Perencanaan Analisis Pondasi Bayah

Embed Size (px)

DESCRIPTION

n Analisis Pondasi Bayah

Citation preview

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    1/29

    FOUNDATION CALCULATION SHEET

    One-Stop Solution for Foundation

    TITLE DESCRIPTION

    PROJECT/JOB NO. 5

    PROJECT/JOB NAME Perencanaan Pondasi Batching Plant Bayah

    CLIENT NAME Motive Mulia

    SITE NAME Area Banten

    DOCUMENT NO.

    REFERENCE NO.

    STRUCTURE NAME Pondasi Bayah

    LOAD COMBINATION GROUP NAME

    REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    2/29

    Page 1

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    FOUNDATION LISTS

    Group Name No. Description No. DescriptionPONDASIBYH 1 F1

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    3/29

    Page 2

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    CONTENTS

    1. GENERAL

    1.1 CODE & STANDARD

    1.2 MATERIALS & UNIT WEIGHT

    1.3 SUBSOIL CONDITION & SAFETY FACTORS

    1.4 LOAD COMBINATION

    2. DRAWING

    2.1 LOCATION PLAN & DETAIL SKETCH

    3. FOUNDATION DATA

    3.1 FOOTING AND SECTION DATA

    3.2 PIER DATA

    3.3 LOAD CASE

    3.4 LOAD COMBINATION

    4. CHECK OF STABILITY

    4.1 CHECK OF SLIDING

    4.2 CHECK OF OVERTURNING MOMENT

    4.3 CHECK OF CONTACT PRESSURE

    5. DESIGN OF FOOTING

    5.1 DESIGN MOMENT AND SHEAR FORCE

    5.2 REQUIRED REINFORCEMENT

    5.3 ONE WAY SHEAR FORCE

    5.4 TWO WAY SHEAR FORCE

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    4/29

    Page 3

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    1. GENERAL

    1.1 CODE & STANDARDItems Description

    Design Code American Concrete Institute (ACI 318) [Metric]

    Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-05]

    Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]

    Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL

    1.2 MATERIALS & UNIT WEIGHT

    Items Value

    Concrete (f'c : compressive strength)

    Lean Concrete (Lf'c : compressive strength)

    Rs (Soil unit weight)

    Rc (Concrete unit weight)

    Es (Steel Modulus of Elasticity)

    Ec (Concrete Modulus of Elasticity)

    - Soil Capacity

    Items Value

    Soil Name Unit-01

    Footing List F1

    Qa (Soil Bearing Capacity)

    Buoyancy Not Consider

    WL (Water Label from the EL = 0) 0 mm

    FD (Frost Depth from the EL = 0) 0 mm

    Internal Friction Angle

    Passive Soil Pressure Not Consider

    Cu (Undrained cohesion)

    1.3 SUBSOIL CONDITION & SAFETY FACTORSItems Description

    Allowable Increase of Soil (Wind) 33.33 %

    Allowable Increase of Soil (Seismic) 33.33 %

    Allowable Increase of Soil (Test) 20 %

    Safety factor against overturning for OVM1(FO1) 1.5

    Safety factor against overturning for OVM2(FO2) 1.5

    Safety factor against overturning for OVM3(FO3) 1.5

    Safety factor against overturning for OVM4(FO4) 1.9

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Reinforcement (D10 ~ D16 , yield strength)

    Reinforcement (D19 ~ , yield strength)

    350.000 kgf/cm2

    0.000 kgf/cm2

    40000.000 kgf/cm2

    40000.000 kgf/cm2

    1.600 ton/m3

    2.400 ton/m3

    2.000 109 kgf/cm

    2

    250998.000 kgf/cm2

    Clay , 0 tonf/m2

    4000 tonf/m2

    0

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    5/29

    Page 4

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    Safety factor against sliding for the SL1(FS1) 1.5

    Safety factor against sliding for the SL2(FS2) 1.8

    Safety factor against sliding for the SL3(FS3) 1.5

    Safety factor against sliding for the SL4(FS4) 1.5

    0.35

    1.4 LOAD COMBINATION

    Index Load Case Name Load Case Description

    1 SW SELF WEIGHT

    2 Bundle BUNDLE FULL LOAD

    Comb . ID Load Combination for stability

    1 1.0 SW + 1.0 Bundle

    Comb . ID Load Combination for Reinforcement

    2 1.0 SW + 1.0 Bundle

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Friction factor (m )

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    6/29

    2. DRAWING REFERENCE DWGNO. DWG NO. DWG T

    N O T E S

    * OUTPUT UNIT : mm

    Perencanaan Pondasi Batching Plant Bayah

    FOUNDATION LOCATION PLA

    Pondasi Bayah

    SQUADCHECK

    PRO CE SS PIPIN G V ES SE LS S TR UC T. E

    SCALE

    AS SHOWN

    JOB NO.

