i Office of the President Ministerial Policy Statement MPS: Office of the President Table of Contents PRELIMINARY Foreword …………………………………………………………..………………… iii Abbreviations and Acronyms ………………………………………………………..…… iv Structure of Report ……………………………….……………………...…..……...…… viii Executi ve Summary ………………………………………………………………………… i x Vote: 001 Office of the President V1: Vote Overview ……………………………………..…………………………… 1  V2: Vote Performanc e for FY 2013/14 and Planned Outputs for FY 2014/15…….  2 V3: Detailed Planned Outputs for FY 2014/15 ………………………………... ..…. 6 V4: Proposed Budget Allocations for 2014/15 and the Medium Term……………..… 42 V5: Vote Crosscutting Issues ………………..………………………………………… 44 Vote Function 1111: Internal Security ……………………………………………………. 46 Staff Establishment Structure………………………………………………………...…….  55 Vote: 002 State House V1: Vote Overview ……………………………………..……………………..…… 101 V2: Vote Performa nce for FY 2013/14 and Planned Outputs for FY 2014/15…….  102 V3: Detailed Planned Outputs for FY 2014/15 …………………………….…………. 103  V4: Proposed Budget Allocations for 2014/15 and the Medium Term…………….… 122 V5: Vote Crosscutting Issues ………………..………………………………………… 124  Staff Establishment Structure…………………………………………………...………….  126 Vote: 107 Uganda AIDS Commission V1: Vote Overview ……………………………………..……….………………… 172 V2: Vote Performance for FY 2013/14 and Planned Outputs for FY 2014/15 …….  173 V3: Detailed Planned Outputs for FY 2014/15 ………………………………….……. 175 V4: Proposed Budget Allocations for 2014/15 and the Medium Term………….…… 188 V5: Vote Crosscutting Issues ………………..………………………….……………… 190 Staff Establishment Structure………………………………………………...…………….  192 Preliminary

Mps - 14- Presidency 2014-15 Consolidated Final

Embed Size (px)

DESCRIPTION

Presidency budget 2014

Citation preview

  • i

    Office of the President Ministerial Policy Statement

    MPS: Office of the President

    Table of Contents

    PRELIMINARY

    Foreword .. iii Abbreviations and Acronyms .. iv Structure of Report ......... viii Executive Summary ix

    Vote: 001 Office of the President

    V1: Vote Overview .. 1 V2: Vote Performance for FY 2013/14 and Planned Outputs for FY 2014/15. 2 V3: Detailed Planned Outputs for FY 2014/15 ...... 6 V4: Proposed Budget Allocations for 2014/15 and the Medium Term.. 42 V5: Vote Crosscutting Issues .. 44 Vote Function 1111: Internal Security . 46 Staff Establishment Structure.... 55

    Vote: 002 State House

    V1: Vote Overview .... 101 V2: Vote Performance for FY 2013/14 and Planned Outputs for FY 2014/15. 102 V3: Detailed Planned Outputs for FY 2014/15 .. 103 V4: Proposed Budget Allocations for 2014/15 and the Medium Term. 122 V5: Vote Crosscutting Issues .. 124 Staff Establishment Structure.... 126

    Vote: 107 Uganda AIDS Commission

    V1: Vote Overview ... 172 V2: Vote Performance for FY 2013/14 and Planned Outputs for FY 2014/15. 173 V3: Detailed Planned Outputs for FY 2014/15 .. 175 V4: Proposed Budget Allocations for 2014/15 and the Medium Term. 188 V5: Vote Crosscutting Issues ... 190 Staff Establishment Structure.... 192

    Preliminary

  • ii

    Office of the President Ministerial Policy Statement

    MPS: Office of the President

    Vote: 112 Ethics and Integrity

    V1: Vote Overview ... 196 V2: Vote Performance for FY 2013/14 and Planned Outputs for FY 2014/15. 197 V3: Detailed Planned Outputs for FY 2014/15 ..... 197 V4: Proposed Budget Allocations for 2014/15 and the Medium Term. 215 V5: Vote Crosscutting Issues ..... 216 Staff Establishment Structure.... 218

    Vote: 159 External Security Organizations

    V1: Vote Overview ... 222 V2: Vote Performance for FY 2013/14 and Planned Outputs for FY 2014/15. 223 V3: Detailed Planned Outputs for FY 2014/15 .. 223 V4: Proposed Budget Allocations for 2014/15 and the Medium Term. 229 V5: Vote Crosscutting Issues ..... 230

    Annexes:

    Annex 1: Recommendations from Parliament and Institutional Responses 232 Annex 2: Unfunded Priorities. 237

    Preliminary

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    Foreword

    Abbreviations and Acronyms

    Rt. Hon. Speaker and Honourable Members of Parliament, in fulfilment of the requirement under Section 6

    (2) of the Budget Act, 2001; I have the honour to present to Parliament the Ministerial Policy Statement for

    the Presidency detailing the planned outputs and activities and Budget Estimates for the Financial Year

    2014/15.

    The Vision of the Presidency remains: "A secure, well governed and developed nation" and the five (05)

    Votes under the Presidency have continued to execute their mandates and deliver outputs geared towards

    the attainment of this vision. The Presidency continues to promote peace and security, good governance,

    accountability; coordinating the HIV/AIDS national multi sectoral response, and mobilization of citizens

    to participate in the Socio-Economic Transformation and Development of Uganda in line with Uganda's

    Vision 2040.

    Rt. Hon. Speaker and Honourable Members, I wish to report that as you might have noted from the three

    quarterly reports that we submitted for this Financial Year, the resources that this august House voted for

    the Presidency were utilized in line with the plans that you approved with minor adjustments caused by

    budgetary constraints. I therefore take this opportunity to invite your guidance regarding the planned

    activities for the Financial Year 2014/15.

    I would like to register my appreciation to the Hon. Speaker, the Hon. Minister for Finance, Planning and

    Economic Development, the Hon. Chairpersons and Members of the Parliamentary Committee on

    Presidential Affairs, the Budget Committee and all Hon. Members of Parliament for the support that you

    have continued to render to the Presidency towards the attainment of its overall goal of transforming the

    Nation.

    For God and My Country

    Frank Tumwebaze, MP

    MINISTER IN-CHARGE OF THE PRESIDENCY AND KCCA

    OLEBound160:

    Preliminary

    iii

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    Abbreviations and Acronyms

    African Association for Public Administration and ManagementAAPAM

    Anti Corruption Public Private PartnershipACPPP

    African Development BankADB

    Allied Democratic ForcesADF

    Acquired Immune Defficiency syndrmeAIDS

    African Union Mission in SomaliaAMISOM

    Anti-RetroviralARV

    Accountability Sector Strategic Investment PlanASSIP

    African UnionAU

    African Union-led Regional Cooperation Initiative on the LRAAU-RCI-LRA

    Budget Frame-work PaperBFP

    BillionBn

    Cabinet Forward Agenda PlanCabFAP

    Chief Administrative OfficerCAO

    Canadian Association for Public Administrtion and ManagementCAPAM

    Centre Coordinating TutorsCCT

    Country Code Top Level DomainccTLD

    Cabinet Hand BookCHB

    Common Market of East and South AfricaCOMESA

    Cabinet SecretariatCS

    Coordination of Civil Society FundCSF

    Civil Society OrganisationCSO

    Director of Administration and FinanceDAF

    Directorate of Economic Affairs and ResearchDEAR

    Directorate of Ethics and IntegrityDEI

    DevelopmentDev

    Director General Internal Security OrganisationDGISO

    District Integrity Promotion ForumDIPF

    District Internal Security OfficerDISO

    Democratic Republic of CongoDRC

    Deputy Resident District CommissionersDRDC

    Deputy Secretary to CabinetDSC

    East African CommunityEAC

    Essential Medicines and Health SuppliesEMHS

    Eastern and Southern Africa Association of Accountant GeneralsESAAG

    External Security OrganisationESO

    Financial YearFY

    Guide to Good RegulationsGGR

    Great Lakes Initiative on AIDsGLIA

    Government of UgandaGoU

    His ExcellencyH.E

    Human Immuno-deficiency VirusHIV

    Preliminary

    iv

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    Head of Public Service and Secretary to CabinetHPS&SC

