medical education, and research center, and Information and Communication Technology (ICT) platform;
c. Improving the quality of existing staff.
9. Activity
Activities Implementation
Locations Project
Implementation Units To develop hospital university and reconstruct academic facilities of medical faculty
DKI Jakarta University of Indonesia
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
University of Indonesia
37,500 9,000 46,500 IDB
Total 37,500 9,000 46,500
P‐86
GB‐ID : GBP1‐05‐02300‐0800‐061294‐07 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,647 21,992 15,268 7,593 46,500 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Start‐up workshop/mid‐term
review and familiarization 40
b. Training development 1,275
c. Civil works 25,774
d. Procurement of equipment 12,660
e. Consultancy 2,342
f. PMU 120
g. Financial auditing 50
h. Contigency 4,239
Total 2,462 25,774 12,660 1,275 4,329 13. Project References :
BB 2006 ‐ 2009 ID: P‐05‐02300‐1006‐061294
P‐87
GB‐ID : GBP1‐05‐02300‐0800‐061289 1. Project Title : Development of Teaching Hospital of Andalas University 2. Project Type : Project Assistance 3. Executing Agency : Ministry of National Education 4. Implementing Agency : Andalas University 5. Duration : 60 months 6. Location : Padang, West Sumatera 7. Objectives
The project will be designed to strengthen, develop and upgrade the University of Andalas, Padang, in the field of medicine and university automation. New development will be directed to the hospital university to support the faculty of medicine and university automation to support all existing faculties. These developments are fully arranged with technology education to meet the objectives of the Millennium Development Goals, especially in the field of global partnership and poverty eradication in West Sumatera through affordable larger opportunities in higher education. This developed institution will serve as a resource and research center and also provides services to larger communities in the field of medication. The design of the project for the development of university hospital of the University of Andalas will involve: (i) restructuring and modernization of the existing curriculum to be integrated with technological contents, (ii) establishment of hospital university under the faculty of medicine and, (iii) upgrading and development of Information and Communication Technology (ICT) platform as a basis to daily academic activities and university management in the preparation of state owned legal higher education entity, (iv) quality improvement of existing staff, (v) adding and strengthening of library facilities in terms of ICT infrastructures development, (vi) and, in turn larger opportunity for poor but gifted secondary school graduates and quality improvement of higher education graduates.
8. Scope of Projects a. Restructuring and modernization of the existing curriculum to be integrated with
technologica content b. Establishments of university hospitals (including Center of Medical Instrumentation
Technology), medical education and research center, and ICT Plattform c. Improving the quality of existing staff
9. Activities
Activities Implementation
Locations Project
Implementation Units To develop hospital university and reconstruct academic facilities of medical faculty
Padang, West Sumatera
Andalas University
P‐88
GB‐ID : GBP1‐05‐02300‐0800‐061289 10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Andalas University 33,800 7,000 40,800 IDB Total 33,800 7,000 40,800
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
352 7,585 17,968 14,543 352 40,800 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. PMU 245
b. DED Consultant 252
c. PMSC 430
d. Construction work 15,721
e. Equipment design 55
f. Procurement equipment
16,146
g. Auditing project 50
h. Procurement of furniture and fixture
1,750
i. Curriculum development
275
j. Training& HRD 1,350
k. Contigency 4,526
Total 982 15,721 19,246 275 4,576 13. Project References :
BB 2006 ‐ 2009 ID: P‐05‐02300‐1006‐061289
P‐89
Ministry of Transportation
P‐91
Directorate General of Sea Transportation GB‐ID : GBP1‐03‐02204‐0800‐076060 1. Project Title : Belawan Port Development 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation 5. Duration : 36 months 6. Location : Belawan, Medan – North Sumatera Province 7. Objectives
a. Improving the growth capacity of port facilities for operational; b. Anticipating the growth of current of goods and passenger; c. Following technology development of sea transport.
8. Scope of Projects
a. Developing area for the container terminal. b. Construction of Cargo Warf c. Capacity Enhancement of Access Channel d. Procurement of Container Handling Equipment
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Design and Supervision b. Construction c. Procurement d. Training
Belawan Directorate General of Sea Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Sea Transportation
95,575 20,617 116,192 IDB
Total 95,575 20,617 116,192 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 25,000 25,000 31,192 25,000 116,192
P‐92
GB‐ID : GBP1‐03‐02204‐0800‐076060 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Design and
Supervision 15,000
b. Terminal, Cargo Warf and Access Channel
71,192 2,500
c. Container handling equipment
25,000 1,500 1,000
Total 15,000 71,192 25,000 1,500 3,500 13. Project References :
BB 2006 ‐ 2009 ID: P1‐03‐02204‐0408‐076060
P‐93
GB‐ID : GBP1‐03‐02200‐0801‐066344 1. Project Title : Improvement of Port Security System 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation 5. Duration : 24 months 6. Location : Sumatera, Kalimantan, Bali and Sulawesi Island 7. Objectives
a. To accelerate the Implementation of port security measures based on the port security facility plans.
b. To improve the Indonesian port security level. c. To transfer the technology on port security to Indonesian officer
8. Scope of Projects
a. Procurement of consultants that will arrange a plan which will improve port security. b. Survey and Master plan
9. Activities
Activities Implementation Locations Project Implementation Units Sumatera, Kalimantan, Bali
and Sulawesi Island Directorate General of Sea Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Sea Transportation
5,456 ‐ 5,456 Japan (JICA)
Total 5,456 ‐ 5,456 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,728 2,728 5,456 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Procurement Consultant, Survey, Master Plan
5,456
Total 5,456 13. Project References :
BB 2006 ‐ 2009 ID: T‐03‐02200‐0408‐066344
P‐94
GB‐ID : GBP1‐03‐02200‐0800‐066337‐07 1. Project Title : Indonesia Ship Reporting System 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Sea Transportation, Ministry of
Transportation 5. Duration : 48 months 6. Location : Nation Wide 7. Objectives
A Ship Reporting System and VTS (Vessel Traffic System) should provides up to date information on the movements of vessels in order to give a quick and maximum assistance by participating vessels to a vessel which may be in distress, and in order to facilitate a quick SAR operation in case of missing of a participating vessel.
8. Scope of Projects
a. Establish report station Report receiving station (receiving station) will be setup the major cost station 1st, 2nd and 3rd
b. Establish report sub centers Report sub centers (sub centers) will be setup nine (9) of 1st class and nine (9) of 2nd class coast stations
c. Establish ship reporting center Ship reporting center will be setup at transmitting site of Jakarta coast station Tj. Priok
d. Establish data transmition line Telecommunication line for report transmition on land is as follows 1) center to sub center: Internet/existing HF 2) sub center to 3rd class station : existing HF
e. Establish VTS station in Sunda and Lombok Straits
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Design and Supervision b. Equipment and Software Procurement c. Installation and Activity d. Training e. Equipment Delivery
Nation Wide Directorate General of Sea Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Sea Transportation
14,000 2,891 16,891 Denmark
Total 14,000 2,891 16,891
P‐95
GB‐ID : GBP1‐03‐02200‐0800‐066337‐07 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,732 4,098 5,464 1,366 13,660 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Design and
Supervision 312
b. Equipment and Software Procurement
1,698 11,338
c. Training 312
Total 312 1,698 11,338 312 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐02200‐0408‐066337
P‐96
GB‐ID : GBP1‐04‐04300‐0800‐065464‐07 1. Project Title : Vessel Traffic Services (VTS) System 2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Sea Transportation, Ministry of Transportation 5. Duration : 48 months 6. Location : Nation Wide 7. Objectives
To establish of VTS System is urgently needed because it will contribute to: a. Monitor the maritime traffic, the maritime area and the traffic lanes b. Improve the security of the traffic c. Improve the efficiency of vessel movements d. Protect the environment e. Surveillance, detection and tracking of vessels f. Provision of general information to vessels g. Provision of specific information to assist ships for navigation h. Monitoring and analyzing risks of collision and grounding i. Assisting vessels requiring special attention j. Anticipating and assisting vessels arriving and departing port areas
8. Scope of Projects
Mayor system composition of Vessel Traffic Services (VTS) System is Radar System, Radar Tracking, Multifunction Console, VHF Radio System and Transmission Link. It will be set up at: a. Tanjung Medang in Rupat Island; b. Tanjung Parit in Bengkalis Island; c. Jantan in Karimun Island; d. Dangas in Batam Island; e. Tanjung Berakit in Bintan Island; f. Sabang, Sigli, Lhokseumawe, UG Peureuteam, Tg Tamiang, Belawan, Berhala Island, and
Jemur Island. 9. Activities
Activities Implementation Locations Project Implementation Units
a. Design and Supervision b. Equipment Procurement c. Installation d. Training
DIY, Aceh s.d Sumut Directorate General of Sea Transportation
P‐97
GB‐ID : GBP1‐04‐04300‐0800‐065464‐07 10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Local Funding(US $ 000)
Total of Funding(US $ 000)
Remarks
Directorate of Navigation
28,740 500 29,240 Norway : loan (US$ 14,100) JICA : Grant (US$ 14,640)
Total 28,740 500 29,240 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 19,240 29,240 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Design and Supervision 700 b. Equipment Procurement 24,840 c. Installation 300 d. Training 700
Total 700 300 24,840 700 13. Project References :
BB 2006‐2009 ID: P‐03‐02200‐0408‐066340
P‐98
Directorate General of Civil Aviation GB‐ID : GBP1‐03‐02200‐0700‐08‐066353 1. Project Title : Procurement of Airport Rescue and Fire Fighting Equipment 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportation 5. Duration : 24 months 6. Location : 43 Airports in Indonesia 7. Objectives
a. To complete rescue and Fire Fighting Equipment through procurement of new fire fighting vehicles
b. Replacement the old system to support aviation safety 8. Scope of Projects
a. Procurement of equipment b. Training
9. Activities
Activities Implementation Locations Project
Implementation Units
a. Delivery of that equipment from originating country to Indonesia
b. Supervision and commissioning c. Factory Acceptance Test d. Factory Raining for operator and
maintenance technician e. Local/on site training
Sibolga, Gn. Sitoli, Jambi, Bengkulu, Waingapu, Ende, Kendari, Gorontalo, Palangkaraya, Sampit, Nabire, Wamena, Manokwari, Jayapura, Sorong, Merauke, Waikabubak, Siborong‐borong, Rengat, Singkep, Tj. Pandan, Pk. Pinang, Lampung, Cilacap, Bima, Ketapang, Pangkalan Bun, Sintang, Kota Baru, Ruteng, Tj. Selor, Sangir Talaud, Poso, Maumere, Atambua, Sinabang, Tapak Tuan, Meulaboh, Larantuka, Sarmi, Enarotali, Tanah Merah, Mamuju.
Directorate General of Civil Aviation
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Civil Aviation
28,700 3,000 31,700 Netherland
Total 28,700 3,000 31,700
P‐99
GB‐ID : GBP1‐03‐02200‐0700‐08‐066353 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
6,340 25,360 31,700 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Procurement of
equipment 30,115
b. Services 792.5
c. Training 792.5
Total 792.5 30,115 792.5 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐02200‐0302‐066353
P‐100
Directorate General of Railway GB‐ID : GBP1‐03‐02200‐0800‐066363 1. Project Title : Procurement of Railway Track Construction and Maintenance
Machinery 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Railway, Ministry of Transportation 5. Duration : 72 months 6. Location : Java Island 7. Objectives
To increase the reliability of track by procurement of railway track construction and maintenance machinery.
8. Scope of Projects
a. Procurement of goods b. Consulting services
9. Activities Activities Implementation Locations Project Implementation Units
a. Design and supervision b. Equipment procurement and
installation
Java Island Directorate General of Railway
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Railway
51,200 6,080 57,280 Germany (KFW)
Total 51,200 6,080 57,280 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th 6th
Total
5,000 10,000 12,500 12,500 10,000 7,280 57,280 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Design and supervision 5,000
b. Equipment procurement and installation
51,200 1,080
Total 5,000 51,200 1,080 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐02200‐0408‐066363
P‐101
GB‐ID : GBP1‐03‐02200‐0700‐08‐066360 1. Project Title : Procurement of 1000 km Track Material and 200 Units Turn Out 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Railway, Ministry of Transportation 5. Duration : 36 months 6. Location : Java and Sumatera 7. Objectives
a. To increase the service level to user b. To support maintenance mechanism track and improvement of the track maintenance
quality and to prolong the used of the track and also automatically will increase safety. c. To anticipate the increasing capacity due to the signaling and double tracking project d. To support standard maintenance by using the mechanism maintenance equipment to
catch up the standard requirement 8. Scope of Projects
a. Procurement of 1500 Km Track Material, type UIC‐54 b. Procurement of 360 units Turn Out
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Procurement of 1500 Km Track Material,
type UIC‐54 b. Procurement of 360 units Turn Out
Java and Sumatera Directorate General of Railway
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Railway
102,000 19,500 121,500 China
Total 102,000 19,500 121,500 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
56,000 23,000 23,000 102,000
P‐102
GB‐ID : GBP1‐03‐02200‐0700‐08‐066360 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Procurement of 1500
Km Track Material, type UIC‐54
88,720
b. Procurement of 360 units Turn Out
13,280
Total 102,000 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐02200‐0408‐066360
P‐103
GB‐ID : GBP1‐03‐02200‐0800‐066361‐07 1. Project Title : Railway Double Tracking on Java South Line Project (Phase II‐Stage
III) 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Railway, Ministry of Transportation 5. Duration : 60 months 6. Location : Southern Java 7. Objectives
To provide sufficient transport line capacity so as to reduce traveling time and improved safety and accuracy in train operation.
8. Scope of Projects
a. Construction railway double tracking b. Consulting supervision
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Construction railway b. Procurement Consultant Supervision
Southern Java Directorate General of Railway
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Railway
76,000 ‐ 76,000 Japan (JBIC)
Total 76,000 ‐ 76,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
7,600 15,200 22,800 19,000 11,400 76,000 12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Total *) Data not available
13. Project References :
BB 2006 ‐ 2009 ID: P1‐03‐02200‐0408‐066361‐07
P‐105
Ministry of Defense
P‐107
GB‐ID : GBP1‐05‐01200‐0700‐08‐062398 1. Project Title : Improvement of Aeromedical Hospital 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Defense 4. Implementing Agency : Ministry of Defense 5. Duration : 24 months 6. Location : DKI Jakarta and Yogyakarta 7. Objectives
a. To complete the treatment equipment, so can serve treatment as maximum as possible. b. To improve the diagnostic and treatment to hospital’s patient of the outpatient department
and inpatient ward. c. To enhance the health professional capacity in diagnosis, therapy, rehabilitation and
maintenance/logistic management. 8. Scope of Projects
The availability of Aeromedical Hospital were forms of part of something prosperity on health serving the military and government officials. Therefore, there is a need to propose the adequate medical equipment relevance. Moreover, also as last diforced from district hospital where the district hospital can not take up the patient problem. So, it is very expected the availability of Aeromedical Hospital to increasing the capability on serving the military and government official as completely.
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Central surgery equipment, nervous operation
equipment, cardiology equipment, urology operation equipment, anestology equipment, teeth and mouth maintenance equipment, EKG 3 channel equipment, arthroscopy set equipment, CT scan, EEG and brain mapping, anchocardiografi and other equipment.
b. To improve the diagnostic and treatment capability to cover prevalent secondary and tertiary care problems in accordance with the level of care of each of the providers.
c. Provide training and education of all personnel on diagnostic and early treatment procedures.
DKI Jakarta/ Indonesian Wide
Indonesian Airforce
P‐108
GB‐ID : GBP1‐05‐01200‐0700‐08‐062398
Activities Implementation Locations
Project Implementation
Units d. Central surgery equipment, nervous operation
equipment, cardiology equipment, urology operation equipment, anestology equipment, teeth and mouth maintenance equipment, EKG 3 channel equipment, antroscopy set equipment, CT scan, EEG and brain mapping, anchocardiografi and other equipment.
e. To improve the diagnostic and treatment capability to cover prevalent secondary and tertiary care problems in accordance with the level of care of each of the providers.
Hardjolukito Hospital Yogyakarta
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Defense 18,000 2,000 20,000 Austria Total 18,000 2,000 20,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
13,000 7,000 20,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Component I: Aeromedical Hospital throughout Indonesia.
a. Central surgery equipment, nervous operation equipment, cardiology equipment, urology operation equipment, anestology equipment, teeth and mouth maintenance equipment, EKG 3 channel equipment, antroscopy set equipment, CT scan, EEG and brain mapping, anchocardiografi and other equipment and Civil works.
600 1,200 7,850
P‐109
GB‐ID : GBP1‐05‐01200‐0700‐08‐062398
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others b. To improve the diagnostic and
treatment capability to cover prevalent secondary and tertiary care problems in accordance with the level of care of each of the providers and civil works.
550 1,300
c. Provide training and education of all personnel on diagnostic and early treatment procedures.
1,000
Sub Total 1,150 2,500 7,850 1,000 Component II : Hardjolukito Hospital a. Procurement of central surgery
equipment, nervous operation equipment, cardiology equipment, urology operation equipment, anestology equipment, teeth and mouth maintenance equipment, EKG 3 channel equipment, arthroscopy set equipment, CT scan, EEG and brain mapping, echocardiography and other equipment and civil works.
300
650 5,550
b. Improving the diagnostic and treatment capability to cover prevalent secondary and tertiary care problems in accordance with the level of care of each of the providers.
250 750
Sub Total 550 1,400 5,550 Total 1,700 3,900 13,400 1,000
13. Project References :
BB 2006 ‐ 2009 ID: P‐05‐01200‐0202‐062398
P‐110
GB‐ID : GBP1‐07‐01200‐0700‐08‐062395 1. Project Title : Procurement of Mobile Hospital and Hospital Equipment 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Defense 4. Implementing Agency : Ministry of Defense 5. Duration : 12 months 6. Location : Nanggroe Aceh Darussalam (NAD) 7. Objectives
a. To improve the diagnostic and treatment for mobile hospital’s patient of the outpatient department and impatient ward;
b. To minimize the impacts of the insufficient health services; c. To enhance the health professional capacity in diagnosis, therapy, rehabilitation and
maintenance/logistic management; d. To increase the supporting services for the hospital care through proficient of medical
equipment, to fulfill the improvement of Army professional and other Army medical facilities.
8. Scope of Projects
The Indonesian Army has the obligation to encourage a dynamic army development in the peripheral areas, especially in isolated areas and islands, including providing health care for the people. This activity has been developed in the form of Indonesian Army civic operation which was carried out since the Tsunami tragedy in December 26, 2004. The existing medical hospital capacity is not equipped with enough equipment. The main service are : ambulatory treatment in general care, specific care on maternal and child health, minor surgery, dental health service, nutrition‐diet program and patient care. Currently, the existing medical equipment is inadequate for supporting services. Therefore, there is the need to propose the adequate medical equipment relevance for enhancing the quality of mobile hospital service specifically. This proposal includes the procurement of hospital equipment and training for logistic management.
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. The mobile hospital will be equipped with medical
facilities as operating theatre (surgery) including the necessary medical equipment
b. ICU, including the necessary medical equipment c. A nursing ward including the necessary medical
equipment 40 X‐Ray unit d. Clinical and pathological laboratory unit e. Blood Bank f. Dentistry
NAD TNI Head Quarter
P‐111
GB‐ID : GBP1‐07‐01200‐0700‐08‐062395
Activities Implementation
Locations
Project Implementation
Units g. Dispensary h. Delivery of equipment i. Pre‐installation and final installation j. Training for medical equipment user k. Provide training material and logistic management
arrange manual maintenance l. Monitoring and supervision along the utilization of
equipment m. Maintenance and repairing to assure the
equipment/good performance of the system
NAD TNI Head Quarter
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Defense 13,000 13,000 Spain Total 13,000 13,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
13,000 13,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. The mobile hospital will be equipped with medical facilities as operating theatre (surgery) including the necessary medical equipment
1,950
b. ICU, including the necessary medical equipment
1,000
c. A nursing ward including the necessary medical equipment 40 X‐Ray unit
2,850
d. Clinical and pathological laboratory unit
2050
P‐112
GB‐ID : GBP1‐07‐01200‐0700‐08‐062395
Categories (US $ 000) Detail of Activities
Services Construct‐
ions Goods Trainings Others
e. Blood Bank 100
f. Dentistry 550
g. Dispensary 750
h. Delivery of equipment 750
i. Pre‐installation and final installation 650
j. Training for medical equipment user 1,250
k. Provide training material and logistic management arrange manual maintenance
350
l. Monitoring and supervision along the utilization of equipment
350
m. Maintenance and repairing to assure the equipment/good performance of the system
400
Total 1,400 9,600 1,250 750 13. Project References :
BB 2006 ‐ 2009 ID: P‐07‐01200‐0202‐062395
P‐113
Ministry of Agricultural
P‐115
GB‐ID : GBP1‐05‐02400‐0801‐061130 1. Project Title : Combating Avian Influenza in the Field of Veterinary Medicine 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Agricultural 4. Implementing Agency : Directorate General of Livestock Services, Ministry of Agricultural 5. Duration : 36 months 6. Location : NVDAL, Bogor West Java, DIC Five Banjarbaru South Kalimantan 7. Objectives
a. To strengthen of challenge test of Avian Influenza vaccines assay in the National Veterinary Drugs Assay Laboratory (NVDAL) Laboratories.
b. To strengthen procurement of laboratory equipment and to facilitate routine testing for purpose or vaccine certification in Na VDAl Laboratories.
