11
Pedro Lopez Martin Building Engineer & Construction Architect

Pedro lopez portfolio

  • Upload
    plm27

  • View
    223

  • Download
    1

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Pedro lopez portfolio

Pedro Lopez Martin

Building Engineer & Construction Architect

Page 2: Pedro lopez portfolio

Address: Plaza Parque Blanco 1, 3-C Telephone: +34 626788017 28100 Madrid E-mail [email protected] Spain Birth date: 27 February 1988

_personal profile

Building Engineer and recently graduated Architectural Technologist. Highly motivated and hardworking person. I am used to work in multidisciplinary teams. I like innovation and I am always open to new ideas and different ways of thinking construction.

_education 2007-2012 Building Engineer Universidad Politécnica de Madrid_UPM

2013-2014 Architectural Technology and Construction Managment Copenhagen School of Design and Technology_KEA

2012-2013 ERASMUS programme in Copenhagen at KEA Offered expanding enrollment for obtaining Danish title after Erasmus

_profesional experience

2014 - Present CBRE_International Building Consultancy Consultant. Building and Workplace management department. Projects Stay vs Go: BBVA, Randstad and AXA Sustainability: Energy certifications and I+D Wellness certificate

2014 - 6 months Henning Larsen Architects_Intenship Construction Architect. Project: Herlev Hospital 52000 m2 Constructive and structural solutions. Plans & sections.

2013 Workshop Ecoweek New Nordic Living

2012 - 1 year EJUCA_Construction company_Internship Architecture Technician. Studies and architectural projects Department. Technical Presentations, planning, costs, measurements and assistant site manager

2011 Planning and work control competition_organized by CMS & UPM2011 Maintenance and Rehabilitation competition_organized by UPM

_skills

advancedAutoCAD, Revit, Microsoft Project, Presto, Word, Excel, PowerPoint

mediumCype, CypeCAD, Abobe Photoshop, Illus-trator, Indesign, Archibus.

_languages

Spanish Native English Fluent Danish Module 1

_others

Web Developer course in UPMLanguages: Java, CSS, HTML5Software: Dreamweaver, Sublime Text

_hobbies

Movies, sports, music, learning & traveling

Pedro López Martín

Page 3: Pedro lopez portfolio

CONSTRUCTION

Great construction knowledge from general con-structive sections to key junctions and detailing.

The fact of having been working in Spain and Denmark, has allowed me to a better under-standing of construction in both, precast and in situ elements. I have also worked with different solutions depending on climate; facades, insula-tion...

Always thinking in new and innovative solutions in order to get the best quality in construction.

1

23

4

1: 8-22-8-22-8 Triple glass curtain wall2: Rubber between glass for coldbridge3: Steel frame mounted with screws/600 mm

to fiber board4: 8 mm Fiberboard bolted/600 mm

to concrete slab

5 6 7

8

9

10

11

5: Linoleum finish floor on 75mm in-situ concrete6: 50mm polysterene insulation7: 200mm cast in-situ concrete #20 Ø8mm8: 350mm polysterene insulation9: 150mm foamglass insulation10: 1200x1200mm concrete pad foundation11: 300x300mm concrete beam12: 50mm sand blinding13: 150mm hardcore14: DPM15: Drainage system16: 15mm Neophrene17: Steel Plate 400x400x100mm18: Grid steel #20 Ø12mm19: Waterproof

12

13

14

Ground level

GRAVEL

SAND

15

16

17 1819

800

200

Scale

Checked by

Drawn by

Date

Project number

Como se indica

18/0

6/20

13 1

2:00

:30

Section A-A, KJ,ground

floor/Curtain wall

Author

Checker

3AA

Escale 1:5

PRODUCIDO POR UN PRODUCTO DEL ESTUDIANTE DE AUTODESK

PR

OD

UC

IDO

PO

R U

N P

RO

DU

CTO

DE

L ES

TUD

IAN

TE D

E A

UTO

DE

SK

PRODUCIDO POR UN PRODUCTO DEL ESTUDIANTE DE AUTODESK

PR

OD

UC

IDO

PO

R U

N P

RO

DU

CTO

DE

L E

STU

DIA

NTE

DE

AU

TOD

ES

K

1: 150 mm Prefabricated concrete wall panelsfastened to concrete panels with steel rebars/300 mm

2: 25 kg/lbm Steel brackets/2 pr. board/2000 mmbolted into conrete wall with25 mm stripped polysteren insulation/600 mm in between

3: 300 mm Rockwool insulation4: 15 mm 1220x 2440 mm fiberboard cut to fit

screwed onto 25 kg/lbm steel connectors5: 8 mm Corten steel sheeds

screwed onto steel 10 kg/lbm brackets/2 pr sheed/2000 mm

1

2

3

4

5

8-22-8-22-8 mmTriple glass curtain wall

Steel profile systeme bolted into concrete wall panels

Corden steel screwed onto fiberboards

Fiber boards mounted with angle brackets

100x50 mm wooden battens w DPM and 100 mm insul.