    Inter Agency ForumIAF

    International Conference on the Great Lakes RegionICGLR

    Information and Communication TechnologyICT

    Internally Displaced PersonsIDPs

    Intergrated Financial Management SystemIFMS

    Inter Governmental Authority on DevelopmentIGAD

    International Organization for MigrationIOM

    Inter Parliamentary UnionIPU

    Internal Security OrganisationISO

    Institute of Security StudiesISS

    Joint AIDS ReviewJAR

    Joint Permanent CommissionJPC

    Kampala Capital City AuthorityKCCA

    Local GovernmentLG

    Lords Resistance MovementLRA

    Monitoring & EvaluationM&E

    Markets and Agricultural Trade Improvement ProgrammeMATIP

    Ministries, Departments and AgenciesMDA

    Millennium Development GoalsMDGs

    Medicines, Health Services and Drugs Monitoring UnitMHSDMU

    Ministry of Internal AffairsMIA

    Ministry of Energy and Mineral DevelopmentMoEMD

    Ministry of Finance, Planning and Economic DevelopmentMoFPED

    Ministry of Local GovernmentMoLG

    Ministry of Public ServiceMoPS

    Memorandum of UnderstandingMoU

    Ministerial Policy StatementMPS

    MicrosoftMS

    Medium TermMT

    Medium Term Expenditure FrameworkMTEF

    Midterm ReviewMTR

    Makerere University Business SchoolMUBS

    National Agricultural Advisory ServicesNAADS

    National Anti Corruption StrategyNACS

    National Leadership InstituteNALI

    National AIDS Spending AssessmentNASA

    National Development PlanNDP

    Non Government OrganisationNGO

    National Resistance MovementNRM

    National HIV/AIDS Strategic PlanNSP

    National Secretariat for Patriotism ClubsNSPC

    National Social Security FundNSSF

    Preliminary

    v

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    Non Tax RevenueNTR

    Northern Uganda Social Action FundNUSAF

    National Water and Sewarage CorporationNWSC

    Output Oriented BudgetingOOB

    Office of the PresidentOP

    Office of the Vice PresidentOVP

    Poverty Action FundPAF

    Policy Analysis UnitsPAUs

    Policy Development GuidePDG

    Prosperity for AllPFA

    Public Finance and Accountability ActPFAA

    People Living with Human Immuno-deficiency VirusPLHIV

    Public Procurement and Disposal ActPPDA

    Public Private PartnershipsPPP

    Peace, Recovery and Development PlanPRDP

    Permanent SecretaryPS

    Permanent SecretariesPS

    Regulatory Best PracticesRBP

    Resident District CommissionersRDC

    Regulatory Impact AssessmentRIA

    Saving and Credit Cooperative OrganisationsSACCO

    Self Coordinating EntitiesSCE

    State HouseSH

    Small and Medium EnterprisesSME

    Sector Working GroupSWG

    Technical Working GroupTWG

    Uganda AIDS CommissionUAC

    Uganda Media CentreUMC

    United NationsUN

    United Nations Convention Against CorruptionUNCAC

    United Nations Office on Drugs and CrimeUNODC

    Uganda National Roads AuthorityUNRA

    Uganda People's Defence ForcesUPDF

    Universal Primary EducationUPE

    Uganda Revenue AuthorityURA

    Uganda Railways CorporationURC

    Universal Secondary EducationUSE

    Uganda ShillingsUshs

    Uganda ShillingsUshs/UGX

    Uganda TelecommunicationsUTL

    Value Added TaxVAT

    Vote FunctionVF

    Very Important PersonsVIP

    Preliminary

    vi

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    Vice PresidentVP

    World AIDS campaign initiativeWAD

    Young Empowered And HealthyYEAH

    Preliminary

    vii

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    Structure of the Ministerial Policy Statement

    The Ministerial Policy Statement is structured by Vote, as follows:

    This section sets out past performance and future plans for Central and Local Government Votes in

    more detail. It is structured as follows for each Vote: A Vote Overview sets out key details of the

    vote, including past performance, future plans and key performance issues to be addressed including

    costing implications.

    Annex Recommendations from parliament and institutional responses

    Vote Overview

    Vote Annexes

    Vote Functions

    Each Minister shall cause to be prepared and submitted to Parliament a Policy Statement of the relevant

    Ministry on the preliminary [budget] estimates .... by the 30th day of June in each year. Budget Act 2001,

    Section 6 (1)

    Structure

    Since the FY2011/12 budget cycle, the preparation of sector BFPs, Ministerial Policy Statements and

    Budget Estimates centre around the notion of Vote Functions. A Vote Function is a set of programmes,

    projects, and Local Government Grants, defining the roles and responsibilities of a vote/institution, and

    contributing towards the attainment of vote and overall sector objectives.

    As such, a Vote Function provides detailed information on centralised services, by capturing allocations to

    Central Ministries and Stand Alone Votes, and decentralised services funded via grants to Local

    Governments

    Provides details of approved staff structure for each programme and project (including names of staff

    and vacant posts). This is clearly demonstrated in the form of an organogram.

    Staff Establishment Structure

    Preliminary

    viii

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    Executive Summary

    The mandate, functions and powers of H.E the President and H.E the Vice President (the Presidency) are

    provided for under Articles 98 and 108 of the Constitution of the Republic of Uganda.

    The Vision of the Presidency is: A Secure, Well Governed and Developed Nation while the Mission Statement is: To provide Leadership in Public Policy Management and Good Governance for National

    Development. The Presidency comprises five Votes namely: Vote 001 Office of the President; Vote

    002 - State House; Vote 107 Uganda AIDS Commission; Vote 112 Ethics and Integrity; and Vote 159 External Security Organization and these have continued to pursue goals and execute activities aimed at

    actualizing the aforementioned Vision and Mission.

    Performance for the FY 2013/14

    The major accomplishments registered during the FY 2013/14 covered the broad areas of leadership and

    patriotism development; strengthening the monitoring of implementation of government programmes and

    projects; supporting policy formulation; enhanced coordination of the national responce to HIV/AIDS, and

    provision of security to Ugandans within and outside the country. Works were completed on five (05)

    government offices in Abim, Amuru, Buvuma, Kamuli and Otuke Districts; the population was mobilized

    towards peace and stablity, poverty reduction and development; and logistical support was provided to

    Cabinet in the formulation, determination and implementation of Government policy. Patriotism training

    programs were conducted; three national days celebrated and the offices of RDCs / DRDCs re-tooled. In the

    same vein, necessary logistical support was provided for the welfare and security of H.E the President and

    H.E the Vice President as well as their immediate families. The national response to HIV/AIDS scourge

    was coordinated especially through enlisting support from cultural and other Institutions; while the National

    Ethical Values Policy was approved and launched.

    In a bid to strengthen the monitoring of the implementation of government programs and projects, the

    Presidency organized one induction/orientation workshop for all Resident District Commissioners and their

    Deputies and a number of resolutions were made aimed at improving capacity to enforce better service

    delivery. New Boards and Committees were appointed. A new Board of Directors was constituted for the

    Uganda Printing and Publishing Corporation; while the mandates of the Board of the Uganda AIDS

    Commission and the Presidential Awards Committee were renewed with some new appointments. Also, the

    National Honours and Awards Regulations, 2013 were published. The Uganda Media Centre has continued

    to coordinate the provision of factual information concerning government policies and programmes within

    and abroad.

    Planned outputs for 2014/15

    In the FY 2014/15, the Presidency will maintain broad goals similar to those of FY 2013/14 including but

    not limited to strengthening the monitoring of the implementation of government programmes and projects,

    promotion of security, bilateral relations and good neighborliness, strengthening policy formulation,

    patriotism, leadership, good governance and accountability, coordination of HIV/AIDS multi-sectoral

    response and government communications. In pursuit of the above mentioned objectives, logistical support

    will be provided for the welfare and security of H.E the President and H.E the Vice President as well as

    their immediate families; masses and leaders mobilized country-wide towards socio-economic

    development; construct two government offices in Bundibugyo and Butambala Districts; and retool the

    offices of the RDCs / DRDCs by providing basic furniture, office equipment and vehicles. The National

    Anti Corruption Strategy (NACS) will be disseminated; and strengthen the collaboration with cultural and

    religious leaders and institutions in the national HIV /AIDS prevention effort. Internal and external security

    Preliminary

    ix

  • Office of the PresidentMPS:

    Ministerial Policy StatementOffice of the President

    services shall be strengthened and provided for the protection of Ugandans, and their property as well as

    our territorial integrity.

    The Presidency will engage all Ministries, Departments and Agencies with a view to agree on the

    mechanisms for the involvement of RDCs/DRDCs in the monitoring of implementation of government

    programmes In their respective districts. Related to the above, the MDAs are being urged to avail copies to

    RDCs/DRDCs of all the contracts and progress reports of all programmes and projects being Implemented

    in the districts to ensure proper and timely dissemination of information to the citizens. A three-year

    strategic plan for the Directorate of Economic Affairs and Research was developed and it re-orients the

    Directorate to monitor Key Economic Government programmes/projects and policies as per the new M&E

    framework through synergies and collaborative arrangements with other key organs of Government.

    Hon. Speaker and Members, the major challenge facing the Presidency is the constrained budget vis--vis a

    wide and varied mandate.

    Budget request for FY 2014/15

    Rt. Hon. Speaker, in order to fulfill the above stated plans in the FY 2014/15, I am seeking Parliamentary

    approval of the following budget: Shs. 78,535,010,299/= Recurrent , Shs. 4,976,137,243/= Development

    expenditure for Vote 001 Office of the President (Including ISO); Shs. 233,352,292,446/= Recurrent ,

    Shs18,684,030,302/= Development expenditure for Vote 002 State House; Shs 227,809,000/=

    Development expenditure for Vote 107 Uganda AIDS Commission; Shs. 4,680,804,660/= Recurrent and Shs 1,210,596,691/= Development expenditure for Vote 112 Ethics and Integrity and Shs. 15,848,956,874/= Recurrent and Shs 392,000,000/= Development expenditure for Vote 159 External

    Security Organization.

    I beg to move.