8. Scope of Projects
a. Construction of Laboratory BSL‐3. b. Procurement of laboratories equipment. c. Capacity Building and training
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Construction of Laboratory BSL‐3 b. Procurement of laboratories equipment c. Capacity Building and training
Bogor, West Java Directorate General of Livestock Services
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Livestock Services
4,200 ‐ 4,200 Germany
Total 4,200 ‐ 4,200 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,050 1,680 1,470 4,200
P‐116
GB‐ID : GBP1‐05‐02400‐0801‐061130 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Construction of Laboratory
BSL‐3 2,700
b. Procurement of laboratories equipment
1,000
c. Capacity Building and training
500
Total 2,700 1,000 500 13. Project References :
BB 2006 ‐ 2009 ID: T‐05‐02400‐0703‐061130
P‐117
GB‐ID : GBP1‐04‐01800‐0800‐065402 1. Project Title : Drip Irrigation Development for Horticultural Production through
Shallow Groundwater 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Agricultural 4. Implementing Agency : Directorate General for Land and Water Management, Ministry of
Agriculture 5. Duration : 36 months 6. Location : North Sumatera, Riau, West Java, Central Java, DI Yogyakarta, East
Java, Bali, NTB, South Sulawesi, North Sulawesi 7. Objectives
Immediate objectives a. To increase land productivity and cropping intensity in the rain‐fed areas trhough
providing adequate irrigation water supply at the model demonstration areas b. To achieve more efficient and effective use of irrigation water c. To increase knowledge and skill of agricultural staff in the field of agricultural farming,
particularly at the demonstration areas d. To establish self reliance of farmers in operation and maintenance of irrigation facilities e. To disseminate solar cell irrigation technology for horticultural crops production f. To minimize horticultural crop production losses as result of securing water supply
8. Scope of Projects
a. Equipment, procurement, and construction of irrigation facilities for water supply and holtucultural crop irrigation system with solar panel will be used for generating water pumps and pressure head of irrigation systems
b. To increase the establishment of Water User Association (WUA) and farmers groups c. Operation and maintenance of irrigation facilities during the project d. Training and comparative study for agricultural staffs concerned
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Institutional Strengthening b. Equipment procurement and
construction of irrigation facilities c. Operation and maintenance d. Consultant services
Project location (10 provinces)
Directorate General for Land and Water Management
P‐118
GB‐ID : GBP1‐04‐01800‐0800‐065402 10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Land and Water Management, Ministry of Agriculture
28,000 ‐ 28,000 Spain
Total 28,000 ‐ 28,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
9,240 10,360 8,400 28,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions Goods Trainings Others Drip Irrigation Development 3,500 18,000 4,150 2,350 ‐
Total 3,500 18,000 4,150 2,350 13. Project References :
BB 2006 ‐ 2009 ID: P‐04‐01800‐0403‐065402
P‐119
Indonesian National Police
P‐121
GB‐ID : GBP1‐07‐06000‐0800‐062437 1. Project Title : Integrated Trunking Radio Communication for Indonesian
National Police 2. Project Type : Project Assistance 3. Executing Agency : Indonesian National Police 4. Implementing Agency : Indonesian National Police 5. Duration : 12 months 6. Location : West Kalimantan, Central Kalimantan, South Kalimantan, and East
Kalimantan 7. Objectives
To build up an integrated Indonesian National Police radio operational communication network especially in big cities as the centers of an organized crime network.
8. Scope of Projects
The increasing criminal trend in Indonesia is happening in the big cities which need specific equipment for police communication. Prototype radio communication for big cities should comply with the operational needs of the Indonesian National Police. The main priority is to build the Indonesian National Police radio communication which has the capability to support activities of the Indonesian National Police, and to strengthen the Indonesian National Police long distance communication network by enhancing its command, coordination, communication, and information.
9. Activities
Activities Implementation Locations Project
Implementation Units
To provide radio communication equipment network in the big cities
West Kalimantan, Central Kalimantan, South Kalimantan, and East Kalimantan
Indonesian National Police
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Indonesian National Police
48,000 10,000 58,000 Korea
Total 48,000 10,000 58,000
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
58,000 58,000
P‐122
GB‐ID : GBP1‐07‐06000‐0800‐062437 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others To provide radio communication equipment network in the big cities
1,000 5,000 50,000 1,500 500
Total 1,000 5,000 50,000 1,500 500 13. Project References :
BB 2006 ‐ 2009 ID: P‐07‐06000‐0301‐062437
P‐123
GB‐ID : GBP1‐07‐06000‐0700‐08‐062439 1. Project Title : Procurement of Hospital Equipment and Mobile Hospital 2. Project Type : Project Assistance 3. Executing Agency : Indonesian National Police 4. Implementing Agency : Indonesian National Police 5. Duration : 12 months 6. Location : Nanggroe Aceh Darussalam (NAD) and North Sumatera 7. Objectives
a. To improve the diagnostic and treatment for mobile hospital’s patient of the outpatient department and inpatient ward.
b. To minimize the impact of insufficient health services. c. To enhance the health professional capacity in diagnosis, therapy, rehabilitation and
maintenance. d. To increase the supporting services for the hospital care through proficient of medical
equipment. e. To fulfill the improvement of the professional police and other police medical facilities.
8. Scope of Projects
The Indonesian National Police serves the member of police as well as communities. The existing medical hospital capacity is not equipped with enough equipment. The main services are: ambulatory treatment in general care, specific care on maternal and child health, minor surgery, dental health service, nutrition diet program and impatient care.
9. Activities
Activities Implementation Locations Project
Implementation Units Procurement of Hospital Equipment and Mobile Hospital
NAD and North Sumatera Indonesian National Police
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Indonesian National Police
21,000 3,700 24,700 Spain
Total 21,000 3,700 24,700 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
24,700 24,700
P‐124
GB‐ID : GBP1‐07‐06000‐0700‐08‐062439 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐
ions Goods Trainings Others
Procurement of Hospital Equipment and Mobile Hospital
2,500 11,500 8,000 1,500 1,200
Total 2,500 11,500 8,000 1,500 1,200 13. Project References :
BB 2006 ‐ 2009 ID: P‐07‐06000‐0301‐062439
P‐125
Indonesian Institute of Science
P‐127
GB‐ID : GBP1‐04‐07900‐0700‐08‐065451 1. Project Title : Animal Husbandry Technology and Practice Improvement to
Accelerate Meat and Milk Production (Meat‐Milk Pro) 2. Project Type : Project Assistance 3. Executing Agency : Indonesian Institute of Science 4. Implementing Agency : Research Centre for Biotechnology, Indonesian Institute of Science 5. Duration : 36 months 6. Location : Cibinong Science Centre, West Java, South Sulawesi, and West
Sumatera 7. Objectives
The objective of the project is to promote animal husbandry as a pillar industry of Indonesia’s rural economy. For this reason, the project is dedicated to build research infrastructure and facilities. The project is also aimed to build incubator facilities as a vehicle to accelerate dissemination of science and technology based innovation to the public. The project is aimed to build information system as clearing house for beef and dairy cattle activities, and to support the development of science and science base technology on livestock to boost innovation and accelerate beef and dairy cattle business and other related industry. Through the accomplishment of this objective, LIPI, by herself and through the collaboration with other research institutes, universities and stake holders should be able to promote various research programmers, accumulate basic knowledge, create technology, and improve the affectivity and efficiency of beef and dairy cattle business. It is expected that LIPI will continuously facilitate the improvement of the efficiency and affectivity of beef and dairy cattle industry and facilitate the creation of a new technology.
8. Scope of Projects
a. Capacity Building Problems in the beef and dairy cattle industry development include those related to major input sides of the industry i.e. 1) Infrastructure of science and technology of the livestock sub‐sector, 2) Human resources development, Information technology 3) Management of the services. Those three components are interconnected and
contribute to the success as well as the failure of the whole livestock industries development.
b. Intermediary mechanism institution Problems in the intermediary mechanism of livestock industry development are very much related to adoption of technology, such as through incubator a technology system, which covers: 1) Institutional networking in the livestock development, 2) Working mechanism, partnership and information flow among responsible institutions 3) Adoption of the technology (Technical service team, production team, demonstration
farm).
P‐128
GB‐ID : GBP1‐04‐07900‐0700‐08‐065451
c. Transformation Science and Technology Problems in the transformation of science and technology system, particularly in livestock development, are very much related to production systems which basically consist of: 1) Post harvest production technology, 2) Marketing and capital management 3) Institutional supports.
9. Activities
Activities Implementation
Locations Project Implementation Units
a. Research and Development (Science and technology centre), incubator technology
Cibinong Science Centre, Bogor, West Java
Research Centre for Biotechnology, Indonesian Institute of Science
Bogor Agriculture University
b. Dairy Plant Incubator West Java Provincial Livestock Services of West Java Padjadjaran University Indonesian Agricultural Technology
Assessment and Development Institute Provincial Assessment Institute of
Agricultural Technology c. Beef Plant Incubator South Sulawesi Provincial Livestock Services of South
Sulawesi Hasanuddin University Provincial Assessment Institute of
Agricultural Technology d. Beef Plant Incubator West Sumatera Provincial Livestock Services of West
Sumatera Andalas University Provincial Assessment Institute of
Agricultural Technology 10. Funding Source
Implementing Agencies Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Re ‐marks
Research Centre for Biotechnology, Indonesian Institute of Science
Bogor Agriculture University 13,116 1,792 14,908
Provincial Livestock Services of West Java Padjadjaran University Indonesian Agricultural Technology
Assessment and Development Institute Provincial Assessment Institute of
Agricultural Technology
2,864 2,864
Spain
P‐129
GB‐ID : GBP1‐04‐07900‐0700‐08‐065451
Implementing Agencies Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Provincial Livestock Services of South Sulawesi
Hasanuddin University Provincial Assessment Institute of
Agricultural Technology
1,521 1,521
Provincial Livestock Services of West Sumatera
Andalas University Provincial Assessment Institute of
Agricultural Technology
2,252 2,252
Spain
Total 19,753 1,792 21,545 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
6,139 9,841 5,565 21,545 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Research and Development Infrastructure Facilities (Science and technology centre), incubator technology
1,096.4 18,083.2
b. Human Resource Development 1,673.5 c. Program Development and
Dissemination 443.5
d. Administration 248.4 Total 443.5 1,096.4 18,083.2 1,673.5 248.4
13. Project References :
BB 2006 ‐ 2009 ID: P‐04‐07900‐0407‐065451
P‐131
National Resilience Institute
P‐133
GB‐ID : GBP1‐07‐06400‐0700‐08‐062454 1. Project Title : Strengthening the Capacity Building Program of National
Resilience Institute 2. Project Type : Project Assistance 3. Executing Agency : National Resilience Institute 4. Implementing Agency : National Resilience Institute 5. Duration : 24 months 6. Location : DKI Jakarta 7. Objectives
The project objectives aimed to toward support the implementation of project vision and mission. Therefore, this project expected to strongly support and fasten National Resilience Institute short, middle, and long term program implementation, especially to support assessment and education program.
8. Scope of Projects
National Resilience Institute is aimed to prepare and solidity national leader and also to conduct the strategic assessment about national and international issues (actual). Therefore National Resilience Institute as the prestigious course and assessment institute (think tank), requires reengineering in the organization, system and recruitment procedure, curriculum, leveraging the capacity of the human resources, assessment process, and the availability of its infrastructure in the information, especially to support assessment and education program.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Planning and analyzing of the information
policy and system b. Redesign, reconstruction and
reimplementation of system software, development tools and application software
c. Redevelopment and rehabilitation of information network infrastructure
d. Procurement and construction of hardware and network equipment supply
e. Maintenance services (update content, troubleshooting and system monitoring)
f. Developing and upgrading of the centralized database system
g. Evaluation and audit of information system and policy
h. Socialization and training for system user, administrator and supporter
DKI Jakarta National Resilience Institute
P‐134
GB‐ID : GBP1‐07‐06400‐0700‐08‐062454 10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
National Resilience Institute
9,000 2,000 11,000 Spain
Total 9,000 2,000 11,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
7,250 3,750 11,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
ServicesConstruct‐ions
Goods Train ings
Others
a. Planning and analyzing of the information policy and system
242
b. Redesign, reconstruction and reimplementation of system software, development tools and application software
2,684
c. Redevelopment and rehabilitation of information network infrastructure
935
d. Procurement and construction of hardware and network equipment supply
3,124
e. Maintenance services (update content, troubleshooting and system monitoring)
957
f. Developing and upgrading of the centralized database system
892
g. Evaluation and audit of information system and policy
1,089
h. Socialization and training for system user, administrator and supporter
858
i. Freight and Insurance 209
Total 5,874 4,059 858 209 13. Project References :
BB 2006 ‐ 2009 ID: P‐07‐06400‐0202‐062454
P‐135
Local Government of DKI Jakarta Province
P‐137
GB‐ID : GBP2‐03‐02200‐0800‐066362‐07 1. Project Title : Construction of Jakarta Mass Rapid Transit Project Phase I 2. Project Type : Project Assistance 3. Executing Agency : Local Government of DKI Jakarta Province 4. Implementing Agency : Local Government of DKI Jakarta Province 5. Duration : 60 months 6. Location : DKI Jakarta, West Java 7. Objectives
The objectives of the project are to relieve the heavy traffic congestion in the urban areas in Jakarta City by providing an efficient public transport service and transport feeder system, to enhance the urban commuter system on the existing railway and bus transport system, to reduce the environmental pollution and road traffic accidents and to support economic vitality in Jakarta City area and national development.
8. Scope of Projects
a. Engineering Services b. Construction
9. Activities
Activities Implementation Locations Project Implementation Units a. Engineering Services b. Construction
DKI Jakarta Local Government of DKI Jakarta Province
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Local Government of DKI Jakarta Province
450,000 45,000 495,000 Japan (JBIC)
Total 450,000 45,000 495,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
95,000 100,000 100,000 150,000 50,000 495,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Engineering Services 25,000
b. Construction 470,000
Total 25,000 470,000 13. Project References :
BB 2006 ‐ 2009 ID: P2‐03‐02200‐0408‐066362‐07
P‐139
Local Government of Riau Province
P‐141
GB‐ID : GBP2‐03‐03301‐0800‐067493 1. Project Title : Southern Pekanbaru Water Supply Development Project 2. Project Type : Project Assistance 3. Executing Agency : Local Government of Riau Province 4. Implementing Agency : Local Government of Riau Province 5. Duration : 24 months 6. Location : Pekanbaru, Riau 7. Objectives
The overall output this program is to increase service quality of existing systems and condition: a. Expanding the service by optimizing and building new systems b. Improving the quality of services by applying minimum standard of service c. Capacity building of PDAM human resources.
8. Scope of Projects
a. Detailed engineering design (DED) b. Human resources development program c. Rehabilitation of the distribution pipeline system and replacement the main water meter d. Renewing of the existing distribution pipeline system with the distribution pipeline.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Detail Design and Management Assistance
b. Water Treatment Plant
c. Transmission System
d. Booster Stations
e. Distribution Line f. House Connection
Pekanbaru, Riau Local Government of Riau Province
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Local Government of Riau Province
27,500 4,600 32,100 Denmark
Total 27,500 4,600 32,100 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 22,100 32,100
P‐142
GB‐ID : GBP2‐03‐03301‐0800‐067493 12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Detail Design and Management Assistance
b. Installation of Water Treatment Plant & Intake
c. Transmission System Booster Stations
d. Distribution Line
e. House Connection
f. Land Clearance
Total *) Data not available
13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐03301‐0603‐067493
P‐143
State Electricity Company (PT. PLN)
P‐145
GB‐ID : GBP3‐03‐02004‐0405‐076126 1. Project Title : Additional Loan for Labuan Angin Coal Fired Power Plant 2x115
MW North Sumatera 2. Project Type : Project Assistance 3. Executing Agency : State Electricity Company (PT. PLN) 4. Implementing Agency : State Electricity Company (PT. PLN) 5. Duration : 36 months 6. Location : North Sumatera 7. Objectives
a. To finish constructing power plant on time; b. To finishing civil works completely and safely.
8. Scope of Projects
a. Variation order i.e. site preparation (clearing, grubbing, stripping, filling and compaction); b. Redesigning and Constructing of foundation structure; c. Re‐observation sea water condition and characteristic and also redesigning and
constructing of jetty. 9. Activitie
Activities Implementation Locations Project Implementation Units Total Project North Sumatera PT. PLN
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
PT. PLN 31,783 3,178 34,961 China Total 31,783 3,178 34,961
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
29,716.85 5,244.15 34,961 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Total Project 34,961
Total 34,961 13. Project References :
BB 2006 ‐ 2009 ID: P3‐03‐02004‐0405‐076126
P‐146
GB‐ID : GBP3‐03‐02004‐0800‐076128 1. Project Title : Java Sumatera Transmission Line ‐ Engineering and Supervision
Services 2. Project Type : Project Assistance 3. Executing Agency : State Electricity Company (PT. PLN) 4. Implementing Agency : State Electricity Company (PT. PLN) 5. Duration : 72 months 6. Location : South Sumatra, Lampung, Banten and Wes Java Province 7. Objectives
a. To improve the power supply capacity in Sumatra and Java; b. To ease the stringency of power demand in both the Java system and the Sumatra system; c. To improve the reliability of power supply by interconnecting these two transmission
systems. 8. Scope of Projects
a. Review basic engineering design and specification; b. Preparation of tender document and assistance in procurement process; c. Assistance in Construction Supervision.
9. Activities
Activities Implementation Locations Project Implementation Units Engineering and Supervision Services
South Sumatra, Lampung, Banten, and West Java Province
PT. PLN
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
PT. PLN 40,000 ‐ 40,000 Japan (JBIC) Total 40,000 ‐ 40,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th 6th 7th
Total
1,533 8,369 4,341 5,790 6,921 7,220 5,826 40,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Engineering and Supervision Services
40,000
Total 40,000 13. Project References :
BB 2006 ‐ 2009 ID: P3‐03‐02004‐0405‐076128
P‐147
GB‐ID : GBP3‐03‐02004‐0800‐076129 1. Project Title : Kusan Hydro Electric Power Plant 63 MW 2. Project Type : Project Assistance 3. Executing Agency : State Electricity Company (PT. PLN) 4. Implementing Agency : State Electricity Company (PT. PLN) 5. Duration : 72 months 6. Location : South Kalimantan 7. Objectives
a. To increase power supply in South Kalimantan by 65 MW as renewable; b. To reduce oil consumption of about 83 million liter oil equivalent per‐annum; c. To improve financial performance of PT. PLN South Kalimantan area.
8. Scope of Projects
a. Preparation of Detail Design and Tender Document. b. Construction
9. Activities
Activities Implementation
Locations Project Implementation
Units Total project include study, construction , etc
South Kalimantan PT. PLN
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
PT. PLN 95,500 ‐ 95,500 Japan (JBIC)
Total 95,500 ‐ 95,500 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th 6th
Total
2,500 3,500 25,000 45,000 15,500 4,000 95,500 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Total project include study, construction , etc
3,500 87,000 5,000
Total 3,500 87,000 5,000 13. Project References :
BB 2006 ‐ 2009 ID: P3‐03‐02004‐0405‐076129
P‐148
GB‐ID : GBP3‐03‐02004‐08005‐066514 1. Project Title : Parit Baru Steam Power Plant 2. Project Type : Project Assistance 3. Executing Agency : State Electricity Company (PT. PLN) 4. Implementing Agency : State Electricity Company (PT. PLN) 5. Duration : 48 months 6. Location : West Kalimantan 7. Objectives
a. To improve reliability of electricity supply in West Kalimantan b. To reduce oil consumption for power sector and reduce production cost
8. Scope of Projects
a. Preparation Detail Design and Tender Document b. Construction of power plant 2x55 MW Benefits: a. To increase reliability of electric supply b. To reduce oil consumption c. To reduce cost production of electricity in West Kalimantan system.
9. Activities
Activities Implementation
Locations Project
Implementation Units Investment Cost Contingency Financing Charge During Development
West Kalimantan PT. PLN
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
PT. PLN 93,500 15,000 108,500 China Total 93,500 15,000 108,500
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
10,000 20,000 30,000 48,500 108,500
P‐149
GB‐ID : GBP3‐03‐02004‐08005‐066514 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Investment Cost 2,000 105,500
b. Contingency
c. Financing Charge During Development
1,000
Total 3,000 105,500 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐02004‐0405‐066514
P‐150
GB‐ID : GBP3‐03‐02004‐0800‐066502‐07 1. Project Title : Takalar Steam Coal Power Plant (2 x 100 MW) in South Sulawesi 2. Project Type : Project Assistance 3. Executing Agency : State Electricity Company (PT. PLN) 4. Implementing Agency : State Electricity Company (PT. PLN) 5. Duration : 48 months 6. Location : South Sulawesi 7. Objectives
a. To produce electric power by 2 x 100 MW b. To fulfill electric power requirement in South Sulawesi and surrounding area.
8. Scope of Projects
a. Preparation of detail design and tender document b. Construction Benefits: a. To replace oil consumption b. To increase income of PT. PLN (Persero) c. To increase reliability of electric supply.
9. Activities
Activities Implementation Locations Project Implementation
Units Total project include study, construction, supply fixed O&M etc.
South Sulawesi PT. PLN
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
PT. PLN 281,000 ‐ 281,000 Spain Total 281,000 ‐ 281,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
56,200 84,300 84,300 56,200 281,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Total project include study 281,000
Total 281,000 13. Project References :
BB 2006 ‐ 2009 ID: P‐03‐02004‐0405‐066502
P‐151
GB‐ID : GBP3‐03‐02004‐0800‐076134 1. Project Title : Upper Cisokan Pumped Storage HEPP (1000 MW) 2. Project Type : Project Assistance 3. Executing Agency : State Electricity Company (PT. PLN) 4. Implementing Agency : State Electricity Company 5. Duration : 52 months 6. Location : Cisokan, Cianjur, West Java 7. Objectives
a. To fullfil the load demands of electricity by adding 1040 MW at Jamali System in peak time. b. To provide a reliable of peaking unit in Jamali Power system. c. To increase capacity factor of based load unit especially steam coal power plants to
pumping the water energy d. To reduce oil consumption for power plants e. To reduce cost production
8. Scope of Projects
a. Preparation Detail Design and Tender Document b. Construction Benefits: a. To replace oil consumption b. To increase income of PT. PLN (Persero) c. To increase reliability of electric supply d. To reduce cost production
9. Activities
Activities Implementation Locations Project Implementation Units Total project Cisokan, Cianjur, West Java PT. PLN
10. Funding Source
Implementing Agency
Foreign Funding(US $ 000)
Counterpart Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
PT. PLN 469,473 82,848 552,321 World Bank
Total 469,473 82,848 552,321 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
27.616 82.848 165.696 193.912 82.249 552,321
P‐152
GB‐ID : GBP3‐03‐02004‐0800‐076134 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Total project include study 552,321
Total 552,321 13. Project References :
BB 2006 ‐ 2009 ID: P3‐03‐02004‐0405‐076134
TECHNICAL ASSISTANCE
T ‐ 153
National Disaster Management Agency (NDMA)
T ‐ 155
GB ID : GBT1‐03‐11200‐0801‐068006
1. Project Title : Disaster Information Sharing System for Emergency Response
2. Project Type : Technical Assistance
3. Executing Agency : National Disaster Management Agency (NDMA)
4. Implementing Agency : National Disaster Management Agency
5. Duration : 6 months
6. Location : DKI Jakarta
7. Objectives
To know needs of disaster information system for emergency response in form a hard ware and soft ware for Crisis Centre in Centre level and Provincial Level.
8. Scope of Projects
Study for Crisis Centre in Centre level and Provincial Level (some districts as sampling).
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Preparation (meeting, setting up of design
study, planning for implementation, etc). b. Implementation for study. c. Formulate for the result and
recommendation. d. Reporting.