360x360 mm concrete column

Ø75 mm down pip e darinage

Reinforcement/300 mm

Steel rebar connection filled w/ grout

Steel rebar connection filled w/ grout

1: 150 mm Prefabricated concrete wall panelsfastened to concrete panels with steel rebars/300 mm

2: 25 kg/lbm Steel brackets/2 pr. board/2000 mmbolted into conrete wall with25 mm stripped polysteren insulation/600 mm in between

3: 300 mm Rockwool insulation4: 15 mm 1220x 2440 mm fiberboard cut to fit

screwed onto 25 kg/lbm steel connectors5: 8 mm Corten steel sheeds

screwed onto steel 10 kg/lbm brackets/2 pr sheed/2000 mm

1

2

3

4

5

Ø75 mm down pip e darinage

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

1 : 5

20/0

6/20

13 1

3:20

:43

BB, KJ, gr.fl.ext wall &

curtain wallProject Number

Gr. Fl. ext.wall

TML

Issue Date

Author

Checker

A106

1 : 5

BB, KJ, Curtain wall and ext.wall gr.fl1

1 : 5BB-CC, KJ, gr.fl. ext. walls

2

No. Description Date

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TOD

ES

K S

TUD

EN

T PR

OD

UC

T

PRODUCED BY AN AUTODESK STUDENT PRODUCT

PR

OD

UC

ED

BY

AN

AU

TOD

ES

K S

TUD

EN

T P

RO

DU

CT

250

5

6

10

11

78

1 2 34

9

8

76

5

1: Linoleum finish floor on 75mm in-situ concrete1*: Linoleum finish floor on 200mm in-situ concrete2: 50mm polysterene insulation3: 200mm Hollowcore slab4: DPM5: 200mm cast in-situ concrete6: 350mm polysterene insulation7: 50mm sand blinding8: 150mm hardcore9: Ground10: 150mm foamglass insulation11: 1000x450mm concrete strip foundation12: Steel reinforcement13: 250mm Filigran concrete wall

9

12

13

12

1*

GROUND FLOOR

BASEMENT

GROUND

4

2610

45 160 45

Scale

Checked by

Drawn by

Date

Project number

Como se indica

18/0

6/20

13 1

3:07

:12

Section B-B,KJ,basement

floor/basementwall

AutorVerificador

A5

Escale 1:10

PRODUCIDO POR UN PRODUCTO DEL ESTUDIANTE DE AUTODESK

PR

OD

UC

IDO

PO

R U

N P

RO

DU

CTO

DE

L ES

TUD

IAN

TE D

E A

UTO

DE

SK

PRODUCIDO POR UN PRODUCTO DEL ESTUDIANTE DE AUTODESK

PR

OD

UC

IDO

PO

R U

N P

RO

DU

CTO

DE

L E

STU

DIA

NTE

DE

AU

TOD

ES

K

ETAGE 02

31250

AJ

10

525

3

158

2

4

5015

015

0

ETAGE T4

31250

ETAGE T5

31250

REV.

:

:

:

:

:

:

EMNEDATO

DATO

SAG NAVN

TEGN.NR.

EMNE:

UDARB.

:GODKENDT

KONTROL

UDARB.

N

MÅL

2013.07.04

NHH

Detalje.nr :

HENNING LARSEN ARCHITECTS ¤ VESTERBROGADE 76, ¤ 1620 KØBENHAVN V

Note:

HOVEDPROJEKT

1 : 5

AuthorFacade/terrassegulv

Checker

D.906

Approver

A_X_X_4_37_105

Materiale beskrivelse

NR: Beskrivelse

beton bagplade2 22 x 142 mm Kebony SYP terressebræt - glat m/sidespor (Tø/Sne)3 38 x 68 mm Kebony SYP Strø (Tø/Sne)4 Justerbar opklodsning (Tø/Sne)

5.00

Opklodsning for lodret last og lodret justering

Hagehovedbolt i ankerskinne

Justeringselement både vandret og vinkel,samt overførelse af vandret last

Drypnæse profil

Betonskrue

Understopning

Sternkant

Betonplade 100mm

Hagehovedbolt i ankerskinne

Facadesøjle

Vejrbestanding uorganisk plade

Kasseprofil

Materet rude

Bærearm i konstruktionsstål, HE120B

100

120 380

Min

. 20m

m

1760

860

2100

Note (1)

REV.

:

:

:

:

:

:

EMNEDATO

DATO

SAG NAVN

TEGN.NR.

EMNE:

UDARB.

:GODKENDT

KONTROL

UDARB.

N

MÅL

2013.07.04

NHH

Detalje.nr :

HENNING LARSEN ARCHITECTS ¤ VESTERBROGADE 76, ¤ 1620 KØBENHAVN V

Note:

HOVEDPROJEKT

1 : 10

rlnFacade sternkant

Checker

D.902

Approver

NB!Alle mål i mm

Alle betonkanterafrundes tilsvarendeen form af Ø5

Note:1 : Hvad er denforventedenedbøjning pådækket? Dette ermed henblik på enteleskopløsning affacade

Hældning 10‰

Page 4: Pedro lopez portfolio

02 Ground Floor0

2 02 Ground Floor0

2

03 First Floor4000

3 03 First Floor4000

3

01 Foundations-1100

101 Foundations-1100

1

04 Roof8000

4 04 Roof8000

4

17 20 22 24 26 28 31 33 35 37

05 Roof Top8500

5 05 Roof Top8500

5

Sand

Gravel

CURTAIN WALL

1.Triple Glass Saint Gobain Climalite plus N Thickness = 4-12-4-12-4 mm U- Value = 0,6 with 90% Argon in the air cavity U- Value = About 0,5 with Air Gel microbubbles2.Triple conector joined to auxiliar beam3.Triple conector joined to auxiliar beam for corners4.Auxiliar horizontal beam 600x700 mm5.Auxiliar vertical beam 700x700 mm

EXTERNAL WALL

1.Plaster layer 10 mm2.Concrete wall 150 mm3.Insulation XPS Poliestyrene 300 mm4.Auxiliar vertical structure joined to theconcrete wall with connector 300x200mm Distance between axis 1000mm.5.Auxiliar horiontal steel structure Distance between axis 1000 mm.6.Ceramic panels 1000x1000 mm.

