www.ero-ks.org 1 PRIZRENI GJILANI PRISHTINA MITROVICA Ujmani Valac Deçani Leposavic Vushtrria Burimi Klina Dragashi Shtërpca Vitia Rahoveci Lipjan Shtimje Ferizaji Kamenica Podjeva SHKUPI 2 Drenasi 1 2 1 3 A B 1 3 4 Theranda Sharri 1 2 2 FYROM ALBANIA MONTE NEGRO SERBIA SERBIA Novi Pazar 2 PEJA Skënderaji GJAKOVA Trepça Berivojcë 5 Feronikeli Bardh Kosovo Kosovo Transmission Transmission Network Network Energy Regulatory Office Prishtina September 2006 Rifat Blakaj Head of Energy Supply and Market Structure ERO

PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org1

PRIZRENI

GJILANI

PRISHTINA

MITROVICA

UjmaniValac

Deçani

Leposavic

VushtrriaBurimi

Klina

Dragashi

Shtërpca

Vitia

Rahoveci

Lipjan

Shtimje

Ferizaji

Kamenica

Podjeva

SHKUPI

2

Drenasi

12

13

A

B

13

4

Theranda

Sharri

1

2

2

FYROM

ALBANIA

MONTE NEGRO

SERBIA

SERBIA

Novi Pazar 2

PEJA

Skënderaji

GJAKOVA

Trepça

Berivojcë

5

Feronikeli

Bardh

KosovoKosovo

Transmission Transmission

NetworkNetwork

Energy Regulatory Office

PrishtinaSeptember 2006

Rifat BlakajHead of Energy Supply and Market Structure

ERO

Page 2: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org2

Background

Territory 10 877 km2

Approx. 2 million inhabitants

Installed capacity 1513 MW

In 2005In 2005Net Production 4000 GWh

Consumption 4264 GWh

Import (Intake) 490 GWh

Export (Off take) 226 GWh

Page 3: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org3

Lines and Transformers

Lines• HVL 400 kV - 181 km in HN - 179 km• HVL 220 kV - 361 km in HN - 182 km• HVL 110 kV - 643 km -

Transformers• Tr 400/220 kV - 1200 MVA in HN - 1200 MVA• Tr 220/110 kV - 1000 MVA -• Tr 220/35/10(20) kV - 400 MVA -• Tr 110/35/10 kV - 1162 MVA -

• Transit (2005) - 3129 GWh• Transit Key (2005) - 43.02

Page 4: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org4

Kosovo Transmission Scheme

Page 5: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org5

Calculation of NTCImportant Influence Factors

Network data:Summer/Winter ratingsMaintenance

Load/GenerationSummer/WinterWeek/WeekendDay/Night

Scenario’sGeneration Concentration

Transfer Reliability Margin (TRM)Value for import/export

Page 6: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org6

Calculation of NTC, TRM, ATC, AAC

Currently this calculation is not applied in Kosovo

• For capacity calculation are missing:

- approach in the general and daily regional data

- training for use of PSS/E software for capacity allocation

Page 7: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org7

Capacity Allocation

150300100400KOMKfrom Kosovo to Macedonia

255510150660KOSRfrom Kosovo to Serbia

150300100400KOMNfrom Kosovo to Montenegro

10521050260KOALfrom Kosovo to Albania

150300100400MKKOfrom Macedonia to Kosovo

255510150660SRKOfrom Serbia to Kosovo

150300100400MNKOfrom Montenegro to Kosovo

10521050260ALKOfrom Albania to Kosovo

ATC(KOSTT)NTCTRMTTCAllocation

IDDirection

• Data in the table are regional

- Allocation Capacity right of Kosovo lines is arrogated by Serbia- Also there are many problems in capacity allocation for import and export

Page 8: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org8

Current situation

Network 110 kV with problems in some areas - used for internal consume- n-1 criteria is not fulfilled in most of HV lines and TR- three interconnection lines are used sometimes in island form and very

rare in parallel

Network 400 kV is stabile - mainly used for transit- n-1 criteria is not fulfilled for transformers

Network 220 kV lines mainly stabile, congestion in transformers. n-1 criteria is not fulfilled

- line to Albania in many cases insufficient- line to Serbia under utilized

Page 9: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org9

Electricity flow in HV lines

Some features:

- Electricity flow is usually from north to south direction

- Kosovo has no/or very slight/impact in electricity flow

- In 400 and 220 kV side voltage level lower than the nominal one

- High level of electricity flow in proportion with consumption

1958135350228Average (MWh)

1645051,1853,0662,000Total Flow

133451,17001,998Injection

-31-460-15-3,066-2Offtake

HVL 205 Serbia

HVL 2303 Albania

HVL 437 Montenegro

HVL 407 Serbia

HVL 420 MacedoniaGWh

Electricity flow in HV lines

Page 10: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org10

Ujmani Valac

VushtrriaBurimi

FYROM

ALBANIA

MONTE NEGRO

SERBIA

SERBIA

-2

-3,097

-15

-460

133

1,998

1,170

45

Electricity flow in HVL

Page 11: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org11

Kosovo Transmission Network

Line 400 kV 181 km

Line 220 kV 361 km

Line 110 kV 643 km

Substation

Page 12: PEJA Deçani Transmission Transmission DrenasiBardh ... Presentation/ERO Presentation 2006/Presentati… · 2 Background 4Territory 10 877 km2 4Approx. 2 million inhabitants 4Installed

www.ero-ks.org12

Hamdi Mramori street 1Prishtina – Kosovo (UNMIK)

Tel: +381 (0) 38 247 615Fax: +381 (0) 38 247 620e-mail: [email protected]

www.ero-ks.org

ThankYou

Energy Regulatory Office