21
DP コンプライアンステスト最新動向 Manabu Nagata Granite River Labs [email protected]

PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

DP コンプライアンステスト最新動向

Manabu NagataGranite River Labs

[email protected]

Page 2: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

アジェンダ

1

DisplayPort 認証試験

1.4の現状と2.0への対応

DisplayHDR認証試験

Page 3: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

2

DisplayPort 認証試験

Page 4: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

3

DP 2.0 認証試験

• 2020年にCTSがリリースを予定しており、現在準備中です。

• 2020年の初期製品でDP2.0の初期認証を行う予定です。

• 2020年Q1に最終製品がリリースされます。

Page 5: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

4

DP/DPC 1.4 認証試験

テストプランは、デバイスの種類と、サポートされる機能に依存します。

DPC 1.4

Power Delivery Electrical Tests

Power Delivery Protocol Tests(including Device Pin Assignments Verification)

VBUS and VCONN Verification

PHY Crosstalk Test 2+2 (DP & USB)

Billboard Test

DP 1.4

(Std, Mini)

DisplayPort Main Link Electrical Test

DisplayPort AUX Channel PHY

Link Layer Test

EDID

Interoperability

Multi-Stream Transport (MST)

Page 6: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

Alt mode:

VBUSとVCONNで、同時に負荷をかけることにより、電圧降下によりエラーが発生。

DP2レーン、USB2レーン使用時にクロストークによるエラーが発生。

Source

1.4/HBR3: 新しく規定されたEye Heightでは、CTLE設定が最適化されていないためエラーが発生。

Sink

DPCDが実装されていない場合Link試験でエラーが発生。

Cable

USB Type-C to DPケーブルでType-C側コネクタの両面が使えなくエラーが発生。

ケーブルのシールドが原因でクロストークによるエラーが発生。

Test Considerations

5

Page 7: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

6

DP/DPC 1.4 Certification Test 送信側電気試験 :

1. HBR3 at TP3_RX_DFE is Normative for eye diagram

2. Spectral test method apply to VSL/PE.

受信側電気試験 : ジッタトレランス試験

HBR3シンクデバイス :

テストポイント: TP2_CTLE Short channel, TP3_CTLE Long channel

Rx PHY LFSJ (0.5kHz and 1MHz) for HBR2/HBR3

HBR3 TP3_CTLE Waveform EYE Height (EH): ≥65mV_diff_pp

Page 8: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

7

DP/DPC 1.4 認証試験 DSC/FEC Test

DP認証試験にはDSC/FECの両方が必要です。10月15日から開始されています。 (サポートの場合)

認証試験実施前に、CDFフォームに記入していただきます。

DP over Type-C Test

DP_Alt_Mode_on_USB_Type-C_1.0a_CTS_Vconn_Test_SCR

CH10 Discovery and USB PD test: DP alt modeに入る際のVconnスワップ試験。

CH11 VBUSおよび、Vconnの試験条件を定義します。 (GRL 提案)

Page 9: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

DP Passive ケーブルコンプライアンステスト

DP/DPC Passive HBR3 8K ケーブルコンプライアンステスト

DP/DPC Passive HBR2/HBR/RBR ケーブルコンプライアンステスト

DPC cable

Power Delivery Electrical Tests

Power Delivery Protocol Tests(including Device Pin Assignments Verification)

Billboard Test

DP cable(Std, Mini)

Insertion Loss Fit at Nyquist Frequency

Integrated Multi-reflection

Integrated Crosstalk between DisplayPort Lanes

Integrated Return Loss

Differential to Common Mode Conversion

Passive Cable DC Signal Test

Intra-pair Skew / Inter-pair Skew

Bulk Cable and Connector Impedance

8

Page 10: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

DP Passive ケーブルコンプライアンステスト

DP/DPC HBR3 8K passive cable test by IntePar .

SI Test items HBR3 8K DP cable HBR3 8K DPC cable

Insertion Loss Fit at Nyquist Frequency

-5.5dB @ 1.35GHz-8.5dB @ 2.7GHz-11dB @ 4.05GHz

-5.5dB @ 1.35GHz-8.5dB @ 2.7GHz-11dB @ 4.05GHz

Integrated Multi-reflection IMR ≤ 0.0579 * ILfitNq2 + 1.64 * ILfitNq -23.23 Same as left

Integrated Crosstalk between DisplayPort Lanes

IFEXT ≤ -35dBINEXT≤ -23dB

IFEXT ≤ -35dBINEXT≤ -33dB

Integrated Return LossIRL < 0.0336 × ILFitAtNq2 + 1.28 × ILFitAtNq –

8.87IRL ≤ 0.0336 * ILfitNq2 + 1.28 *

ILfitNq – 10.87

Differential to Common Mode Conversion

≤ -17dB from 0.1GHz to 8.1GHz Same as left

Passive Cable DC Signal Test

Continuity detected for HPD/CONFIG 1,2 signalContinuity not detected for DP_PWR signal