DKI Jakarta NDMA
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
NDMA 450 ‐ 450 Japan (JICA)
Total 450 ‐ 450
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
450 450
T ‐ 156
GB ID : GBT1‐03‐11200‐0801‐068006
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Preparation b. Implementation for Study.c. Formulate for the result
and recommendation. d. Reporting.
450
Total 450
13. Project References :
BB 2006 ID: P‐03‐11200‐0302‐068006
T ‐ 157
GB ID : GBT1‐03‐11200‐0802‐068006
1. Project Title : Emergency, and Humanitarian Program (E&HP)
2. Project Type : Technical Assistance
3. Executing Agency : National Disaster Management Agency (NDMA)
4. Implementing Agency : National Disaster Management Agency
5. Duration : 48 months
6. Location : National wide
7. Objectives
To support the establishment operationalisation and enhancement of : a. Disaster Management Regional Depot in Indonesia. b. ASEAN Humanitarian Coordinating Centre for Humanitarian Assistance on Disaster
Management (AHA Centre). 8. Scope of Projects
The establishment of Disaster Management Regional Depot.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Preparation (meeting, need assessment,
planning of action, etc) b. Implementation c. Monitoring and Evaluation
12 Provinces NDMA
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
NDMA 28,050 ‐ 28,050 Australia
Total 28,050 ‐ 28,050
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
4,207.5 7,012.5 7,012.5 7,012.5 2,805 28,050
T ‐ 158
GB ID : GBT1‐03‐11200‐0802‐068006
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Preparation (meeting, need
assessment, planning of action, etc)
5,610
b. Implementation 19,635 c. Monitoring and Evaluation 2,805
Total 8,415 19,635
13. Project References :
BB 2006 ID: P‐03‐11200‐0302‐068006
T ‐ 159
GB ID : GBT1‐03‐11200‐0803‐068006
1. Project Title : Enhanced Humanitarian Response
2. Project Type : Technical Assistance
3. Executing Agency : National Disaster Management Agency (NDMA)
4. Implementing Agency : National Disaster Management Agency
5. Duration : 24 months
6. Location : National wide
7. Objectives
To support conducting for ASEAN Emergency Rapid Assessment Team (ERAT) training, ASEAN Damage and Loss Assessment Training, ASEAN Emergency Logistic Management Training.
8. Scope of Projects
Training for ASEAN ERAT, ASEAN DLA, ASEAN ELM.
9. Activities
Activities Implementation Locations Project Implementation Units
Training for ERAT, DLA, ELM Central/Provincial NDMA
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
NDMA 2,550 ‐ 2,550 Australia
Total 2,550 ‐ 2,550
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,020 1,530 2,550
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Training 2,550
Total 2,550
13. Project References :
BB 2006 ID: P‐03‐11200‐0302‐068006
T ‐ 161
Assessment and Aplication of Technology Agency (BPPT)
T ‐ 163
GB ID : GBT1‐05‐04200‐0801‐064588
1. Project Title : Microturbine Cogeneration Technology Application Project
2. Project Type : Technical Assistance
3. Executing Agency : Assessment and Aplication of Technology Agency (BPPT)
4. Implementing Agencies
: a. Deputy for Information Technology, Energy and Material, Assessment and Aplication of Technology Agency
b. Ministry of Energy and Mineral Resources
5. Duration : 60 months
6. Location : National Wide
7. Objectives
Remove barriers to the widespread application of Microturbine Cogeneration Technology (MCT) in Indonesia, through: a. Demonstration of MCT Technology and widespread information of the cost effectiveness of
MCT in power generation sector, b. Developing sustainable application of MCT by establishing the market and financial
scheme, c. Reduce the initial cost of MCT and make it a least cost alternative for energy applications in
the industrial and commercial sectors in Indonesia. 8. Scope of Projects
This project will introduce, promote, demonstrate and facilitate the marketing and application of MCT through 6 componenets: a. Technology Assessment & MCT Application Development b. MCT Demonstration& Market Development c. Technical Support to MCT Financing d. Policy & Institutional Support e. MCT Promotion f. Technical Support for Local MCT Industry
9. Activities
Activities Implementation
Locations Project
Implementation Units
a. Technology Assessment & MCT Application Development
b. MCT Demonstration & Market Development c. Technical Support to MCT Financing d. Policy and Institution Support e. MCT Promotion
Banten, Riau, West Java and East Java
BPPT and Ministry of Energy and Mineral Resources
T ‐ 164
GB ID : GBT1‐05‐04200‐0801‐064588
Activities Implementation
Locations Project
Implementation Units f. Technical Support for Local MCT Industry g. Learning and Evaluation and Adaptive
Management h. Learning Evaluation and Adaptive
Management
Banten, Riau, West Java and East Java
BPPT and Ministry of Energy and Mineral Resources
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
BPPT 2,600 ‐ 2,600 UNDP
Total 2,600 ‐ 2,600
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
50 600 700 650 600 2,600
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Introduce, promote, demonstrate and facilitate the marketing and application of MCT
2,600
Total 2,600
13. Project References :
BB 2006 ID: T‐05‐04200‐0104‐064588
T ‐ 165
Statistics Indonesia Agency (BPS)
T ‐ 167
GB ID : GBT1‐06‐05500‐0801‐068482
1. Project Title : Capacity Building on Dissemination and Use of Small Area Statistics for 2010 Population Cencus in Indonesia
2. Project Type : Technical Assistance
3. Executing Agency : Statistics Indonesia Agency (BPS)
4. Implementing Agency : Directorate of Census and Survey Methodology Development, Statistics Indonesia Agency
5. Duration : 36 months
6. Location : DKI Jakarta
7. Objectives a. Regional development through effective planning and programs by local governments
using reliable and detailed statistical data will be attained in Indonesia, particularly in remote areas.
b. Statistical capacity of staffs of central and local governments, particularly in eastern part of Indonesia will be improved.
8. Scope of Projects Development, processing and analysis of small area statistics
9. Activities Activities Implementation Locations Project Implementation Units
Equipment procurement DKI Jakarta
Training DKI Jakarta and other 3 cities
Workshop DKI Jakarta and other 12 cities
Directorate of Census and Survey Methodology Development
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate of Census and Survey Methodology Development
1,809 ‐ 1,809 Japan (JICA)
Total 1,809 ‐ 1,809
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
902 453,5 453,5 1,809
T ‐ 168
GB ID : GBT1‐06‐05500‐0801‐068482
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Equipment procurement 376
Training in and out of countries 533
Workshop 900 Total 376 533 900
13. Project References : BB 2006 ID: T‐06‐05500‐0101‐068482
T ‐ 169
Ministry of Religius Affair
T ‐ 171
GB ID : GBT1‐05‐02500‐0801‐061059
1. Project Title : Supporting Islamic Leadership through Islamic Institutions of Higher Education (SILE)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Religius Affair
4. Implementing Agency : Ministry of Religius Affair
5. Duration : 36 month
6. Location : IAIN Surabaya, UIN Makassar, IAIN Palembang, IAIN Mataram and IAIN Banjarmasin
7. Objectives The project goal at the impact level is to improve the capacity of government and civil society to develop and implement policies and programs, consistent with democratic governance principles, and in support of effective decentralization. The project purpose at the outcome level is to build the capacity of UIN/IAIN community outreach functions with local communities, as well as the capacity of the Ministry of Religious Affairs (MoRA) in order to effectively integrate democratic governance practices and issues in their strategies, programs and budgets. a. Outcome 1 is: Civil society groups (especially those representing and working with the
poorest and most marginalized) are more effective in enhancing local participation in public fora and in civic education on issues related to democratic governance at the provincial, district and sub‐district levels.
b. Outcome 2 is: UIN/IAINs are more effective in developing and planning policies, programs and systems for effective outreach.
c. Outcome 3: MoRA is more effective in developing, implementing, and monitoring policies and plans, in consultation with the UIN/IAINs, particularly in relation to their outreach functions for affected communities
8. Scope of Projects
The project will have three components: a. Enhancing Community Level Participation:
The first component of SILE will focus on enhancing participation of groups at the local level, relying on democratic governance practices. Assistance provided through the project will strengthen UIN/IAIN’s capacity to work with selected community organizations as outreach partners to support awareness raising on democratic governance. Support under this component will include, inter alia, establishment of a mechanism(s) to support small, short‐term, community‐based initiatives that respond to community needs while clearly demonstrating democratic governance principles, e.g. mobilizing community resources to support socio‐economic development, increasing local accountability, promoting inclusiveness or freedom from discrimination and enhancing women’s participation in community level consultations (musrenbang) for purposes of local government budgeting and planning.
T ‐ 172
GB ID : GBT1‐05‐02500‐0801‐061059
Community groups benefiting from support under this component will be encouraged to access resources from relevant institutions as part of a sustainability strategy. The project is expected to work in approximately 35 districts in the two provinces which would allow it to reach up to 2.8M students in the madrasahs and pesantrens and an estimated 3,500 mosques.
The component will also work directly with the UIN/IAINs to strengthen their capacity to assist local communities and organizations. This is likely to include support for the establishment of Outreach Coordination Units within the UIN/IAINs to enhance coordination of outreach activities and to encourage multidisciplinary approaches. The Canadian Executing Agency (CEA), in partnership with the UIN/IAINs, will assess these options, and others, at the project implementation stage. (Approximately $5.0M)
b. Strengthening UIN/IAINs’ internal management:
The UIN/IAINs need to strengthen their own internal management structures and practices to enhance their effectiveness and to model democratic governance practices (e.g. ensuring academic freedom, better integration of gender and social inclusion issues in programs). This component will be supported by activities such as, but not limited to, advisory assistance to senior management, Faculties and centers such as the Centers for Women’s/Gender Studies, Community Development and Communication, Research, and Social Services. The CEA, in partnership with the UIN/IAINs, will assess priority needs and develop a strategy at the project implementation stage. (Approximately $3.0M)
c. Technical Assistance to MoRA on planning and gender mainstreaming:
The project will provide technical assistance to MoRA(e.g. on policy development, planning and budgeting) to build the human and technical capacities of the Ministry’s Planning Unit. MoRA has a planning and data bureau in each directorate‐general, including the one responsible for Islamic Education which is responsible for the UIN/IAINs. There is also a planning bureau in the Secretariat‐General which has responsibilities for the whole Ministry. The latter includes the unit tasked to promote gender mainstreaming. Support offered through SILE will strengthen MoRA’s capacity to support the UIN/IAIN outreach functions as well as the Ministry’s efforts in the area of gender mainstreaming. The project will also help promote and strengthen networks among the UIN/IAINs and with Canadian universities in areas linked to the outreach functions. This component will be key to ensuring sustainability of the outreach investments. (Approximately $2.5M)
T ‐ 173
GB ID : GBT1‐05‐02500‐0801‐061059
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Strengthening democratic governance
practices at the community level b. Organizational capacity development c. Curriculum review and development d. Internships, scholarships, sabbatical
programs, exchanges and linkages e. Research and Dissemination
IAIN Surabaya, UIN Makassar, IAIN Palembang, IAIN Mataram and IAIN Banjarmasin
IAIN Surabaya, UIN Makassar, IAIN Palembang, IAIN Mataram and IAIN Banjarmasin
10. Funding Source Implementing
Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Religius Affair
18,000 ‐ 18,000 Canada
Total 18,000 ‐ 18,000
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
4,000 9,000 5,000 18,000
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Supporting Islamic Leadership through Islamic Institutions of Higher Education
900 1,800 13,500 1,800
Total 900 1,800 13,500 1,800
13. Project References : BB 2006 ID: P‐05‐02500‐1008‐061059
T ‐ 175
Ministry of Home Affairs
T ‐ 177
GB ID : GBT1‐01‐05502‐0801‐073091
1. Project Title : Support for Community Facilitator PNPM
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Home Affair
4. Implementing Agency : Directorate General of Community Development, Ministry of Home Affair
5. Duration : 12 months
6. Location : DKI Jakarta, Salatiga, Medan, Pekanbaru, Palembang, Makassar, Mataram, Manado, Sorong, Balikpapan
7. Objectives To improve and prepare the community‐based facilitators to be ready to drive empowerment program in community level.
8. Scope of Projects a. Provision of experts; b. Training: preparation and implementation; c. Network and sytem information.
9. Activities
Activities Implementation Locations Project
Implementation Units a. Coordination Meeting in National,
Regional and Local level b. Formulation of training materials
and manuals through meeting and key expert discussion
DKI Jakarta, Salatiga, Medan, Pekanbaru, Palembang, Makassar, Mataram, Manado, Sorong, Balikpapan
c. Establishment of community‐based facilitators database
DKI Jakarta
d. Training: Management Training and Training of Trainers
e. Evaluation and Reporting
DKI Jakarta, Salatiga, Medan, Pekanbaru, Palembang, Makassar, Mataram, Manado, Sorong, Balikpapan
Directorate General of Community Development
10. Funding Source Implementing
Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Community Development
2,000 ‐ 2,000 WB (Trust Fund)
Total 2,000 ‐ 2,000
T ‐ 178
GB ID : GBT1‐01‐05502‐0801‐073091
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
2,000 2,000
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
a. Expert and Support Staff Fee
320
b. Non Personal Direct Cost 1,500 c. Operational Cost 180
Total 320 1,680
13. Project References : BB 2006 ID: T1‐01‐05502‐0402‐073091
T ‐ 179
GB ID : GBT1‐01‐05502‐0802‐073091
1. Project Title : Support for PNPM Generasi
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Home Affair
4. Implementing Agency : Directorate General of Community Development, Ministry of Home Affair
5. Duration : 12 months
6. Location : West Java, East Java, North Sulawesi, Gorontalo, NTT
7. Objectives To support the pilot program through technical assistance, operational research, and communication outreach.
8. Scope of Projects PNPM Generasi is an innovative pilot program launched by ghe Government of Indonesia in July 2007, designed to accelerate achievement of three Millenium Development Goals; universal basic education; reducation in child mortality; and improvement in maternal health. Villages participating in PNPM Generasi commit to improving 12 basic health and education indicators related to antenatal and maternal care, immunizations, nutrition, and primary and junior secondary enrolment and attendance
9. Activities Activities Implementation Locations Project Implementation Units
a. Specialized technical assistance
b. Communications and Socialization Work
West Java, East Java, North Sulawesi, Gorontalo, NTT
Directorate General of Community Development, Ministry of Home Affair
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Community Development, Ministry of Home Affair
10,000 ‐ 10,000 WB (Trust Fund)
Total 10,000 ‐ 10,000
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
10,000 10,000
T ‐ 180
GB ID : GBT1‐01‐05502‐0802‐073091
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
a. Specialized technical assistance
4,000
b. Communications and socialization work
6,000
Total 10,000
13. Project References : BB 2006 ID: T1‐01‐05502‐0402‐073091
T ‐ 181
Ministry of Energy and Mineral Resources
T ‐ 183
GB ID : GBT1‐04‐05502‐0801‐075093
1. Project Title : Barrier Removal to the Cost Effective Development and Implementation of Energy Efficiency Standards and Labeling Project
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Energy and Mineral Resources
4. Implementing Agency : Directorate General of Electricity and Energy Utilization, Ministry of Energy and Mineral Resources
5. Duration : 60 months
6. Location : DKI Jakarta
7. Objectives
BRESL is aimed at rapidly accelerating the adoption and implementation of energy standard and labels (ES&L), and in so doing bring about energy savings from the use of energy efficient appliances/equipment.
8. Scope of Projects
a. ES&L Policy‐Making Program b. ES&L Capacity‐Building Program c. ES&L Manufacturer Support Program d. ES&L Regional Coordination Program e. ES&L Pilot Project
9. Activities
Activities Implementation
Locations Project
Implementation Units a. ES&L Policy‐Making Program b. ES&L Capacity‐Building Program c. ES&L Manufacturer Support Program d. ES&L Regional Coordination Program e. ES&L Pilot Project
DKI Jakarta Directorate General of Electricity and Energy Utilization, Ministry of Energy and Mineral Resources
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Electricity and Energy Utilization, Ministry of Energy and Mineral Resources
1,800 ‐ 1,800 UNDP
Total 1,800 ‐ 1,800
T ‐ 184
GB ID : GBT1‐04‐05502‐0801‐075093
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
206,0 275,3 392,8 213,6 82,3 1,800
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. ES&L Policy‐Making
Program 369,2
b. ES&L Capacity‐Building Program
484,5
c. ES&L Manufacturer Support Program
221,0
d. ES&L Regional Coordination Program
189,4
e. ES&L Pilot Project 310,9 f. Project Management 225,0
Total 369,2 221,0 484,5 725,3
13. Project References :
BB 2006 – 2009 ID: T1‐04‐05502‐0405‐075093
T ‐ 185
GB ID : GBT1‐03‐02000‐0801‐066071
1. Project Title : Development of Electrical Technician Competency Standards and Guidelines
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Energy and Mineral Resources
4. Implementing Agency : Ministry of Energy and Mineral Resources
5. Duration : 10 months
6. Location : Jakarta
7. Objectives a. To formulate competency standard guidelines; b. To cluster competency standard unit; c. To formulate qualification framework; and d. To formulate assessment guidelines in all electricity business
8. Scope of Projects
a. Investigation of data and review of regulation and competency standard unit; b. Formulation competency standard guidelines; c. Formulation qualification standard guidelines; d. Formulation assessment guidelines.
9. Activities Activities Implementation Locations Project Implementation Units
Development study Jakarta Ministry of Energy and Mineral Resources
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Energy and Mineral Resources
2,012 ‐ 2,012 Japan (JICA)
Total 2,012 ‐ 2,012
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,012 2,012
T ‐ 186
GB ID : GBT1‐03‐02000‐0801‐066071
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Development study 2,012
Total 2,012
13. Project References :
BB 2006 – 2009 ID: T‐03‐02000‐0405‐066071
T ‐ 187
GB ID : GBT1‐03‐02000‐0802‐066071
1. Project Title : Energy Conservation and Efficiency Improvement
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Energy and Mineral Resources
4. Implementing Agency : Ministry of Energy and Mineral Resources
5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives To promote national energy conservation policy
8. Scope of Projects a. Overseas training on energy conservation and efficiency improvement
9. Activities Activities Implementation Locations Project Implementation Units
Training Jakarta Ministry of Energy and Mineral Resources
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Energy and Mineral Resources
60 ‐ 60 Japan (JICA)
Total 60 ‐ 60
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
30 30 60
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Training 60
Total 60
13. Project References :
BB 2006 – 2009 ID: T‐03‐02000‐0405‐066071
T ‐ 188
GB ID : GBT1‐03‐02000‐0803‐066071
1. Project Title : The System Design and Establisment of Distribution Control System for Optimizing Management in Semarang and Bekasi (Phase II)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Energy and Mineral Resources
4. Implementing Agency : Ministry of Energy and Mineral Resources
5. Duration : 24 months
6. Location : Semarang, Central Java and Bekasi, West Java
7. Objectives a. To optimize distribution asset management utilizing modern distribution power facilities b. To establishof distribution information system based on Geological Information System
(GIS) for distribution power facilities c. To review the current system, recommend and implement proper improvent program in
pilot sites
8. Scope of Projects a. Review and investigate the current system for managing distribution facility; b. Analize the current system and provide comprehensive recommendations for establishing
distribution information system; c. System design of distribution information (DIS) in 2 pilot sites d. Establish distribution information system (DIS) in 2 pilot sites e. Investigate and recommend the most suitable distribution information system to be
installed in Indonesia f. Making a manual book for National Distribution Information System (NDIS) engineers g. Training for Indonesian managers and engineers
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Basic and detail design b. Training expense c. System establishment d. Other expense
Central Java (Semarang) and West Java (Bekasi)
Ministry of Energy and Mineral Resources
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Energy and Mineral Resources
2,600 500 3,100 Korea (KOICA)
Total 2,600 500 3,100
T ‐ 189
GB‐ID : GBT1‐03‐02000‐0803‐066071
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,000 1,100 3,100
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Basic and detail design 800 b. Training expense 100 c. System establishment 1,450 d. Other expense 750
Total 800 1,450 100 750
13. Project References :
BB 2006 – 2009 ID: T‐03‐02000‐0405‐066071
T ‐ 191
Ministry of Forestry
T ‐ 193
GB ID : GBT1‐04‐02900‐0801‐065085
1. Project Title : Comprehensive Approach for Conservation and Restoration of Ecosystems in Protected Areas
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Forestry
4. Implementing Agency : Directorate of Forest Protection and Nature Conservation, Ministry of Forestry
5. Duration : 48 months
6. Location : Selected sites among national parks and conservation areas
7. Objectives
Conservation of the biodiversity and ecosystems and nature resources utilized sustainability.
8. Scope of Projects
Capacity development of the related organization for conservation and restoration of ecosystems are strengthened, through the rehabilitation and reforestation of the degraded lands.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Formulation of structure and system to
rehabilitate and reforest of the degraded lands.
b. Development of master plan to rehabilitate and reforest of the degraded lands.
c. Pilot project of the rehabilitation and reforestation of the degraded lands
Selected sites among national parks and conservation areas
Directorate of Forest Protection and Nature Conservation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Forestry 2,122 ‐ 2,122 Japan (JICA)
Total 2,122 ‐ 2,122
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
500 600 600 422 2,122
T ‐ 194
GB ID : GBT1‐04‐02900‐0801‐065085
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Conservation and Restoration of Ecosystems
2,122
Total 2,122
13. Project References :
BB 2006 – 2009 ID: T‐04‐02900‐0405‐065085
T ‐ 195
GB ID : GBT1‐04‐02900‐0802‐065085
1. Project Title : Strategy for Strengthening Biodiversity Conservation through Appropriate National Park Management and Human Resources Development
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Forestry
4. Implementing Agency : Secretariate General, Directorate General of Forest Protection andNature Conservation, and Forestry Planning Agency, Ministry ofForestry
5. Duration : 60 months
6. Location : Bogor and Gunung Halimun – Salak National Park (GHSNP)
7. Objectives
a. Established efficient and uninterrupted planning and management through implemented activity of area designation, planning, facilitation, maintenance, management, promotion, education of national park.
b. Developed and implemented systematic training program for national park officers on efficient and uninterrupted planning and management, covering: 1) The methodology of inventory of national park potential for supporting products and
services for ecotourisme activities; 2) The methology of national park landscape planning for ecotourism activities; 3) Efficient and effective national park management; 4) Attracting people through marketing, promotion, an education regarding product and
services from national parks; 5) Empowering local guides and local interpreters surrounding the national parks; 6) Strengthening and facilitating local community participation through income
generating activities. c. Developed monitoring and evaluation system for improving national management.
