10/7/2014 Page 1 of 3 P:\2014\114145.00 Kaiser Elementary\2 Correspondence\Agenda and Minutes\20141001 DAG Kaiser MeetingMinutes.docx
PROJECT NAME: Kaiser Elementary School DATE: 10/01/14
NOTES BY: Philip Stewart PROJECT #: 113328.00
MEETING: Design Advisory Group
NEXT MEETING: 10/08/14
ATTENDEES:
Elinor Roller ‐ Kaiser Rosalie Maestas – Kasier Josefita Lopez – Kaiser Jerome Martinez – Kaiser Rosie Merell – Kaiser Cesar Sanchez – Kaiser Keri Hernandez – Kasier Lynn Green wood – Kaiser Janet Fernandez – Kaiser Kaki Zeeb – DPS Kelly Yamasaki – OZ Architecture Philip Stewart – OZ Architecture
DISTRIBUTION: Attendees
The aforementioned minutes constitute our understanding of the items discussed. If this is not an accurate written description of the intent and results of this meeting, please contact this office with comments. The minutes will stand as a record of the meeting unless corrections are received within seven (7) days after receipt.
ITEM #: DESCRIPTION: RESPONSIBILITY: DEADLINE:
001 Introductions ‐ Kaki Zeeb, DPS Project Manager ‐ Kelly Yamasaki, OZ Principal ‐ Philip Stewart, OA Project Manager ‐ OZ will be responsible for DAG meeting minutes. A copy of the
presentation will be attached to minutes.
Info n/a
002 Scope walk through ‐ re: Attachments ‐ KY: emphasized the importance of seeing beyond themselves as
this renovation will remain a part of the educational process for years to come.
‐ Reviewed all scope items
Info n/a
003 Budget ‐ KY: emphasized maintaining budget. Design team will keep
expectations aligned with the budget.
Info n/a
004 Question ‐ ER: Who’s responsible for ultimate design execution?
The DAG has an advisory role. The district’s representatives, however, has ultimate design control. DPS has ultimate project oversight.
‐ There is a concern over the who is responsible for the project. It was noted the District has checks to ensure design meets standards and meets objectives.
Info n/a
10/7/2014 Page 2 of 3 P:\2014\114145.00 Kaiser Elementary\2 Correspondence\Agenda and Minutes\20141001 DAG Kaiser MeetingMinutes.docx
005 Community Meeting ‐ The DAG confirmed a desire to address the community. They
noted a Thanksgiving event is well attended, and this can act an a community meeting.
Info n/a
006 Schedule ‐ re: Attachments ‐ Project team believes renovation can occur over one summer.
Any summer programs would need to be relocated during construction.
‐ There was expressed concern for construction bleeding into the school year.
Info n/a
007 DAG Open Comments ‐ Can we install ceiling or wall mounted projectors? Kaki says that
would be part of the remodeled classrooms. ‐ Can they include boards and projectors in rooms that are not
open? Kaki said we can look at it. ‐ Security is a major concern since the building is so open. ‐ How do they still keep a sense of community between teachers
and classes? We'll show them options. ‐ Will we be carpeting the tiled floors? DPS is using a recycled tile
that is no buff. ‐ Mechanical system is problematic. Look at control and balance.
Problems with Kindergarten, Special Ed, 1st grade. ‐ The plan as shown is correct. ‐ Furniture will come from a different budget. ‐ Technology concerns about being 20 years out. How do we
design for technologies that are unknown. ‐ All flexible partitions will be replaced. ‐ Daylighting is an option. OZ & DPS has already been discussed.
Due to budget, Solatubes would be the only solution viable. Skylights and windows would be too costly.
‐ Special Education is a part of the project. ‐ Special Education does have ventilation concerns. ‐ Lighting will be addressed through possible energy rebates with
Xcel.
Info n/a
008 Special Education ‐ Center based classrooms. Serves autism.
Info n/a
009 Enrollment ‐ Current enrollment is 412. ‐ It is a two round school, not 3 round. ‐ School serves the community with a lot of ECE.