    Preliminary

    x

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    The chart below shows total funding allocations to the Vote by Vote Function over the medium term:

    Table V1.1: Overview of Vote Expenditures (UShs Billion)(ii) Summary of Past Performance and Medium Term Budget Allocations

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    20

    Cab

    inet

    Su

    pp

    ort

    an

    d

    Po

    licy

    Dev

    elo

    pm

    en

    t

    Co

    ord

    inati

    on

    of

    the

    Secu

    rity

    Secto

    r

    Eco

    no

    mic

    Po

    licy

    Mo

    nit

    ori

    ng

    ,Ev

    alu

    ati

    on

    & I

    nsp

    ecti

    on

    Go

    vern

    men

    t

    Mo

    bil

    isati

    on

    , M

    ed

    ia

    an

    d A

    ward

    s

    Po

    licy

    , P

    lan

    nin

    g a

    nd

    Su

    pp

    ort

    Serv

    ices

    Ush

    s B

    illi

    on

    2013/14 Approved Budget Estimates 2014/15 Budget Projections 2015/16 Budget Projections

    Chart V1.1: Medium Term Budget Projections by Vote Function (Excluding Taxes, Arrears)

    V1: Vote Overview

    "To provide leadership in public policy management and good governance for National Development".

    (i) Vote Mission Statement

    Wage

    Non Wage

    GoU

    Ext. Fin

    GoU Total

    Total GoU + Ext Fin (MTEF)

    Development

    Recurrent

    Taxes 0.5910.590 0.000 0.630

    Total Budget 38.31959.790 31.017 39.490

    (ii) Arrears

    and Taxes

    Arrears 0.0005.210 0.000 0.009 N/A

    N/A

    N/A

    N/A

    N/A N/A

    (i) Excluding Arrears, Taxes

    13.3468.8587.496 6.685 10.707 11.456

    26.27524.12544.732 21.871 24.650 25.143

    3.7133.4941.762 2.461 3.494 3.536

    0.0001.2510.000 0.000 0.000 0.000

    43.33436.47853.990 31.017 38.851 40.135

    43.33437.72953.990 31.017 38.851 40.135

    2016/172012/13

    Outturn

    Rel. by

    End Mar

    Approved

    Budget 2014/15 2015/16

    MTEF Budget Projections2013/14

    Vote Overview

    1

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    V2: Vote Performance for FY 2013/14 and Planned Outputs for FY 2014/15

    (i) Past Vote Outputs

    This section describes past vote performance and planned Outputs, in terms of key vote outputs

    Economic Policy Monitoring, Evaluation and Inspection:

    A three year Strategic Plan was developed for the Directorate of Economic Affairs and Research with

    support from GIZ. Monitored the development of industrial parks in eight (8) districts as well as the

    progress of value addition initiatives in the agricultural sector with respect to beef/dairy, vegetable oil,

    cotton, tea, horticulture, fisheries, sugarcane and coffee in forty one (41) districts. Reports with summaries

    of key findings and recommendations were developed and disseminated to line MDAs for action. Reviewed

    the implementation of Pension reforms as well as the oil and gas policy and agricultural financing

    initiatives. Developed a concept note on government land titling in liaison with the line Ministry.

    Undertook a study on the challenges of railway and water transport services in the Eastern, Northern and

    Central regions of Uganda, reports produced and disseminated. Trained staff and selected RDCs/DRDCs in

    M&E and policy analysis. Carried out a capacity needs assessment for the training needs of RDCs/DRDCs.

    The Manifesto Implementation Unit researched and collected information on water and agriculture sectors;

    analyzed reports from Ministries of Health and Energy and conducted monitoring visits in Bushenyi,

    Hoima, Kasese, Manafwa, Butaleja to assess the status of their implementation of the Manifesto. The

    findings were summarized in three (03) quarterly reports which were distributed to stakeholders.

    Cabinet Support and Policy Development:

    The Cabinet Secretariat supported Cabinet by ensuring that all Cabinet meetings were facilitated and

    decisions were captured. In particular, a Cabinet retreat for Ministers was held; 40 sets of Agendas and 40

    sets of Minutes were issued to Ministers; 9 Agenda and 9 sets of Minutes were issued to Permanent

    Secretaries; 110 draft Cabinet submissions were reviewed for accuracy and quality within 08 working days

    and 2662 extracts of Cabinet decisions issued to Ministers, Ministers of State and Permanent Secretaries.

    A mission to Ontario, Canada took place from 10th to 25th August 2013 to commence development of the

    training curriculum for Policy Capacity development of the Public Service, while two (2) Cabinet Officers

    were supported to attend a training in Public Policy Analysis and 1 Officer attended training in Leadership

    and Change Management facilitated by the Eastern and Southern African Management Institute (ESAMI) in

    Tanzania and South Africa respectively.

    Preliminary 2013/14 Performance

    (iii) Vote Outcomes and Outcome Indicators

    The table below sets out the vote outcomes and outcome indicators

    Table V1.3: Vote Outcomes and Outcome Indicators

    Outcome Statement Outcome Indicators Baseline Target

    FY2014/15

    Base year

    Leadership and Public policy

    management strengthened for good

    governance

    201145%Percentage of Cabinet submissions

    complying with the adequacy

    checklist based on the initial

    submission

    80%

    N/AN/APercentage of policies to Cabinet

    responsive to NDP Priorities

    80%

    2010N/AProportion of the population aware of

    their role in government

    programs/projects/policies

    N/A

    N/AN/AThe Office of the President indirectly

    contributes to wealth creation, food

    security and job creation by vetting

    policy submissions from MDAs to

    ensure that they are in responsive to

    the NDP priorities

    Yes

    Vote Overview

    2

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Table V2.1: Past and 2014/15 Planned Key Vote Outputs

    The Cabinet Handbook and the guide to Policy Development & Management were revised and distributed

    to Ministries, Departments and Agencies.

    Government Mobilization, Media and Awards:

    Under the Vote Function of Government Mobilization, Media and Awards, the Vote through the offices of

    the RDCs / DRDCs conducted 598 sensitization awareness and mobilization programs of the population to

    support government programs / projects; monitored 995 Government programmes and projects; conducted

    Leadership training programs at NALI; organized three (03) National celebrations viz; the 51st

    Independence Anniversary celebrations held on 9th October 2013 in Rukungiri District, the 28th Victory

    Day Celebrations held on 26th January 2014 in Mayuge District and the 25th Heroes' Day celebrations held

    on 9th June 2014 in Mityana District; held nine (09) cross border meetings and one (01) Joint Border

    Commissioners' meeting; held six (06) investiture ceremonies i.e. the 51st Independence Anniversary

    Celebrations on 9th October, 2013; the 28th Victory Day celebrations; (Tarehe Sita) celebrations on 6th

    Feb. 2014; International Womens day celebrations on 8th March 2014; the Labour Day celebrations on 1st

    May 2014; and the Heroes' Day celebrations on 9th June 2014; conducted three (03) major Patriotism

    training programs for 1,858 teachers; Mobilized and coordinated Groups in the Diaspora; procured ten (10)

    double cabin pickups for the RDCs / DRDCs and conducted an induction / refresher course for RDCs /

    DRDCs at the National Leadership Institute Kyankwanzi to enhance effective monitoring of government

    programs / projects.

    In an effort to ensure consistent and accurate reflection of Uganda in the media, the Vote coordinated

    coverage of 59 Field Presidential functions; processed 1642 accreditation for local and International

    journalists; issued 300 press releases; organized 340 radio talk shows and 109 TV Talk shows which were

    attended by government officials; organized and held 107 Press Briefings; produced and distributed 6000

    copies of magazines for the Independence Day, Victory Day and Heroes' Day celebrations.

    The Vote is also in the process of producing a Handbook for RDCs to ensure coherent dissemination of key

    government programs / projects.

    Policy Planning and Support Services:

    Under the Vote Function of Policy, Planning and Support services, the Vote coordinated activities of Public

    Administration Sector Working Group (SWG). Specifically, two (02) meetings of the SWG and 06

    meetings of Technical Working Group (TWG) were held; coordinated and submitted to the Office of the

    Prime Minister Vote contributions to Government Annual Performance Report for FY 2012/13 and

    Government Half Annual Performance Report for FY 2013/14 and; built capacity for nine (09) officers to

    undertake various performance improvement courses.

    Construction was undertaken and works completed for five (05) government offices in Abim, Amuru,

    Buvuma, Kamuli and Otuke Districts; whereas construction is on-going at Butaleja and Rubirizi Districts.

    Renovation for the RDCs office in Serere District was also completed.

    Achievements by End MarchPlanned outputs Planned Outputs

    2013/14Vote, Vote Function Key Output

    2014/15

    Vote: 001 Office of the President

    Vote Function: 1601 Economic Policy Monitoring,Evaluation & Inspection

    Monitoring the performance of government policies, programmes and projects160101Output:

    Monitoring conducted to assess

    the implementation of the PMA

    framework as regards

    commercial farming, marketing

    and agro-processing.

    Held three stakeholders'

    dialogue meetings on the

    Macroeconomic outlook, health

    service delivery and

    performance of education

    sector. Actionable

    recommendations were

    generated and disseminated to

    relevant MDAs for

    implementation.

    Monitoring conducted to assess

    progress of establishment of

    Irrigation schemes and water

    harvesting technologies for

    increased agricultural

    productivity

    Progress of Energy production

    projects and schemes

    monitored; hydro-power, solar

    and biogas.

    Description of Outputs:

    Vote Overview

    3

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Achievements by End MarchPlanned outputs Planned Outputs

    2013/14Vote, Vote Function Key Output

    2014/15

    Monitored the development of

    industrial parks in eight (8)

    districts as well as the progress

    of value addition initiatives in

    the agricultural sector with

    respect to beef/dairy, vegetable

    oil, cotton, tea, horticulture,

    fisheries, sugarcane and coffee

    in forty one (41) districts.

    Reports with summaries of key

    findings and recommendations

    were developed and

    disseminated to line MDAs for

    action.

