2
Malaysian Water Academy Sdn Bhd No. 24, 3rd Floor, Jalan Sri Hartamas 8, Taman Sri Hartamas, 50480 Kuala Lumpur 03 - 6201 1457 / 1562 Hafis: [email protected] Farah: [email protected] Find out more at http://www.mwa.org.my/academy- training.html The objective of this Module is to ensure that water booster pump house is in safe condition and well operated and provide a water supply that meets the customer demands for reliability of supply and flow in accordance with regulatory requirements and, Standard Operating Procedures. At the end of this programme, participants will be able to:- Access water booster pump house work instruction Prepare water booster pump house operation work area Operate booster pump house Maintain booster pump house asset Inspect booster pump house Perform finishing activities 23 - 24 OCT 2018 MWA, SRI HARTAMAS

MWA, SRI HARTAMAS · Z?Q! Z O?QZ) )O?>ZU Operators/ authorities/ contractors whoever interested in Water Booster Pump House Operation ?m ó 8.30am - Registration

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MWA, SRI HARTAMAS · Z?Q! Z O?QZ) )O?>ZU Operators/ authorities/ contractors whoever interested in Water Booster Pump House Operation ?m ó 8.30am - Registration

WATER

BOOSTER

PUMP

HOUSE

OPERATION

Malaysian Water Academy SdnBhd

No. 24, 3rd Floor, Jalan Sri Hartamas 8, Taman Sri Hartamas, 50480 Kuala Lumpur

A D D R E S S

03 - 6201 1457 / 1562 Hafis: [email protected] Farah: [email protected]

C O N T A C T

Find out more athttp://www.mwa.org.my/academy-

training.html

OBJECTIVE OF THE

COURSE

The objective of this Module is to

ensure that water booster pump

house is in safe condition and well

operated and provide a water

supply that meets the customer

demands for reliability of supply

and flow in accordance with

regulatory requirements and,

Standard Operating Procedures.

At the end of this programme,

participants will be able to:-

Access water booster pump

house work instruction

Prepare water booster pump

house operation work area

Operate booster pump house  

Maintain booster pump house

asset 

Inspect booster pump house

Perform finishing activities

23 - 24 OCT 2018MWA, SRI HARTAMAS

T R A I N I N G B Y M A L A Y S I A N

W A T E R A C A D E M Y S D N B H D

Page 2: MWA, SRI HARTAMAS · Z?Q! Z O?QZ) )O?>ZU Operators/ authorities/ contractors whoever interested in Water Booster Pump House Operation ?m ó 8.30am - Registration

T A R G E T P A R T I C I P A N T S

Operators/ authorities/ contractors

whoever interested in Water

Booster Pump House Operation

D A Y 18.30am     - Registration 9.00am    - Introduction of Water                       Booster Pump House Operation 9.30am     - Access Water Booster Pump  House                      Work Instruction 10.30am   - Tea Break 10.45am    - Water Booster Pump House tools &                      equipment 12.00pm   - Water Booster Pump House                      Operation work area 1.00pm     - Lunch 2.00pm    - Booster Pump House asset 3.30pm     - Tea Break 4.00pm     - Procedure for replacement of                        booster pump house asset 5.00pm    - Program ends

Trainer possessed an Advanced

Diploma in Electrical Engineering

(Power) from Universiti Teknologi

MARA (UiTM). He is currently

Managing Director at Norisman

Venture, which manages piping projects,

pumps and electrical installation

projects. Prior to this he worked with

Perbadann Bekalan Air Pulau Pinang

Sdn Bhd (PBAPP) for almost 23 years

and had served various departments

within the company. He is also one of

the instructors at PWSA and a trainer

approved by Jabatan Pembangunan

Kemahiran (JPK) since 2010. He also

obtained a Professional Engineer (PE)

in 2005 and Competent Electrical

Engineer in 2007.

I R . I S M A I L I S H A K

COMPANY STAMP:

SIGNATURE:

RM 1,200.00 MWA Member

RM 1,500.00 Non-Member

RM 800.00 Student Member

REGISTRATION FEE:

PHONE NO:

EMAIL ADDRESS:

ORGANIZATION ADDRESS:

DESIGNATION:

NAME:

R E G I S T R A T I O N F O R M

R E G I S T E R N O W !

HRDF Claimable

BEM CPD Hours Applied

P R O G R A M

D A Y 2

8.30am    - How to operate Booster Pump House  10.00am  - Identify preventive maintenance 10.30am   - Tea Break 10.45am    - Booster pump house inspection 1.00pm     - Lunch 2.00pm    - Method of work area cleaning 3.30pm     - Tea Break 4.00pm     - Perform finishing activities 4.30pm     - Summary/ Q&A 5.00pm     - Program ends

I N C O L L A B O R A T I O N W I T H