    5

    MICR

    F1

    1 2

    3 4

    5 6

    7 8

    9 10

    11 12

    13 14

    15 16

    A01

    01

    Z X

    Y

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    7/29

    OUTPUT U

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    8/29

    REFERENCE DWG

    NO. DWG NO. DWG T

    N O T E S

    * OUTPUT UNIT : mm

    Perencanaan Pondasi Batching Plant Bayah

    FOUNDATION DETAIL FOR

    F1

    SQUADCHECK

    PRO CE SS PIPIN G V ES SE LS S TR UC T. E

    SCALE

    AS SHOWN

    JOB NO.

    5

    MICR

    REV. DATE DESCRIPTION DRWN

    CHKDAPPDAPPDAPPD

    1 2

    3 4

    5 6

    7 8

    9 10

    11 12

    13 14

    15 16

    LC FOOTING

    LC

    FOOTING

    2068.5

    2263

    6937

    2263

    2068.5

    1468.5

    2263

    2337

    2263

    1468

    .5

    15600

    9800

    FOUNDATION PLAN

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    9/29

    REFERENCE DWG

    NO. DWG NO. DWG T

    N O T E S

    * OUTPUT UNIT : mm

    Perencanaan Pondasi Batching Plant Bayah

    FOUNDATION DETAIL FOR

    F1

    SQUADCHECK

    PRO CE SS PIPIN G V ES SE LS S TR UC T. E

    SCALE

    AS SHOWN

    JOB NO.

    5

    MICR

    REV. DATE DESCRIPTION DRWN

    CHKDAPPDAPPDAPPD

    LC FOOTING

    D16@150

    D16@150

    3 TYP

    .

    D16@150

    D16@150

    TOP BOTTOM

    REINFORCEMENT PLAN

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    10/29

    OUTPUT U

    1 2

    3 4

    5 6

    7 8

    9 10

    11 12

    13 14

    15 16

    800

    CRUSHED STONE 100 TH

    LEAN CONC. 50 THK

    1 2 9 10

    ELEVATION S1 - X

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    11/29

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    12/29

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    13/29

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    14/29

    Page 13

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    3. FOUNDATION DATA

    3.1 FOOTING AND SECTION DATA

    600 600

    1

    600 600

    2

    600 600

    3

    600 600

    4

    600 600

    5

    600 600

    6

    600 600

    7

    600 600

    8

    600 600

    9

    600 600

    10

    600 600

    11

    600 600

    12

    600 600

    13

    600 600

    14

    600 600

    15

    600 600

    16

    15600

    98

    00

    The Origin coordinate

    The Center of gravity (0,0) mm

    800

    200

    ( mm )

    Ft. Name F1

    Ft. Type

    Area

    Ft. Thickness 800.00 mm

    Ft. Volume

    Ft. Weight 293.530 tonf

    Soil Height 0.00 mm

    Soil Volume

    Soil Weight 0.000 tonf

    Buoyancy Not Consider

    Self Weight (except Pr.SW) 293.530 tonf

    Section Data( mm )

    Ft.Name Direction Ft. Volume Soil Volume Pier Wt

    F1 All Direct

    Sec.Name Section Area Ft. Weight Soil Weight Total Weight

    S1

    3.2 PIER DATA

    Off X , Off Y is offset position from the Center of the footing

    If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter

    Area is pier concrete area

    Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)

    Unit( Length : mm , Weight : tonf , Area : m2)

    Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y

    F1

    1 Rectangle 600.000 600.000 200.000 0.173 -5731.500 -3431.50

    2 Rectangle 600.000 600.000 200.000 0.173 -3468.500 -3431.50

    3 Rectangle 600.000 600.000 200.000 0.173 -5731.500 -1168.50

    4 Rectangle 600.000 600.000 200.000 0.173 -3468.500 -1168.50

    5 Rectangle 600.000 600.000 200.000 0.173 -5731.500 1168.50

    6 Rectangle 600.000 600.000 200.000 0.173 -3468.500 1168.50

    7 Rectangle 600.000 600.000 200.000 0.173 -5731.500 3431.50

    8 Rectangle 600.000 600.000 200.000 0.173 -3468.500 3431.50

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    MAT

    152.880 m2

    122.304 m3

    0.000 m3

    152.880 m2

    122.304 m3

    293.530 tonf

    0.000 m3

    0.000 tonf

    2.765 tonf

    296.294 tonf

    0.360

    0.360

    0.360

    0.360

    0.360

    0.360

    0.360

    0.360

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    15/29

    Page 14

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    9 Rectangle 600.000 600.000 200.000 0.173 3468.500 -3431.50