    Economic policy implementation160102Output:

    Inspections carried out to assess

    the performance of the transport

    sector in the country and

    Stakeholder consultative

    meetings held on policy issues

    aimed at generating actionable

    recommendations for line

    MDAs to present them to the

    attention of Cabinet for action

    Monitoring conducted to assess

    the performance of Uganda

    Railways Corporation (URC)

    and water transport services for

    which a report has been

    produced and recommendations

    forwarded to relevant MDAs for

    action.

    Inspection undertaken to assess

    the status of tourism roads in

    Bwindi Impenetrable National

    Park and a report produced with

    actionable recommendations

    that were forwarded to relevant

    MDAs for appropriate action.

    Monitoring activities carried out

    in the water and rail sub-sectors

    given the large scope of these

    two transport sub-sectors. Air

    transport to be handled in

    subsequent quarter.

    Inspections carried out to assess

    developments in the oil and

    mining sector.

    Special inspections carried out

    on the utilization and

    management of Local

    Government funds.

    Description of Outputs:

    Economic Research and Information160104Output:

    Policies reviewed to identify

    policy weaknesses with the aim

    of generating actionable

    recommendations for policy

    development. This will be in

    the: Energy sector (Oil and

    Gas), Pension, Insurance and

    Microfinance

    Research conducted on the

    implementation and

    performance of the pension

    policy and a report produced

    and submitted to relevant

    MDAs for appropriate action.

    Research carried out to assess

    the progress in the development

    of the Energy (oil and gas)

    sector, the report is in draft form.

    Research on Agricultural

    Financing on-going.

    Undertake a study on the

    strategies in the skills

    development policy to ensure

    that it addresses the

    requirements in the Vision 2040.

    Selected Public Private

    Partnership initiatives analysed.

    Three-year Strategic Plan for

    DEAR implemented.

    Description of Outputs:

    Vote Function: 1602 Cabinet Support and Policy Development

    Cabinet meetings supported160201Output:

    1.Proportion(Percentage) of

    Cabinet decisions

    communicated to MDAs within

    4 working days after

    confirmation of Minutes by

    Cabinet. 2.Average time(days)

    taken to scrutinise Cabinet

    submissions.

    1.40 Agenda, and Minutes of

    Cabinet meetings issued.

    2. 9 Agenda and Minutes of PS'

    meetings issued.

    3. 110 Draft Cabinet

    Submissions reviewed for

    60 Agenda and Minutes issued

    to Ministers and Ministers of

    State.

    12 Agenda and 12 sets of

    minutes issued to all PS';

    248 draft cabinet submissions

    Description of Outputs:

    Vote Overview

    4

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Achievements by End MarchPlanned outputs Planned Outputs

    2013/14Vote, Vote Function Key Output

    2014/15

    adequacy.

    4. 2,662 Extracts of Cabinet

    Decisions Issued to Ministers,

    Ministers of State and

    Permanent Secretaries.

    5. Returns on implementation

    of Cabinet Decisions placed on

    the Cabinet Agenda every

    month.

    6. Cabinet Records (Minutes

    and Memoranda) for 2012 and

    2013 sorted and bound and part

    of 2014 sorted.

    7. Four (4) Cabinet Committee

    Meetings facilitated.

    8. One (01) Ceremonial

    function of Cabinet managed.

    reviewed for adequacy;

    4,800 extracts of cabinet

    decisions issued to ministers

    and PS';

    Returns on implementation of

    Cabinet decisions placed on the

    Cabinet Agenda every month;

    Cabinet records for 2013 and

    2014 sorted and bound and part

    of 2015 sorted;

    6 Cabinet Committee meetings

    facilitated;

    Ceremonial functions of

    Cabinet managed

    Capacityfor policy formulation strengthened160203Output:

    Comprehensive Long Term

    Policy Capacity Development

    Plan for the Public Service

    Developed. Needs Assessment

    Report on Policy Capacity in

    MDAs developed and

    disseminated to all MDAs. Top

    and Senior Managers in

    Ministries and Departments

    trained in Policy Formulation

    and Management. Government

    Strategic Communications

    facilitated. Policy Resource

    Materials developed and

    disseminated to MDAs.

    1.Implementation of the training

    curriculum for the

    Comprehensive Long Term

    Policy Capacity Development

    Plan (CLTPCDP) for the Public

    Service commenced.

    2. Training curriculum and

    content for Policy Analysts

    developed the the CLTPCDP

    3. Meeting of Policy Analysts in

    Ministries, Departments and

    Agencies held.

    4. Annual Cabinet Retreat

    Organised.

    5. Policy Resource Materials

    namely; 200 copies of the

    Cabinet handbook developed

    and disseminated to MDAs.

    Implementation of the

    Comprehensive Long Term

    Policy Capacity Development

    Plan for the Public Service

    continued.

    The Regulatory Best Practice

    Framework Implemented;

    Newly recruited staff trained /

    inducted.

    Meetings for policy practioners

    held.

    Computerisation of Cabinet

    Memos Completed.

    Support to Ministry of Public

    Service to review and establish

    competencies for Policy

    Analysts provided.

    Description of Outputs:

    Vote Function: 1603 Government Mobilisation, Media and Awards

    Mobilisation and Implementation Monitoring160352Output:

    Sensitisation and awareness

    campaign programmes

    conducted in all districts.

    Government programs

    monitored. National Patriotism

    Secretariat offices staffed and

    equipped. Patriotism clubs

    coordinated country wide.

    409 Sensitisation and

    mobilization reports submitted

    by the RDCs to the Office of the

    President.

    Awareness campaign

    programmes conducted in all

    the 112 Districts - 152 Radio

    talk shows held.

    1394 Government

    programmes/projects monitored

    and inspected in the Districts.

    Leadership training programmes

    conducted for five categories

    viz; Members of Parliament;

    Sensitisation and awareness

    campaign programmes

    conducted in all districts.

    Government programs

    monitored in all Districts.

    Four (04) regional Workshops

    for RDCs/DRDCs held.

    Leadership training programs

    provided at the National

    Leadership Institute

    Kyankwanzi.

    Description of Outputs:

    Vote Overview

    5

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Economic Policy Monitoring, Evaluation & Inspection:

    Under this Vote Function, monitoring will be conducted to asses progress of: establishment of Irrigation

    schemes and water harvesting technologies for increased agricultural productivity; Energy production

    projects and schemes; hydro-power, solar and biogas. Inspections will be carried out to assess developments

    in the oil, mining and the ICT sectors after which dialogue meetings will be organized for key stakeholders

    in the sectors to formulate performance improvement strategies. The Vote will undertake a study on the

    strategies in the skills development policy to ensure that it addresses the requirements of Vision 2040.

    Selected Public Private Partnership initiatives will be analyzed and their impact assessed; and commence

    implemetation of the three-year Strategic Plan for DEAR.

    Cabinet Support and Policy Development

    The Vote plans to maintain the time within which Cabinet Decisions are communicated to MDAs at (3)

    three working days after confirmation of Minutes by theCabinet; provide Secretarial and Logistical support

    to Cabinet and its Committees; reduce the average time taken to scrutinize Cabinet Submissions from (08)

    eight days to (6) days as a result of increased capacity arising from newly recruited staff, as well as provide

    technical guidance to MDAs in the preparation of Cabinet submissions. The Cabinet Secretariat will also

    continue the implementation of the Comprehensive Long Term Policy Capacity Development Plan for

    Policy Analysts and senior Managers in the entire Public Service; provide strategic policy advice to the

    Presidency and organs of Government, and facilitate ceremonial functions of Cabinet. The Cabinet

    Secretariat will continue to build capacity for policy development in Government and will specifically

    develop and distribute policy development resource materials (guides, manuals and templates), develop

    skills of Cabinet Ministers and policy officials in MDAs and equip the Cabinet Secretariat Staff with

    knowledge, skills and modern methods of supporting cabinet to make evidence based decisions and

    implement them.

    Government Mobilization, Media and Awards:

    Under this Vote Function will continue to build on the achievements of the past year to: mobilize the

    population for active participation, support and involvement in national development programs; support the

    offices of the RDCs/DRDCs in monitoring the implementation of government programmes for improved

    service delivery; support and coordinate the countrywide operations of Patriotism Clubs in secondary

    schools to nurture a spirit of nationalism; management of government information and media coverage both

    locally and internationally.

    The National Honors and Awards Chancery will organize 06 (six) investiture ceremonies for the

    conferment of honors and awards. Eight (08) Cross-border meetings will be facilitated and 03 National

    2014/15 Planned Outputs

    V3: Detailed Planned Outputs for FY 2014/15

    Achievements by End MarchPlanned outputs Planned Outputs

    2013/14Vote, Vote Function Key Output

    2014/15

    177 RDCs / DRDCs; 133

    Principal Human Resource

    Officers; 150 youth from

    Rukungiri; and 202 URA

    graduate trainees.

    Physical infrastructure and

    equipment at NALI maintained.

    Vote Function: 1604 Coordination of the Security Sector

    Coordination of Security Services160401Output:

    Security Agencies coordinated.

    Security guideline issued. Inter

    agency reports analysed

    Security Agencies coordinated.

    Security guideline issued.

    Inter agency reports analysed.

    Security Agencies coordinated.

    Security guideline issued.

    Inter agency reports analysed.

    Description of Outputs:

    Vote Function: 1649 Policy, Planning and Support Services

    Vote Overview

    6

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001functions organized namely; Independence Day Celebrations; Victory Day celebrations and Heroes Day

    celebrations. Four (04) four regional training workshops to build capacity for RDCs/DRDCs in monitoring

    and inspection of Government programs will also be conducted.