GREEN ROOF

1. Grass and small plants2. Soil for the plants around 60 mm3. Geotextil membrane Antiroots protection4. Waterproof membrane5. Insulation XPS Hard poliestyrene Thickness 300 mm6. Poor concrete for slope 1-2%7. Roof slab

GROUND FLOOR SLAB

1. Linoleum finishing floor2. Self-leveling mortar to receive the finishing3. Ground floor slab Thickness 300 mm4. Steel Reinforcement. Grid # 8mm diameter @ 100mm5. Insulation XPS Hard poliestyrene Thickness 200 mm6. Sand 50 mm7. Hardcore 150 mm8. Ground

WAFFLE SLAB FIRST FLOOR AND ROOF

1. Waffle Slab Thickness 300 mm2. Coffers of extruded poliestyrene 660x660mm3. Abacus for shear forces4. Steel Reinforcement. Grid # 8 mm diameter @ 100 mm5. Nerves which work like beams6. Conectors for suspended ceiling7. Registable Panels 500x500 mm

FOOTINGS

1. Foamglass insulation 150 mm2. Column and footing insulation Hard XPS Poliestyrene Thickness 100mm3. Ground floor slab Steel reinforcement grid # 8 mm diameter @100 mm4. Pad footing steel reinforcement #12 mm diameter @ 100 mm5. Pad footing 1200x1200 mm6. Steel bars to receive and connect the plate for the UPN column7. Waterproof layer8. Steel Column UPN-3809. Steel plate with adittional brackets for a strong connection10. Perimetral drainage system and small foundation for the drainage

00 Bottom Foundations 1-1550

100 Bottom Foundations 1-1550

1

GENERAL SECTION OF THE KINDERGARTEN

00 Bottom Foundations 2-1800

100 Bottom Foundations 2-1800

1

03 First Suspended ceiling3200

3 03 First Suspended ceiling3200

3

04 Roof Suspended ceiling7200

4 04 Roof Suspended ceiling7200

4

Doors2100

3 Doors2100

3

Doors 26100

3 Doors 26100

3

200 1200 200

www.autodesk.com/revit

Scale

Checked by

Drawn by

Date

Project number

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

ConsultantAddressAddressPhoneFaxe-mail

Project Address

As indicated

12/0

1/20

14 2

0:20

:35

GENERALSECTION A1

Number

KINDERGARTEN

Roskilde_Commune

9-1-2014

Author

Checker

A116g

Enter address here

No. Description Date

Page 5: Pedro lopez portfolio

Design and structures calculations using graphic and numeric methods.