Info n/a
010 Square Footage Comparison ‐ RE: Attachments ‐ Comparison is with a 3 round school.
Info n/a
10/7/2014 Page 3 of 3 P:\2014\114145.00 Kaiser Elementary\2 Correspondence\Agenda and Minutes\20141001 DAG Kaiser MeetingMinutes.docx
011 Priority Comments ‐ Coat closet is cramped, need more coat area. ‐ Currently few adult restrooms. ‐ Need variation for specialty rooms. ‐ Need a space for speech therapy. ‐ Need space for OT/PT rooms. These are not full time rooms. ‐ Could use stage for storage. Stage needs better utilization. ‐ Building needs more storage. ‐ Need for kiln and larger art room.
Info n/a
012 Priorities List Below is a list of all the program ideas the DAG designated. The DAG prioritized on a scale of 1 to 3. 1 being a must to 3 being a like. #1 (Must be a part of the project) Security Ventilation Flexible Maintain good circulation Enclose / Divide Special Education #1.5 Technology Upgrades #2 (Should be a part of the project) Acoustics Community Coat area is cramped Not enough restrooms (public and student) Break out spaces (incl Speech Therapy, OT/PT) Larger Art Room #2.5 Daylighting Kiln for Art Room #3 (Would like to have in the project) Storage in Classrooms Upgraded Lighting (increase priority if additional funding is found) Stage is underutilized Risers for the stage General storage
Info n/a
KAISER ELEMENTARY SCHOOLDESIGN ADVISORY GROUP
October 1, 2014
Project Team
Kaiser Elementary School
Denver Public Schools Katheryn Zeeb - Project Manager Susan Oullette - Planner
OZ Architecture Kelly Yamasaki - Principal Philip Stewart - Project Manager Anne Shaver - Job Captain
Design Consultants The Ballard Group - Mechanical Cator Ruma Assoc. - Electrical Kluesner Consulting - Cost Estimator
Project Schedule
DAG Meetings - Every to every other Wednesday
October 1 - DAG Meeting #1 (introductions, scope, schedule, priorities)
October 8 - DAG Meeting #2 (plan layout review and preferences)
October 22 - DAG Meeting #3 (plan layout review and design decisions)
October 24 - Schematic/Design Development Submittal -Allscopedefined - Floor & Ceiling Plans, Interior Elevs - Mechanical & Electrical Plans
Oct 24 to Nov 10 - DPS Review and Cost Analysis Review
November 12 - DAG Meeting #4 (finalizeplans,interiordesignreview)
November 18 - Community Meeting?
December2 - DAGMeeting#5(finaldesign)
December 3 - 50% Construction Document Submittal - All Plans and Elevations, Schedules, SomeDetails,Specifications
Dec 3 to Dec 10 - DPS Review and Cost Analysis Review
December 18 - 100% Constructrion Document Submittal -AllDrawings,Specifications,and Interior Design Information
TBD - DPS Review
TBD - Bidding for Contractors
June 6, 2015 - Begin Construction
GB20411 Quarry Tile Installation Completed
GB20412 MIT - related Air Cooling System In Project - Replace unit in MDF room - Move exhaust fan away from Mechanical Cooling Tower
Added Mechanical Scope In Project Move exhaust awasy from cooling tower
GB20413 Building Code Issues To be added to - Corridor walls not rated remodel - Exit Signage
GB20414 Open Plan Remodel