8. Scope of Projects
a. Strengthen the capacity of government officers through training activities; b. Provide support for establishing nation wide national park management; c. Improve the capacity and skill set of forestry personnel in managing national parks.
T ‐ 196
GB ID : GBT1‐04‐02900‐0802‐065085
9. Activities
Activities Implementation
Locations Project Implementation Units
a. Support developing the human resource development program
b. Support building conducting system of the human resource development program and conducting the program
c. Support strengthening collaboration about conducting the human resource development program with other institution, local government, NGO, etc.
Bogor and Gunung Halimun – Salak National Park (GHSNP)
Secretariate General, Directorate General of Forest Protection and Nature Conservation, and Forestry Planning Agency, Ministry of Forestry
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding(US $ 000)
Remarks
Ministry of Forestry 4,855 ‐ 4,855 Japan (JICA)
Total 4,855 ‐ 4,855
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
855 1,000 1,000 1,000 1,000 4,855
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Strengthening Biodiversity Conservation
3,855 1,000
Total 3,855 1,000
13. Project References :
BB 2006 – 2009 ID: T‐04‐02900‐0405‐065085
T ‐ 197
Ministry of Marine Affairs and Fisheries
T ‐ 199
GB ID : GBT1‐04‐03200‐0700‐08‐065115
1. Project Title : Assistance for Small and Medium Entreprises (SMEs) in Fish and Shrimp Industry
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Marine Affairs and Fisheries
4. Implementing Agency : Directorate General for Fish Processing and Marketing, Ministry of Marine Affairs and Fisheries
5. Duration : 12 months
6. Location : East Java, North Sumatera, Lampung, South Sulawesi, East Kalimantan, and Papua
7. Objectives a. To develop, produce, sale of marketing acceptable fisheries products to increase fisheries
income for improvement of fisheries management. b. To address problem on most fishermen who are living under the poverty line. c. Promoting to develop, produce, sale of valuable fisheries products taken account of market
needs.
8. Scope of Projects a. Providing facilities of production chains of the small‐ medium fisheries enterprises in
satisfying requirements of international standard, such as cold storage, packaging, labeling; b. Setting‐up business incubator in production base areas. c. Building facilities and infrastructure of the business incubator for fisheries products. d. Setting up information networking among SMEs and between SMEs and other relevant
agencies, private sectors, industries and academics e. Developing production clusters of SMEs in given areas; f. Capacity building for fisheries business development:
1) increase SME knowledge on standard quality and safety requirements 2) increase SME capacity to promote their products 3) encourage technical and facilitate financial support for clustering small scale processor
activities to ensure long term viability. 4) strengthen the abilities of Indonesia’s small – medium scale fishermen and enterprises
in helping them to broaden and to improve their human resources [to be new exporter];
T ‐ 200
GB ID : GBT1‐04‐03200‐0700‐08‐065115
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Facility/equipment installation b. Capacity building c. Research and surveying d. Institutional strengthening e. Fisheries infrastructure for monitoring,
controlling & surveillance
East Java, North Sumatera, Lampung, South Sulawesi, East Kalimantan, Papua
Directorate for Foreign Market Development
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Fish Processing and Marketing
3,500 34 3,534 Japan (JICA)
Total 3,500 34 3,534
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
3,534 3,534
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Training and Expert 700 200
Equipment and other 900 1,500 234
Total 700 900 1500 200 234
13. Project References :
BB 2006 – 2009 ID: T‐04‐03200‐0403‐065115
T ‐ 201
GB ID : GBT1‐04‐03200‐0700‐08‐065117
1. Project Title : Sustainable Indonesia Fisheries Product Competitiveness
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Marine Affairs and Fisheries
4. Implementing Agency : Directorate General of Fish Processing and Marketing, Ministry of Marine Affairs and Fisheries
5. Duration : 12 months
6. Location : East Java, North Sulawesi, Lampung, Southeast Sulawesi, North Maluku, Papua
7. Objectives
a. To strengthen national Centre of Quality in responsible for the development of National Fisheries Safety policy
b. To design sustainable Indonesia fisheries product competitiveness for implementing suitable fisheries management
c. To improve the standard required by consumers and standard of food safety in particular in the international market.
8. Scope of Projects
a. Plan formulation in developing sustainable Indonesia fisheries product competitiveness. b. Site selection and commodities selection for sustainable fisheries product competitiveness c. Development infrastructure for ensuring the effectiveness of monitoring, controlling and
surveillance of sustainable fisheries management d. Infrastructure development for post‐harvesting in monitoring, testing and controlling
fisheries product safety and quality e. Collaboration and consultation with research institutes and academic bodies for promotion
and information network for responsible management 9. Activities
Activities Implementation
Locations Project
Implementation Units a. Plan formulation in developing sustainable
Indonesia fisheries product competitiveness; b. Site selection and commodities selection for
sustainable fisheries product competitiveness: c. Developing infrastructure for ensuring the
effectiveness of monitoring, controlling and surveillance of sustainable fisheries management;
d. Infrastructure development for post‐harvesting in monitoring, testing and
East Java, North Sulawesi, Lampung, Southeast Sulawesi, North Maluku, Papua
Directorate General of Fish Processing and Marketing
T ‐ 202
GB ID : GBT1‐04‐03200‐0700‐08‐065117
Activities Implementation
Locations Project
Implementation Units e. Collaboration and consultation with research
institutes and academic bodies for promotion and information network for responsible management
East Java, North Sulawesi, Lampung, Southeast Sulawesi, North Maluku, Papua
Directorate General of Fish Processing and Marketing
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate for Foreign Market Development
3,400 3,400 Japan (JICA)
Total 3,400 3,400
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,500 1,900 3,400
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Training 400 b. Counterpart 700 c. Equipment 500 1,000 d. Expert 200 e. Training in Japan f. Others 200 400
Total 1,100 500 1,000 200 600
13. Project References :
BB 2006 – 2009 ID: TT‐04‐03200‐0403‐065117
T ‐ 203
Ministry of Health
T ‐ 205
GB‐ID : GBT1‐05‐02400‐0702‐08‐061132
1. Project Title : Health Policy Advisor
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Health
4. Implementing Agency : Secretariat General, Ministry of Health
5. Duration : 24 months
6. Location : DKI Jakarta 7. Objectives
a. Assist The Ministry of Health to implement strategic planning and support in achieving 17 priority objectives
b. Provide assistance in coordinating Japan’s ODA on health sector for fruitful and productive implementation
c. Provide assistance in the implementation stage of collaboration between Government of Indonesia and Government of Japan in the health sector
8. Scope of Projects
a. Review and recommendation of planning and budgeting approach in health sector b. Japan’s ODA activities in health sector implementation and coordinating accordingly c. Japan’s assistance in health sector in line with national strategy
9. Activities
Activities Implementation Locations Project Implementation Units Consultant DKI Jakarta Secretariat General
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Secretariat General, Ministry of Health
256 256 Japan (JICA)
Total 256 256 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
52 104 100 256 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Consultant 256
Total 256 13. Project References : BB 2006 ‐ 2000 ID: T‐05‐02400‐0790‐061132
T ‐ 206
GB‐ID : GBT1‐05‐02400‐0701‐08‐061132
1. Project Title : Policy Analysis and Formulation in the Health Sector
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Health
4. Implementing Agency : Secretariat General , Ministry of Health
5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
Strengthening center’s for improved process in the field of policy
8. Scope of Projects
a. Strengthening CHPDA through improve process in the field of policy analysis and development that expected would strengthen significant elements of the national health system
b. Strengthening the establishment for a systematic link between the national and the decentralized level in terms of analyzing and developing policies and implementation guidelines, and identifying the funds required for their requirement s (Pilot Project)
c. Planned to function similar as a” clearing house” respectively d. Strengthen is capacity focused on competencies, human resources, budget and tested
instruments to carry pot its tasks. 9. Activities
Activities Implementation Locations Project Implementation Units a. Capacity Building (workshop,
short term training, study) b. Technical Assistance c. Equipment
Central, Provincial, Selected district
Secretariat General
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Secretariat General, Ministry of Health
2,600 ‐ 2,600 Germany (GTZ)
Total 2,600 ‐ 2,600
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
500 700 1,400 2,600
T ‐ 207
GB‐ID : GBT1‐05‐02400‐0701‐08‐061132
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Capacity Building 1,000 b. Technical Assistance 1,000 c. Equipment 600
Total 1,000 600 1,000
13. Project References : BB 2006 ‐ 2000 ID: T‐05‐02400‐0790‐061132
T ‐ 208
GB‐ID : GBT1‐05‐02400‐0700‐08‐061130
1. Project Title : Strengthening Surveillance and Response to Avian and Pandemic Influenza
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Health
4. Implementing Agency : Ministry of Health
5. Duration : 36 months
6. Location : Nation Wide
7. Objectives
To contribute to the national and global strategy of Avian Influenza Control & Human Influenza Pandemic Preparedness
8. Scope of Projects
a. Procurement and installations of manufacturing equipment and utilities b. Operational training on production and quality control capabilities
9. Activities
Activities Implementation
Locations Project Implementation Units
a. Managing Human case
b. Protection of High Risk
Directorate General of Medical Care
c. Epidemiological Surveillance of Human
Directorate General of Disease Control and Environmental Health
d. Risk Communication, Information & Public Awareness
Pusat Komunikasi Publik & Pusat Promosi Kesehatan
e. Strengthening Sustainable Management
f. Strengthening surveillance on animal & human
Directorate General of Disease Control and Environmental Health
g. Prevention & Control Directorate General of Medical Care & National Institute of Health Research & Development
h. Strengthening Health services
Nation Wide
Directorate General of Medical Care
T ‐ 209
GB‐ID : GBT1‐05‐02400‐0700‐08‐061130
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Health 21,800 ‐ 21,800 WHO & Japan (JICA)
Total 21,800 ‐ 21,800
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
7.000 7.000 7.800 21,800
12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Managing Human case b. Protection of High Risk c. Epidemiological
Surveillance of Human
d. Risk Communication, Information & Public Awareness
e. Strengthening Sustainable Management
f. Strengthening surveillance on animal & human
g. Prevention & Control h. Strengthening Health
services
Total *) Data not available
13. Project References : BB 2006 ‐ 2000 ID: T‐05‐02400‐0703‐061130
T ‐ 211
Ministry of Finance
T ‐ 213
GB‐ID : GBT1‐06‐01500‐0801‐064154
1. Project Title : Long Term Training (Tax Administration and Financial Accounting)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Finance
4. Implementing Agency : Directorate General of Taxes
5. Duration : 48 months
6. Location : DKI Jakarta
7. Objectives
To increase the capacity of government staff in field of tax intensification
8. Scope of Projects
Graduate study overseas
9. Activities
Activities Implementation Locations Project Implementation Units
Graduate study DKI Jakarta Directorate General of Taxes
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Taxes
120 ‐ 120 Japan (JICA)
Total 120 ‐ 120
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
30 30 30 30 120
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Graduate study 120
Total 120
13. Project References :
BB 2006 – 2009 ID: T‐06‐01500‐0101‐064154
T ‐ 214
GB‐ID : GBT1‐06‐01500‐0801‐064137
1. Project Title : Practical Knowledge of Foreign Affairs and International Cooperation
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Finance
4. Implementing Agencies : Center for International Cooperation (CIC) Fiscal Policy Office
5. Duration : 36 months
6. Location : DKI Jakarta
7. Objectives
To support economic, fiscal, and financial policy of GOI, especially related to international issues.
8. Scope of Projects
a. Financing all training and short course in Foreign Affairs and International Cooperation b. Financing To Master degree in International Relation to CIC officer
9. Activities
Activities Implementation Locations Project Implementation Units
Training course and graduate study
DKI Jakarta CIC Fiscal Policy Office
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding(US $ 000)
Remarks
CIC Fiscal Policy Office 40 ‐ 40 Japan (JICA)
Total 40 ‐ 40
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
20 10 10 40
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Training course 40
Total 40
13. Project References :
BB 2006 – 2009 ID: T T‐06‐01500‐0101‐064137
T ‐ 215
Ministry of Communication and Information Technology
T ‐ 217
GB‐ID : GBT1‐03‐05900‐0702‐08‐066176
1. Project Title : IT Expert Advisory Mission
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Communication and Information Technology (MoCIT)
4. Implementing Agency : Directorate General of Post and Telecommunications, MoCIT
5. Duration : 6 months
6. Location : DKI Jakarta
7. Objectives
To share IT policy experiences of Korea in telecommunications policy and provide grant IT policy for Indonesia.
8. Scope of Projects
Expert advisory mission
9. Activities
Activities Implementation Locations Project Implementation Units
Consultation Jakarta Directorate General of Post and Telecommunications
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Post and Telecommunications
300 ‐ 300 Korea (KADO)
Total 300 ‐ 300
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
300 300
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Consultation 300
Total 300
13. Project References :
BB 2006‐2009 ID : T‐03‐05900‐0409‐066176
T ‐ 218
GB‐ID : GBT1‐01‐05502‐0801‐073091
1. Project Title : Support PNPM Communication Strategy
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Communication and Information Technology (MoCIT)
4. Implementing Agency : Ministry of Communication and Information Technology (MoCIT)
5. Duration : 12 months
6. Location : National Wide
7. Objectives
To develop the communication strategy of PNPM so that the communities will actively participate and getting involved in the programs of PNPM.
8. Scope of Projects
a. To define the basic principles and focus strategy of the socialization and communication of PNPM;
b. To define the scope of communication strategy, including the characteristics of target groups, approach strategy, message strategy, channeling strategy and communicator strategy;
c. To develop the communication strategy of PNPM; d. To put the strategy into action.
9. Activities
Activities Implementation Locations
Project Implementation Units
a. Coordination Meeting in National, Regional and Local level
National Wide
b. To formulate communication strategy through meeting and key expert discussion
Jakarta
c. Personal and/or group communication through community discussion, focus group discussion and visiting the community leader
National Wide
d. To develop guidance book, leaflet and booklet of communication strategy
Jakarta
e. To conduct socialization of PNPM using both printed and electronic media such as newspaper, magazine, radio station and television, including community radio station
f. To use off‐air media such as banner, poster and so on
g. To use the traditional‐art show such as Wayang and others
h. Media visit
National Wide
Department of Communication and Information
T ‐ 219
GB‐ID : GBT1‐01‐05502‐0801‐073091
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Department of Communication and Information
2,000 ‐ 2,000 WB (Trust Fund)
Total 2,000 ‐ 2,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,000 2,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Formulation of
Socialization Material 95.2
b. Socialization through mas media
1,311.0
c. Direct Socialization 579.5 d. Monitoring and
Evaluation 13.5
Total 95.2 1,904.0
13. Project References :
BB 2006‐2009 ID: T1‐01‐05502‐0402‐073091
T ‐ 221
Ministry of Public Works
T ‐ 223
Agency for Research and Development GB‐ID : GBT1‐03‐03300‐0700‐08‐066193
1. Project Title : Capacity Development for River Basin Organizations (RBOs) in Practical Water Resources Management and Technology
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agencies
: a. Ministry of Public Works b. Research Centre for Water Resources (RCWR), Agency for
Research and Development (ARD), Ministry of Public Works
5. Duration : 36 months
6. Location : National Wide
7. Objectives
a. Study and assessment of current situation about capacity of water resources management in Indonesia
b. Empowerment of the Research Centre for Water Resources (RCWR). Function of study basin information, water allocation and effective water use, river management, infrastructural management and coordination/ participation for stakeholders will be empowered.
c. Establishment of the Dissemination Unit for Water Resources Management and Technology (DUWRMT). The unit will have functions on preparation of guidelines for RBOs in practical management and technology, training for RBOs with texts and materials, center of information on RBOs, consultation for RBOs, assistance for pilot RBOs as case study and assistance of planning RBOs projects. Empowered RCWR will assist DUWRMT in knowledge and human resources
8. Scope of Projects
a. Report on assessment of the current situation and capacity of water resources management in Indonesia
b. Establishment plan of DUWRMT and its initial operation c. Empowerment plan of RCWR and its initial operation d. Empowerment plan of DGWR and its initial operation e. Guideline for RBOs in practical water resources management f. Texts, materials, syllabus and dissemination modules for RBOs training g. Workshops on new capacity development system for RBOs
T ‐ 224
GB‐ID : GBT1‐03‐03300‐0700‐08‐066193
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Study and assessment b. Establishment plan of DUWRMT and its initial operation c. Empowerment of the RCWR and its initial operation d. Empowerment of the DWRM and its initial operation e. Guidelines f. Text and materials for RBOs Training
National Wide
g. Organizing workshops Jakarta, Solo
DGRW, ARD
10. Funding Source
Implementing AgenciesForeign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
a. DGRW b. ARD
8,641 1,296 9,937 Japan (JICA)
Total 8,641 1,296 9,937
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
1,000 3,000 4,000 1,937 9,937
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services
Construct‐ions
Goods Trainings Others
a. Study and assessment 1,500 b. Establishment plan of DUWRMT
and its initial operation 2,437
c. Empowerment of the RCWR and its initial operation
1,000
d. Empowerment of the DGWR and its initial operation
1,000
e. Guidelines 1,.500 f. Text and materials for RBOs
Training 1,500
g. Organizing workshops 1,000 Total 5,937 1,500 1,500 1,000
13. Project References : BB 2006‐2009 ID: T‐03‐03300‐0404‐066193
T ‐ 225
Directorate General for Highways GB‐ID : GBT1‐03‐03300‐0700‐08‐066210
1. Project Title : Road Policy Advisor
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Directorate General for Highways, Ministry of Public Works
5. Duration : 24 months
6. Location : DKI Jakarta 7. Objectives
To establish and implement rational and efficient road policy with decentralization process and private sector involvement to be taken into consideration.
8. Scope of Projects
a. To provide advice and/or guidance on road sector issues and to assist formulation of road policy and projects.
b. To support on‐going studies and projects for their smooth implementation. c. To foster coordination and cooperation between government agencies and private sector to
facilitate a private sector involvement in road projects. d. To enhance the capacities of local governments and of stakeholders concerned in road
administration through the technical cooperation 9. Activities
Activities Implementation Locations Project Implementation Units Advisory Jakarta Directorate General for Highways
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Highways
230 ‐ 230 Japan (JICA)
Total 230 ‐ 230 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
100 130 230 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Consultating services 230
Total 230 13. Project References :
BB 2006‐2009 ID: T‐03‐03300‐0408‐066210
T ‐ 226
Directorate General for Water Resources GB‐ID : GBT1‐03‐03306‐0800‐076045
1. Project Title : Integrated Disaster Mitigation Management for Banjir Bandang
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Directorate General for Water Resources, Ministry of Public Works
5. Duration : 36 months
6. Location : Sumatra, Java, and Sulawesi islands
7. Objectives To improve the awareness of disaster prevention and establish the disaster prevention activities as daily ones
8. Scope of Projects a. Planning the countermeasures both structural and non structural in case study sites b. Establishment of disaster mitigation management system for ‘banjir banding” c. Growing up training program for community leaders on disaster mitigation management d. Making hazard maps for communities by inhabitants e. Investigation training program with local organization and STC to improve the ability of
disaster investigation.
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Establishment of the sampling process
of hazard area of banjir bandang b. Establishment of warning and refuge
system c. Evaluation drill for the establishment
and keeping of a confineable disaster prevention system
d. Input from the recipient government
Sumatra, Java, and Sulawesi islands
Directorate General for Water Resources, Ministry of Public Works
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Water Resources
1,231 ‐ 1,231 Japan (JICA)
Total 1,231 ‐ 1,231
T ‐ 227
GB‐ID : GBT1‐03‐03306‐0800‐076045
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
400 400 431 1,231
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Individual experts 1,231
Total 1,231
13. Project References : BB 2006‐2009 ID: T1‐03‐03306‐0302‐076045
T ‐ 228
GB‐ID : GBT1‐03‐03300‐0700‐08‐066273
1. Project Title : Integrated Water Resources Management in Jabodetabek and Its Surrounding Area
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Directorate General for Water Resources, Ministry of Public Works
5. Duration : 36 months
6. Location : West Java, DKI‐Jakarta, Banten Provinces
7. Objectives a. To formulate a framework plan as a strategic plan (Pola) for integrated water resources
management in 3 territories of river basin management authorities (Projek Induk Pengembangan Wilayah Sungai ‐ PIPWS) that are: Citarum, Ciliwung‐Cisadane, Cidanau‐Ciujung‐Cidurian.
b. To formulate a master plan of use management in 3 PIPWS of Citarum‐Ciliwung‐Ciujung and existing studies and plan within the scheme of the above formulated framework plan
c. To formulate priority projects for urgent implementation d. To conduct transfer of knowledge to counterpart personnel and related local governments
and communities personnel e. To formulate a framework plan as POLA for integrated water resources management in 3
PIPWS those are Citarum, Ciliwung‐Cisadane, and Cidanau‐Ciujung‐Cidurian f. To formulate a master plan of integrated water resources management in 3 PIPWS g. To conduct transfer of knowledge to counterpart personnel and related local governments
and communities personnel
8. Scope of Projects a. To clarify their problems, constrain, impacts, and role in the existing condition of water
resources sector b. To review the existing so as to meet the current phase or situation against institution and
budgetary system, and c. To rearrange the planning sc hale of the structural components and the balance between
the structural and non structural measure to meet the current and future needs and conditions
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Phase I: Formulated of a POLA of water
resources management b. Phase II: Conduct preparation of master
plan of integrated water resources management
In 3 river basins territories (Citarum, Ciliwung‐Cisadane, and Cidanau‐Ciujung‐Cidurian
Directorate General of Water Resources
T ‐ 229
GB‐ID : GBT1‐03‐03300‐0700‐08‐066273
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Water Resources
2,000 750 2,750 Japan (JICA)
Total 2,000 750 2,750
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,000 1,000 750 2,750
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Integrated Water Resources Management in Jabodetabek and Its Surrounding Area (6 Ciʹs RB)
2,750
Total 2,750
13. Project References :
BB 2006‐2009 ID: T‐03‐03300‐0404‐066273
T ‐ 230
GB‐ID : GBT1‐03‐03300‐0700‐08‐066542
1. Project Title : Water Resources Policy Advisor
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Directorate General for Water Resources, Ministry of Public Works
5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
To assist Government of Indonesia (GOI) mainly in promoting water sector reform which GOI has been promoting under the Law on Water Resources (Law No.7 of 2004), from the standpoint of having worked in Japan that has formulated water resources management systems under the similar geomorphological and hydrological conditions to Indonesia in Asia‐monsoon region
8. Scope of Projects
a. To provide advice and/or guidance mainly on sector reform activities of the Directorate General for Water Resources and its related organizations and formation of water resources related projects
b. To support on‐going studies and projects for their smooth implementation c. To foster coordination and cooperation between agencies concerned in this sector d. To enhance the capacities and capabilities of the stakeholders concerned through the
technical cooperation 9. Activities
Activities Implementation Locations Project Implementation Units
Consultating services Jakarta Directorate General for Water Resources
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Water Resources
320 ‐ 320 Japan (JICA)
Total 320 ‐ 320
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
200 120 320
T ‐ 231
GB‐ID : GBT1‐03‐03300‐0700‐08‐066542
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Consultating services 320
Total 320
13. Project References :
BB 2006‐2009 ID: T‐03‐03300‐0690‐066542
T ‐ 233
Ministry of National Education
T ‐ 235
GB‐ID : GBT1‐05‐02300‐0801‐061529
1. Project Title : Delivering Better Education
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Education
4. Implementing Agency : a. Ministry of National Education b. Ministry of Religious Affairs c. Local Government of Aceh Province d. Local Government of Papua Province
5. Duration : 48 months
6. Location : DKI Jakarta, Aceh Province, Papua Province
7. Objectives a. To improve the quality of education services b. To improve the quality of human resources in education c. To support the development of educational policy
8. Scope of Projects a. Develop medium term of education strategic plan b. Teacher and training and certification system c. School performance management
9. Activities
Activities Implementation
Locations Project Implementation Units
a. Develop medium term of education strategic plan
b. Teacher and training and certification system
c. School performance management
DKI Jakarta, Aceh Province, Papua Province
Ministry of National Education, Ministry of Religious Affairs, Local Government of Aceh Province, Local Government of Papua Province
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of National Education, Ministry of Religious Affairs, Local Government of Aceh Province, Local Government of Papua Province
18,785 ‐ 18,785 Australia
Total 18,785 ‐ 18,785
T ‐ 236
GB‐ID : GBT1‐05‐02300‐0801‐061529
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
5,000 5,000 5,000 3,785 18,785
12. Funding Allocations *) Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
a. Develop medium term of education strategic plan
b. Teacher and training and certification system
c. School performance management
Total *) Data not available
13. Project References : BB 2006‐2009 ID: T‐05‐02300‐1006‐061529
T ‐ 237
GB‐ID : GBT1‐05‐02304‐0800‐071057
1. Project Title : Enhancement of Global Carbon Sequestration Potential from Indonesian Tropical Forest (Phase II)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Education
4. Implementing Agency : Directorate General of Higher Education, Ministry of National Education
5. Duration : 5 months
6. Location : Indonesian Region
7. Objectives a. To demonstrate the existing rate and location of deforestation in Indonesia and its impacts
on climate condition; b. To demonstrate the benefit of carbon sequestration from Indonesian‐wide reforestation on
lessening the negative impacts of climate change; c. To develop the “blue print” of a reforestation company in which the main business line is
planning and managing reforestation program; d. To implement the reforestation program in selected priorities regions; e. To extend the implementation of reforestation program to other parts of Indonesia.
