Materi TTC # 1 - Introduksi TTC & PK.pdf

Embed Size (px)

Citation preview

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    1/29

    2/12/2014 Motion & Time Study - SritomoW.Soebroto

    1

    Materi TTC # 1

    INTRODUKSI

    Sritomo W. Soebroto

    Laboratorium Ergonomi & Perancangan Sistim Kerja

    Jurusan Teknik Industri

    INSTITUT TEKNOLOGI SEPULUH NOPEMBER

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    2/29

    Agenda Pembelajaran # 1Semester Genap 2013-14

    2

    Mgg ke- Pokok Bahasan

    1Kontrak Kuliah

    Introduksi Perkuliahan

    2Proses Produksi, Produktivitas, dan Nilai Tambah

    Lean Manufacturing

    3 Work Operation Anaysis (Konsep Ekonomi Gerakan)Gerakan Therbligh

    4 Predetermined Time Standards Systems (PTSS) - MTM

    5Work Operation Analysis (Peta Kerja)

    Penjelasan Responsi secara umum & TPM MTM

    6Stopwatch Time Study

    Briefing tugas besar

    7

    Pelaksanaan Modul Stopwatch time study

    (TPM dan Pengambilan data sebelum perbaikan)

    8 & 9 EBTS

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    3/29

    Agenda Pembelajaran # 2Semester Genap 2013-2014

    Mgg ke- Pokok Bahasan

    10Metode Kuantitatif Sistem Manusia-Mesin

    Job Design & Job Analysis

    11Work Sampling

    Tes Pendahuluan Modul Work Sampling

    12 Standard Data

    (Pengambilan data worksampling di luar kelas)

    13Materi Terapan 1 : Keseimbangan Lintasan Operasi & Sistem Antrian

    (Pengambilan data worksampling di luar kelas)

    14Materi Terapan 2 : SMED

    (Pengambilan data worksampling di luar kelas)

    15 Materi Terapan 3 : Kompensasi Finansial

    16 (Pelaksanaan ICE pada 26-30 Mei 2014)

    17 Review materi mata kuliah TTC18 Ujian akhir praktikum3

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    4/29

    Bobot/Prosentase Penilaian :

    Motion & Time Study -Sritomo W.Soebroto

    4 2/12/2014

    Evaluasi Tengah Semester: 25%

    Tugas Kelas: 10%

    Responsi di Laboratorium: 30% - 40%

    Tugas Besar: 25%-35%

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    5/29

    Motion & Time Study -Sritomo W.Soebroto

    5 2/12/2014

    Tujuan Instruksional

    Memberikan pemahaman mengenai

    konsep dasar dan teknik-teknik yang

    berkaitan dengan analisis dan perancangan tata-cara kerja dan pengukuran kerja.

    Memberikan kemampuan kepada mahasiswa untuk

    menerapkan teknik-teknik tersebut untukmerancang sistem kerja yang lebih efektif-efisien

    dalam kerangka peningkatan produktivitas

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    6/29

    Motion & Time Study -Sritomo W.Soebroto

    6 2/12/2014

    Kepustakaan

    Barnes, Ralph M. Motion and Time Study: Design and

    Measurement of Work.New York: john Wiley & Sons,

    1980.

    Currie, R.M. and Joseph E. Faraday. Work Study. London : Pitman

    Books Ltd., 1982.

    Krick, Edward V. Methods Engineer ing : Design and Measurement

    of Work Methods.New York: John Wiley & Sons Inc., 1962.

    Mundel, Marvin E. and David L. Danner. Motion and Time Study:

    Improving Productivity.Englewoods Cliffs, N.J.: Prentice-Hall Inc.,

    1994. Niebel, Benjamin W. Motion and Time Study.Homewood, Il.:

    Richard D.Irwin, 1993.

    Polk, Edward J. Methods Analysis and Work Measurement. New

    York: McGraw-Hill Book Co., 1984.

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    7/29

    Motion & Time Study -Sritomo W.Soebroto

    7 2/12/2014

    Buku-Buku

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    8/29

    Motion & Time Study -Sritomo W.Soebroto

    8 2/12/2014

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    9/29

    Motion & Time Study - SritomoW.Soebroto

    92/12/2014

    Knowledge dealing with the

    systematic determination of a

    preferable work methodwith the

    time required

    for the uses of human

    and equipment to perform such

    work as well as a development of

    material & toolsto make the

    established method and time

    practical

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    10/29

    Motion & Time Study- Sritomo W.Soebroto

    10 2/12/2014

    Goals of Work Study

    Eliminate elements of work

    Combine elements of work Rearrange elements of work

    Simplify task

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    11/29

    Motion & Time Study- Sritomo W.Soebroto

    11 2/12/2014

    Motion & Time Study(purely the study of techniques)

    Guidance to understand thenature and true costs of work

    Assist management inreducing unnecessary costs

    Balancing work cells tomake work flow smoother

    Learn the details of workand make improvement

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    12/29

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    13/29

    Motion & Time Study- Sritomo W.Soebroto

    13 2/12/2014

    History of Motion and Time Study

    Developed in about 1880. Frederick W.Taylor, the

    first user of the stopwatch to measure work

    content, to define afair dayswork

    In 1900, Frank and Lillian Gilbreth startedworking with methods study, to find best method.