Same as left

Intra-pair Skew Inter-pair Skew

Informative Informative

Bulk Cable and Connector Impedance

Informative Informative

9

Page 11: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

10

DP/DPC 1.4 認証試験

• Passiveケーブルは認証を受けることが出来ます。

(スタンダード、DP over Type-Cを含む)

• DPCケーブルアダプタの、テスト項目を更新します。

(10.4 USB Type-C-to-DPパッシブアダプタの接続方向)

• アクティブケーブルのCTSは策定中です。

Page 12: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

11

DisplayHDR認証試験(HDR 1.1 vs HDR 1.0)

Page 13: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

DisplayHDR Ecosystem

HDR

Content

HDR

Source

HDR

Display

Panel

12

Page 14: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

GRL is DisplayHDR ATC

◼HDR (High-Dynamic-Range) / HDR10

New

13

Page 15: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

GRL is DisplayHDR ATC

◼HDR - True Black (less than 0.0005 cd/m)

14

Page 16: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

15

試験実施前に情報を確認します テストを正しく効率的に実行します Passレポートを提供します(二重確認のたするめ) レポートをVESAへ送信します

GRL(ATC)

VESAのメンバーとして申し込みます 最新のCTSとDUTの機能を確認します 必要な情報とDUTをGRLへ提供します

Customer(Applicant)

レポートの結果を確認します DUTが認証されていることをGRLへ通知されます

VESA(Certification Association)

証明書を顧客へ通知します(HDRロゴが製品で利用可能であることを通知します)

GRL(ATC)

Page 17: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

DisplayHDR certification program

◼試験要件 :○ シンクのすべてのポートでHDR試験を実施。 (DP, HDMI…)○ シンクのDPポートは、DP CTSでテストをする必要があります。

◼試験装置 : ○ Nvidia/AMD/Intel ○ Konica Minolta CS-2000A○ Klein K10-A○ HDR Test application, WindowsDisplayColorPerformance.exe

◼試験項目 : 1. Minimum-white Luminance 2. Corner Box Test – Black-level Test3. Tunnel Test – Black-level Test4. Color Gamut Specifications5. Bit Depth Specifications6. Rise-time Specifications

16

Page 18: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

DisplayHDR certification update

• DisplayHDR CTS 1.0認証試験が開始されました。

• 最新のCTS 1.1バージョンがリリースされましたが、HDR試験アプリケーショ

ンは、開発および議論中となっております。 (DisplayHDR 1400を含む)

17

Page 19: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

GRL DisplayPortテストソリューション

18

GRL-USB-PD-C2 - USB Type-C™ and USB Power

Delivery Compliance Tester & Analyzer

PHY Test Automation for DP-C, TBT3, USB Type-C

USB PD Tests for DP-C Compliance (Chap 10/11)

USB PD 3.0/2.0 and Quick Charge 4

… and much more

Sink PHY Test Automation for the Anritsu BERT

(GRL-DP14-SINK)

Automatically calibrates BERT and Scope to

create stressed eye for Sink Jitter Tolerance testing

1.4 and 1.2 CTS

2.0 draft

Sink PHY Test Automation for the Tektronix

BERTScope (GRL-DP14-SINK)

Automatically calibrates BERT and Scope to

create stressed eye for Sink Jitter Tolerance testing

1.4 and 1.2 CTS

Tek ScopeBERTScope

New

New

Page 20: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

GRL Convenient Locations

GRL WW HQ & Lab

Santa Clara, CA

Partner Lab

Boeblingen, Germany

GRL Taiwan Labs

Taipei

GRL India Lab

Bangalore

GRL Asia Pacific HQ

Singapore

GRL US R&D

Beaverton, OR

GRL Malaysia Lab

Penang

GRL Japan Lab

YokohamaGRL China Labs

Shanghai

Dongguan

ATC

ATC

ATCATC

4 DisplayPort ATCs and counting!

Page 21: PD Test Fixture Requirements...PHY Test Automation for DP-C, TBT3, USB Type-C USB PD Tests for DP-C Compliance (Chap 10/11) USB PD 3.0/2.0 and Quick Charge 4 … and much more Sink

Thank You

GRL Japan:

Kanji Miyashita, Director of Sales

[email protected]

GRL Silicon Valley:

Quintin Anderson, Co-Founder & COO

[email protected]

GRL Taiwan:

How Wu, Director of Sales

[email protected]

GRL China:

Evan Sun, VP & GM

[email protected]

20