ConcreteSteelWood

Diagrams

Sorftware: CypeCAD

STRUCTURES

413

3

5

5

7

7

9

9

11

11

13

13

15

15

20 20

22 22

24 24

26 26

28 28

31 31

33 33

35 35

41

43

43

4444

45

45

4646

ScaleDrawn by

Date

various

DETAILED COLUMNSKINDERGARTENRoskilde_Commune

9-1-2014

Pedro LópezA120

GENERIC STEEL COLUMNCONCRETE COLUMN GROUND-FIRST FLOOR

CONCRETE COLUMN FOUNDATION-GROUND FLOOR

COLUMNS LOCATION

1

1

3

3

5

5

7

7

9

9

11

11

13

13

15

15

17 17

20 20

22 22

24 24

26 26

28 28

31 31

33 33

35 35

37 37

40

40

41

41

43

43

4444

45

45

4646

ScaleDrawn by

Date

1:75

G FLOOR.WAFFLE SLAB.BOTTOM REINFORCEMENT

KINDERGARTENRoskilde_Commune

9-1-2014

Pedro LópezA128

3

4

FRAME 3

FRAME 4

1

1

3

3

5

5

7

7

9

9

11

11

13

13

15

15

17 17

20 20

22 22

24 24

26 26

28 28

31 31

33 33

35 35

37 37

40

40

41

41

43

43

4444

45

45

4646

ScaleDrawn by

Date

1:100

G FLOOR.WAFFLE SLAB.BOTTOM REINFORCEMENT

KINDERGARTENRoskilde_Commune

9-1-2014

Pedro LópezA127

FRAME 1

FRAME 2

1

2

Page 6: Pedro lopez portfolio

ScaleDrawn by

Date

1:100

1st FLOOR.WAFFLE SLAB.BOTTOM REINFORCEMENT

KINDERGARTENRoskilde_Commune

9-1-2014

Pedro LópezA125

ScaleDrawn by

Date

1:100

G FLOOR.WAFFLE SLAB.BOTTOM REINFORCEMENT

KINDERGARTENRoskilde_Commune

9-1-2014

Pedro LópezA124

ScaleDrawn by

Date

1:100

ROOF.WAFFLE SLAB.BOTTOM REINFORCEMENT

KINDERGARTENRoskilde_Commune

9-1-2014

Pedro LópezA126

Page 7: Pedro lopez portfolio

PLANNING & COST CONTROL

Id ACTIVIDADES Duración Costo

0 REHABILITACIÓN PALACIO DE MALPICA EN TOLEDO 261 días 535.034,28 Euro1 1 INICIO DE OBRA 0 días 0,00 Euro2 2 INSTALACIONES PROVISIONALES 5 días 0,00 Euro3 3 ESTUDIOS PREVIOS 5 días 3.361,92 Euro4 4 DETERMINACIÓN DE TÉCNICAS DE LIMPIEZA 3 días 1.260,72 Euro5 5 ANDAMIAJE 215 días 28.748,11 Euro6 5.1 MONTAJE DE ANDAMIO 5 días 13.267,02 Euro7 5.2 ALQUILER DE ANDAMIO 210 días 2.214,07 Euro8 5.3 DESMONTAJE DE ANDAMIO 5 días 13.267,02 Euro9 6 CONTROL ARQUEÓLOGOS 218 días 7.594,40 Euro10 6.1 PROYECTO 5 días 1.305,07 Euro11 6.2 INFORME DE SEGUIMIENTO 3 días 2.332,93 Euro12 6.3 SEGUIMIENTO 210 días 3.956,40 Euro13 7 ACTUACIONES EN CUBIERTAS 155 días 252.150,23 Euro14 7.1 DESMONTAJES Y DEMOLICIONES 43 días 32.873,64 Euro15 7.1.1 DEMONT TEJA Y ENRIPIADO 10 días 16.364,98 Euro16 7.1.2 DEMONT ESTRUCTURA DE MADERA 11 días 8.870,57 Euro17 7.1.3 DEMOLICIÓN FÁBRICAS Y FORJADO 13 días 4.309,32 Euro18 7.1.4 VARIOS 9 días 3.328,77 Euro19 7.2 ESTRUCTURA MADERA 74 días 46.474,17 Euro20 7.2.1 ACOPIO ELEMENTOS DE MADERA 17 días 9.061,98 Euro21 7.2.2 MONTAJE ESTRUCTURAL 53 días 26.080,99 Euro22 7.2.3 VARIOS 7 días 11.331,20 Euro23 7.3 CUBIERTAS Y SOPORTES 55 días 99.641,71 Euro24 7.3.1 NUEVO ENRIPIADO 22 días 22.455,04 Euro25 7.3.2 AISLAMIENTO 18 días 28.705,64 Euro26 7.3.3 COLOCACIÓN DE TEJA 48 días 48.481,03 Euro27 7.4 TRATAMIENTO DE PROTECCIÓN 33 días 46.713,30 Euro28 7.4.1 TRATAMIENTO DE MADERA 12 días 41.694,63 Euro29 7.4.2 ARTESONADO INTERIOR 21 días 5.018,67 Euro30 7.5 VARIOS 112 días 26.447,41 Euro31 7.5.1 LIMPIEZA BAJO CUBIERTA 6 días 3.814,63 Euro32 7.5.2 CANALON CONEXIÓN 12 días 13.582,41 Euro33 7.5.3 CERRAJERÍA 10 días 5.643,30 Euro34 7.5.4 HUECOS DE VENTILACIÓN 6 días 1.425,88 Euro35 7.5.5 TRABAJOS DE INTERIOR 3 días 1.981,19 Euro36 8 ACTUACIONES EN LA FACHADA 157 días 148.614,06 Euro37 8.1 DESMONTAJES DEMOLICIONES Y PICADOS 43 días 12.465,17 Euro38 8.1.1 DEMONT ELEMENTOS DE FABRICA 10 días 1.129,33 Euro39 8.1.2 DEMOLICIÓN DE FABRILLOS Y MAMP 17 días 5.165,38 Euro40 8.1.3 PICADO DE MORTERO 16 días 6.170,46 Euro41 8.2 ALBAÑILERÍA 92 días 69.264,90 Euro42 8.2.1 GRIETAS Y FISURAS 14 días 4.003,03 Euro43 8.2.2 EJECUCIÓN DE FÁBRICAS 13 días 8.302,33 Euro44 8.2.3 SANEADO Y RECATADO DE FACHADA 44 días 26.779,34 Euro45 8.2.4 ENFOSCADOS 16 días 20.615,23 Euro46 8.2.5 ELEMENTOS VARIOS 2 días 262,12 Euro47 8.2.6 RECTIFICACIÓN DE HUECOS 18 días 8.523,29 Euro48 8.2.7 TRACERÍA 6 días 779,56 Euro49 8.3 LIMPIEZA 19 días 18.754,61 Euro50 8.4 TRATAMIENTO ESPECIAL DE PROTECCIÓN 13 días 25.399,28 Euro51 8.5 TRATAMIENTO DE HUMEDADES 22 días 15.288,22 Euro52 8.5.1 DESECACIÓN 14 días 14.521,46 Euro53 8.5.2 EXCAVACIÓN POZOS 3 días 140,94 Euro54 8.5.3 POZOS Y ARQUETAS 4 días 493,87 Euro55 8.5.4 RESTITUCIÓN DEL PAVIMENTO 1 día 131,95 Euro56 8.6 VARIOS 9 días 7.441,88 Euro57 9 CERRAJERIA 4 días 3.415,88 Euro58 10 CARPINTERIA DE MADERA 31 días 34.230,87 Euro59 10.1 RESTAURACIÓN DE CARPINTERÍA 28 días 24.527,06 Euro60 10.2 CARP. NUEVA 3 días 9.703,81 Euro61 11 VIDRIERÍA 3 días 1.748,73 Euro62 12 REMATES Y ACABADOS 7 días 0,00 Euro63 13 GESTIÓN DE RESIDUOS 261 días 18.536,82 Euro64 14 SEGURIDAD Y SALUD 261 días 21.955,55 Euro