    10 Rectangle 600.000 600.000 200.000 0.173 5731.500 -3431.50

    11 Rectangle 600.000 600.000 200.000 0.173 3468.500 -1168.50

    12 Rectangle 600.000 600.000 200.000 0.173 5731.500 -1168.50

    13 Rectangle 600.000 600.000 200.000 0.173 3468.500 1168.50

    14 Rectangle 600.000 600.000 200.000 0.173 5731.500 1168.50

    15 Rectangle 600.000 600.000 200.000 0.173 3468.500 3431.50

    16 Rectangle 600.000 600.000 200.000 0.173 5731.500 3431.50

    3.3 LOAD CASE

    Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are bason the right hand rule.

    Fx

    Fy

    Fz

    Mx

    My

    Mz

    Index Load Case Name Load Case Description

    1 SW SELF WEIGHT

    2 Bundle BUNDLE FULL LOAD

    Unit( tonf , tonf-m )

    Ft.Name Pr.Name Load Case Fx Fy Fz Mx My

    F1

    11 0 0 -0.17 0

    2 6.58 6.58 87.24 -0.21 0.2

    21 0 0 -0.17 0

    2 -6.58 6.58 87.24 -0.21 -0.2

    31 0 0 -0.17 0

    2 6.58 -6.58 87.24 0.21 0.2

    41 0 0 -0.17 0

    2 -6.58 -6.58 87.24 0.21 -0.2

    51 0 0 -0.17 0

    2 6.58 6.58 87.24 -0.21 0.2

    61 0 0 -0.17 0

    2 -6.58 6.58 87.24 -0.21 -0.2

    71 0 0 -0.17 0

    2 6.58 -6.58 87.24 0.21 0.2

    81 0 0 -0.17 0

    2 -6.58 -6.58 87.24 0.21 -0.2

    91 0 0 -0.17 0

    2 6.58 6.58 87.24 -0.21 0.2

    101 0 0 -0.17 0

    2 -6.58 6.58 87.24 -0.21 -0.2

    111 0 0 -0.17 0

    2 6.58 -6.58 87.24 0.21 0.2

    121 0 0 -0.17 0

    2 -6.58 -6.58 87.24 0.21 -0.2

    131 0 0 -0.17 0

    2 6.58 6.58 87.24 -0.21 0.2

    14 1 0 0 -0.17 0

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    0.360

    0.360

    0.360

    0.360

    0.360

    0.360

    0.360

    0.360

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    16/29

    Page 15

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    2 -6.58 6.58 87.24 -0.21 -0.2

    151 0 0 -0.17 0

    2 6.58 -6.58 87.24 0.21 0.2

    161 0 0 -0.17 0

    2 -6.58 -6.58 87.24 0.21 -0.2

    Footing SW 0.000 0.000 -293.530 0.000 0.00

    3.4 LOAD COMBINATION

    In Pier Top

    without Self Weight

    In Footing Bottom

    with Pier Self Weight,

    But without Footing Self Weight,

    In Footing Bottom Center

    with Pier & Footing Self Weight & Soil Weight,

    Case PileType

    in centroid of Pile Group

    Case NonPileType

    in centroid of Footing

    3.4.1 Load Combination in Pier Top (Without SW)Unit( tonf , tonf-m )

    Ft.Name Pr.Name L.Comb.

    11 6.581 6.581 87.241 -0.208 0.20

    2 6.581 6.581 87.241 -0.208 0.20

    21 -6.581 6.581 87.241 -0.208 -0.20

    2 -6.581 6.581 87.241 -0.208 -0.20

    31 6.581 -6.581 87.241 0.208 0.20

    2 6.581 -6.581 87.241 0.208 0.20

    41 -6.581 -6.581 87.241 0.208 -0.20

    2 -6.581 -6.581 87.241 0.208 -0.20

    51 6.581 6.581 87.241 -0.208 0.20

    2 6.581 6.581 87.241 -0.208 0.20

    61 -6.581 6.581 87.241 -0.208 -0.20

    2 -6.581 6.581 87.241 -0.208 -0.20

    71 6.581 -6.581 87.241 0.208 0.20

    2 6.581 -6.581 87.241 0.208 0.20

    81 -6.581 -6.581 87.241 0.208 -0.20

    2 -6.581 -6.581 87.241 0.208 -0.20

    91 6.581 6.581 87.241 -0.208 0.20

    2 6.581 6.581 87.241 -0.208 0.20

    101 -6.581 6.581 87.241 -0.208 -0.20

    2 -6.581 6.581 87.241 -0.208 -0.20

    111 6.581 -6.581 87.241 0.208 0.20

    2 6.581 -6.581 87.241 0.208 0.20

    121 -6.581 -6.581 87.241 0.208 -0.20

    2 -6.581 -6.581 87.241 0.208 -0.20

    13 1 6.581 6.581 87.241 -0.208 0.20

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Fx Fy Fz Mx M

    F1

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    17/29

    Page 16

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    2 6.581 6.581 87.241 -0.208 0.20