    Policy planning and support services:

    The Vote Function of Policy, Planning, Consultation and Support services will continue to perform its role

    of coordinating and supporting the operations of Departments to ensure efficient management of human,

    financial and physical resources. The major outputs shall include: construction of two (02) office premises

    for RDCs in Bundibugyo and Butambala Districts; renovation of 02 RDC offices in Mubende and Lira

    Districts; procurement of office equipment and furniture; as well as acquistion of a heavy duty standby

    generator and a luggage scanner for the new office block. In addition, manage the servicing and

    maintenance of vehicles; manage the provision of utilies; provide staff welfare; monitor and appraise staff

    performance; and coordinate the activities of the Public Administration Sector Working Group in general

    and the production of the Public Administration Sector Development Plan in particular.

    Table V3.1: Vote Function Profiles, Programme/Project Profiles and Workplan Outputs

    Vote Function: Economic Policy Monitoring,Evaluation & Inspection16 01

    Services:

    Responsible Officer:

    Vote Function Profile

    The Directorate of Economic Affairs and Research consists of two Departments

    namely; Monitoring and Evaluation and Economic Affairs and Policy

    Development. The Directorate conducts research on economic issues and

    performance of the economy. The Monitoring and Evaluation Department collects

    and analyses information which is in turn used for decision making by the

    Presidency to ensure efficient and effective utilisation of resources. The

    Department of Economic Affairs and Policy Development provides the Presidency

    with timely and well researched information on performance of the economy,

    implementation of government policies, and proposals for policy review.

    The Manifesto Implementation Unit exists to coordinate and monitor progress in

    the implementation of programmes in the NRM 2011-16 Election Manifesto.

    Director, Economic Affairs and Research

    Vote Function Projects and Programmes:Project or Programme Name Responsible Officer

    Recurrent Programmes

    03 Monitoring & Evaluation Director, Directorate of Economic Affairs & Research

    04 Monitoring & Inspection Director, Directorate Economic Affairs & Research

    05 Economic Affairs and Policy Development Director, Economic Affairs & Research

    12 Manifesto Implementation Unit Director, Manifesto Implementation Unit

    Programme 03 Monitoring & Evaluation

    Director, Directorate of Economic Affairs & Research

    -To ensure that government policies/programs/projects are effectively monitored and

    evaluated.

    -To regularly monitor and provide information on performance of MDAs and LGs to the

    Presidency and ensure that appropriate measures are taken to solve any operational problems

    that may be detected.

    -Monitor and evaluate the implementation and performance of government

    programmes/projects.

    -Activities involve carrying out monitoring exercises, evaluation and convening of

    stakeholders' meetings for consultation, report presentation and dissemination of findings and

    Responsible Officer:

    Objectives:

    Outputs:

    Programme Profile

    Vote Overview

    7

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Economic Policy Monitoring,Evaluation & Inspection16 01

    Programme 03 Monitoring & Evaluation

    Workplan Outputs for 2013/14 and 2014/15

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    Monitoring conducted to assess

    the implementation of key

    economic government

    programs/projects including but

    not limited to; the development

    of indusrial parks and value

    addition projects with emphasis

    on commercial farming,

    marketing and agroprocessing

    in the following sub-sectors;

    beef, milk, palm oil (kalangala),

    sunflower, sugarcane, cattle

    ranches, cotton, tea, coffee,

    horticulture (flowers, vegetables

    and fruits) and fish farming.

    Consultation meetings held

    vaious MDAs that oversee the

    implementation and promote

    development of the sub-sectors

    mentioned above.

    Held three stakeholders'

    dialogue meetings on the

    Macroeconomic outlook, health

    service delivery and

    performance of education

    sector. Actionable

    recommendations were

    generated and disseminated to

    relevant MDAs for

    implementation.

    Monitored the development of

    industrial parks in eight (8)

    districts as well as the progress

    of value addition initiatives in

    the agricultural sector with

    respect to beef/dairy, vegetable

    oil, cotton, tea, horticulture,

    fisheries, sugarcane and coffee

    in forty one (41) districts.

    Reports with summaries of key

    findings and recommendations

    were developed and

    disseminated to line MDAs for

    action.

    Monitoring the

    performance of

    government policies,

    programmes and projects

    Monitoring conducted to assess

    progress of establishment of

    Irrigation schemes and water

    harvesting technologies aimed

    at increasing agricultural

    productivity.

    Progress of Energy production

    projects and schemes monitored

    with focus on hydro-power,

    solar and biogas.

    010116

    Wage Recurrent

    Non Wage Recurrent

    Total

    41,199

    581,950

    623,149

    24,362

    316,946

    341,308

    41,195

    581,950

    623,144

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    41,199

    581,950

    623,149

    24,362

    316,946

    341,308

    41,195

    581,950

    623,144

    recommendations to concerned MDALGs.

    Annual Workplan for 2014/15 - Outputs, Activities, Inputs and their Cost

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    Monitoring conducted to assess progress of establishment of Irrigation

    schemes and water harvesting technologies aimed at increasing

    agricultural productivity.

    Progress of Energy production projects and schemes monitored with focus

    on hydro-power, solar and biogas.

    Undertake literature review.

    Develop a data collection framework.

    Carry out harmonised monitoring for all districts where identified

    activities are being implemented through unified monitoring by RDCs.

    Engage respective implementing MDAs to ensure effective monitoring of

    programs/projects.

    Conduct verification field trips.

    Produce harmonized reports on program implementation.

    Engage MDAs on the findings.

    Monitoring the performance of government policies, programmes and projects010116

    Activities to Deliver Outputs:

    Planned Outputs:

    Output:

    Inputs Quantity Cost

    1 Commissioner field allowance (8x12) () 96.0 13,920

    MSEM allowances (8x12) () 0.0 0

    Servicing of vehicles (5x12) () 60.0 120,000

    air ticket (charge) 3.0 3,757

    per diem (3 persons) (day) 23.0 22,902

    Per diem (minister) (day) 7.0 10,150

    Oils and Lubricants (items) 15.6 7,800

    Fuel for office coordination (litres) 20,000.0 67,000

    monthly fuel for monitoring trips (2388ltrs x 12)

    (litres)

    28,498.1 95,469

    DSTV for Director's Office (Monthly) 12.0 4,000

    1 Asst. Commissioner field allowances (8x12)

    (night)

    96.0 12,480

    4 drivers' allowances (night) 384.0 21,120

    6 technical staff field allowances (9x8x12) (night) 864.0 95,040

    Bodyguard allowance (night) 96.0 6,720

    MSEM allowances (8x12) (night) 96.0 17,760

    Anti-virus software (packs) 20.0 1,800

    Permanent Staff (Person Years) 8.0 41,195

    Colored toner (piece) 4.0 1,840

    External hard disks (piece) 4.0 920

    Flash disks (piece) 24.0 1,440

    Vote Overview

    8

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Economic Policy Monitoring,Evaluation & Inspection16 01

    Programme 03 Monitoring & Evaluation

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    Wage Recurrent

    Non Wage Recurrent

    Total

    41,195

    581,950

    623,144

    Hubs (piece) 2.0 800

    Toner Cartridge 05A (piece) 6.0 2,280

    Toner Cartridge 1230 D (piece) 12.0 1,800

    Toner Cartridge 35A (piece) 6.0 1,260

    Toner Cartridge 42A (piece) 6.0 2,880

    Toner Cartridge 53A (piece) 6.0 2,280

    Newspapers (8x31x12) (pieces) 2,976.0 4,464

    periodicals (pieces) 41.0 1,204

    Stationery (pieces) 1,099.4 21,989

    Cross cutting issues (service) 4.0 2,000

    Printing (service) 5.0 1,500

    Maintenance of office equipments (1x12) (services) 12.0 6,000

    Medical expenses (Services) 4.0 3,320

    Air Tickets (ticket) 1.0 8,555

    short courses at Esami (tuition) 2.0 9,000

    Universal Power Supply (unit) 10.0 8,500

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    41,195

    581,950

    623,144

    Programme 04 Monitoring & Inspection

    Workplan Outputs for 2013/14 and 2014/15

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    Inspections carried out to assess

    the performance of the economy

    with reference to key sectors i.e

    transport sector with respect to

    accessibility, facilitation of

    internal and external trade and

    promotion of tourism. Focus

    will be put on rail, air and water

    transport.

    Monitoring conducted to assess

    the performance of Uganda

    Railways Corporation (URC)

    and water transport services for

    which a report has been

    produced and recommendations

    forwarded to relevant MDAs

    for action.

    Inspection undertaken to assess

    the status of tourism roads in

    Bwindi Impenetrable National

    Park and a report produced with

    actionable recommendations

    that were forwarded to relevant

    MDAs for appropriate action.

    Monitoring activities carried out

    in the water and rail sub-sectors

    given the large scope of these

    two transport sub-sectors. Air

    transport to be handled in

    subsequent quarter.

    Economic policy

    implementation

    Inspections carried out to assess

    developments in the oil and

    mining sectors.

    Inspections carried out on

    emerging economic issues as

    assigned by the Minister of

    State for Economic Monitoring.

    020116

    Director, Directorate Economic Affairs & Research

    To improve service delivery in Government through strengthening inspectorate units in

    programs/project/ policy implementation.

    Inspections conducted to track the progress of implementation of government investment

    projects.