65 15 CONTROL DE CALIDAD 261 días 13.416,99 Euro

66 16 FIN DE OBRA 0 días 0,00 Euro

REHABILITACIÓN PALACIO DE MALPICA EN TOLEDO01/06

INSTALACIONES PROVISIONALESESTUDIOS PREVIOS

08/06 DETERMINACIÓN DE TÉCNICAS DE LIMPIEZAANDAMIAJE

MONTAJE DE ANDAMIOALQUILER DE ANDAMIO

22/03 DESMONTAJE DE ANDAMIOCONTROL ARQUEÓLOGOS

08/06 PROYECTO05/04 INFORME DE SEGUIMIENTO

15/06 SEGUIMIENTOACTUACIONES EN CUBIERTAS

DESMONTAJES Y DEMOLICIONES08/06 DEMONT TEJA Y ENRIPIADO

22/06 DEMONT ESTRUCTURA DE MADERA09/07 DEMOLICIÓN FÁBRICAS Y FORJADO

26/07 VARIOSESTRUCTURA MADERA

09/07 ACOPIO ELEMENTOS DE MADERA27/07 MONTAJE ESTRUCTURAL

10/10 VARIOSCUBIERTAS Y SOPORTES

26/09 NUEVO ENRIPIADO03/10 AISLAMIENTO

05/10 COLOCACIÓN DE TEJATRATAMIENTO DE PROTECCIÓN

01/08 TRATAMIENTO DE MADERA17/08 ARTESONADO INTERIOR

VARIOS08/08 LIMPIEZA BAJO CUBIERTA

12/12 CANALON CONEXIÓN28/12 CERRAJERÍA

09/11 HUECOS DE VENTILACIÓN17/09 TRABAJOS DE INTERIOR

ACTUACIONES EN LA FACHADADESMONTAJES DEMOLICIONES Y PICADOS

10/10 DEMONT ELEMENTOS DE FABRICA24/10 DEMOLICIÓN DE FABRILLOS Y MAMP

16/11 PICADO DE MORTEROALBAÑILERÍA

10/12 GRIETAS Y FISURAS25/02 EJECUCIÓN DE FÁBRICAS

25/12 SANEADO Y RECATADO DE FACHADA28/12 ENFOSCADOS

25/02 ELEMENTOS VARIOS14/03 RECTIFICACIÓN DE HUECOS

09/04 TRACERÍA09/04 LIMPIEZA

28/12 TRATAMIENTO ESPECIAL DE PROTECCIÓNTRATAMIENTO DE HUMEDADES

11/01 DESECACIÓN31/01 EXCAVACIÓN POZOS

05/02 POZOS Y ARQUETAS11/02 RESTITUCIÓN DEL PAVIMENTO

06/05 VARIOS17/05 CERRAJERIA

CARPINTERIA DE MADERA14/03 RESTAURACIÓN DE CARPINTERÍA

23/04 CARP. NUEVA26/04 VIDRIERÍA

23/05 REMATES Y ACABADOSGESTIÓN DE RESIDUOSSEGURIDAD Y SALUDCONTROL DE CALIDAD31/05

06 07 08 09 10 11 12 01 02 03 04 05 06 07junio julio agosto septiembre octubre noviembre diciembre enero febrero marzo abril mayo junio julio agosto

2013

Tarea

Tarea crítica

Hito

Resumen

Tarea resumida

Tarea crítica resumida

Hito resumido

Progreso resumido

División

Tareas externas

Resumen del proyecto

Agrupar por síntTarea

Tarea crítica

Tarea inactiva

Hito inactivo

Resumen inactivo

Tarea manual

Sólo duración

Informe de resumen manual

Resumen manual

Sólo el comienzo

Sólo fin

Progreso

DURACION: 12 MESESFECHA COMIENZO: vie 01/06/12FECHA FINALIZACION: vie 31/05/13

DIAGRAMA DE GANTT EJUCA S.A. REHABILITACIÓN PALACIO DE MALPICA EN TOLEDO

MINISTERIO DE FOMENTO

REHABILITACIÓN PALACIO DE MALPICA EN TOLEDO

EJUCA S.A.

Page 8: Pedro lopez portfolio

1 : 1500ETAGE 01 - BRUTTOAREALOPGØRELSE

1 : 1500ETAGE K1 - BRUTTOAREALOPGØRELSE

1 : 1500ETAGE 02 - BRUTTOAREALOPGØRELSE

1 : 1500ETAGE 03 - BRUTTOAREALOPGØRELSE

1 : 1500ETAGE 04 - BRUTTOAREALOPGØRELSE

1 : 1500ETAGE 05 - BRUTTOAREALOPGØRELSE

Etage K1

Bruttoareal: 13230 m2

Etage 1

Bruttoareal: 13595 m2

Etage 2

Bruttoareal: 10530 m2

Etage 3 - Blok 04

Bruttoareal: 4836 m2

Etage 4 - Blok 04

Bruttoareal: 4785 m2

Etage 5

Bruttoareal: 4771 m2

Etage 3 - Blok 03

Bruttoareal: 1754 m2

Etage 4 - Blok 03

Bruttoareal: 1736 m2

AAABACADAKANAOAPAQ AM BABBBCBD

BE

BFBGBH

BK

BJ AH

ØK ØJ ØH ØG ØF ØE ØD ØC ØBVX VV VU VT VS VR VQ

AJ

AFAGAL ØA

AM-A AL-A AK-A

AED15

D19

VYVZVAAVABVACVADVAEVAF ØLØMØNØOVAG

52800 52800 52800 52800 52800

48600

47140

35250

31300

48600

6000 6000 6000 6000 2030 3970 4300 1700 1900 4100 940 3230 5140 860 4620 1380 4620 1380 1040580 2760 6240 1060 4420 5230 3140 1360 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890 3610 890

4775 41

65

PLANS & ELEVATIONS

Experience in plans and elevations for presenta-tions.

Use of different colors and textures to express the variety of uses in a plan.

Handmade sketches for fast explanations and ideas.