GB20693 ADA Upgrades In Project - 1 ADA Sign @ Parking - Exterior directional signs to Lobby - Correct ramp to Play Area - Van Signage (Complete) - Grab Bar Correction (Complete) - Sink Correction (Complete) - Ramp too Steep (Complete)
GB20164 ConformtoDPSSpecifications InProject - Update all room signs - Fire Alarm and reverse 911 system - Update electrical plans
Project Number Descrition Status
1ST TO 3RD GRADE
4TH AND 5TH GRADE ECE
ECE
KINDER LMCART
SPECIALED
ADMIN
P.E. CAFETERIA
MUSIC
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference Comments
1 600 600 Reception 1 542 -581 200 200 Principal's Offices 1 160 -40 Assumed1 120 120 Offices 5 642 522 Unknown rooms1 200 200 Conference Room 1 187 -131 20 20 - -201 250 250 Work Room 1 149 -101 Assumed1 140 140 - -140
01 400 400 Work Room 102 1 868 468 Near Auditorium2 50 100 - -100
01 75 75 - -75
1 400 400 - -400
1 50 50 - -50Hallway 1 258 258
02,555 2,806 251
310Nurse’s Office and Exam 1 160 160 Office 1 204 44Cot Room 1 100 100 Cot Room 1 102 2Accessible Toilet Room 1 50 50 Toilet 1 23 -27 Not Accessible
310 329 19
2,865 3,135 270
Description
General OfficeADMINISTRATIVE AREA
Total Administration Square Footage
Work Room
Conference Room
Sub-Total Square Footage
Coat Closet
Storage
Community Room
Sub-Total Square Footage
Mail RoomOther
Teacher's Work/Meeting Room
EXISTING KAISER ELEMENTARY
Clinic
CLINIC
CURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Principal’s Office
Psychologist/Social Worker
Administration Staff Toilets
Assistant Principal’s Office
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Standard Classroom 2 900 1,800 2
Special Ed 119 733 -167
Special Ed 119B 1,090 190
Toilet 1 24 24
Toilet 2 24 24
0
0
Severe Needs Classroom 1 1000 1,000 0 0 -1,000
Resource Room 1 340 340 Storage 1 105 -235Sub-Total: Special Education 3 3,140 0 1,976 -1,164
3 350 1,050 Staff Lounge 453 -597Office 113A 217 217 Off CorridorOffice 115A 227 227 Off CorridorSpecial Ed 116A 228 228 Off CorridorOffice 118A 229 229 Off CorridorECE Resource 105A 225 225 Off CorridorELA 107B 227 227 Off CorridorSpecial Ed 108A 226 226 Off CorridorOffice 110A 217 217 Off Corridor
3 325 975 -3 100 300 - -3001 100 100
Sub-total: Work and Resource Rooms 2,325 2,249 -76
23,815 26,126 2,311
Main Area 1 2,500 2,500 LMC 1 2,196 -304Seminar Rooms 2 150 300 - 0 -300Computer Lab 1 1,100 1,100 Lab 1 491 -609LMC Office 1 120 120 Office 1 120 0LMC Storage 1 300 300 Storage 3 490 190LMC Workroom 1 200 200 - 0 -200LMC Total 4,520 3,297 -1,223
Special Education
Resource Room
Total Classroom Area
Support Spaces
LEARNING MATERIALS CENTER
Teacher Work/Conference
Math Materials StorageInstructional Materials Storage
LMC Program
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Standard Classroom 2 900 1,800 2
Special Ed 119 733 -167
Special Ed 119B 1,090 190
Toilet 1 24 24
Toilet 2 24 24
0
0
Severe Needs Classroom 1 1000 1,000 0 0 -1,000
Resource Room 1 340 340 Storage 1 105 -235Sub-Total: Special Education 3 3,140 0 1,976 -1,164
3 350 1,050 Staff Lounge 453 -597Office 113A 217 217 Off CorridorOffice 115A 227 227 Off CorridorSpecial Ed 116A 228 228 Off CorridorOffice 118A 229 229 Off CorridorECE Resource 105A 225 225 Off CorridorELA 107B 227 227 Off CorridorSpecial Ed 108A 226 226 Off CorridorOffice 110A 217 217 Off Corridor