    141 -6.581 6.581 87.241 -0.208 -0.20

    2 -6.581 6.581 87.241 -0.208 -0.20

    151 6.581 -6.581 87.241 0.208 0.20

    2 6.581 -6.581 87.241 0.208 0.20

    161 -6.581 -6.581 87.241 0.208 -0.20

    2 -6.581 -6.581 87.241 0.208 -0.20

    3.4.2 Load Combination in Footing Bottom (With Pier SW)Unit( tonf , tonf-m )

    Ft.Name Pr.Name L.Comb.

    11 6.581 6.581 87.068 -6.789 6.78

    2 6.581 6.581 87.068 -6.789 6.78

    2

    1 -6.581 6.581 87.068 -6.789 -6.78

    2 -6.581 6.581 87.068 -6.789 -6.78

    31 6.581 -6.581 87.068 6.789 6.78

    2 6.581 -6.581 87.068 6.789 6.78

    41 -6.581 -6.581 87.068 6.789 -6.78

    2 -6.581 -6.581 87.068 6.789 -6.78

    51 6.581 6.581 87.068 -6.789 6.78

    2 6.581 6.581 87.068 -6.789 6.78

    61 -6.581 6.581 87.068 -6.789 -6.78

    2 -6.581 6.581 87.068 -6.789 -6.78

    71 6.581 -6.581 87.068 6.789 6.78

    2 6.581 -6.581 87.068 6.789 6.78

    8

    1 -6.581 -6.581 87.068 6.789 -6.78

    2 -6.581 -6.581 87.068 6.789 -6.78

    91 6.581 6.581 87.068 -6.789 6.78

    2 6.581 6.581 87.068 -6.789 6.78

    101 -6.581 6.581 87.068 -6.789 -6.78

    2 -6.581 6.581 87.068 -6.789 -6.78

    111 6.581 -6.581 87.068 6.789 6.78

    2 6.581 -6.581 87.068 6.789 6.78

    121 -6.581 -6.581 87.068 6.789 -6.78

    2 -6.581 -6.581 87.068 6.789 -6.78

    131 6.581 6.581 87.068 -6.789 6.78

    2 6.581 6.581 87.068 -6.789 6.78

    14

    1 -6.581 6.581 87.068 -6.789 -6.78

    2 -6.581 6.581 87.068 -6.789 -6.78

    151 6.581 -6.581 87.068 6.789 6.78

    2 6.581 -6.581 87.068 6.789 6.78

    161 -6.581 -6.581 87.068 6.789 -6.78

    2 -6.581 -6.581 87.068 6.789 -6.78

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Fx Fy Fz Mx M

    F1

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    18/29

    Page 17

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)

    Load Combination of Elastic Condition

    - C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )

    Ft.Name L.Comb. C.G. of Load

    1 0.000 0.000 1099.565 0.000 0.000 7800.0 , 4900

    Load Combination of Ultimate Condition

    - C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )

    Ft.Name Sec.Na L.Comb. C.G. of Load

    S1 2 0.000 0.000 1099.565 0.000 0.000 7800.0 , 4900

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Fx Fy Fz Mx My

    F1

    Fx Fy Fz Mx My

    F1

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    19/29

    Page 18

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    4. CHECK OF STABILITY

    4.1 CHECK OF SLIDINGFormula : (

    m Fz + P.F

    Fxor

    m Fz + P.F

    Fy) > Fs -> OK (Uni-Axial)

    P.F = Passive Force (apply only in case checked passive force, mark by P ) Unit ( tonf

    Ft.Name Dir. L.Comb. Fs(i) Result

    F1X 1 1.8

    Y 1 1.8

    4.2 CHECK OF OVERTURNING MOMENT

    Formula : ( Mry / Moy or Mrx / Mox) > OVM(i) -> OK Unit ( tonf-m

    Ft.Name Dir. L.Comb. OVM(i) Result

    F1X 1 1.5 N/A

    Y 1 1.5 N/A

    4.3 CHECK OF CONTACT PRESSURE

    4.3.1 Contact Pressure Formula

    'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

    q1,q2 =Fz

    Af

    My X(i)Iy

    orMx Y(i)