Advance skills in Autodesk Revit and AutoCAD

*Herlev Hospital_Henning Larsen Architects

Page 9: Pedro lopez portfolio

A1 A5 A7 A8 A9 A10 A12 A13 A16 A17 A18 A19

AA

AB

AC

AD

AK

AN

AO

AP

AQ

AR

AT

AU

AS

A2 A4 A6

AM

B1 B2 B3 B6 B7 B8 B9 B12

BA

BB

BC

BD

BE

BF

BG

BH

BK

B10B4

BJ

AH

A3 A11 A14 A15

B5 B11

Ø1 Ø2V1 V2

AJ

AF

AG

AL

A2-1 A3-1

AM-A

AL-A

AK-A

AE

A20

A5-1 A16-1 A17-1 A18-1

C2

C3

C4

C5

C6

C7

C8

C9

C10

C11

C12

C13

C16

C17

C18

C19

C20

C21

C27

C28

C30

C31

C32

C33

C34

C35

C36C37

C38

C39

C40

C41

C42

C43

C44

C45

D1

D2

D3

D4

D5

D6

D7

D8

D13

D14

D15

D16

D17

D18

D19

C29

CA

DB

DA

C22

C23

C25

C1

C46

D9

D20

D10

D11

D12

C26

C24

C14

C15

B5-1

A3-2 A10-1 A11-1

VAE

VAF

A2-2

ØO

VAG

??

Rent depot06.05.032

Urentskyllerum/affaldsrum

06.05.031

Patientmodtagelse04.03.035

Personalerum04.03.043

Rent depot04.03.049

??

Base04.03.036

Overvågning04.03.038

Overvågning04.03.039

Sengestue,neonatal,

intermediær

04.03.013

Sengestue,neonatal,

intermediær

04.03.015

Sengestue,neonatal

04.03.016

Sengestue,neonatal,

intermediær

04.03.017

Toilet/bad,neonatal

04.03.018

Patient/pårørendekøkken

04.03.042Patienttoilet, HCP

04.03.045

Mælkekøkken04.03.046

Rengøring04.03.055

Medicinrum04.03.051

Afdelingskøkken,lille

04.03.054

RP-SB09.02.009

T1-0 Trappe09.04.058

Korridor09.03.015

Sengestue,neonatal

04.03.001Sengestue,

neonatal

04.03.002Sengestue,neonatal

04.03.003Sengestue,neonatal

04.03.004

Sengestue,neonatal

04.03.005Ambulatorium,

alm.

04.03.047

Personaletoilet04.03.044Kopirum

04.03.056

Sengestue,neonatal,

intermediær

04.03.008

Sengestue,neonatal,

intermediær

04.03.009

Sengestue,neonatal,

intermediær

04.03.010

Sengestue,neonatal,

intermediær

04.03.011

Sengestue,neonatal,

intermediær

04.03.012T1-1 Elevator09.04.055

T1-3 Elevator09.04.056 T1-2 Elevator

09.04.057

EL09.02.020

T2-0 Trappe09.04.062

Korridor09.03.040

T3-1 Elevator09.04.085

T3-2 Elevator09.04.106

T3-3 Elevator09.04.107

T2-3 Elevator09.04.102

T2-2 Elevator09.04.103

T2-1 Elevator09.04.101

EL- tavle09.02.125

Sengestue,neonatal

04.03.007

Toilet/bad,neonatal

04.03.019

Toilet/bad,neonatal

04.03.020Sengestue,

neonatal

04.03.014Opholdsrum,

patienter/pårørende

04.03.041

Kontor04.03.040

L2 Forsynings-elevator

09.04.052 EL09.02.141

EL09.02.142

Base04.03.037

Korridor09.03.049

Gæsteomklædning,Dame

07.01.039

POA postpladser07.02.040

Kontor, anæstesiarb. pl.

07.01.029

Personale arb.stationer

07.02.019

Medicinrum07.02.033

Apparatur oghjælpemiddeldepot

07.02.035

Patientkøkken,(thekøkken)