8. Scope of Projects
This project is divided into three phases: a. Phase I : Preliminary study b. Phase II : Development of reforestation program an company c. Phase III : Implementation of reforestation program
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Preparation of solid baseline data for
benchmarking the achievement of reforestation program with 2007 data as the baseline
b. Projection of future carbon sequestration and its impacts on climate variability in Indonesia
c. Development of the blue print of the restoration company
d. Selection of three priority regions for implementing the reforestation program
Indonesia Regions Directorate General of Higher Education, Ministry of National
T ‐ 238
GB‐ID : GBT1‐05‐02304‐0800‐071057
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Higher Education, Ministry of National
200 ‐ 200 IDB, European Union
Total 200 ‐ 200
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
200 200
12. Funding Allocation Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Enhancement of Global Carbon Sequestration Potential
200
Total 200
13. Project References : BB 2006‐2009 ID: T‐05‐02300‐1006‐071057
T ‐ 239
GB‐ID : GBT1‐05‐02300‐0800‐061297
1. Project Title : TA for Development of the Engineering Faculty of the Hasanuddin University
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Education
4. Implementing Agency : Hasanuddin University, Makassar, South Sulawesi
5. Duration : 60 months
6. Location : Makassar, South Sulawesi
7. Objectives Engineering Faculty of Hasanuddin University becomes the main center of education, research, application and development of science and engineering faculty in eastern Indonesia.
8. Scope of Projects a. To enhance the competency of staff (teaching and laboratory staff) b. To develop learning management system, such as curriculum development, student access
to information, and lecturer soft skills as well as for students. c. To improve research of teaching staffs involve in national and international research. d. To establish a strong networking to industries, other universities and communities in
Indonesia. 9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Training for lecturer
b. Training for laboratory staff for operation and maintenance of laboratories
c. Training and collaboration for lecturers in advance research in Japan
d. Curricululum development to suit ISO
e. Syllabus improvement in specific area in engineering
f. Conducting seminars and workshops g. Joint research with industries
Makasar Hasanuddin University
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Hasanuddin University 3,584 ‐ 3,584 Japan (JICA)
Total 3,584 ‐ 3,584
T ‐ 240
GB‐ID : GBT1‐05‐02300‐0800‐061297
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
600 800 800 800 584 3,584
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
TA for Development of the Engineering Faculty of the Hasanuddin University
1,584 500 1,500
Total 1,584 500 1,500
13. Project References : BB 2006‐2009 ID: P‐05‐02300‐1006‐061297
T ‐ 241
Ministry of Trade
T ‐ 243
GB‐ID : GBT1‐02‐09000‐0700‐08‐064317
1. Project Title : Increasing the Capability of Mastering Chinese Language for Small and Medium Enterprises (SMEs) and Government Officials
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Trade
4. Implementing Agency : Indonesia Export Training Center (IETC), National Agency for ExportDevelopment , Ministry of Trade
5. Duration : 48 months
6. Location : DKI Jakarta (Central Government)
7. Objectives Strengthening the knowledge and skill of the Indonesian SMEs and government officials in business communication through Chinese Language.
8. Scope of Projects Training course of Mandarin business language.
9. Activities Activities Implementation Locations Project Implementation Units
Training for Indonesian SMEs and government officials
China IETC
10. Funding Source Implementing
Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
IETC 1,694 ‐ 1,694 China
Total 1.,694 ‐ 1,694
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
400 400 500 394 1,694
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Mandarin training 1,694
Total 1,694
13. Project References : BB 2006‐2009 ID: T‐02‐09000‐0401‐064317
T ‐ 244
GB‐ID : GBT1‐02‐03501‐0801‐074099
1. Project Title : Multi Donor Facility (MDF) for Trade and Business Climate 2. Project Type : Project Assistance 3. Executing Agency : Ministry of Trade 4. Implementing Agency : Ministry of Trade 5. Duration : 48 Months 6. Location : DKI Jakarta
7. Objectives
a. To improve national and international trade and business policies b. To improve instrument climate in Indonesia in achieving better national competitiveness
8. Scope of Projects
a. Development of experts task force in Ministry of Trade b. Capacity building in dealing with trade policy formulation c. Bureaucracy reformatin in Ministry of Trade d. Coordination among government institution related to trade and business climate e. Policy review on investment obstacles f. Improvement of investment obstacles g. Improvement of finding access of small and medium enterprises
9. Activities
Activities Implementation
Locations Project Implementation
Units
a. Development of experts task force in Ministry of Trade
b. Capacity building in dealing with trade policy formulation
c. Bureaucracy reformatin in Ministry of Traded. Coordination among government institution
related to trade and business climate e. Policy review on investment obstacles f. Improvement of investment obstacles g. Improvement of finding access of small and
medium enterprises
DKI Jakarta Ministry of Trade
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding(US $ 000)
Total of Funding(US $ 000)
Remarks
Ministry of Trade 5,000 ‐ 5,000 World Bank
Total 5,000 ‐ 5,000
T ‐ 245
GB‐ID : GBT1‐02‐03501‐0801‐074099
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
1,000 2,000 1,000 1,000 5,000
12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Construct
ions Goods Trainings Others
a. Development of experts task force in Ministry of Trade
b. Capacity building in dealing with trade policy formulation
c. Bureaucracy reformatin in Ministry of Trade
d. Coordination among government institution related to trade and business climate
e. Policy review on investment obstacles
f. Improvement of investment obstacles g. Improvement of finding access of
small and medium enterprises
TOTAL *) Data not available
13. Project References :
BB 2006 ‐ 2009 ID: T1‐02‐03501‐0401‐074099
T ‐ 246
GB‐ID : GBT1‐05‐09004‐0410‐074058
1. Project Title : Trade and Support Programme II
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Trade
4. Implementing Agency : Ministry of Trade, Ministry of Industry, Ministry of Agriculture, Ministry of Fisheries, BSN, KAN
5. Duration : 48 months
6. Location : DKI Jakarta
7. Objectives To facilitate a further integration of Indonesia into the international trade system. The specific objectives of the programme are: to improve coordination and transparency in the process for formulation and implementation of trade policy; to upgrade the quality infrastructure that supports Indonesia’s access to international markets, and to strengthen the capacity of Indonesian business associations to promote the internationalization of their members and the openness of the Indonesian economy.
8. Scope of Projects a. Integrated trade policy b. Export quality infrastructure c. Capacity building of business associations
9. Activities
Activities Implementation
Locations
Project Implementation
Units
Integrated trade policy: Technical assistance to strengthen the capacity of MOT
and relevant stakesholders to formulate trade policy for improvement of export quality infrastructure
Support the strengthening of the dialogue between MOT
TA to support the clarification of roles and responsibilities of different agencies involved in export quality infrastructure
Ministry of Trade
Export quality infrastructure: TA to develop and implementation action plans to
strengthen the capacity of export quality infrastructure agencies
TA to facilitate the access of Indonesian SMEs yo up‐to‐date technical conformity assessment and recognized testing and certification
TA improve the quality of testing laboratories
DKI Jakarta
MOT, MOF, MMAF, BSN, KAN
T ‐ 247
GB‐ID : GBT1‐05‐09004‐0410‐074058
Activities Implementation
Locations
Project Implementation
Units
TA to operate and maintain installation of laboratory equipment with accordance to EU trade policy
Capacity building of Business Associations/Civil society on management and export skills, improvement
DKI Jakarta
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
MOT, MOF, MMAF, BSN, KAN 15,000 ‐ 15,000 ADB
Total 15,000 ‐ 15,000
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
3,000 4,000 5,000 3,000 15,000
12. Funding Allocation Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
a. Technical Assistance 10,250 b. Training Logistic 900 c. Study Tours/Internatonal
Travel 650
d. Studies and Publication 550 e. Monitoring and Evaluation 150 f. Auditing 150 g. Equipment 1,775 h. Vehicles 25 i. Operating Cost 100 j. Information 200 k. Contingencies 200
Total 11,100 1,800 1,550 500
13. Project References : BB 2006‐2009 ID: T1‐05‐09004‐0410‐074058
T ‐ 249
Ministry of Transportation
T ‐ 251
Directorate General of Land Transportation GB‐ID : GBT1‐03‐02200‐0408‐066372
1. Project Title : Integrated Public Transportation Master Plan for the Bandung Metropolitan Area
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate General of Land Transportation, Ministry of Transportation
5. Duration : 36 months
6. Location : Bandung, West Java Province
7. Objectives a. To establish of urban transportation policy b. To formulate public transportation master plan c. To prepare funding schemes for public transportation system development d. To set‐up institutional and to specify the role of each level of government.
8. Scope of Projects a. Review the current master plan, blue print, and strategic plan for related institution,
ministries etc, that responsible in land transportation sub‐sector for Bandung Metropolitan Area.
b. Review past and recent studies that focused on the Land Transport Sub‐Sector Development Plan.
c. Formulating a comprehensive general plan in central, regional, and local government level for harmonizing and synchronizing in policy framework (as macro plan) and will consist of: 1) Policy framework on Land Transport Development General Plan with synchronizing to
Mid Term Development Plan of Transportation Sector. 2) Policy framework on safety management for each land transport mode.
d. Formulating implementing plan for short term/immediate plan, mid term and long term development plan for the materialization of the above general plan.
e. Strategy and program for integrated land transport development plan. f. Project identifications and project screening for immediate, short term, mid term, and long
term development plan. g. Feasibility study for high priority for sub‐project selected.
9. Activities
Activities Implementation
Locations Project Implementation Units
Development study
Bandung Directorate General of Land Transportation, Ministry of Transportation
T ‐ 252
GB‐ID : GBT1‐03‐02200‐0408‐066372
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Land Transportation
1,000 ‐ 1,000 Perancis
Total 1,000 ‐ 1,000
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
300 300 400 1,000
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Dev elopement Study 1000
Total 1000
13. Project References : BB 2006‐2009 ID: T‐03‐02200‐0408‐066372
T ‐ 253
GB‐ID : GBT1‐03‐02200‐0700‐08‐066372
1. Project Title : Program for Improvement of Transport System in Medium‐Sized Cities
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Land Transportation, Ministry of Transportation 5. Duration : 24 months
6. Location : National Wide
7. Objectives
a. To establish of urban transportation policy in medium cities b. To formulate public transportation master plan c. To prepare funding schemes for public transportation system development d. To set‐up institutional and to specify the role of each level of government
8. Scope of Projects
a. Development study b. Training
9. Activities
Activities Implementation Locations Project Implementation Units a. Development Study b. Training
National Wide Directorate General for Land Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General for Land Transportation
5,000 5,000 Germany (GTZ)
Total 5,000 5,000 11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
3,000 2,000 5,000 12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Development study 4,000 b. Training 1,000
Total 4,000 1,000 13. Project References :
BB 2006‐2009 ID: T‐03‐02200‐0408‐066372
T ‐ 254
Directorate General of Sea Transportation GB‐ID : GBT1‐02‐02204‐0800‐076062
1. Project Title : New Public Private Partnership Strategy for Port Developmnet and Management
2. Project Type : Technical Assistance 3. Executing Agency : Ministry of Transportation 4. Implementing Agency : Directorate General of Sea Transportation, Ministry of Transportation 5. Duration : 24 months
6. Location : National Wide
7. Objectives
Public Private Partnership (PPP) strategy for ports development and management will be formulated which include : a. Hierarchy of port including budgeting system b. Regulation and rule for PPP with model project c. Strategy for development of bulk cargo port with model project d. Private sector investment promotion e. Support for competition policy f. Support for economic, trade (manufacturing, natural resources)
8. Scope of Projects
a. Gathering information regarding trade and industry of Indonesia b. Gathering information regarding sea transportation c. Gathering information regarding transport policy d. Gathering information regarding port development and management policy e. Gathering information regarding decentralization and privatization f. Discussion about the problems for port development and management g. Select model projects for container transportation and natural resources h. Make a suggestion for budgeting system and port category i. Make a suggestion for strategy for port development and management j. Setting of cost allotment in regard to examination execution model projects k. Execution of profit and loss calculation
9. Activities
Activities Implementation Locations Project Implementation Units
Development Study National Wide Directorate General of Sea Transportation
T ‐ 255
GB‐ID : GBT1‐02‐02204‐0800‐076062
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Sea Transportation
1,602 ‐ 1,602 Japan (JICA)
Total 1,602 ‐ 1,602
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
602 1,000 1,602
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Consulting services 1,602
Total 1,602
13. Project References :
BB 2006‐2009 ID: T‐03‐02200‐0408‐076062
T ‐ 256
GB‐ID : GBT1‐03‐02200‐0802‐066344
1. Project Title : Port Security Management Project (Phase II)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate General of Sea Transportation (DGST), Ministry of Transportation
5. Duration : 24 months
6. Location : National Wide
7. Objectives
a. To assist DGST to make a new regulation in accordance with the amendment of the Shipping Law in which Intemational Ship Port Security (ISPS) will be included.
b. To give technical transfer to Indonesia Port Administration c. Plan‐Do‐See System including Port Facility Security Assessment (PFSA) and Port Facility
Security Plan (PFSP) to Indonesian Port Administration. d. To examine curriculums of systematic and integrated training for DGST, PELINDO, and
local government staff in charge e. To assist DGST to renew PFSPs.
8. Scope of Projects
a. Enforcement of Port Security System and Administration body b. Enhance Plan‐Do‐See System including Port Facility Security Assessment (PFSA) and Port
facility Security Plan (PFSP) c. Revision the curriculums of Trainings for DGST, PELINDO, and local government staff in
charge 9. Activities
Activities Implementation Locations Project Implementation Units
Development Study National Wide Directorate General of Sea Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Sea Transportation
9,500 ‐ 9,500 Japan (JICA)
Total 9,500 ‐ 9,500
T ‐ 257
GB‐ID : GBT1‐03‐02200‐0802‐066344
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
4,750 4,750 9,500
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Consulting services 8,500 1,000
Total 8,500 1,000
13. Project References :
BB 2006‐2009 ID: T‐03‐02200‐0408‐066344
T ‐ 258
GB‐ID : GBT1‐03‐02200‐0803‐066344
1. Project Title : Port Security System Improvement Project (Phase II)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate General of Sea Transportation, Ministry of Transportation
5. Duration : 24 months
6. Location : Sumatera, Kalimantan, Bali and Sulawesi Island
7. Objectives a. To accelerate the implementation of port security measures based on the port security
facility plans; b. To improve the Indonesian port security level; c. To transfer the technology on port security to Indonesian officers.
8. Scope of Projects a. Procurement of consultans that will arrange a plan which will improve port security. b. Consultant activities will include survey and master plan
9. Activities Activities Implementation Locations Project Implementation Units
Development Study Sumatera, Kalimantan, Bali and Sulawesi Island
Directorate General of Sea Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Sea Transportation
12,000 ‐ 12,000 Japan (JICA)
Total 12,000 ‐ 12,000
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
5000 7000 12,000
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Development Study 12,000 Total 12,000
13. Project References : BB 2006‐2009 ID: T‐03‐02200‐0408‐066344
T ‐ 259
GB‐ID : GBT1‐03‐02200‐0801‐066346
1. Project Title : Project for Improvement of Maritime Transport Safety
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate of Sea and Coast Guard, Directorate General of Sea Transportation, Ministry of Transportation
5. Duration : 24 months
6. Location : National Wide
7. Objectives
a. To Upgrade the capability of PSC officers of the Indonesian authority through technology transfer and training;
b. To Establish effective/efficient PSC implementation system such as formulation of practical PSC inspection manuals;
c. To Improve safety of maritime transport through eliminating sub‐standard ships. 8. Scope of Projects
a. Technical assistance in upgrading the capability of PSC officers of the Indonesian authority; b. Conducting survey and formulating master plan for an effective/efficient PSC inspection
manuals; 9. Activities
Activities Implementation Locations Project Implementation Units
Development Study National Wide Directorate General of Sea Transportation,
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate of Sea and Coast Guard
651 ‐ 651 Japan (JICA)
Total 651 ‐ 651
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
300 351 651
T ‐ 260
GB‐ID : GBT1‐03‐02200‐0801‐066346
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Consulting Services 300 351
Total 300 351
13. Project References :
BB 2006‐2009 ID: T‐03‐02200‐0302‐066346
T ‐ 261
GB‐ID : GBT1‐03‐02200‐0801‐066345
1. Project Title : Project for Shipping and Sea Transportation Improvement (Phase‐2)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate of Sea and Coast Guard, Directorate General of Sea Transportation, Ministry of Transportation
5. Duration : 24 months
6. Location : National Wide
7. Objectives
a. To develop a sustainable and competitive domestic shipping system. b. To facilitate the materialization of the public ship finance program that can promote
improvement/modernization of the Indonesian shipping industry. 8. Scope of Projects
a. Formulating concrete system of the public ship finance program suitable for the Indonesian domestic shipping industry
b. Promoting and improvement of ship management system that supports the public ship finance program
9. Activities
Activities Implementation Locations Project Implementation Units
Development study National Wide Directorate of Sea Traffic and Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate of Sea Traffic and Transportation
921 ‐ 921 Japan (JICA)
Total 921 ‐ 921
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
400 521 921
T ‐ 262
GB‐ID : GBT1‐03‐02200‐0801‐066345
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Consulting Services 921
Total 921
13. Project References :
BB 2006‐2009 ID: T‐03‐02200‐0408‐066345
T ‐ 263
GB‐ID : GBT1‐03‐02200‐0700‐08‐066342
1. Project Title : Strengthening Maritime Safety and Security Especially for Anti Piracy and Anti Maritime Terrorism
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate General of Sea Transportation, Ministry of Transportation
5. Duration : 24 months
6. Location : National Wide
7. Objectives a. To ensure maritime security especially in the Strait of Malacca. b. To reduce the number of pirate attack against ships in Indonesia territorial waters. c. To provide a system to prevent piracy armed robbery, and maritime terrorism. d. To provide equipments and facilities of 11 public ports facilities to comply ISPS Code
8. Scope of Projects Preliminary Report, Intermediate Report, Interim Draft Final Report, and Final Report
9. Activities
Activities Implementation Locations Project Implementation Units
Development Study National Wide Directorate General of Sea Transportation
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Sea Transportation
440 ‐ 440 Japan (JICA)
Total 440 ‐ 440
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
220 220 440
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Consulting Services 440 Total 440
13. Project References : BB 2006‐2009 ID: T‐03‐02200‐0408‐066342
T ‐ 264
Directorate General of Civil Aviation GB‐ID : GBT1‐03‐02200‐0801‐066355
1. Project Title : Introduction of New CNS/ATM System
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportations
4. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportations
5. Duration : 12 months
6. Location : Central Office Jakarta
7. Objectives
To assist Directorate General of Civil Aviation (DGAT) in implementing New Communications, Navigation Surveillance/Air Traffic Management (CNS/ATM) System based on International Civil Aviation Organisation (ICAO) Standard.