3 325 975 -3 100 300 - -3001 100 100
Sub-total: Work and Resource Rooms 2,325 2,249 -76
23,815 26,126 2,311
Main Area 1 2,500 2,500 LMC 1 2,196 -304Seminar Rooms 2 150 300 - 0 -300Computer Lab 1 1,100 1,100 Lab 1 491 -609LMC Office 1 120 120 Office 1 120 0LMC Storage 1 300 300 Storage 3 490 190LMC Workroom 1 200 200 - 0 -200LMC Total 4,520 3,297 -1,223
Special Education
Resource Room
Total Classroom Area
Support Spaces
LEARNING MATERIALS CENTER
Teacher Work/Conference
Math Materials StorageInstructional Materials Storage
LMC Program
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Standard Classroom 2 900 1,800 2
Special Ed 119 733 -167
Special Ed 119B 1,090 190
Toilet 1 24 24
Toilet 2 24 24
0
0
Severe Needs Classroom 1 1000 1,000 0 0 -1,000
Resource Room 1 340 340 Storage 1 105 -235Sub-Total: Special Education 3 3,140 0 1,976 -1,164
3 350 1,050 Staff Lounge 453 -597Office 113A 217 217 Off CorridorOffice 115A 227 227 Off CorridorSpecial Ed 116A 228 228 Off CorridorOffice 118A 229 229 Off CorridorECE Resource 105A 225 225 Off CorridorELA 107B 227 227 Off CorridorSpecial Ed 108A 226 226 Off CorridorOffice 110A 217 217 Off Corridor
3 325 975 -3 100 300 - -3001 100 100
Sub-total: Work and Resource Rooms 2,325 2,249 -76
23,815 26,126 2,311
Main Area 1 2,500 2,500 LMC 1 2,196 -304Seminar Rooms 2 150 300 - 0 -300Computer Lab 1 1,100 1,100 Lab 1 491 -609LMC Office 1 120 120 Office 1 120 0LMC Storage 1 300 300 Storage 3 490 190LMC Workroom 1 200 200 - 0 -200LMC Total 4,520 3,297 -1,223
Special Education
Resource Room
Total Classroom Area
Support Spaces
LEARNING MATERIALS CENTER
Teacher Work/Conference
Math Materials StorageInstructional Materials Storage
LMC Program
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
# CLAS
S
2 1000 2,000 5ECE - Special Ed 101 928 -72ECE 103 928 -72ECE 105 1,394 394ECE 106 1,405 405ECE 107 963 -37
2 50 100 2 96 -4Toilet 1 48 -2Toilet 2 48 -2
01 100 100 2
Storage 1 70 -30Storage 2 70 -30Coats 6 108 108
2 1150 2,200 5 6,058 3,858
2 1200 2,400 2Kindergarten 112 1,194 -6Kindergarten 111 1,192 -8
1 50 50 2Toilet 1 30 -20Toilet 2 30 -20
2 100 200 2Storage 1 112A 96 -4Storage 2 97 -3
2 1350 2,650 2 2,639 -11
Kindergarten
Storage
Early Childhood Education
Sub-Total ECE
Classroom
INSTRUCTIONAL AREAS
Toilets
Learning Communities
Classroom
Toilets
Storage
Sub-Total Kindergarten
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
SquareFeet
SquareFeet
Room Name Room No. Quantity
Existing Difference Comments
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Description
6 900 5,400 41st Classroom 113 1,335 4351st Classroom 114 1,344 4442nd Classroom 115 1,260 3602nd Classroom 116 1,260 360Coats 1 107 107Coats 2 107 107Coats 3 107 107
6 900 5,400 4 5,520 120
9 900 8,100 6 13rd Classroom 117 1,345 4453rd Classroom 118 1,329 4294th Classroom 107A 1,151 2514th Classroom 110 1,335 4355th Classroom 109 1,344 4445th Classroom 108 965 65Coats 4 107Coats 5 108
9 900 8,100 6 7,684 -41619 18,350 17 21,901 3,551
Sub-Total Grades 1 & 2
Total ECE - 5
Classroom
Sub-Total Grades 3 - 5
Grades 1 & 2Classroom
Grades 3 - 5