    Responsible Officer:

    Objectives:

    Outputs:

    Programme Profile

    Vote Overview

    9

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Economic Policy Monitoring,Evaluation & Inspection16 01

    Programme 04 Monitoring & Inspection

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    Wage Recurrent

    Non Wage Recurrent

    Total

    43,751

    282,700

    326,451

    25,870

    182,706

    208,577

    43,751

    282,700

    326,451

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    43,751

    282,700

    326,451

    25,870

    182,706

    208,577

    43,751

    282,700

    326,451

    Annual Workplan for 2014/15 - Outputs, Activities, Inputs and their Cost

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    Inspections carried out to assess developments in the oil and mining

    sectors.

    Inspections carried out on emerging economic issues as assigned by the

    Minister of State for Economic Monitoring.

    Conduct literature review on selected programs/projects.

    Hold meetings with key stakeholders for data collecion.

    Conduct inspections to assess programs/projects performance.

    Hold consultation meetings with all stakeholders for harmonisation.

    Produce reports and disseminate findings and propose recommendations

    for policy intervention.

    Economic policy implementation020116

    Wage Recurrent

    Non Wage Recurrent

    Total

    43,751

    282,700

    326,451

    Activities to Deliver Outputs:

    Planned Outputs:

    Output:

    Inputs Quantity Cost

    Office telephone charges (airtime) 12.7 7,600

    Monthly office imprest (assorted) 12.0 35,285

    Internet services (bill) 4.0 2,800

    toner (cartridges) 23.0 9,660

    Regional meetings on M&E for RDCs/DRDCs

    (hotel hire)

    4.0 50,000

    Fuel (litres) 571.4 2,000

    Fuel for regional RDCs/DRDCs mtgs (litres) 10,000.0 35,000

    Allowances (night) 100.0 11,000

    Per diem (minister) (night) 14.0 20,911

    Per diem for M&E trips (15 officers) (per diem) 480.0 52,800

    Permanent Staff (Person Years) 7.0 43,751

    Flash disks (pieces) 5.0 340

    Trips to follow up emerging issues in RDC reports

    (quarterly trips)

    4.9 52,200

    Air tickets (ticket) 1.0 704

    Short courses (tuition) 4.0 2,400

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    43,751

    282,700

    326,451

    Programme 05 Economic Affairs and Policy Development

    Workplan Outputs for 2013/14 and 2014/15

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    Policies reviewed to identify

    policy weaknesses with the aim

    Research conducted on the

    implementation and

    Economic Research and

    Information

    Undertake a study on the

    strategies in the skills

    040116

    Director, Economic Affairs & Research

    To strengthen the policy making process through participation in policy analysis and review.

    Outputs include;

    Research conducted on the effectiveness of policy implementation and key sectors of the

    economy.

    Staff capacity in policy development and analysis strengthened.

    Responsible Officer:

    Objectives:

    Outputs:

    Programme Profile

    Vote Overview

    10

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Economic Policy Monitoring,Evaluation & Inspection16 01

    Programme 05 Economic Affairs and Policy Development

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    of generating actionable

    recommendations for policy

    development in the areas of;

    Energy (Oil and Gas sector),

    Investment and Taxation and

    Microfinance.

    performance of the pension

    policy and a report produced

    and submitted to relevant

    MDAs for appropriate action.

    Research carried out to assess

    the progress in the development

    of the Energy (oil and gas)

    sector, the report is in draft

    form.

    Research on Agricultural

    Financing on-going.

    development policy to ensure

    that it addresses the

    requirements of the Vision

    2040.

    Selected Public Private

    Partnership initiatives analysed.

    Three-year Strategic Plan for

    DEAR implemented.

    Wage Recurrent

    Non Wage Recurrent

    Total

    30,657

    234,809

    265,466

    18,128

    141,834

    159,963

    30,657

    234,809

    265,466

    Staff equipped with skills in

    monitoring and evaluation; and

    policy development and analysis.

    Capacity needs assessment

    study carried out to establish

    training needs for

    RDCs/DRDCs.

    Tailor made courses developed

    and RDCs/DRDCs trained to

    build capacity in monitoring of

    government programs/projects.

    Two (02) staff facilitated to

    travel to South Africa for policy

    development analysis and

    evaluation training.

    Capacity needs assessment

    study is ongoing to establish

    training needs for

    RDCs/DRDCs.

    Some RDCs/DRDCs trained to

    build capacity in monitoring of

    government programs/projects.

    Economic policy

    development strengthened

    Staff equipped with skills - Staff

    facilitated to attend short and

    long courses .

    050116

    Wage Recurrent

    Non Wage Recurrent

    Total

    12,125

    150,521

    162,646

    7,170

    88,436

    95,606

    12,125

    150,521

    162,646

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    42,783

    385,330

    428,112

    25,298

    230,271

    255,569

    42,783

    385,330

    428,112

    Annual Workplan for 2014/15 - Outputs, Activities, Inputs and their Cost

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    Undertake a study on the strategies in the skills development policy to

    ensure that it addresses the requirements of the Vision 2040.

    Selected Public Private Partnership initiatives analysed.

    Three-year Strategic Plan for DEAR implemented.

    Literature review

    Data collection

    Organise meetings with key stakeholders.

    Produce reports with recommendations to guide policy development after

    consultations with stakeholders.

    Economic Research and Information040116

    Activities to Deliver Outputs:

    Planned Outputs:

    Output:

    Inputs Quantity Cost

    contributions to staff () 4.0 2,000

    Airtime for the MSEM (airtime) 12.0 3,000

    Subsistence allowance (allowance) 31.1 4,507

    allowances for facilitators (allowances) 10.0 1,000

    assorted office stationery (assorted) 12.0 8,960

    stationery (assorted) 4.0 4,000

    Electricity (bills) 1.0 3,000

    Water (bills) 1.0 2,000

    water (bottle) 600.0 1,800

    toner (cartridges) 4.0 1,000

    Medical support to staff (contribution) 12.0 8,592

    venue hire (hall) 4.0 4,000

    Fuel for coordination (litres) 918.0 3,213

    transport refund (litres) 7,262.8 25,420

    Data for modems (Monthly) 12.0 1,800

    Subscription to DSTV for MSEM (monthly) 12.0 3,597

    teas and refreshment for the minister's office

    (monthly)

    12.0 10,000

    Newspapers for MSEM office (newspapers) 1,440.0 2,160

    printing and binding (pages) 200.0 4,000

    Buffet meal (person) 200.0 6,000

    Vote Overview

    11

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Economic Policy Monitoring,Evaluation & Inspection16 01

    Programme 05 Economic Affairs and Policy Development

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    Wage Recurrent

    Non Wage Recurrent

    Total

    30,657

    234,809

    265,466

    morning, break and evening bites (person) 600.0 12,000

    sitting allowances (person) 200.0 18,000

    Permanent Staff (Person Years) 3.0 30,657

    journals (pieces) 92.0 460

    assorted small office equipment (quarterly) 4.0 4,300

    Travel Abroad for MSEM (trip) 4.0 100,000

    Staff equipped with skills - Staff facilitated to attend short and long

    courses .

    Develop a training plan and nominate candidates to the training

    committee.

    Facilitate staff to attend relevant training courses.

    Economic policy development strengthened050116

    Wage Recurrent

    Non Wage Recurrent

    Total

    12,125

    150,521

    162,646

    Activities to Deliver Outputs:

    Planned Outputs:

    Output:

    Inputs Quantity Cost

    color toner (cartridges) 7.0 8,960

    Allowances (day) 72.7 8,000

    fuel (litres) 1,624.3 5,685

    meetings with stakeholders (meeting) 13.1 7,877

    Permanent Staff (Person Years) 2.0 12,125

    Courses in M&E and policy analysis (traiing) 4.0 40,000

    Capacity building in M&E skills for RDCs/DRDCs

    (training)

    2.0 80,000

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    42,783

    385,330

    428,112

    Programme 12 Manifesto Implementation Unit

    Workplan Outputs for 2013/14 and 2014/15

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    Reports from Ministries

    analysed

    Monitoring visits conducted in

    districts

    04 quarterly reports and 01

    annual report produced on the

    status of manifest

    implementation

    Copies of status reports on

    manifesto implementation

    distributed to stakeholders

    Media programmes (print and

    electronic) conducted to

    disseminate manifesto

    achievements

    Manifesto documentary updated

    Researched and collected

    information on the Water and

    Agricultural sectors; analyzed

    reports form the Ministry of

    Health and the Ministry of

    Minerals and Energy

    Development on their status of

    manifesto implementation.

    Conducted monitoring visits in

    Bushenyi, Hoima, Kasese,

    Manafwa and Butaleja Districts

    to assess the status of manifesto

    implementation.

    Produced three reports which

    were disseminated to

    stakeholders.

    Monitoring

    Implementation of

    Manifesto Commitments

    Four (04) reports from

    Ministries analysed on a

    quarterly basis.

    Twelve (12) Monitoring visits

    conducted in districts

    Quarterly reports and 01 annual

    report on the status of manifest

    implementation produced and

    disseminated to stakeholders.

    Media programmes (print and

    electronic) conducted to

    disseminate manifesto

    achievements

    Manifesto documentary updated

    030116

    Director, Manifesto Implementation Unit

    To ensure effective implementation of the Manifesto.

    Periodical and Annual status reports on Manifesto implementation produced and disseminated.