8. Scope of Projects
Expert in DGAT to help in the area of CNS/ATM
9. Activities
Activities Implementation Locations Project Implementation Units
Experts Jakarta DGAT
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
DGAT 200 ‐ 200 Japan (JICA)
Total 200 ‐ 200
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
200 200
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Expert 200
Total 200
13. Project References :
BB 2006 ‐ 2009 ID: T‐03‐02200‐0408‐066355
T ‐ 265
GB‐ID : GBT1‐03‐02200‐0801‐066529
1. Project Title : Project for Strengthening Capacity on Ensuring Safe and Efficient Aircraft Operations
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportations
4. Implementing Agency : Directorate General of Civil Aviation, Ministry of Transportation
5. Duration : 24 months
6. Location : Jakarta
7. Objectives To enforce supervision capacity for ensuring safety of air carrier operation.
8. Scope of Projects a. Expertise b. Seminar/Workshop
9. Activities
Activities Implementation Locations Project Implementation Units
a. Expertise b. Seminar/Workshop
Jakarta National Transportation Safety Committee
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
National Transportation Safety Committee
721 ‐ 721 Japan (JICA)
Total 721 ‐ 721
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
300 421 721
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
a. Expertise 350 b. Seminar/Workshop 371
Total 721
13. Project References : BB 2006 ‐ 2009 ID: T‐03‐02200‐0408‐066529
T ‐ 266
Directorate General of Railways GB‐ID : GBT1‐03‐02200‐0700‐08‐066364
1. Project Title : Bandung Urban Railway Transport Development, Electrification Padalarang ‐ Cicalengka Line (Phase I: Engineering Services)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate General of Railways, Ministry of Transportation
5. Duration : 24 months
6. Location : Bandung‐Cicalengka Line
7. Objectives
a. To enhance the quality of urban/commuter railway services in Padalarang Cicalengka line, while improving the connectivity/accessibility of intercity train services from/to Bandung.
b. To reduce the environmental impacts or pollutions due to emmisions from the roads as well as current operations of rail‐vehicles through electrification of the Padalarang ‐ Cicalengka line.
c. To support the conservation/saving the use of non‐renewable energy by the use of electricity in Bandung urban/commuter railway operation.
8. Scope of Projects
a. Detail Engineering Design of Construction b. Tender Assistance.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Detail Engineering Design of Construction Bandung b. Tender Assistance DKI Jakarta
Directorate General of Railways
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Railways
10,000 1,500 11,500 France
Total 10,000 1,500 11,500
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
7,245 4,255 11,500
T ‐ 267
GB‐ID : GBT1‐03‐02200‐0700‐08‐066364
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Detail Engineering Design of
Construction 9,775
b. Tender Assistance 1,725
Total 11,500
13. Project References :
BB 2006‐2009 ID: P‐03‐02200‐0408‐066364
T ‐ 268
GB‐ID : GBT1‐03‐02200‐0700‐08‐066369
1. Project Title : Improvement of Railway Safety Management (Phase II)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate General of Railways, Ministry of Transportation
5. Duration : 12 months
6. Location : Java and Sumatera
7. Objectives a. Improvement of safety management of administrator directing railway operator b. Strengthening of implementation system of administrator arranging the facilities of safety c. Promotion of countermeasure against accident and rule needed for safety d. Establishment of safety system
8. Scope of Projects Technical Assistant, Development Study, and Grant Financial Aid
9. Activities
Activities Implementation Locations Project Implementation Units a. Technical Assistant b. Development Study c. Grant Financial Aid
Java and Sumatera Directorate General of Railways
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Railways
1,500 1,500 Japan (JICA)
Total 1,500 1,500
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
1,500 1,500
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Development Study 1,500 Total 1,500
13. Project References : BB 2006‐2009 ID: T‐03‐02200‐0408‐066369
T ‐ 269
GB‐ID : GBT1‐03‐02200‐0700‐08‐066368
1. Project Title : Improvement of Railway System in the East Jakarta Industrial Region
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Transportation
4. Implementing Agency : Directorate General of Railways, Ministry of Transportation
5. Duration : 12 months
6. Location : DKI Jakarta
7. Objectives
Construction of the new railway branch connecting the Cibitung station area and the Klari station are of the existing railway (PT. KA, north main line connecting Jakarta and Surabaya). The estimate branch length is about 40 Km. The railway branch will cross with fly over twice with Jakarta ‐ Cikampek toll road and run in parallel through the large industrial parks and complexes such MM2100, JABABEKA, EJIP, KIIC, KIM, SCI, etc. as well as regional development towns like Delta Mas and LIPPO Cikarang. Together with the railway branch, improvement of the non railway transportation and distribution is to be considered to make the model share concept possible in the areas. It is a paramount importance to yield the multiplier effect of the project. That is, strengthening of international competitiveness in the trading business and acceleration and encouragement of foreign direct investments into the country.
8. Scope of Projects
a. Technical Assistant (expert, training, etc) b. Development Study c. Grant Financial Aid
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Technical Assistant (expert, training, etc) b. Development Study c. Grant Financial Aid
Jakarta Directorate General of Railways
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Railways
1,502 ‐ 1,502 Japan (JICA)
Total 1,502 ‐ 1,502
T ‐ 270
GB‐ID : GBT1‐03‐02200‐0700‐08‐066368
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,502 1,502
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Development Study 1,502
Total 1,502
13. Project References :
BB 2006‐2009 ID: T‐03‐02200‐0408‐066368
T ‐ 271
Ministry of Industry
T ‐ 273
GB‐ID : GBT1‐02‐01900‐0800‐064385
1. Project Title : Assesment of Indonesia Shipbuilding Industry
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Ministry of Industry
5. Duration : 6 months
6. Location : National wide
7. Objectives a. To assess the current condition of Indonesia shipbuilding industries, and their maintenance
and shipbuilding capability throughout the country. b. To assess the current: component supply chain and manufacturing capability. c. To study the possibility of establishing Indonesia Ship Design Center.
8. Scope of Projects
Assessing the shipbuilding industries by visiting the industries, government agencies, and other related industries in Indonesia
9. Activities
Activities Implementation Locations Project Implementation Units
Field study National wide Ministry of Industry
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Industry 1,500 ‐ 1,500 China
Total 1,500 ‐ 1,500
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,500 1,500
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Field study 1500
Total 1500
13. Project References :
BB 2006‐2009 ID: T‐02‐01900‐0407‐064385
T ‐ 274
GB‐ID : GBT1‐02‐01900‐0801‐064377
1. Project Title : Centre of Excellence for Food and Beverages Industry Development
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Directorate General of Agro‐based and Chemical Industry
5. Duration : 60 months
6. Location : Bogor, Cikarang, Bekasi, West Java
7. Objectives To improve and upgrading the quality and variety of product of food and beverages industry in Indonesia
8. Scope of Projects The scope of cooperation in developing food and beverages industries especially are in the field of standard and technical regulation, quality, food safety, food hygiene, testing raw material, and end‐product, R&D, process and product innovation and technological development, technical assistance, HRD training, consultancy, advisory, data and information provider and develop linkage of Indonesia and overseas business sector
9. Activities
Activities Implementation Locations Project Implementation Units Establishment Center of ExcellenceIntegrated training Consultation
West Java Directorate General of Agro‐based and Chemical Industry
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding(US $ 000)
Remarks
Ministry of Industry 500 ‐ 500 Japan (EPA)
Total 500 ‐ 500
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
100 100 100 100 100 500
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Establishment Center of Excellence 150 250 100 Total 150 250 100
13. Project References : BB 2006‐2009 ID: P‐02‐01900‐0407‐064377
T ‐ 275
GB‐ID : GBT1‐02‐01900‐0802‐064377
1. Project Title : Cooperation in Welding Sector
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Ministry of Industry
5. Duration : 60 months
6. Location : DKI Jakarta
7. Objectives To facilitate and enhance industrial infrastructure, job creation, setting up system and procedure, standardization and other
8. Scope of Projects To set up standard of competency, authorized national body and authorized training body that recognized internationally and the center of excellence for the welding namely welding center
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Basic study on the current situation of welding system
and welding technology in Indonesia b. Technical assistance /dispatch expert in welding
technology and welding scheme system c. Establishment of qualification system for welding (ISO
9606) d. Establishment of qualification system for welding and
NDT personal e. Supporting for implementation of personal
qualification f. Provision of welding text for capacity building g. Training for traners on engineering design, R&D,
testing and quality in providing h. Improving the existing of welding center by providing
the technical assistance and provision of necessary equipment to support the welding centers capability in providing engineering services to the welding industries and supporting the qualification system for welder, welding personnel, and NDT personel
DKI Jakarta Ministry of Industry
i. Conduct welding applied research j. Conduct scientific, technical economic information k. Collaboration with japan welding engineer society;
training and research
T ‐ 276
GB‐ID : GBT1‐02‐01900‐0802‐064377
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding(US $ 000)
Remarks
Ministry of Industry 2,000 ‐ 2,000 Japan (EPA)
Total 2,000 ‐ 2,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
400 400 400 400 400 2,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Cooperation in Welding Sector 1,000 1,000
Total
13. Project References :
BB 2006‐2009 ID: P‐02‐01900‐0407‐064377
T ‐ 277
GB‐ID : GBT1‐02‐01900‐0803‐064377
1. Project Title : Enhancing Capabiity of Mould and Dies Center
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Ministry of Industry
5. Duration : 60 months
6. Location : Mould and dies development center in Indonesia
7. Objectives
To strengthen and upgrade the capability of existing mould and dies technology infrastructure to support the capability of producting mould and dies and enhancing human resources capability.
8. Scope of Projects
a. Develop study and check current infrastructure capability of Indonesian mould and dies center
b. Develop programs to reintorcing and improving existing mould and dies center c. Strengthening infrastructure capability system of existing mould and dies center d. Preparing the mould and dies center to support the development of mould and dies
technology
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Strengthening capability of mould and dies center
human resources in order to support mould and dies center industry and industry which need mould and dies
b. Providing training for trainer c. Upgrading and improve the software capability on
design and produce mould and dies d. Strengthening infrastructure capability of the existing
mould and dies center e. Set up sustainability system of development mould
and dies technology with well infrastructure and expertise
Mould and dies development center in Indonesia
Ministry of Industry
T ‐ 278
GB‐ID : GBT1‐02‐01900‐0803‐064377
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding(US $ 000)
Remarks
Ministry of Industry 2,000 ‐ 2,000 Japan (EPA)
Total 2,000 ‐ 2,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
400 400 400 400 400 2,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Basic study, analysis, and
planning 500
b. Training for trainer 250 c. Training for technician 250 d. Strengthening infrastructure
capability (services) 500
e. Establish system to ensure sustainability of the development mould and dies center (services)
500
Total 1,500 500
13. Project References :
BB 2006‐2009 ID: P‐02‐01900‐0407‐064377
T ‐ 279
GB‐ID : GBT1‐02‐01900‐0804‐064377
1. Project Title : Enhancing SME Competitiveness through Implementation of SME Product Standardization
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Ministry of Industry
5. Duration : 36 months
6. Location : DKI Jakarta
7. Objectives
a. To improve the knowledge of SME entrepreneurship on quality system and product standardization
b. To enhance to ability of existing common service facility on quality system and sertification product
c. To enlarge quality system implementation on SMEs d. To increase the implementation of standardization of SME product
8. Scope of Projects
a. Implementation of quality system and SME product standardization study b. Guidance of quality system implementation and socialization c. Quality system training d. Improvement of tools and equipment testing in common facilities unit e. SMEs quality system facilitation f. Monitoring and evaluation
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Implementation of quality system and SME product
standardization study b. Guidance of quality system implementation c. socialization of quality system implementation
guidance d. quality system training e. implementation of quality system f. Product standardization g. Improvement of tools and equipment testing in
common facilities unit h. SMEs quality system facilitation i. Monitoring and evaluation
DKI Jakarta Ministry of Industry
T ‐ 280
GB‐ID : GBT1‐02‐01900‐0804‐064377
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding(US $ 000)
Remarks
Ministry of Industry 2,700 24 2,724 Japan (EPA)
Total 2,700 24 2,724
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
104 1,450 1,170 2,724
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Implementation of quality
system and SME product standardization study
54
b. Guidance of quality system implementation
25
c. socialization of quality system implementation guidance
25
d. quality system training 250 e. implementation of quality
system
300
f. Product standardization 900 g. Improvement of tools and
equipment testing in common facilities unit
850
h. SMEs quality system facilitation
300
i. Monitoring and evaluation 20
Total 2,104 370 250
13. Project References :
BB 2006‐2009 ID: P‐02‐01900‐0407‐064377
T ‐ 281
GB‐ID : GBT1‐02‐01900‐0805‐064377
1. Project Title : Implementing One Village One Product (OVOP)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Central and Reginonal Government
5. Duration : 60 months
6. Location : 33 provinces
7. Objectives
The main objectives of the implementing of OVOPapproach is to create and to promote innovative product and local creation which has local special characteristic and to increase the comopetitiveness both in national and international market
8. Scope of Projects
a. Conducting basic study b. Coordinating local and central government c. Socialization and dissemination the OVOP program in local government in whole province d. Technical assistance / dispatch experts
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Conducting basic study b. Coordinating local and central government c. Socialization and dissemination the OVOP
program in local government in whole province d. Technical assistance / dispatch experts e. Training for trainer f. Conducting seminar and workshop g. Exhibition
33 provinces Central and Reginonal Government
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Industry 500 ‐ 500 Japan (EPA)
Total 500 ‐ 500
T ‐ 282
GB‐ID : GBT1‐02‐01900‐0805‐064377
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
100 100 100 100 100 500
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Conducting basic study 100 b. Coordinating local and
central government 75
c. Socialization and dissemination the OVOP program in local government in whole province
75
d. Technical assistance / dispatch experts
75
e. Training for trainer 75 f. Conducting seminar and
workshop 50
g. Exhibition 50
Total 325 75 100
13. Project References :
BB 2006‐2009 ID: P‐02‐01900‐0407‐064377
T ‐ 283
GB‐ID : GBT1‐02‐01900‐0801‐064389
1. Project Title : Strengthening Cluster of Small and Medium Enterprise in Indonesia
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Directorate General of Small and Medium Industry
5. Duration : 60 months
6. Location : Java Islands
7. Objectives a. Improving the industrial cluster of SMIs in many provinces in Indonesia b. Improving management system in operation of the sentra c. Increasing the international market access
8. Scope of Projects Experts who have experience in promoting the cluster of SMIs, and these experts could give advice, seminar or lecturer to Indonesian official to improve Sentra and also conduct pilot project.
9. Activities
Activities Implementation Locations Project Implementation Units
Seminar, training, and pilot project
Java Islands Directorate General of Small and Medium Industry
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Small and Medium Industry
3,550 ‐ 3,550 Japan (JICA)
Total 3,550 ‐ 3,550
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
700 700 700 700 750 3,550
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Seminar, training, and pilot project 1,500 550 1,500 Total
13. Project References : BB 2006‐2009 ID: T‐02‐01900‐0407‐064389
T ‐ 284
GB‐ID : GBT1‐02‐01900‐0806‐064377
1. Project Title : Support for Standardization of Electronic Products
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Industry
4. Implementing Agency : Directorate of Electronic Industries,Ministry of Industry
5. Duration : 60 months
6. Location : Bandung, West Java and Surabaya, East Java
7. Objectives
a. To gain center for material and technical product and Baristand Surabaya Electronic testing laboratory ability in providing full quality assurance for customer electronic products
b. To make BAT and Bairstand Surabaya testing laboratory capable c. To gain capability of human resources in electronic industry d. To gain knowledge standards and directives in testing conformity of electronic product e. To enhance electronic supporting industry f. To enhance national electronic product quality
8. Scope of Projects
a. Full consumer electronic products testing b. Capability of human resources on electronic quality assurance c. Testing methods according to national and international standard d. Recognition from national accreditation body e. Recognition of BAT and Baristand Surabaya electronic laboratory as quality assurance from
IEC CB scheme 9. Activities
Activities Implementation
Locations Project
Implementation Units a. Preparation of actin plan b. Laboratory set up c. Training staff d. Accreditation from IEC CB scheme and
prepare of testing methods e. Setting up testing method f. Proteciency testing g. Expanding of scope accreditation from IEC
CB scheme
Bandung, West Java and Surabaya, East Java
Directorate of Electronic Industries,Ministry of Industry
T ‐ 285
GB‐ID : GBT1‐02‐01900‐0806‐064377
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Ministry of Industry 1,335 1,000 2,335 Japan (EPA)
Total 1,335 1,000 2,335
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
500 500 500 500 335 2,335
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Technical assistance 460 b. Training for trainer and
technician
323
c. Transport fee 30 d. Proficiency testing 30
1) sample purchasing 5
2) shipping fee 2,5
3) sample testing fee 7,5
e. IEC CB scheme accreditation and listing fee
484
Total 460 5 323 554
13. Project References :
BB 2006‐2009 ID: P‐02‐01900‐0407‐064377
T ‐ 287
Ministry of Agriculture
T ‐ 289
GB‐ID : GBT1‐05‐01800‐0801‐065405
1. Project Title : Improvement of Contermeasure on the Productive Diseases of Dairy Cattle
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Agriculture
4. Implementing Agency : Directorate General of Livestock Services, Ministry of Agriculture
5. Duration : 24 months
6. Location : West Java
7. Objectives
a. Improvement the technology of veterinary practice and dairy farming management system through the application for the small scale dairy farmers
b. Implementation the training programs for veterinary practice of local veterinary as well as paravet practitioner from dairy cooperative and extension workers for dairy farming
c. Dissemination of the veterinary practice technology and dairy farming management through the on‐farming training by collaboration with local dairy cooperative training activities with self management system for the future operation
8. Scope of Projects
a. Training b. Capacity Building c. Dissemination
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Formulate the training program for veterinary
practice and dairy farming management according to need survey of dairy farming problems;
b. Support the implementation of veterinary practice for dairy farming and dairy farming management;
c. Support to disseminate the veterinary practice technology and skill for dairy farming and dairy farming management by on‐farm training in the collaboration with the local dairy cooperative
West Java Directorate General of Livestock Services, Ministry of Agriculture
T ‐ 290
GB‐ID : GBT1‐05‐01800‐0801‐065405
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Directorate General of Processing and Marketing for Agricultural Product
1,000 ‐ 1,000 Japan (JICA)
Total 1,000 ‐ 1,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
500 500 1,000
12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Training b. Capacity Building c. Dissemination
Total *) Data not available
13. Project References :
BB 2006‐2009 ID: T‐05‐01800‐0403‐065405
T ‐ 291
GB‐ID : GBT1‐04‐01803‐0800‐075080
1. Project Title : Strengthening Plant Varietas Protection in Indonesia
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Agriculture
4. Implementing Agency : a. Center for Plant Variety Protection b. Paddy Research Institute, Sukamandi c. Balitro, Bogor d. Balitsa, Lembang e. Baltihi, Cipanas f. Center for Research in Bio‐Technology and Forestry Plants
Refinement, Yogyakarta
5. Duration : 28 months
6. Location : DKI Jakarta, West Java, and Yogyakarta
7. Objectives
a. To streamline the complete process of application for PVP, DUS testing and reporting in preparation of the act of granting of PVP right by the PVP office
b. To result in a sustainable, effective and cost efficient DUS system for plant variety registration and protection in harmony with the UPOV principles
8. Scope of Projects
a. Strengthening the existing administrative procedures and the technical DUS testing system; b. Familiarizing potential users of the PVP scheme with the on going system c. Creating further awareness and confidence in the Indonesian PVP system
9. Activities
Activities Implementation
Locations Project Implementation Units
Inception Phase, Evaluation administrative and technical system and procedure, Capacity building, Dissemination and symposia
DKI Jakarta, West Java, and Yogyakarta
Center for Plant Variety Protection, Paddy Research Institute Sukamandi, Balitro Bogor , Balitsa Lembang, Baltihi Cipanas, Center for Research in Bio‐Technology and Forestry Plants Refinement, Yogyakarta
T ‐ 292
GB‐ID : GBT1‐04‐01803‐0800‐075080
10. Funding Source
Implementing Agencies Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Center for Plant Variety Protection, Paddy Research Institute Sukamandi, Balitro Bogor , Balitsa Lembang, Baltihi Cipanas, Center for Research in Bio‐Technology and Forestry Plants Refinement, Yogyakarta
692 173 865 Netherland
Total 692 173 865
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
400 400 65 865
12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Inception Phase b. Evaluation administrative and
technical system and procedure
c. Capacity Building d. Dissemination and symposia
Total *) Data not available
13. Project References :
BB 2006‐2009 ID: T1‐04‐01803‐0403‐075080
T ‐ 293
Indonesian National Police
T ‐ 295
GB‐ID : GBT1‐07‐06000‐0800‐062524
1. Project Title : Project for Support Program for Reform of Indonesian National Police
2. Project Type : Technical Assistance
3. Executing Agency : Indonesian National Police
4. Implementing Agency : Indonesian National Police
5. Duration : 36 months
6. Location : National Wide
7. Objectives
To obtain comprehensive and knowledge about modern civilian police system obtain in other country, especially in the field of community policing, and apply/utilize the result to the reform of INP, especially at the institution participants belong to.
8. Scope of Projects Formally, separated from the Indonesia Armed Forces as of April 1, 1999 in the course of Reformation, the Indonesian National Police (hereinafter referred to as INP) were and have been unflinching endeavoring to realize a Civilian Police with serious and continuous efforts to create and/or improve its institutions, instrument/legal framework and means, and culture/human resources in order to become professional, modern and democratic.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Senior advisor to Chief of the Indonesian
National Police. b. Long term expert in the field of POLMAS
(Community Policing in Indonesian National Police)
c. Project on Enhancement of Civilian Police activities (Phase2)
d. Country focused training course in comparative study of Police system for Republic of Indonesia
e. Project on building a society with a sense of safety in Bali
f. Training on Police organization management g. Training on community policing in Indonesian
National Police
National Wide Indonesian National Police
T ‐ 296
GB‐ID : GBT1‐07‐06000‐0800‐062524
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Indonesian National Police
8,060 ‐ 8,060 Japan (JICA)
Total 8,060 ‐ 8,060
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
8,060 8,060
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Senior advisor to Chief of the
Indonesian National Police. 360
b. Long term expert in the field of POLMAS (Community Policing in Indonesian National Police)
360
c. Project on Enhancement of Civilian Police activities (Phase2)
3,750
d. Country focused training course in comparative study of Police system for Republic of Indonesia
590
e. Project on building a society with a sense of safety in Bali
3,000
f. Training on Police organization management
‐
g. Training on community policing in Indonesian National Police
‐
Total 8,060
13. Project References :
BB 2006‐2009 ID: T‐07‐06000‐0301‐062524
T ‐ 297
Indonesian Institute of Science
T ‐ 299
GB‐ID : GBT1‐04‐07900‐0800‐065452
1. Project Title : Assistance in Establishing Research Laboratory for Energy, Environment, and Natural Substances
2. Project Type : Technical Assistance
3. Executing Agency : Indonesian Institute of Science
4. Implementing Agency : Research Center for Chemistry, Indonesian Institute of Science
5. Duration : 12 months
6. Location : DKI Jakarta and West Java
7. Objectives
a. To develop a catalytic process to convert palm oil into gasoline‐like oil and selection of catalyst for the mentioned process;
b. To establish a laboratory for energy, environment and natural resources; and c. To enhance the capability of human resources in the area of energy, environment, and
natural substances through training and research cooperation.