07.02.021

Personalerum07.02.025

Apparaturdepot07.01.063

Forrum, trappe07.01.119

Urentskyllerum/affaldsrum

07.01.136

Rent depot07.01.135

OP stue, Lap. Kir07.01.001

OP stue, Kon. Kir07.01.003

OP stue, Lap. Kir07.01.004

OP stue, Kon. Kir07.01.006

OP stue, Kon. Kir07.01.008 OP stue, Sectio

07.01.009

OP stue, Kon. Kir07.01.010

OP stue, Lap. Kir07.01.011

Apparaturdepot07.01.064

Urentskyllerum/affaldsrum

07.01.053

Rent depot07.01.054

Udpakningsrum07.01.016

Udpakningsrum07.01.017

Udpakningsrum07.01.019

Udpakningsrum07.01.020

Sengeparkering07.01.022

Sengeparkering07.01.023

Sengeparkering07.01.024

Sengeparkering07.01.027

Sengeparkering07.01.028

Sterildepot07.01.036

Debriefingrum /møderum

07.01.043

Tekøkken,pauserum

07.01.079

Koordinatorrum,OP

07.01.092

Personaletoilet07.01.049

Personaletoilet07.01.050

Personaletoilet07.01.051

Fødestue06.05.001

Fødestue06.05.002

Fødestue06.05.003

Fødestue06.05.004

Fødestue06.05.005

Fødestue06.05.006

Fødestue06.05.007

Fødestue06.05.008

Fødestue06.05.009

Fødestue06.05.010

LearningLab/Study room

06.07.002

Toilet/bad,fødestue

06.05.013

Toilet/bad,fødestue

06.05.014

Base06.05.022

Afdelingskøkken,lille

06.05.037

Familierum06.05.049

Familierum06.05.050

Modtagestue,obstetrik

06.05.051Medicinrum06.05.034 Toilet/bad,

Modtagestue

06.05.029

Personalerum06.05.025

Opholdsrum,patienter/pårørende

06.05.024

Familierum06.05.056

Familierum06.05.057

Modtagestue,obstetrik

06.05.054

Modtagestue,obstetrik

06.05.055Modtagestue,obstetrik

06.05.053

Afdelingskøkken,lille

05.01.048

Intensiv stue,1-sengs

05.01.001

Intensiv stue,1-sengs

05.01.002Intensiv stue,

1-sengs

05.01.003Intensiv stue,

1-sengs

05.01.004Intensiv stue,

1-sengs

05.01.005Intensiv stue,

1-sengs

05.01.006Intensiv stue,

1-sengs

05.01.007Intensiv stue,

1-sengs

05.01.008Intensiv stue,

1-sengs

05.01.009

Intensiv stue,1-sengs

05.01.010

Intensiv stue,1-sengs

05.01.011Intensiv stue,

1-sengs

05.01.012 Intensiv stue,1-sengs

05.01.013

Intensiv stue,1-sengs

05.01.014Intensiv stue,

1-sengs

05.01.015Intensiv stue,

1-sengs

05.01.016Intensiv stue,

1-sengs

05.01.017

Intensiv stue,1-sengs

05.01.018

Pårørendemodtagelse05.01.117

Møderum05.01.118

Forrum, toilet05.01.051

Pårørende toilet05.01.071

Pårørende toilet05.01.072

Overvågningsarbejdspladser05.01.065

Overvågningsarbejdspladser05.01.066

Overvågningsarbejdspladser05.01.067

Overvågningsarbejdspladser05.01.068

Overvågningsarbejdspladser05.01.069

Personaletoilet05.01.031

Personaletoilet05.01.034

Patient, toilet/bad05.01.035

Medicinrum05.01.043 Apparatur- og

udstyrs depot

05.01.046Apparatur- ogudstyrs depot

05.01.047

Patient, toilet/bad05.01.036

Medicinrum05.01.052

Rengøring05.01.049

Urentskyllerum/affaldsrum

05.01.037Rent depot05.01.040

Kontor, Fuldtid -Intensiv

05.02.006 Koordinatorrum05.01.023

Kontor05.01.022

Analyserum05.01.026

Rent depot05.01.039

Urentskyllerum/affaldsrum

05.01.038

Nærdepot05.01.062

Sluse05.01.073

Toilet/bad,neonatal

04.03.021

Toilet/bad,neonatal

04.03.022

Toilet/bad,neonatal

04.03.023

Toilet/bad,neonatal

04.03.024

Toilet/bad,neonatal

04.03.025

Toilet/bad,neonatal

04.03.026

Toilet/bad,neonatal

04.03.027 Toilet/bad,neonatal

04.03.028

L5 Forsynings-elevator

09.04.053

T8 Trappe09.04.094

EL09.02.143

A/L-B09.02.102

EL- tavle09.02.140

L4 Automatiskvarelager

09.04.050

T4-0 Trappe09.04.113

EL09.02.144

T4-1 Elevator09.04.067T4-2 Elevator

09.04.109

T4-3 Elevator09.04.068

EL09.02.145

L3 Forsynings-elevator

09.04.054

T7 Trappe09.04.115

EL09.02.147

Toilet/bad,fødestue

06.05.012

EL- tavle09.02.127

Forrum05.01.081Patient, toilet/bad

05.01.082

T6 Trappe09.04.114

Apparatur- ogudstyrs depot

05.01.083

EL- tavle09.02.169

Rene senge06.05.074

Korridor09.03.057

Rene senge06.05.073

Fødekar06.05.069

Korridor09.03.053

Korridor09.03.047

Korridor09.03.054

Toilet/bad,fødestue

06.05.018

Apparatur oghjælpemiddeldepot

04.03.053

T5-0 Trappe09.04.129

OP stue, Kon. Kir07.01.007

Udpakningsrum07.01.018

Sengeparkering07.01.025

Medicinrum, Nichetil væskevogne

07.01.091

Fødekar06.05.071

Toilet/bad,neonatal

04.03.029

Toilet/bad,neonatal

04.03.061

Toilet/bad,neonatal

04.03.062

Toilet/bad,neonatal

04.03.063

Toilet/bad,neonatal

04.03.064

Toilet/bad,neonatal

04.03.065

Korridor09.03.052

Rent depot06.05.080

RP-B09.02.064

Toilet/bad,fødestue

06.05.011

Toilet/bad,fødestue

06.05.015

Fødekar06.05.068

Toilet/bad,fødestue

06.05.016

Toilet/bad,fødestue

06.05.019Fødekar

06.05.072

Toilet/bad,fødestue

06.05.020

Toilet/bad,fødestue

06.05.058Fødekar

06.05.070

Kontor07.03.035

Korridor09.03.056

Korridor09.03.055

Kontor, Fuldtid -Intensiv

05.02.007

FS-S09.02.162

EL09.02.002

OP Dikterrum/stillerum

07.01.088

OP Dikterrum/stillerum

07.01.089

T5-1Evakueringselevator

09.04.130

Toilet/bad,Modtagestue