Page1 131115ValdezESSpaceMatrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Gymnasium 1 6048 6048 Gymnasium 3,239 -2,809P.E. Teacher's Office/Locker 1 120 120 Gym Office 181 61
Gymnasium Toilet 1 70 70 Toilet 23 -47 Non-compliantEquipment Storage 1 150 150 Gym Storage 271 121
0P.E. /Athletics Total 6388 3,714 -2,674
Art Classroom 1 1100 1100 Art 696 -404Kiln Room 1 100 100 - -100Storage Room 1 100 100 - -100Total: Art Room Suite 1300 696 -604
Music Classroom 1 1200 1200 Auditorium 2,354 1,154Storage Room 1 100 100 Storage 2 231 131
Stage 742 742
Total: Music Room Suite 1300 3,327 2,027
37,323 37,160 -163
Kitchen Serving 1 125 125 75 -50 Food Preparation Area 1 700 700 618 -82
Dry Storage Room 1 120 120 200 80Walk-in Freezer/Refrigerator
1 180 180 136 -44 Assumed
Office/Locker Area 1 135 135 70 -65Kitchen Toilet Room 1 50 50 14 -36 Non-CompliantLaundry Area 1 65 65 37 -28 AssumedReceiving Area 1 50 50 -50
Dining/Seating 1 4200 4200 Cafeteria 2,311 -1,889
Community Kitchen 1 50 50 PTA Storage 32 -18 AssumedChair and Table Storage 1 250 250 -250Performance Platform 1 1000 1000 -1,000 Music ProgramMiscellaneous 1 700 700 -700
00
Total: Cafeteria 7,625 3,493 -4,132Total: Assignable Square Feet
47,813 43,788 -4,025
PHYSICAL EDUCATION / ATHLETICS
Art Room Suite
CAFETERIA
Food Service Program
ART
Music Room Suite
MUSIC
P.E./Athletic Program
Total: Core Instructional Areas
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Facility Manager's Office 1 180 180 Office 55 -125 BasementFacility Maintenance 1 350 350 Office 68 -282 BasementFacility Maintenance Toilet 1 60 60 Toilet 117 57 BasementCustodial Closets & Storage 3 60 180 Storage 367 187 BasementFacility Maintenance Storage 1 450 450 Storage 47 -403 Main Floor
Outdoor Equipment Storage 1 250 250 Custodial 138 -112 Main Floor
Auditorium Storage 139 139 Main Floor
Total: Facility Maintenance 1,470 931 -539
Student Toilets Girls 1 109 109Boys 1 92 92Boys 2 114 114Girls 2 92 92Girls 3 92 92Boys 3 103 103Girls 4 108 108Boys 4 92 92Gym Girls 111 111Gym Boys 89 89
Public Toilets Unisex 1 83 83Unisex 2 87 87
Mechanical/Fan Rooms Mechanical Room 2,759 2,759 PenthouseCooling Tower 430 430 PenthouseMechanical Room 1,402 1,402 Mezzanine
Boiler Room Boiler Room 1,796 1,796 BasementChiller Room Chiller Room 968 968 BasementMain Electrical Room Electrical 135 135 BasementMDF Room MDF Room 95 95
Incenerator 291 291Stair 1 119 119 To BasementStair 2 63 63 To RoofCirculation 10,078 10,078
Structure/Other Walls/Structure 7,261 7,261Total: Support Areas and Maintenance (40%)
19,125 26,569 7,444
TOTAL FACILITY (GSF) 66,938 60,935 -6,003
Total Programmed Spaces (Not Incl. Support Areas) 47,813 43,788 -4,025
Program
Program
FACILITY MAINTENANCE
SUPPORT AREAS
Lobbies, Vestibules, Corridors, and Vertical Circulation
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Gymnasium 1 6048 6048 Gymnasium 3,239 -2,809P.E. Teacher's Office/Locker 1 120 120 Gym Office 181 61
Gymnasium Toilet 1 70 70 Toilet 23 -47 Non-compliantEquipment Storage 1 150 150 Gym Storage 271 121
0P.E. /Athletics Total 6388 3,714 -2,674
Art Classroom 1 1100 1100 Art 696 -404Kiln Room 1 100 100 - -100Storage Room 1 100 100 - -100Total: Art Room Suite 1300 696 -604