    In 1928, Elton Mayo, by accident, discovered that

    people work better when their attitude is better.Later known as the human relations

    movement.

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    14/29

    Motion & Time Study- Sritomo W.Soebroto

    14 2/12/2014

    Frederick W. Taylor

    (1856-1915)

    Known as father of scientific management

    and industrial engineering

    First used a stopwatch to study workcontent: Father of Time Study

    Entered the labor force and worked his way

    up to foreman of the machine shop Became Chief Engineer of Midvale Steel

    Works

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    15/29

    Motion & Time Study- Sritomo W.Soebroto

    15 2/12/2014

    Taylors Four Principles of

    Scientific Management

    1. Develop a science for each element of apersonswork, thereby replacing the old rule-of-thumbmethods

    2. Select the best worker for each task and train that

    worker in the prescribed method developed inPrinciple 1

    3. Develop a spirit of cooperation betweenmanagement and labor in carrying out the

    prescribed methods

    4. Divide the work into almost equal shares betweenmanagement and labor, each doing what they do

    best

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    16/29

    Motion & Time Study- Sritomo W.Soebroto

    16 2/12/2014

    Results of Taylors Methods

    Specified the work method;

    Instructed the operator in that method;

    Maintained standard conditions forperforming that work;

    Set time standard goals;

    Paid premiums for doing thetask as specified.

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    17/29

    Motion & Time Study- Sritomo W.Soebroto

    17 2/12/2014

    Innovations of Taylor

    Stopwatch time study

    High-speed steel tool

    Tool grinders

    Slide rules

    Functional typeorganization

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    18/29

    Motion & Time Study- Sritomo W.Soebroto

    18 2/12/2014

    Taylors Experiment

    400-600 men hired at Midvale Steel Works to

    move coal, coke, and iron ore

    Each man used a different shovel

    Taylor performed a formal study of the operation todetermine the most efficient shovel

    varied shovel size,

    duration,number of breaks,

    work hours

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    19/29

    Motion & Time Study- Sritomo W.Soebroto

    19 2/12/2014

    Taylors Shovelling ExperimentSaving Cost : $ 78,000/year

    BEFORE STUDY AFTER STUDY

    No. People 400 - 600 140

    Pounds/Shovel 3 - 38 21

    Bonus No Yes

    Work unit Teams Individual

    Cost/ton 7 cents to 8 cents 3 cents to 4 cents

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    20/29

    Motion & Time Study- Sritomo W.Soebroto

    20 2/12/2014

    Time Standardare goals to strive for

    Manufacturing plants with no standards

    average 60% performance

    Manufacturing plants with time standardsaverage 85% performance

    Manufacturing plants with

    incentive systems average120% performance

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    21/29

    Motion & Time Study- Sritomo W.Soebroto

    21 2/12/2014

    Frank (1868-1924) and

    Lillian Gilbreth (1878-1972)

    Known as parents of motion study

    Developed many new techniques for studying

    work

    Frank Gilbreth

    bricklayers apprentice

    set up his own construction business

    Lillian Gilbreth

    trained psychologist who kept Frank

    from dehumanizing work

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    22/29

    Motion & Time Study- Sritomo W.Soebroto

    22 2/12/2014

    Frank and Lillian Gilbreth

    Started a consulting business Studied motions to improve the work environment

    Elimination or useless motions and reduction ofremaining motions was foundation of their work

    work simplification Developed terminology defining the entire range of

    manual motions

    therbligs

    Therbligs are the basic components of the motionpattern

    search, select, grasp, transport, hold, position,inspect, and assemble, e.g.