06.05.059

Modtagestue,obstetrik

06.05.052

Toilet/bad,Modtagestue

06.05.060

Toilet/bad,Modtagestue

06.05.061

Modtagestue,obstetrik

06.05.048Toilet/bad,

Modtagestue

06.05.062

Toilet/bad,Modtagestue

06.05.063

Toilet/bad,Familierum

06.05.064

Toilet/bad,Familierum

06.05.065

Toilet/bad,Familierum

06.05.066

Toilet/bad,Familierum

06.05.067

Depot06.05.077

Kontor, Fuldtid06.06.003

RP-B09.02.006

L1 Forsynings-elevator

09.04.051

Kontor, POA07.03.031

Base07.02.054

Patienttoilet04.03.069

Patienttoilet04.03.068

Forrum,patienttoilet

04.03.067

Apparaturdepot06.05.078

Personaletoilet06.05.027

Toilet,Venteområde

08.01.026

Toilet,Venteområde

08.01.027

Gæsteomklædning,Herre

07.01.040

Medicinrum07.01.097

Tekøkken,pauserum

07.01.099

OP stue, Lap. Kir07.01.002

OP stue, Lap. Kir +sectio

07.01.005

Udpakningsrum07.01.015

Korridor09.03.069

Kirurgisk vask07.01.113

Kirurgisk vask07.01.116

Kirurgisk vask07.01.114

Kirurgisk vask07.01.117

Kirurgisk vask07.01.115

Kirurgisk vask07.01.118

POA postpladser07.02.057

Pårørende toilet07.02.060

EL09.02.218

Personaletoilet,HCP

07.01.048

Sengestue,neonatal

04.03.006

AGV niche08.03.072

AGV niche08.03.073

AGV niche08.03.074

Korridor09.03.028

Korridor09.03.046

Korridor09.03.070

Korridor09.03.071

Korridor09.03.072

Korridor09.03.075

Korridor09.03.076Korridor

09.03.077

Korridor09.03.080

Korridor09.03.081

Korridor09.03.082

Depot06.05.076

AGV niche08.03.075

Rengøring07.01.065

Rengøring07.02.038

Korridor09.03.091

Stillerum/dikterpladser04.06.041

Stillerum/dikterpladser04.06.042

Stillerum/dikterpladser04.06.043

Forrum, trappe07.01.120

RP-B09.02.004

Familierum06.05.112

Toilet/bad,Familierum

06.05.114

Rengøring06.05.038Personaletoilet

06.05.026

Kommandocentral06.05.115

Pårørendetekøkken

06.05.075

RP-B09.02.213

Personaletoilet06.05.028

Rene senge06.05.113

Personale bad06.05.128

Sterildepot07.02.066

Personale arb.stationer

07.02.067

Overvågning04.03.080

Overvågning04.03.081

Kontor Pædiatri04.06.025

Urent skyllerum07.02.068

Sterildepot, Buffercase carts

07.01.128

Intensiv stue,2-sengs m. sluse

05.01.019

Korridor09.03.014

Personaletoilet05.01.032

Personaletoilet05.01.033

Forrum, toilet05.01.121

Patienttoilet06.05.030

POA postpladser07.02.058

Korridor09.03.190

Forrum, trappe04.03.091

Apparatur ogdepotvarer

06.05.036

Skoprum07.01.130

Korridor09.03.192

Forrum,Intensivstue

05.01.124Forrum,

Intensivstue

05.01.123Forrum,

Intensivstue

05.01.126

Forrum,Intensivstue

05.01.125Forrum,

Intensivstue

05.01.128Forrum,

Intensivstue

05.01.127Forrum,

Intensivstue

05.01.130 Forrum,Intensivstue

05.01.129

Forrum,Intensivstue

05.01.132

Kontor, Fuldtid -Intensiv

05.02.001

Sengeparkering07.01.026

Samtalerum05.01.133

Personalerum05.01.029Kopirum

05.01.050Pårørendeareal

05.01.027

T3-0 Trappe09.04.123

HCP08.01.053

Patienttoilet, HCP07.02.070

Forrum, toilet05.01.140

Pårørendeareal05.01.141

Pårørendeareal05.01.142

Pårørende,tekøkken

05.01.143

Forrum, toilet06.05.130

Forrum, toilet06.05.131

Forrum, toilet07.01.131Forrum, toilet

07.02.072

Forrum,Omklædning

07.02.074

Kopi07.02.071

EL- tavle09.02.139

Sengeparkering,Til ventende

patienter

07.01.132

EL- tavle09.02.126

Personaletoilet,HCP

07.02.028Personaletoilet

07.02.029Personaletoilet

07.02.041

Sengeparkering07.01.133

Sengeparkering07.01.134

EL09.02.018

EL09.02.021

Tekøkken08.02.019

Rummet fortransportvogne,

Omladning

07.01.098

Korridor09.03.200

Toilet,venteområde

08.01.064

Urentskyllerum/affaldsrum

04.03.048

FS-B09.02.080

FS-S09.02.157

FL09.02.097

FS-S09.02.159

FS-B09.02.094

FL09.02.152 FS-B

09.02.161

A/L-B09.02.156

A/L-B09.02.174

A/L-S09.02.086

A/L-B09.02.221

RP-SB09.02.060

FL09.02.170

FS-S09.02.172

A/L-B09.02.223

FS-B09.02.173

A/L-B09.02.224

FL09.02.171

FS-B09.02.179 A/L-S

09.02.093

FS-S09.02.175

FS-S09.02.177

Nærdepot04.03.094

Nærdepot04.03.095

FS-S09.02.180

FS-B09.02.183

FS-B09.02.205

Sprinkler09.02.231

FS-S09.02.199

Korridor09.03.018

VVS09.02.220

VVS09.02.222

VVS09.02.225

FL09.02.238

RP-SB09.02.005

RP-SB09.02.059

FL09.02.239

A/L-SB09.02.240

FS-B09.02.235

FS-B09.02.236

FS-B09.02.237

FS-B09.02.234

A/L-S09.02.229

CB

1 : 200Etage 02

DATO:MÅL: 1 : 200

Etage 02 Plan

2014.04.03

*Herlev Hospital_Henning Larsen Architects

Page 10: Pedro lopez portfolio

WORKPLACE MANAGEMENT

Projects Stay vs Go. This method aims to find the best design and build the best place to work. Finding out a better way to use the area they have, adapting everything to the new ways of working.

The process not only wants a cozy place, but also an efficient place with fluent communications be-tween diferents deparments and workers.

Design&Build

*Project Stay vs Go_CBRE Real Estate

Page 11: Pedro lopez portfolio

[email protected]

Pedro Lopez_Building Engineer & Construction Architect