8. Scope of Projects The scope of this project will relate to collecting these following data: a. Existing energy source that had already developed in Indonesia; b. Existing research result and on going research for potential energy source that available in
Indonesia and level of technology acceptance to local society and local environment if this potential energy source was used;
c. Existing research result and on going research in developing energy source utility and sustainability in Indonesia and level of technology acceptance of the results to local society and local environment;
d. Opinion and suggestion from researcher in Indonesia for research priorities in energy resource development;
e. Global trend in energy resource development. Those data will be analyzed in statistical method for building a solid foundation of a policy suggestion to make research priorities in energy resource development.
9. Activities
Activities Implementation Locations Project
Implementation Units
Data collecting from National and International publications
Research Centre for Chemistry LIPI.Puspiptek Serpong
Survey and Interview Surabaya, Jakarta, Jawa barat, Riau, Palembang, Medan, Banjarmasin, Palangkaraya Manado, Kupang
Research Centre for Chemistry
T ‐ 300
GB‐ID : GBT1‐04‐07900‐0800‐065452
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Counterpart Funding
(US $ 000) Total of Funding
(US $ 000) Remarks
Research Centre for Chemistry
3,000 14 3,014 Korea (KOICA)
Total 3,000 14 3,014
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
3,014. 3,014.
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
a. Collecting data from National and International publications
500
b. Human Resource Development 1,014 c. Survey and Interview 1,000 d. Analyzing data 500
Total 2,000 1,014
13. Project References :
BB 2006 ‐ 2009 ID: T‐04‐07900‐0403‐065452
T ‐ 301
Policy Agency for Government Good/Service Procurement (LKPP)
T ‐ 303
GB‐ID : GBT1‐06‐05500‐0800‐068478
1. Project Title : Electronic Government Procurement Infrastructure Development Technical Advisory
2. Project Type : Technical Assistance
3. Executing Agency : Policy Agency for Government Good/Service Procurement (LKPP)
4. Implementing Agency : Policy Agency for Government Good/Service Procurement
5. Duration : 48 months
6. Location : DKI Jakarta (Central Government)
7. Objectives a. To accelerate a vigorous national business environment; b. To provide proper allotment of national budget; c. To control corruption practices; d. To enhance the competency of procurement professionals and the awareness of general
public.
8. Scope of Projects Scope of the project includes first, developing a nation‐wide Electronic Government Procurement (E‐GP) Master Plan. The master plan is particularly aimed for guiding the development of E‐GP to comply with concept, planning and implementation of electronic government in the future such as e‐transaction, e‐payment, e‐contracting. Second, to ensure the entire of E‐GP transaction is secure, legitimate and reliable, the project is yielding the master plan of public key infrastructure as a security system. Procuring Information and Communication Technology (ICT) facilities are aimed for reducing lack of ICT facilities and its distribution particularly for regional level in order to ease, advocate and convince (local) government institution (users) and entrepreneurs (providers) to implement E‐GP. To encourage users and providers to utilize the E‐GP system, the Government will provide systematic training and to promote the society to participate actively for monitoring procurement process the Government is conducting workshop and seminars for gaining public awareness.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Consultancy Services for developing E‐GP
Nation‐Wide Master Plan b. Consultancy Service for developing Public Key
Infrastructure c. Procuring ICT Hardware and Software (as
needed)
DKI Jakarta
d. Trainings e. Seminars/Workshop
DKI Jakarta and other province/ districts location
LKPP
T ‐ 304
GB‐ID : GBT1‐06‐05500‐0800‐068478
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
LKPP 6,000 6,000 Japan (JICA)
Total 6,000 6,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,000 4,000 6,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Consultancy Services for
developing E‐GP Nation‐Wide Master Plan
1,500
b. Consultancy Service for developing Public Key Infrastructure
1,500
c. Procuring ICT Hardware and Software (as needed)
2,000
d. Trainings 850 e. Seminars/Workshop 150
Total 3,000 2,000 850 150
13. Project References :
BB 2006 – 2009 ID: T‐06‐05500‐0101‐068478
T ‐ 305
Ministry of Environment
T ‐ 307
GB‐ID : GBT1‐04‐04300‐0800‐065586
1. Project Title : Waste Management and Recycle for Building Resources Circulation Society
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of Environment
4. Implementing Agency : Bureau for Planning and International Cooperation, Ministry of Environment, Ministry of Environment
5. Duration : 48 months
6. Location : Jakarta
7. Objectives To increase the capacity of Ministry of Environment staff in waste management, mainly in sociological environment management
8. Scope of Projects Graduate study overseas in field of waste management
9. Activities Activities Implementation Locations Project Implementation Units
Graduate Study scholarship
DKI Jakarta Bureau for Planning and International Cooperation, Ministry of Environment
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Bureau for Planning and International Cooperation
120 ‐ 120 Japan (JICA)
Total 120 ‐ 120
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
30 30 30 30 120
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Graduate study overseas 120 Total 120
13. Project References : BB 2006‐2009 ID: T‐04‐04300‐0590‐065586
T ‐ 309
Ministry of National Development Planning/ National Development Planning Agency
(BAPPENAS)
T ‐ 311
GB‐ID : GBT1‐06‐05500‐0801‐068475‐07
1. Project Title : Aid Information Management System
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Deputy for Development Funding, Bappenas
5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
To support GOI and development partners to accelerate management of external assistances in effective and efficient way, through development of a single management information system in planning, preparation, implementation and monitoring and evaluation of external assistances.
8. Scope of Projects Scope of works for this services are as follows, but not limited to : a. Identification of external assistances report format of development partners in supporting
GOI’s economic development. b. Standardize report of external assistance and its workflow of involved parties
(development partners and GOI agencies) in order to support transparent process. c. Development of Management Information System in reporting of external assistance that
will include planning, implementation, and monitoring and evaluation process. d. Develop database and its user friendly manual of external assistances to support
management information system in reporting of external assistances. e. Develop training program to increase capabilities of stakeholders officers in
implementation of the management information system. 9. Activities
Activities Implementation Locations Project Implementation Units
Development of management information system
DKI Jakarta Deputy for Development Funding, Bappenas
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy for Development Funding, Bappenas
500 15 515 Jerman (KfW)
Total 500 15 515
T ‐ 312
GB‐ID : GBT1‐06‐05500‐0801‐068475‐07
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
265 250 515
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Develop MIS 180 b. Develop Database 300 c. Training 35
Total 480 35
13. Project References :
BB 2006‐2009 ID: T1‐06‐05500‐0101‐068475‐07
T ‐ 313
GB‐ID : GBT1‐02‐05500‐0800‐064476
1. Project Title : Capacity Building in Trade Liberazation Analysis
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Deputy for Economic, Bappenas
5. Duration : 36 Months
6. Location : DKI Jakarta
7. Objectives
The objectives of this project are: (i) to build the capacity of government officials in analyzing and evaluating the impacts of trade liberalization on a country, (ii) to get other countries’ experiences in analyzing and optimizing gains from trade liberalization, and (iii) to analyze the advantages and disadvantages of multilateral, regional, and bilateral trade agreements.
8. Scope of Projects Providing training and comparative study to several government officials who involve in trade policy formulation and analysis.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Learn theoretical frameworks of international
trade and trade liberalization that are important for international trade analysis and policy formulation
b. sharing other countries’ experiences in trade liberalization analysis
c. Courses on analyzing the various impacts of multilateral, regional, and bilateral trade liberalization
d. Courses on analyzing the potentials and barriers of Indonesian exports (in terms of supply and demand in each sector) to other countries in the framework of multilateral, regional, and bilateral trade arrangements
e. Visits to several institutions involving in trade liberalization for sharing some experiences and knowledge in assessing the benefits and drawbacks of trade liberalization agreement, as well as to learn how the institutions are managed.
DKI Jakarta Deputy for Economic, Bappenas
T ‐ 314
GB‐ID : GBT1‐02‐05500‐0800‐064476
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy for Economic, Bappenas
1,000 ‐ 1,000 Korea (KOICA)
Total 1,000 ‐ 1,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
300 300 400 1,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Training and Comparative Study
300 700
Total 300 700
13. Project References :
BB 2006‐2009 ID: T‐02‐05500‐0101‐064476
T ‐ 315
GB‐ID : GBT1‐06‐05500‐0802‐068482
1. Project Title : Decentralization Support Facility (DSF)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Bappenas, Ministry of Finance, and Ministry of Home Affairs
5. Duration : 36 months
6. Location : National Wide
7. Objectives
Assisting GoI’s efforts to implement systematic and coherent decentralization, using a harmonized, and aligned appropriate international development framework. The overall goal of DSF Programmes is to ensure that decentralization is effective and results in improvement services delivery for all citizens.
8. Scope of Projects The scope of this project is in decentralization process in Indonesia, especially in these 4 areas: a. Public services b. Fiscal decentralization and capacity development c. Government reform d. Planning and performance measurement.
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Study/survey for policy development b. National workshop c. Database system development support d. Monitoring and evaluation e. Capacity building f. Supporting activity for its program
National Wide Bappenas, Ministry of Finance, and Ministry of Home Affairs
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
20,000 ‐ 20,000 Australia (AUSAID)
Total 20,000 ‐ 20,000
T ‐ 316
GB‐ID : GBT1‐06‐05500‐0802‐068482
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
600 700 700 20,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Study/survey for policy
development 300
b. National workshop 400 c. Database system
development support 300
d. Monitoring and evaluation 400 e. Capacity building 300 f. Supporting activity for its
program 300
Total 17,000 300
13. Project References :
BB 2006‐2009 ID: T‐06‐05500‐0101‐068482
T ‐ 317
GB‐ID : GBT1‐06‐05500‐0803‐068482
1. Project Title : Delivery Improvement and Local Governance (DIALOG)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Bappenas, Ministry of Finnance, Ministry of Home Affairs, Local Governments, and Universities/NGOs
5. Duration : 48 months
6. Location : Eastern Indonesia
7. Objectives
The primary objective of DIALOG is to improve the quality of public service delivery and public financial management in the participating regions through: a. Plotting an incentive system for local government based on their performance
improvements, congruent to the task and reposibilities of each level of government; and b. Operationalizing local government’s performance monitoring and evaluation system, based
on existing framework, for central and provincial government to use.
8. Scope of Projects a. Government and service delivery reform b. District block grant c. Capacity building and technical assistance d. Implementing support, monitoring, and evaluation
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Government and service delivery reform b. District block grant c. Capacity building and technical assistance d. Implementing support, monitoring, and
evaluation
Eastern Indonesia Bappenas, Ministry of Finnance, Ministry of Home Affairs, Local Governments, and Universities/NGOs
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Bappenas 3,066 60 3,126
Local government 11,530 7,535 19,065
Universities/NGO 3,950 ‐ 3,950
World Bank 2,502 ‐ 2,502
Australia (AUSAID)
Total 21,048 7,595 28,643
T ‐ 318
GB‐ID : GBT1‐06‐05500‐0803‐068482
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
904 4,775 7,869 6,080 1,420 21,048
12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Total *) Data not available
13. Project References :
BB 2006‐2009 ID: T‐06‐05500‐0101‐068482
T ‐ 319
GB‐ID : GBT1‐06‐05500‐0802‐068475‐07
1. Project Title : Enhancing Capacity for Better Aid Management (ECBAM)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Deputy for Development Funding Affairs, Bappenas
5. Duration : 36 months
6. Location : Jakarta
7. Objectives
To support the government to address capacity problems in aid management through activities mainly in skill development and policy advisory.
8. Scope of Projects a. Improving Bappenas capacity to develop a better aid policy to be aligned with national
priority b. Improving Bappenas capacity in managing foreign aid (loan/grant) c. Improving human resources capacity of Bappenas
9. Activities
Activities Implementation
Locations Project Implementation
Units a. Training/workshops b. Consulting services and advisory c. Policy study and evaluation
Jakarta Deputy for Development Funding Affairs, Bappenas
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy for Development Funding Affairs, Bappenas
600 ‐ 600 UNDP
Total 600 ‐ 600
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
200 200 200 600
T ‐ 320
GB‐ID : GBT1‐06‐05500‐0802‐068475‐07
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Training workshops 30 25 270
b. Consulting advisory 120 15
c. Study and evaluation 120 20
Total 270 60 270
13. Project References :
BB 2006‐2009 ID: T1‐06‐05500‐0101‐068475‐07
T ‐ 321
GB‐ID : GBT1‐05‐04300‐0800‐065462
1. Project Title : Environmental Governance and Sustainable Livehoods Programme in Sulawesi, Indonesia
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Local Government of all Provinces in Sulawesi
5. Duration : 60 months
6. Location : Sulawesi
7. Objectives
a. To improve environmental and natural resources governance in selected watershed in Sulawesi
b. To reduce poverty through increased sustainable livelihood apportunities and well being for poor rural men, women, boys, and girls in selected intersheds in Sulawesi
8. Scope of Projects
a. Capacity buildings of key stakeholders, involving men and women, to take action on priority environmental and natural resources and maritim issues affecting communities in selected watersheds, both at the community and watershed levels;
b. Development and implementation of natural resources and maritime (NRM) solutions on a partnership basis by key stakeholders, involving men and women, at the community and watershed levels.
c. Strengthened natural resource governance structures and processes, institutionalized by village, district and provincial governments:
d. Adaptation of structures and processes for improved environmental and natural resources governance, by government and/or other authorities, both at community and watershed levels, and policy linkages to these local innovations.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Capacity buildings b. Development and implementation of NRM c. Strengthened natural resource governance
structures and processes d. Adaptation of structures and processes
Sulawesi Provincial Local Government in Sulawesi
T ‐ 322
GB‐ID : GBT1‐05‐04300‐0800‐065462
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Provincial Local Government in Sulawesi
20,000 ‐ 20,000 Canada
Total 20,000 ‐ 20,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
4,000 4,000 4,000 4,000 4,000 20,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Environmental Governance and Sustainable Livehoods Programme
20,000
Total 20,000
13. Project References :
BB 2006‐2009 ID: T‐05‐04300‐0504‐065462
T ‐ 323
GB‐ID : GBT1‐01‐05501‐0800‐076089
1. Project Title : Indonesia Slum Alleviation Policy and Action Plan (SAPOLA)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (Bappenas)
4. Implementing Agency : Ministry of National Development Planning/National Development Planning Agency
5. Duration : 24 months
6. Location : National Wide
7. Objectives
To develop national policies strategies on reduction of slum areas and improvement of their living condition. This will included a clear share of roles and responsibilities between national and local government in promoting the upgrading of slum areas, followed by program to develop adequate housing and supported facilities in urban areas
8. Scope of Projects
a. Study for development of a national framework policy and a strategy manual fo local government
b. Establishment of a national working group on slum upgrading c. Reviewing the national policy and strategy in slum alleviation
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Draft policy desk‐studies b. Informal Settlement Mapping: c. Assessment of Local Conditions d. Development of a policy framework for
slum upgrading in urban areas. e. Creation of a policy implementation scheme
for local governments. f. National Working Group Development. g. Pilot project
National Wide Bappenas
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Bappenas 1,100 320 1,420 World Bank
Total 1,100 320 1,420
T ‐ 324
GB‐ID : GBT1‐01‐05501‐0800‐076089
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
710 710 1,420
12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Draft policy desk‐studies b. Informal Settlement
Mapping:
c. Assessment of Local Conditions
d. Development of a policy framework for slum upgrading in urban areas.
e. Creation of a policy implementation scheme for local governments.
f. National Working Group Development.
g. Pilot project
Total *) Data not available
13. Project References :
BB 2006‐2009 ID: T1‐01‐05501‐0410‐076089
T ‐ 325
GB‐ID : GBT1‐03‐05501‐0800‐076090
1. Project Title : Indonesia Water and Sanitation Policy and Action Planning Facility (Phase III)
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agencies : a. Deputy of Bappenas for Poverty, Manpower, and SME, Ministry of National Development Planning (Bappenas)
b. Ministry of Public Works, c. Ministry of Health, d. Ministry of Home Affairs, e. Ministry of Finance f. Ministry of Environment
5. Duration : 48 months
6. Location : Eastern Indonesia
7. Objectives
a. To develop Water Supply and Environmental Sanitation (WSES) policies in response to evolving political, economic, social and technological context and best practice.
b. To develop improved systems and procedures for implementation of WSES policies. c. To strengthen sector functions, with emphasis on coordination and communication,
knowledge management, human resource development and Monitoring and Evaluation (M&E).
8. Scope of Projects a. Development WSES policies in response to evolving political, economic, social and
technological context and best practice b. Development improved systems and procedures for implementation of WSES policies. c. Strengthening sector functions, with emphasis on coordination and communication,
knowledge management, human resource development and M&E. 9. Activities
Activities Implementation
Locations Project Implementation Units
a. Policy development b. Policy implementation c. Sector management d. Project management
Eastern Indonesia a. Deputy of Bappenas for Poverty, Manpower, and SME, Bappenas
b. Ministry of Public Works, c. Ministry of Health, d. Ministry of Home Affairs, e. Ministry of Finance Ministry of
Environment
T ‐ 326
GB‐ID : GBT1‐03‐05501‐0800‐076090
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
8,800 250 9,050 World Bank
Total 8,800 250 9,050
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
2,300 2,300 2,300 2,150 9,050
12. Funding Allocations *)
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Policy development b. Policy implementation c. Sector management d. Project management
Total *) Data not available
13. Project References :
BB 2006‐2009 ID: T1‐03‐05501‐0605‐076090
T ‐ 327
GB‐ID : GBT1‐02‐05500‐0801‐064477
1. Project Title : Innovation Policy Framework for Small and Medium Enterprises
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agencies : a. BAPPENAS b. SME Inovation Center c. Agency for Assessment and Application Technology (BPPT)
5. Duration : 18 months
6. Location : DKI Jakarta
7. Objectives
a. Aims at developing an innovation policy framework for providing support and mechanism for promoting technology‐based entrepreneurship
b. To Strengthen the role of the SME innovation center in facilitating the cooperation between the government (central and local level)
8. Scope of Projects
a. Specifying and evaluating support measures provided by central and local government b. Review stakeholder to be involve for maximum synergy in technology development and
dissemination for SMEs c. Specifying and evaluating government owned research and developing institution d. Specifying and evaluating the role of SME innovation center with regards to the promoting
of technology based entrepreneurship e. Evaluating the supply and demand sides of technology for small and medium scale
business f. Developing a policy framework related to innovations for SMEs and entrepreneurship
promotion g. Establishing a design for a standardization/quality assurance program for technology
development and dissemination h. Specifying and developing support mechanism for technology development and
dissemination cooperation and partnership especially related to SMEs i. Developing an entrepreneurship promotion model with technological competencies and
business viability j. Developing an integrated management information system for technology dissemination
and utilization
T ‐ 328
GB‐ID : GBT1‐02‐05500‐0801‐064477
9. Activities
Activities Implementation
Locations
Project Implementation
Units a. Specifying and evaluating support measures provided
by central and local government Review stakeholder to be involve for maximum synergy in
technology development and dissemination for SMEs b. Specifying and evaluating government owned research
and developing institution c. Specifying and evaluating the role of SME innovation
center with regards to the promoting of technology based entrepreneurship
d. Evaluating the supply and demand sides of technology for small and medium scale business
e. Developing a policy framework related to innovations for SMEs and entrepreneurship promotion
f. Establishing a design for a standardization/quality assurance program for technology development and dissemination
g. Specifying and developing support mechanism for technology development and dissemination cooperation and partnership especially related to SMEs
h. Developing an entrepreneurship promotion model with technological competencies and business viability
i. Developing an integrated management information system for technology dissemination and utilization
DKI Jakarta BAPPENAS, SME Inovation Center, Agency for Assessment and Application Technology (BPPT)
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
BAPPENAS, SME Inovation Center, Agency for Assessment and Application Technology (BPPT)
5,000 100 5,100 Canada
Total 5,000 100 5,100
T ‐ 329
GB‐ID : GBT1‐02‐05500‐0801‐064477
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
3,000 2,100 5,100
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Innovation Policy Framework for Small and Medium Enterprises
5,100
Total 5,100
13. Project References :
BB 2006‐2009 ID: T‐02‐05500‐0101‐064477
T ‐ 330
GB‐ID : GBT1‐06‐05500‐0801‐068482
1. Project Title : Long Term Finance Security for National Backbone Infrastructure Development
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Deputy for Infrastructure, Bappenas
5. Duration : 48 months
6. Location : Jakarta
7. Objectives
Overall Goal To realize the long‐term and mid‐term dynamic nation economic development through realizing the National Backbone Infrastructure Development.
Project Purpose a. To create the long‐term perspective public finance plan to realize dynamic and efficient
national development. b. To streamline the Backbone Infrastructure finance demand best combining the possible
financial resources. c. To create the mutual trust between the GOI and private sectors and to promote private
investment and stabilize the macro economy
8. Scope of Projects a. Comprehensive National Development Plan b. Authorize “the National Backbone Infrastructure Project” c. Optimize the long‐term budgeting plan for the National Backbone Infrastructure Projects d. Hold periodical consultative meetings in between GOI and private sectors e. Comparative research of cases in the world such as Japan, USA, other Asian countries and
others f. Formulating the 2010‐2014 Blue Book
9. Activities
Activities Implementation
Locations Project Implementation
Units
Development Study
Seminar/Trainning
Jakarta Deputy for Infrastructure Bappenas
T ‐ 331
GB‐ID : GBT1‐06‐05500‐0801‐068482
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy Infrastructure Bappenas
1,100 ‐ 1,100 Japan (JICA)
Total 1,100 ‐ 1,100
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
200 300 300 300 1,100
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Development Study 700
Seminar/Trainning 400
Total 700 400
13. Project References :
BB 2006‐2009 ID: T‐06‐05500‐0101‐068482
T ‐ 332
GB‐ID : GBT1‐06‐05500‐0803‐068475‐07
1. Project Title : Monitoring and Evaluation System
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Deputy Chairman for Development Funding Affairs, Bappenas
5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
The purposes of this program are: a. To draw together the extensive and growing body of experience with the institutionalizing
of government monitoring systems including program assessment, particularly those in developed countries.
b. To establish the cooperation with developed countries, which have institutionalized development monitoring system. The lesson can be used as an experience to be learned.
c. To review existing government regulation on monitoring for development program/project. d. To strengthen the development monitoring capacity‐building work, to undertake the
assigned roles and responsibilities. e. To support exchange of skills, knowledge and expertise between Australia Government
Agency and Bappenas. f. To strengthen the capacity‐building in BAPPENAS as a leading institution in coordination
of development monitoring and evaluation, especially focuses on the ability of government and civil society to conduct good‐quality monitoring practices.