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    23/29

    Motion & Time Study- Sritomo W.Soebroto

    23 2/12/2014

    Professor Elton Mayo

    Known as the father of the human

    relations movement

    Involved in the Western ElectricCompanys Hawthorne plant productivity

    studies (1924-1933)

    studied what factors affect productivity

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    24/29

    Motion & Time Study- Sritomo W.Soebroto

    242/12/2014

    Phases of the study

    Phase I (1924-1927): Illumination Study

    premise was that increased illumination would increase

    productivity

    results were inconclusive due to other factors

    Phase II (1927-1929): Relay Assembly Study

    premise was that a change in working conditions

    would result in a change in productivity

    Studied the following factors: incentive system, rest

    periods, paid lunch breaks, elimination of Saturday

    work, reduction in work hours, free lunch and drinks

    Results of study are as follows:

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    25/29

    Motion & Time Study- Sritomo W.Soebroto

    252/12/2014

    PHASE NO. WEEKS

    DURATION

    CUMULATIVE

    NO. WEEKS

    FACTOR HOURS WORKED

    PER PERSON

    AVERAGE

    HOURLY

    OUTPUT

    AVERAGE

    WEEKLY

    OUTPUT

    1 2 2 In regular dept 39.7 49.51 1,9732 5 7 Experiment room 45.6 49.4 2,254

    3 8 15 Incentive system 44.7 51.25 ,289

    4 5 20 2-5 min. rest 42.4 53.11 2,251

    5 4 24 2-10 min. rest 44.2 55.9 2,470

    6 4 28 6-8 min. rest 44.2 55.9 2,470

    7 11 39 11 min A.M.-Lunch-10 min. rest

    41.4 56.1 2,305

    8 7 46 Stop hr. early 40.7 62.5 2,5429 4 50 Stop 1 hr. early 39.0 64.5 2,516

    10 1 62 Same as 7 43.6 61.7 2,69111 9 71 No. 7 + eliminate

    Sat A.M.

    39.6 63.6 2,517

    12 12 83 No. 3 nolunch/rests

    45.9 61.0 2,802

    13 31 114 Same as No. 7 but

    brought own lunch-

    given beverages

    43.1 66.7 ,873

    Hawthorne Plant: Relay Assembly Experiment 13 Phases

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    26/29

    Motion & Time Study- Sritomo W.Soebroto

    262/12/2014

    Phases of the study (2)

    Phase III (1929-1930): Interviewing Program

    Twenty one thousand employees interviewed to determinewhat people want from their jobs

    Phase IV (1931-1932): Bank Wire Observation Room

    Informal organization and its influence on productivity

    were studied

    Results of Hawthorne studies did not go as intended

    factors thought to improve performance did not lead to anautomatic improvement

    studies did show that change affects the employeesattitude, which affects results

    As long as employee attitudes remained positive, whenother factors were changed negatively, production stillimproved

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    27/29

    Motion & Time Study- Sritomo W.Soebroto

    272/12/2014

    Early Contemporaries

    Laurence Gantt

    developed graphs to measure performance and

    visually display projected schedules

    used by shipbuilding industry during WWI Known as Gantt Chart

    also developed wage payment system based on

    performance

    Shigeo Shingo

    http://cgl.microsoft.com/clipgallerylive/packages/j012/j0124715.cilhttp://cgl.microsoft.com/clipgallerylive/packages/IN00/IN00600_.cilhttp://cgl.microsoft.com/clipgallerylive/packages/j012/j0124717.cilhttp://cgl.microsoft.com/clipgallerylive/packages/j021/j0217150.cilhttp://cgl.microsoft.com/clipgallerylive/packages/j012/j0124715.cil
  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    28/29

    Motion & Time Study- Sritomo W.Soebroto

    282/12/2014

    Trends

    Fair and safe treatment of workers

    Government regulation of methods,

    standards and work design Work measurement for indirect labor

    service jobs

    Computerized techniques

  • 8/10/2019 Materi TTC # 1 - Introduksi TTC & PK.pdf

    29/29

    29

    Tugas # 1(untuk didiskusikan dalam kelompok)

    Cari dan bacalah artikel (studi literatur) tentang langkah-langkahpenelitian kerja yang telah dilakukan oleh 4 (empat) pioneers (FredTaylor, Frank & Lillian Gilbreth, dan Mayo yang telah memberikankontribusi nyata didalam aktivitas studi tentang kerja? Selanjutnyadiskusikan dua hal berikut ini : (1) Kenapa kontribusi merekadianggap yang paling signifikan dibandingkan dengan yang lainnya(Adam Smith, Babbage, dan/atau generasi setelah mereka); (2) Apakaitannya studi tentang Ergonomi Industri dengan Studi tentang TataCara & Pengukuran Kerja. Jelaskan.

    Semua laporan harap dibuat dan diserahkan dalam bentuk hard(copy)-print atau softcopy. Hard/print copy maupun softcopy bisadiserahkan setelah group (praktikum) terbentuk.