    Responsible Officer:

    Objectives:

    Outputs:

    Programme Profile

    Vote Overview

    12

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Economic Policy Monitoring,Evaluation & Inspection16 01

    Programme 12 Manifesto Implementation Unit

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    Wage Recurrent

    Non Wage Recurrent

    Total

    53,673

    140,943

    194,616

    31,738

    89,914

    121,652

    53,673

    140,943

    194,617

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    53,673

    140,943

    194,616

    31,738

    89,914

    121,652

    53,673

    140,943

    194,617

    Annual Workplan for 2014/15 - Outputs, Activities, Inputs and their Cost

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    Four (04) reports from Ministries analysed on a quarterly basis.

    Twelve (12) Monitoring visits conducted in districts

    Quarterly reports and 01 annual report on the status of manifest

    implementation produced and disseminated to stakeholders.

    Media programmes (print and electronic) conducted to disseminate

    manifesto achievements

    Manifesto documentary updated

    Reports from Ministries analysed

    Monitoring visits conducted in districts

    04 quarterly reports and 01 annual report produced on the status of

    manifest implementation

    Copies of status reports on manifesto implementation distributed to

    stakeholders

    Media programmes (print and electronic) conducted to disseminate

    manifesto achievements

    Manifesto documentary updated

    Monitoring Implementation of Manifesto Commitments030116

    Wage Recurrent

    Non Wage Recurrent

    Total

    53,673

    140,943

    194,617

    Activities to Deliver Outputs:

    Planned Outputs:

    Output:

    Inputs Quantity Cost

    Newspaper adverts (advert) 4.0 2,400

    Allowances for directors (allowances) 66.7 10,000

    Per diem for directors (allowances) 90.0 13,500

    Per diem for staff (allowances) 160.0 10,400

    refreshments for office and meetings (assorted) 36.0 3,600

    stationery (assorted) 4.3 1,728

    photocopying and binding (copies) 498.3 4,236

    fuel (litres) 12,239.0 41,001

    Fuel for directors (litres) 3,691.2 12,365

    Newspapers (paper) 559.5 671

    Permanent Staff (Person Years) 8.0 53,673

    business cards (piece) 300.0 150

    external hard disk (pieces) 1.0 500

    toner (pieces) 4.6 1,140

    letter heads (reams) 4.0 320

    photocopying paper (reams) 72.0 1,008

    vehicle servicing (service) 15.0 9,750

    Advertisements (services) 8.0 1,883

    Dinner/lunch allowance (value) 72.0 4,752

    oils and lubricants (value) 32.0 1,600

    vehicle repair (value) 33.2 19,939

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    53,673

    140,943

    194,617

    Vote Overview

    13

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Cabinet Support and Policy Development16 02

    Services:

    Responsible Officer:

    Vote Function Profile

    The Cabinet Secretariat facilitates the President, Vice President, the Prime

    Minister and Cabinet in executing their Constitutional Mandate of formulating,

    determining and implementing Government policies.

    In addition, the function exists to set clear guidelines for effective policy

    development across Government and in particular building the policy capacity of

    Cabinet and that of the Line Ministries, Departments and Agencies (MDAs).

    This process involves the provision of the following strategic services:

    Supporting H.E. the President and Cabinet in the determination of Government

    policy and the delivery of Governments expectations;

    Providing sound policy advice to H.E. the President and Cabinet;

    Providing secretariat support to Cabinet and its Committees;

    Undertaking the gate keeping and challenge function in respect to policy

    submissions from Line Ministries to Cabinet;

    Building capacity for policy development across Government;

    Preparing the Public Service for better management of transitions in Government;

    Supporting the political leadership in the translation of Election Manifestos into

    policies and programs for implementation;

    Supporting Cabinet in monitoring and co-ordinating the implementation of its

    decisions;

    Institutionalizing Regulatory Best Practice (RBP) in Policy making in Government;

    Managing transitions between political administrations and supporting the

    continuity of Government.

    Permanent Secretary/ Dep. Secretary to the Cabinet

    Vote Function Projects and Programmes:Project or Programme Name Responsible Officer

    Recurrent Programmes

    07 Cabinet Secretariat Permanent Secretary/ Deputy Secretary to Cabinet

    Programme 07 Cabinet Secretariat

    Permanent Secretary/ Deputy Secretary to Cabinet

    The Cabinet Secretariat envisions an effective and efficient Government machinery for public

    policy making and its management. The mission is to support Cabinet in the discharge of its

    constitutional mandate (Article 111 (2)) of determining, formulating, and implementing

    Government policy. This is realized through the pursuit of the following objectives:

    (i) To ensure that Cabinet effectively and efficiently discharges its constitutional mandate of

    determining, formulating and implementing government policy;

    Responsible Officer:

    Objectives:

    Programme Profile

    Vote Overview

    14

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Cabinet Support and Policy Development16 02

    Programme 07 Cabinet Secretariat

    Workplan Outputs for 2013/14 and 2014/15

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    1.60 Agenda, and Minutes of

    Cabinet meetings issued.

    2. 12 Agenda and Minutes of

    PS' meetings issued.

    3. Number (248) of Draft

    Cabinet Submissions reviewed

    for adequacy.

    4. 4,800 Extracts of Cabinet

    Decisions Issued to Ministers,

    Ministers of State and

    Permanent Secretaries.

    5. Returns on implementation

    of Cabinet Decisions placed on

    the Cabinet Agenda every

    month.

    6. Cabinet Records (Minutes

    and Memoranda) for 2012 and

    2013 sorted and bound and part

    of 2014 sorted.

    7. Number (4) of Cabinet

    Committee Meetings facilitated.

    8. Ceremonial functions of

    Cabinet managed.

    1.40 Agenda, and Minutes of

    Cabinet meetings issued.

    2. 9 Agenda and Minutes of PS'

    meetings issued.

    3. 110 Draft Cabinet

    Submissions reviewed for

    adequacy.

    4. 2,662 Extracts of Cabinet

    Decisions Issued to Ministers,

    Ministers of State and

    Permanent Secretaries.

    5. Returns on implementation

    of Cabinet Decisions placed on

    the Cabinet Agenda every

    month.

    6. Cabinet Records (Minutes

    and Memoranda) for 2012 and

    2013 sorted and bound and part

    of 2014 sorted.

    7. Four (4) Cabinet Committee

    Meetings facilitated.

    8. One (01) Ceremonial

    function of Cabinet managed.

    Cabinet meetings

    supported

    1. 60 Agenda and Minutes of

    Cabinet Meetings issued to

    Ministers and Ministers of State.

    2. 12 Agenda and Minuets of

    Permanent Secretaries issued.

    3. 248 Draft Cabinet

    Submissions reviewed for

    adequancy.

    4. 4,800 extracts of Cabient

    Deceisions issued to Ministers

    and Permanent Secretaries.

    5. Returns on implementation of

    Cabinet Decisions placed on the

    Cabinet Agenda every month.

    6. Cabinet records(Minutes and

    Memoranda) for 2013 and 2014

    sorted and bound and part of

    2015 sorted.

    7. 6 Cabinet Committee

    Meetings facilitated.

    8. Ceremonial functions of

    Cabinet managed.

    010216

    (ii) To ensure that the Presidency effectively provides leadership to Ministries, Departments

    and Agencies (MDAs) in the public policy management process; and,

    (iii) To support the Public Administration Sector to deliver effective leadership, coordination

    and good governance in the country.

    Below is an overview of the outputs and activities of the Cabinet Secretariat:

    Meetings of Cabinet and its Committees organized and facilitated; monthly Permanent

    Secretaries forum facilitated; Cabinet Submissions reviewed for quality; implementation of Cabinet Decisions monitored; Cabinet Library maintained; Cabinet Archives managed;

    Courier Services provided to the Cabinet function; Ceremonial functions of Cabinet

    organized and facilitated; implementation of the Presidents election manifesto supported;

    strategic communications planning in government coordinated;

    The above outputs shall be attained through the following activities:

    Providing secretariat and logistical support to Cabinet, its Committees and Permanent

    Secretaries forum; providing technical guidance to MDAs in the preparation of Cabinet

    Submissions; monitoring the progress of the implementation of key Cabinet Decisions;

    providing Cabinet with a functional Cabinet library; maintaining the Cabinet archives;

    delivering mail to Government Departments and Institutions; organizing and facilitating

    ceremonial functions of Cabinet; facilitating Strategic Communications in Government;

    developing and distributing policy resource materials; developing skills of Cabinet and

    Policy Officials in MDAs; managing the periodic restructuring of the Cabinet Secretariat;

    providing Policy advice to support decision making in Government and streamlining the

    functioning of Cabinet Committees.

    Outputs:

    Vote Overview

    15

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Cabinet Support and Policy Development16 02

    Programme 07 Cabinet Secretariat

    Approved Budget, Planned

    Outputs (Quantity and

    Location)

    Expenditure and Prel.

    Outputs by End Mar

    (Quantity and Location)

    Proposed Budget, Planned

    Outputs (Quantity and

    Location)

    Project, Programme

    Vote Function Output

    UShs Thousand

    2014/152013/14

    Wage Recurrent

    Non Wage Recurrent

    Total

    293,378

    1,286,167

    1,579,544

    173,479

    751,450

    924,929

    293,378

    1,286,167

    1,579,544

    1.Commence implementation of

    the Comprehensive Long Term

    Policy Capacity Development

    Plan for the Public Service.

    2. Training curriculum and

    content for Policy Analysts

    developed..

    3. Top and Senior Managers in

    Ministries and Departments

    trained in Policy Formulation

    and Management.