8. Scope of Projects
a. Monitoring‐Evaluation Development System b. Training c. Workshop
9. Activities
Activities Implementation Locations Project Implementation Units a. Monitoring‐Evaluation
Development System b. Training c. Workshop
DKI Jakarta Deputy Chairman for Development Funding Affairs
T ‐ 333
GB‐ID : GBT1‐06‐05500‐0803‐068475‐07
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy Chairman for Development Funding Affairs
300 10 310 Australia
Total 300 10 310
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
125 185 310
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Monitoring‐Evaluation
System Development 200
b. Improvement Capacity (comparative study)
70
c. Procurement of Supporting Facilities
30
d. Workshops 6 e. Others 4
Total 200 30 76 4
13. Project References :
BB 2006‐2009 ID: T1‐06‐05500‐0101‐068475‐07
T ‐ 334
GB‐ID : GBT1‐06‐05500‐0804‐068475‐07
1. Project Title : Planning and Bugeting Reform
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Deputy for Development Funding Affairs, Bappenas
5. Duration : 36 months
6. Location : Jakarta
7. Objectives
To support central and local government officer in developing and implementing medium term and result based planning and budgeting into a planning and budgeting system.
8. Scope of Projects
Technical Assistance in public finance (medium term planning and budgeting – result based planning and budgeting – central – local transfer system), capacity building for central and local government official through training/study tour in Indonesia and abroad, Seminar/Workshop.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Technical Assistance. b. Capacity Building for Central and Local
Government Officer on Planning – Budgeting System.
c. Workshop and Seminars among stakeholders (Central and Local Government).
DKI Jakarta Deputy for Development Funding Affairs, Bappenas
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy for Development Funding Affairs, Bappenas
1,120 500 1,620 Japan (JICA)
Total 1,120 500 1,620
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
540 540 540 1,620
T ‐ 335
GB‐ID : GBT1‐06‐05500‐0804‐068475‐07
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Local/International Experts 850 b. Long Term/Short Term
Training/Education 470
c. Seminar/Workshop 170 d. Secretariat support 130
Total 850 130 470 170
13. Project References :
BB 2006‐2009 ID: T1‐06‐05500‐0101‐068475‐07
T ‐ 336
GB‐ID : GBT1‐05‐02400‐0701‐08‐061132
1. Project Title : Rice Fortification for the Poor
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (Bappenas)
4. Implementing Agency : a. Ministry of National Development Planning/National Development Planning Agency (Bappenas)
b. BULOG
5. Duration : 24 months
6. Location : Karawang and Bekasi
7. Objectives
a. A national local and regional economic development strategy based on the pilot experiences is established and institutionalized.
b. Regional competitiveness is improved through SME promotion, inter‐district cooperation and regional marketing.
8. Scope of Projects Project will cover Central Java region and other potential region for replication the current pilot project. Issues to be addressed by this project are interregional cooperation, regional marketing, improvement of regional competitiveness, setting up LRED support facility at national level and capacity building of local and central government in local and regional economic development planning.
9. Activities
Activities Implementation
Locations Project
Implementation Units
a. Assessing and identifying new technologies b. Capacity building, production and distribution
of fortified rice c. Blending and milling
Bulog
d. Advocacy, social mobilization, evaluation & policy development
e. Project management
Karawang and Bekasi
Bappenas
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
a. Bulog 1,214 1,214
b. Bappenas 1,160 1,160
ADB
Total 2,374 2,374
T ‐ 337
GB‐ID : GBT1‐05‐02400‐0701‐08‐061132
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
410 1,099 865 2,374
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct‐ions
Goods Trainings Others
a. Assessing and Identifying New Technologies
180.0 20.0
b. Capacity Building, Production and Distribution of Fortified Rice
124.0 310.0 40.0
c. Blending and Milling 817.0 110.0 d. Advocacy, Social
Mobilization, Evaluation & Policy Development
465.0
e. Project Management 308.0
Total 1,429.0 310.0 635.0
13. Project References :
BB 2006‐2009 ID: T‐05‐02400‐0790‐061132
T ‐ 338
GB‐ID : GBT1‐06‐05500‐0803‐068475‐07
1. Project Title : Strengthening Capacity to Improve Aid Effectiveness
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency (BAPPENAS)
4. Implementing Agency : Deputy for Development Funding, Bappenas
5. Duration : 12 months
6. Location : DKI Jakarta
7. Objectives
To strengthen the capacity of the office of Deputy of Development Funding, Bappenas in order to support improving effectiveness of aids utilization
8. Scope of Projects
The TA will provide advice and assistance to support aid effectiveness with scope of works are: a. Preparing the Action Plan to achieve indicators of Paris Declaration b. Developing Management Information System (MIS) in Deputy for Development Funding; c. Developing Operation Manual for office of Deputy for Development Funding; d. Providing skills training for staff; and e. Providing comparative study to look at experience in Asia Pacific.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Consultants provision to develop action plan,
operation manual and management information system (MIS)
b. Computer equipment to support consultants, secretariat and integrated MIS in Deputy for Development Funding (LAN equipment, server, etc)
c. Capacity building assisted by training specialist consultant including international, domestic and group training
Jakarta Deputy for Development Funding
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy for Development Funding, Bappenas
1,300 60 1,360 Japan (JICA)
Total 1,300 60 1,360
T ‐ 339
GB‐ID : GBT1‐06‐05500‐0803‐068475‐07
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,360 1,360
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Consultants 600 b. Equipment 60 c. Training, Seminars,
Comparative Study and Conferences
460
d. Miscellaneous Administration & Support Cost
15
e. Surveys and Data Collection
18
f. Contingencies 47
Total 600 60 460 80
13. Project References :
BB 2006 – 2009 ID: T‐06‐05500‐0101‐068475
T ‐ 340
GB‐ID : GBT1‐01‐05502‐0801‐073091
1. Project Title : Support to Delivering Services to Poor Community
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National Development Planning Agency (BAPPENAS)
4. Implementing Agency : Local Universities, NGO
5. Duration : 12 months
6. Location : Jakarta, Gorontalo, and Papua
7. Objectives
To prepare and undertake initial activities to improve quality of public service delivery and financial management through (i) piloting a performance‐based incentive system for Local Governments to improve their ability to deliver poverty services; (ii) operationalizing local government M&E systems.
8. Scope of Projects
a. Provision of M&E expert to the central government b. Provision of facilitation and technical assistance to local governments c. Provision of technical assistance to develop baseline data and to review related regulatory
framework 9. Activities
Activities Implementation
Locations Project
Implementation Units a. Assistance to Bappenas to operationalize M&E
framework Jakarta
b. Conducting baseline survey in service delivery and assessments of local government financial management
c. Assistance tolocal goverments to develop action plan for improving service delivery and financial management
Gorontalo, Papua
d. Field trips, workshops, training and meetings Jakarta, Gorontalo, Papua
Bappenas, Local Universities, NGO
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Bappenas, Local Universities, NGO
943 ‐ 943 World Bank
Total 943 ‐ 943
T ‐ 341
GB‐ID : GBT1‐01‐05502‐0801‐073091
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
943 943
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Baseline Survey 475
b. Assistance to Local Government
400
c. Field Trips, Workshops, Training
68
Total 943
13. Project References :
BB 2006‐2009 ID: T1‐01‐05502‐0402‐073091
T ‐ 342
GB‐ID : GBT1‐01‐05502‐0802‐073091
1. Project Title : Support for Management Information System (MIS) PNPM
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National Development Planning Agency (BAPPENAS)
4. Implementing Agency : Deputy for Poverty, Manpower and SME, Bappenas
5. Duration : 12 Months
6. Location : DKI Jakarta
7. Objectives
To develop and implement a Management Information System (MIS) of PNPM Mandiri which will be a comprehensive system contained of all poverty reduction programs in Indonesia
8. Scope of Projects
a. To consolidate database of all on‐going poverty programs in Indonesia in a same structure as agreed later.
b. To develop a comprehensive integrated Management Information System of PNPM Mandiri as the development of the existing poverty reduction program databases.
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Coordination among parties involved in the
previous and will be carried out poverty reduction programs
b. To develop the structure of database as agreed by all parties
c. Data collecting from previous poverty reduction programs
d. To consolidate collected data in the agreed structure
e. To identify the requirements of the integration step
f. To develop the MIS of PNPM Mandiri g. To entry collected data into the new PNPM
Mandiri Management Information System h. To update the data regularly
Jakarta Deputy for Poverty, Manpower and SME
T ‐ 343
GB‐ID : GBT1‐01‐05502‐0802‐073091
10. Funding Source
Implementing AgencyForeign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy for Poverty, Manpower and SME
1,000 ‐ 1,000 World Bank
Total 1,000 ‐ 1,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1,000 1,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
MIS development 1,000
Total 1,000
13. Project References :
BB 2006‐2009 ID: T1‐01‐05502‐0402‐073091
T ‐ 344
GB‐ID : GBT1‐06‐05500‐0802‐068482
1. Project Title : Support on Implementation of Medium Term Expenditure Framework and Performance Based Budgeting
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National Development Planning Agency (BAPPENAS)
4. Implementing Agency : Ministry of National Development Planning/National DevelopmentPlanning Agency
5. Duration : 36 months
6. Location : DKI Jakarta
7. Objectives
To give support on developing and implementing the MTEF and PBB concept in to national and regional planning and budgeting system
8. Scope of Projects Capacity building for central and local government through long term/short term technical assistance/experts, training for central and local government official (short/long term‐education) on public finance/MTEF/PBB, comparative studies, workshop/seminar on MTEF and PBB, support for planning and budgeting reform secretariat
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Long term/short term experts b. Long term/short term Training Education c. Seminar/Workshop
DKI Jakarta Bappenas
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Bappenas 1,200 100 1,300 Korea (KOICA)
Total 1,200 100 1,300
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
400 500 400 1,300
T ‐ 345
GB‐ID : GBT1‐06‐05500‐0802‐068482
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Long term/short term
experts 625
b. Long term/short term Training Education
300
c. Seminar/Workshop 150 d. Secretariat support 225
Total 625 225 300 150
13. Project References :
BB 2006‐2009 ID: T‐06‐05500‐0101‐068482
T ‐ 346
GB‐ID : GBT1‐06‐05500‐0803‐068482
1. Project Title : Support to Bappenas in Mainstreaming Climate Change Issue into Development Plan
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National Development Planning Agency (BAPPENAS)
4. Implementing Agency : Deputy Ministry for Natural Resources, Ministry of National Development Planning/National Development Planning Agency(BAPPENAS)
5. Duration : 12 months
6. Location : Jakarta
7. Objectives
a. To provide and advice for developing a Climate Change Road Map in close consultation with line ministries and donors in a timely and coordinated programmatic approach.
b. To provide support and advice for capacity building for staff of line ministries, and BAPPENAS as well as the regional planning agencies (BAPPEDA) and local governments in charge of development planning and programme formulation in order to enhance their capacity to mainstream climate change into development policies.
8. Scope of Projects a. Awareness and Capacity building:
1) Policy makers and local governments and authorities are aware of climate change topics related to national development planning issues and are in positions to contribute to sector specific climate change programme formulation and planning processes.
b. Donor coordination 1) Developed jointly with and accepted by relevant stakeholders, ie., donors, experts, and
government officials 2) Based upon links between policies for the different sectors and donor
programs/projects as well as the ongoing activities (e.g., CDM, renewable energies) 3) An effective tool to channel donor funds into sectors related to climate change 4) Equipped with a monitoring and evaluation system in order to assess effectiveness of
donor funds. 5) Sustainable in the sense that funding of the donor coordination mechanism is secured
by a medium – to long‐term concept (e.g., donor rotation)
c. A road map for Climate Change Programmes is developed and integrated into development plan, which is: 1) Climate impacts are well understood and impacts management is beginning 2) Climate mitigation options potentials are understood and their synergies with
development priorities are exploited 3) Climate change issues are incorporated in sectoral planning for the next RPJM and RKP
T ‐ 347
GB‐ID : GBT1‐06‐05500‐0803‐068482
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Develop three major Roadmap parts b. Awareness raising and capacity building c. Development and design of the Climate Change
Trust Fund Policy framework
Jakarta Deputy Ministry for Natural Resources
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Deputy Ministry for Natural Resources
300 ‐ 300 Jerman (GTZ) and UNDP
Total 300 ‐ 300
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
T otal
300 300
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. National experts 182 b. International Experts 64 c. Travel 12 d. Workshop, meetings, FGD,
training 24
e. Design, Printing, and Publication
18
Total 300
13. Project References :
BB 2006‐2009 ID: T‐06‐05500‐0101‐068482
T ‐ 348
GB‐ID : GBT1‐06‐05502‐0801‐072092
1. Project Title : Support to Election 2009
2. Project Type : Technical Assistance
3. Executing Agency : Ministry of National Development Planning/National Development Planning Agency (BAPPENAS)
4. Implementing Agencies
: Deputy for Political Affairs, Law, Security, and Defence, Ministryf of National Development Planning/National Development Planning Agency (BAPPENAS)
5. Duration : 36 months
6. Location : DKI Jakarta
7. Objectives
The Multi‐Donor Programme‐Support to Indonesia’s Democratic Elections (Elections MDP) consist of a 3 years technical assistance initiative that seeks to enhance and further consolidate the institutional and professional capacities of the KPU, its Secretariate and its regional office to meet the numerous priorities that are faced both in the immediate and long term. It also seeks to enhance the quality of participation of voters in Indonesia’selections by increasing the awareness of voters on the importance of democratic processes that will serve as a foundation for post election engangement with elected public officials. This support also seeks to facilitate the Government of Indonesia in coordinating international support to elections in Indonesia, with the aim of achieving a harmonized donor programme in line with the principles contained in the Paris Declaration of Aid Effectiveness. To these ends, the programme has been clustered in to two distinct but sequential components of immediate electoral support (2008‐2009) and Lng‐term Istitutional Strengthening and Professional Capacity Development (2009‐2010)
8. Scope of Projects a. To enchance and further consolidate the institutional and professional capacities of the
KPU, its secretariat and its regional offices to meet the numerous priorities that are faced both in the immediate and longer‐term
b. To enchance the quality of participation of voters in Indonesia’s elections, by increasing the awareness of voters on the importance of democratic processes that will serve as a foundation for post‐election engangement with elected public officials.
c. To facilitated the Government of Indonesia in coordinating international support to elections in Indonesia, with aim of achieving a harmonized donor programme in line with the principles contained in the Paris Declaration of Aid Effectiveness.
9. Activities
Activities Implementation
Locations Project
Implementation Units
Immediate Electoral Support 2008‐2009)
Long‐term Institutional Strengthening and Professional Capacity (2009‐2010)
DKI Jakarta Deputy for Political Affairs, Law, Security, and Defence
T ‐ 349
GB‐ID : GBT1‐06‐05502‐0801‐072092
10. Funding Source
Implementing Agency
Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Bappenas 30,000 ‐ 30,000 UNDP
Total 30,000 ‐ 30,000
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
9,000 15,000 6,000 30,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
ServicesConstruct‐ions
Goods Train‐ings
Others
Output 1.1. The Institutional, operational, and management capacities of the KPU to plan and conduct the 2009 legislative and presidential elections to a high standard is strengthened
a. Support the development of electoral procedures and administration
307 287 36
b. Facilitate operational training for election workers
43 172 758 114
c. Assist KPU’s media and public relations, and establish an Election Result Center
488 614 28
d. Support electoral oversight and dispute resolution
589 70 571 86
e. Support the development and implementation of regulations for local elections
114 40
Output 1.2. The levels of political and democratic awareness and voter participation in the electoral process, particularly for under represented segments of Indonesian society are expanded
a. Conduct assessment of voters’education and information needs
140 25
b. Develop a Voters’education and information manual/guideline booklet
140 72 60
T ‐ 350
GB‐ID : GBT1‐06‐05502‐0801‐072092
Categories (US $ 000)
Detail of Activities Services
Construct‐ions
Goods Train‐ings
Others
c. Provide technical assistance to the relevant agencies of the Government of Indonesia to conduct mass media voters’education and information campaign
1,306 145 14 557
d. Administer CSO Voters’ Information and Education Grants Scheme
57 2588
e. Undertake two step training programme to support CSOs to utilize the Grants Scheme
358
Output 1.3. The Government of Indonesia is facilitated in optimizing international electoral assistance efforts and the use of available financial resources through coheren, efficient and timely coordination of electoral support
a. Facilitate the coordination team set up by the Government of Indonesia in ensuring the coherent, timely, and effective international assistance to Indonesia’s elections
55 28 56
b. Support the Government of Indonesia to analyse and verify different programmes of international assistance to Indonesia’s electins
27 40 75
c. Facilitate the Government of Indonesia to monitor and avaluate the effectiveness of international assistance to Indonesia’s elections
58 22 150
Output 2.1. The capacity and professional capabilities of the KPU staff at all levels to enable the KPU to function as a permanent institution of governance are strengthened
d. Assist in post‐election evaluation and development of KPU’s Strategic Plan
140 46
e. Establish a multi fuctional Electoral Resource and Information Center
85 43 10 158
f. Assist the Government of Indonesia in the Development of a permanent voter registry
215 75 210
g. Establish a long‐term professional development programme
220 140 40 30
T ‐ 351
GB‐ID : GBT1‐06‐05502‐0801‐072092
Categories (US $ 000)
Detail of Activities Services
Construct‐ions
Goods Train‐ings
Others
Output 2.2. The Political and democratic participation in the next cycle of elections, particularly for under‐represented segments of the society, through institutionalization of electoral education initiatives, is strengthened
a. Support on going efforts and strategies of multiple stakeholders with their electoral education activities
72 70 645
b. Institutionalise long‐term multiple stakeholders initiatives on electoral education
185 70 103
Output 2.3. The Government of Indonesia is facilitated in arranging a permanent donor coordination facility on support to elections and other efforts to consolidate Indonesia’s democracy
a. Support ongoing efforts of the Government of Indonesia to coordinate donor’s long‐term electoral assistance
204 20 88
b. Facilitate the establishment of a permanent donor coordination facility on elections and other democratic institutions
140 188 75
Total 4,528 70 1,168 3,217 4,579
13. Project References :
BB 2006‐2009 ID: T1‐06‐05502‐0306‐072092
T ‐ 353
Local Government of Maluku Province
T ‐ 355
GB‐ID : GBT2‐06‐05500‐0801‐068481
1. Project Title : Technical Support for Strengthening the Regional Based Education Management
2. Project Type : Technical Assistance
3. Executing Agency : Local Government of Maluku Province
4. Implementing Agency : Local Government of Maluku Province
5. Duration : 36 months
6. Location : Ambon City, Maluku Province
7. Objectives
To improve the quality of education at junior‐high school levels
8. Scope of Projects a. Education supervisor will obtain practical skills and clarify the responsibility in the
collaboration with education section of Local Government of Maluku b. Achievement and network by Brotherhood Education Program (POB) activities ran will be
integrated into the POB lock grant programmed school c. Co‐learning for the betterment of education at sub district levels will be encouraged d. Management and reporting system of POB block grant will be strengthening at each
concerned school e. More opportunities to learn about the local histories, cultures, and knowledge
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Establishing program management technical team b. Making school education c. Making guidelines for school based management d. Conducting baseline and end line survey
Ambon City, Maluku Province
Local Government of Maluku Province
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Local Government of Maluku Province
390 ‐ 390 Japan (JICA)
Total 390 ‐ 390
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
130 130 130 390
T ‐ 356
GB‐ID : GBT2‐06‐05500‐0801‐068481
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Technical support 390
Total 390
13. Project References :
BB 2006 – 2009 ID: T‐06‐05500‐1004‐068481
T ‐ 357
Local Government of South Sulawesi Province
T ‐ 359
GB‐ID : GBT2‐06‐01001‐0800‐067496
1. Project Title : Regional Development Policy Advisor in Sulawesi Region
2. Project Type : Technical Assistance
3. Executing Agency : Local Government of South Sulawesi Province
4. Implementing Agency : Local Government of South Sulawesi Province
5. Duration : 24 months
6. Location : Makassar, South Sulawesi
7. Objectives To promote regional development through stake holder initiatives and inter regional cooperation.
8. Scope of Projects Procurement of international expert that can : a. assist and advice on regional development b. assist formulating development strategy c. assist and facilitate establishing information/human resources networks among the
provinces
9. Activities Activities Implementation Locations Project Implementation Units
Individual expert Makassar Local Government of South Sulawesi Province
10. Funding Source
Implementing Agencies Foreign Funding
(US $ 000) Local Funding(US $ 000)
Total of Funding (US $ 000)
Remarks
Local Government of South Sulawesi Province
991 ‐ 991 Japan (JICA)
Total 991 ‐ 991
11. Disbursement Plan Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
450 541 991
12. Funding Allocations Categories (US $ 000)
Detail of Activities Services Constructions Goods Trainings Others
Expert 991 Total 991
13. Project References : BB 2006 – 2009 ID: T‐06‐01001‐0106‐067496
T ‐ 360
GB‐ID : GBT2‐01‐03301‐0801‐067497
1. Project Title : The Project for Water Supply Service Improvement in Mamminasata Metropolitan Area
2. Project Type : Technical Assistance
3. Executing Agency : Local Government of South Sulawesi Province
4. Implementing Agency : Spatial Planning and Settlements Office, South Sulawesi
5. Duration : 30 months
6. Location : Mamminasata Metropolitan Area, South Sulawesi Province
7. Objectives
To improve water supply conditions in Mamminasata Metropolitan area through effective and efficient water supply operation/maintenance and management
8. Scope of Projects Capacity development of PDAMs in the Mamminasata Metropolitan Area through : a. Experts b. Procurement of Equipment c. Procurement of software of operation and maintenance activity d. Trainings
9. Activities
Activities Implementation
Locations Project
Implementation Units a. Inter regional water supply cooperation/
coordination mechanism establishment b. UFW improvement c. Preparation and execution of financial condition
improvement plan d. Water supply facility operation and management e. Water quality management
Mamminasata Metropolitan Area
Local Government of South Sulawesi Province
10. Funding Source
Implementing Agencies Foreign Funding
(US $ 000) Local Funding (US $ 000)
Total of Funding (US $ 000)
Remarks
Spatial Planning and Settlements Office
3,514 ‐ 3,514 Japan (JICA)
Total 3,514 ‐ 3,514
T ‐ 361
GB‐ID : GBT2‐01‐03301‐0801‐067497
11. Disbursement Plan
Disbursement Plan (US $ 000) 1st 2nd 3rd 4th 5th
Total
1500 1500 514 3,514
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
Water Supply Service Improvement
500 2,000 900 114
Total 500 2,000 900 114
13. Project References :
BB 2006 – 2009 ID: T‐01‐03301‐0106‐067497