Music Classroom 1 1200 1200 Auditorium 2,354 1,154Storage Room 1 100 100 Storage 2 231 131
Stage 742 742
Total: Music Room Suite 1300 3,327 2,027
37,323 37,160 -163
Kitchen Serving 1 125 125 75 -50 Food Preparation Area 1 700 700 618 -82
Dry Storage Room 1 120 120 200 80Walk-in Freezer/Refrigerator
1 180 180 136 -44 Assumed
Office/Locker Area 1 135 135 70 -65Kitchen Toilet Room 1 50 50 14 -36 Non-CompliantLaundry Area 1 65 65 37 -28 AssumedReceiving Area 1 50 50 -50
Dining/Seating 1 4200 4200 Cafeteria 2,311 -1,889
Community Kitchen 1 50 50 PTA Storage 32 -18 AssumedChair and Table Storage 1 250 250 -250Performance Platform 1 1000 1000 -1,000 Music ProgramMiscellaneous 1 700 700 -700
00
Total: Cafeteria 7,625 3,493 -4,132Total: Assignable Square Feet
47,813 43,788 -4,025
PHYSICAL EDUCATION / ATHLETICS
Art Room Suite
CAFETERIA
Food Service Program
ART
Music Room Suite
MUSIC
P.E./Athletic Program
Total: Core Instructional Areas
Page 1 13 1115 Valdez ES Space Matrix.xls
ECE -5 EDUCATIONAL SPACE PROGRAM - 450 CAPACITY-Draft
Quantity
Square Feet
Square Feet
Room Name Room No. Quantity
Existing Difference CommentsDescription
EXISTING KAISER ELEMENTARYCURRENT DPS E.S. ED SPEC AND SPACE PROGRAM FOR 3 Round
Facility Manager's Office 1 180 180 Office 55 -125 BasementFacility Maintenance 1 350 350 Office 68 -282 BasementFacility Maintenance Toilet 1 60 60 Toilet 117 57 BasementCustodial Closets & Storage 3 60 180 Storage 367 187 BasementFacility Maintenance Storage 1 450 450 Storage 47 -403 Main Floor
Outdoor Equipment Storage 1 250 250 Custodial 138 -112 Main Floor
Auditorium Storage 139 139 Main Floor
Total: Facility Maintenance 1,470 931 -539
Student Toilets Girls 1 109 109Boys 1 92 92Boys 2 114 114Girls 2 92 92Girls 3 92 92Boys 3 103 103Girls 4 108 108Boys 4 92 92Gym Girls 111 111Gym Boys 89 89
Public Toilets Unisex 1 83 83Unisex 2 87 87
Mechanical/Fan Rooms Mechanical Room 2,759 2,759 PenthouseCooling Tower 430 430 PenthouseMechanical Room 1,402 1,402 Mezzanine
Boiler Room Boiler Room 1,796 1,796 BasementChiller Room Chiller Room 968 968 BasementMain Electrical Room Electrical 135 135 BasementMDF Room MDF Room 95 95
Incenerator 291 291Stair 1 119 119 To BasementStair 2 63 63 To RoofCirculation 10,078 10,078
Structure/Other Walls/Structure 7,261 7,261Total: Support Areas and Maintenance (40%)
19,125 26,569 7,444
TOTAL FACILITY (GSF) 66,938 60,935 -6,003
Total Programmed Spaces (Not Incl. Support Areas) 47,813 43,788 -4,025
Program
Program
FACILITY MAINTENANCE
SUPPORT AREAS
Lobbies, Vestibules, Corridors, and Vertical Circulation
Page 1 13 1115 Valdez ES Space Matrix.xls
- Assumptions for Early Childhood Education are probably incorrect. 5 Classrooms 3 Classrooms count over standard 3,858 SF over standard
-KindergartensizesareOK.
-Grades1-5sizesareverylargeandnotequitable.Classsizeranges965SFto1,345SF.
5 Classroom count under standard Despite being 5 classrooms under standard, they are 3,551 SF over standard.
- Missing Resource Rooms
-SpecialEducationisundersquarefootage.
-Art,Gym,andCafeteriaareundersquarefootage.
-Musicisoversquarefootage.
1ST TO 3RD GRADE
3RD TO 5TH GRADE
ECE
KINDER LMCART
SPECIALED
ADMIN
P.E. CAFETERIA
MUSIC