    4. PS' Annual Retreat and the

    Cabinet Retreat Organised.

    5. Policy Resource Materials

    developed and disseminated to

    MDAs.

    1.Started implementation of the

    training curriculum for the

    Comprehensive Long Term

    Policy Capacity Development

    Plan (CLTPCDP) for the Public

    Service.

    2. Training curriculum and

    content for Policy Analysts

    developed the the CLTPCDP

    3. Meeting of Policy Analysts in

    Ministries, Departments and

    Agencies held.

    4. Annual Cabinet Retreat

    Organised.

    5. Policy Resource Materials

    namely; 200 copies of the

    Cabinet handbook developed

    and disseminated to MDAs.

    Capacityfor policy

    formulation strengthened

    1. Support the Ministry of

    Public Service to

    establish/review Performance

    plans and competencies for

    Policy practitioners provided.

    2. Implementation of the

    training curriculum for Policy

    Practioners continued.

    3. The Regulatory Best

    Practices Framework and

    establish Regulatory Impact

    Assesment guidelines

    Implemented.

    4. Newly recruited staff of the

    Cabinet Secretariat Inducted.

    5.Top and Senior Managers in

    Ministries and Departments

    trained in Policy Formulation

    and Management.

    5. PS' Annual Retreat and the

    Cabinet Retreat Organised.

    6. Policy Resource Materials

    developed and disseminated to

    MDAs.

    7. Backlog of Cabinet Papers

    computerized.

    An M & E system for tracking

    the implementation of Cabinet

    decisions established.

    8. Four (4) policy briefs to

    Cabinet produced and submitted.

    9. Four (4) National Sectoral

    Policies reviewed for

    consistency,coherance and

    harmony

    030216

    Wage Recurrent

    Non Wage Recurrent

    Total

    41,009

    821,369

    862,378

    24,249

    479,752

    504,001

    41,009

    1,321,369

    1,362,378

    Wage Recurrent

    Non Wage Recurrent

    GRAND TOTAL

    334,386

    2,107,536

    2,441,922

    197,728

    1,231,201

    1,428,930

    334,386

    2,607,536

    2,941,922

    Annual Workplan for 2014/15 - Outputs, Activities, Inputs and their Cost

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    1. 60 Agenda and Minutes of Cabinet Meetings issued to Ministers and

    Ministers of State.

    2. 12 Agenda and Minuets of Permanent Secretaries issued.

    3. 248 Draft Cabinet Submissions reviewed for adequancy.

    Cabinet meetings supported010216

    Planned Outputs:

    Output:

    Inputs Quantity Cost

    Binding Cabinet Records () 1.0 6,331

    Maintenance of Photocopier2(2) () 1.0 5,500

    Procurement of 2 Laptops () 2.0 4,000

    Procurement of a Projector () 1.0 4,000

    Procurement of a small fridge for Commissioner () 1.0 1,000

    Procurement of Uniforms for support staff () 1.0 5,720

    Vote Overview

    16

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Cabinet Support and Policy Development16 02

    Programme 07 Cabinet Secretariat

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    4. 4,800 extracts of Cabient Deceisions issued to Ministers and Permanent

    Secretaries.

    5. Returns on implementation of Cabinet Decisions placed on the Cabinet

    Agenda every month.

    6. Cabinet records(Minutes and Memoranda) for 2013 and 2014 sorted

    and bound and part of 2015 sorted.

    7. 6 Cabinet Committee Meetings facilitated.

    8. Ceremonial functions of Cabinet managed.

    1. Providing secretariat and logistical support to Cabinet,its Committees

    and Permanent Secretaries forum.

    2. Providing techinical guidance to MDAs in the preparation of Cabinet

    Submissions.

    3. Monitoring the progress of the implementation of key Cabinet decisions.

    4. Providing Cabinet with a functional Cabinet Library.

    5. Maintaining the Cabinet archives.

    6. Delivering mail to Government Departments and Institutions.

    7. Organising and facilitating ceremonial functions of Cabinet.

    8. Developing and distributing policy resource materials.

    9. Capacity building of Cabinet Secretariat staff to support Cabinet in its

    functions.

    10. Providing Policy advice to Cabinet and its Committees to support

    decision making in Government.

    Activities to Deliver Outputs:

    Subscription to the Uganda Gazette(Annual) () 1.0 4,200

    Paper clips large (Boxes) 20.0 300

    Paper Clips small (Boxes) 20.0 200

    Staple wires 26/6 (Boxes) 5.0 100

    Cabinet Meals and Refreshments (Meal) 53.0 152,640

    Guard and Security Services at DSC's home

    (Month)

    12.0 1,800

    Honoraria (Month) 1.0 124,083

    Internet subscription (Month) 12.0 12,000

    Medical Expenses to DSC (Month) 12.0 2,220

    Mobile phone allowance for DSC (Month) 12.0 1,800

    Office Imprest (Month) 12.0 120,000

    Provision of Fuel,Lubricants and Oils (Month) 12.0 360,000

    Provision of mileage allowance (Month) 1.0 64,440

    Provision of Safari day/Night allowance (Month) 1.0 94,000

    Provision of Travel allowances for Courier Staff

    (Month)

    1.0 25,908

    Provision of Travel allowances for Officers (Month) 1.0 24,292

    Repair and Servicing of Vehicles (Month) 12.0 114,000

    Highlighters (Packet) 10.0 100

    Markers (Packet) 10.0 100

    Pens (Packet) 20.0 300

    Rubbers bands (Packet) 5.0 25

    Binding clips 15/8" (Packets) 3.0 45

    Binding Clips 2" (Packets) 3.0 30

    Permanent Staff (Person Years) 25.0 293,378

    A4 Spiral Note books (Piece) 100.0 200

    Box files (Piece) 80.0 320

    Cabinet Complimentary Slips (Piece) 5,000.0 3,250

    Delivery books (Piece) 18.0 117

    Endorsing Ink (Piece) 5.0 8

    Fax catridge Brother TN 2015 & Fax roll (Piece) 1.0 220

    Manuscript books (Piece) 10.0 110

    Office glue (Piece) 10.0 60

    Page markers (Piece) 30.0 120

    Plain file covers (Piece) 500.0 150

    Post is notes(small) (Piece) 30.0 54

    Post it notes(medium) (Piece) 30.0 66

    Printed Envelopes 16x12 (Piece) 8,000.0 3,600

    Printed Envelopes A4 (Piece) 8,000.0 2,000

    Printed envelops 10x15 (Piece) 8,000.0 3,200

    Printed file covers (Piece) 500.0 400

    Procurement of a projector (Piece) 1.0 4,000

    Ring binders (Piece) 80.0 400

    Shorthand writing books (Piece) 50.0 75

    White out (Piece) 10.0 50

    Christmas cards (Pieces) 1.0 1,000

    IBM ribbon & eraser (Pieces) 2.0 50

    Printed Envelopes 9x4 (Pieces) 6,000.0 900

    Printing Cabinet Resource Materials (Pieces) 1.0 5,000

    Procurement of 1 Computers (Pieces) 1.0 1,900

    Procurement of 2 Printers (Pieces) 2.0 2,000

    Procurement of 3 filling Cabinets (Pieces) 1.0 3,068

    Procurement of 8 UPS' (Pieces) 8.0 8,000

    Toner 05A & 53A (Pieces) 30.0 7,500

    Toner 417 (Pieces) 10.0 6,000

    Toner 80A (Pieces) 15.0 3,450

    Toner EX 1357 (Pieces) 10.0 8,500

    Cabinet Extracts Slips (Reams) 8.0 176

    Cabinet Return Slips (Reams) 8.0 176

    Letter Heads (Reams) 5.0 500

    Procurement of Photocopying Paper (Reams) 600.0 10,200

    Procurement of Pink Paper (Reams) 500.0 11,000

    Vote Overview

    17

  • Office of the PresidentVote:

    Ministerial Policy StatementOffice of the President

    001

    Vote Function: Cabinet Support and Policy Development16 02

    Programme 07 Cabinet Secretariat

    Planned Outputs and Activities to Deliver Outputs

    (Quantity and Location)

    Inputs to be purchased to deliver outputs and their cost

    Input UShs Thousand

    Wage Recurrent

    Non Wage Recurrent

    Total

    293,378

    1,286,167

    1,579,544

    Books & Periodicals for Cabinet Library (Year) 1.0 5,713

    Minor repair works in the department (Year) 1.0 2,000

    New Vision and Monitor Newspapers for a year

    (Year)

    1.0 16,000

    Procurement of East African & Independent

    Magazine (Year)

    1.0 1,500

    Provision of Airtime on land lines and fax (Year) 1.0 36,000

    Purchase of Car tyres for pool vehicles (Year) 1.0 8,000

    1. Support the Ministry of Public Service to establish/review Performance

    plans and competencies for Policy practitioners provided.

    2. Implementation of the training curriculum for Policy Practioners

    continued.

    3. The Regulatory Best Practices Framework and establish Regulatory

    Impact Assesment guidelines Implemented.

    4. Newly recruited staff of the Cabinet Secretariat Inducted.

    5.Top and Senior Managers in Ministries and Departments trained in

    Policy Formulation and Management.

    5. PS' Annual Retreat and the Cabinet Retreat Organised.

    6. Policy Resource Materials developed and disseminated to MDAs.

    7. Backlog of Cabinet Papers computerized.

    An M & E system for tracking the implementation of Cabinet decisions