    Ix

    if q1 or q2 < 0 , than q1 and q2 will be recalculated

    by following formula

    Px =

    L

    0q(x) width(x) X dx

    L

    0q(x) width(x) dx

    P = L0q(x) width(x) dx

    4.3.2 Input Data

    Ft.Name

    F1

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    ( m Fz + P.F) / Fx or ( m Fz + H.P.F) / Fy

    Fx = 0 , Then N/A OK

    Fy = 0 , Then N/A OK

    Mry / Moy = OVM or Mrx / Mox = OVM

    Fz > 0 , Then N/A

    Fz > 0 , Then N/A

    Af(m2) Fl(m ) Fw(m ) Ix(m

    4) Iy(m

    4)

    152.880 15.600 9.800 1223.5500 3100.4070

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    20/29

    Page 19

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    4.3.3 Pressure Check

    - Qa = Soil bearing capacity

    - Uc = Uplift Allowable capacity

    - X-Direction (Uni-Axial) Unit( tonf , tonf-m , tonf/m2

    Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result

    F1 1

    - Y-Direction (Uni-Axial) Unit( tonf , tonf-m , tonf/m2

    Ft.Name L.Comb. q1 q2 ci cj Qmax Qa Cont.A.R Result

    F1 1

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    -7.192 -7.192 0.000 15.600 -1099.6 -100 % OK5333.2(gross)

    -7.192 -7.192 0.000 9.800 -1099.6 -100 % OK5333.2(gross)

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    21/29

    Page 20

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    5. DESIGN OF FOOTING

    5.1 DESIGN MOMENT AND SHEAR FORCEFooting design is in accordance with unltimate strength method at footing bottom.

    Calculated total pier load as

    Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)

    Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design

    Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

    5.1.1 Data Unit( mm , tonf , tonf-m )

    Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw

    F1S1 X 2 15600.00 9800.00 -1099.565 0.00 -1393.094

    S1 Y 2 9800.00 15600.00 -1099.565 0.000 -1393.094

    5.1.2 Design Parameters

    Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2

    f_cl : Clear Cover for edge of footing reinforcement

    f_clt : Clear Cover for top of footing reinforcement

    f_clb : Clear Cover for bottom of footing reinforcement

    Loc. : Location of Critical Point from left side of footing

    Unit(kgf/cm2,mm)

    f'c fy1 fy2 f_cl f_clt f_clb

    0.85 0.8 350.00 40000.00 40000.00 3.0 3.0

    5.2 REQUIRED REINFORCEMENT

    5.2.1 Reinforcement Formula

    - Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2

    As = fac b h , fac = following

    Area of shrinkage and temperature reinforcement shall provide at least the following ratio

    of reinforcement area to gross concrete area, but not less than 0.0014

    (a) Slabs where Grade 40 or 50 deformed bars are used ........................................................................0.0020

    (b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used ..................................0.0018

    (c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield

    strain of 0.35 percent is used ........................................................................................................0.0018 60,000

    fy

    - Required Reinforcement by Analysis

    As As2

    - At every section of flexural members where tensile reinforcement is required

    As As5 As4 ---- ACI Eq (10-3)

    - The requirements of Eq (10-3) need not be applied, if every section As provided is

    at least one -third greater then that required by analysis ---- ACI CODE 10.5.3

    As2= r .req b d

    As3= 1.333 r .req b d

    As4=200

    fyb d

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Fz M Q

    3.0

    f(Flexure) f(Shear)

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    22/29

    Page 21

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    As5=3 fck

    fyb d

    Asmax= 0.75r

    b b d

    r b= 0.85 b 1fck

    fy

    0.003 Es

    0.003 Es+ fy

    Selected As = Max ( As1, As2, Min ( As3, Max ( As4, As5) ) )

    If Selected As < Using As < Asmax, then OK!!

    Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.

    But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier

    Where,

    Rn =Mu

    f bd2 , f = 0.85 , r .req =

    0.85 fck

    fy ( 1 - 1 -

    2Rn

    0.85fck )

    5.2.2 Check of Footing Reinforcement

    Footing Name : F1 GroupType : Mat_Foundation

    - X direction (All Width)

    Sec.Nam L.Comb. Using Bar (mm) Width b (m) d (cm)

    S12 top 11.569 9.800 78.905 133.033

    2 botom 7.764 9.800 78.905 133.033

    Sec.Nam L.Comb.

    S12 top 3.779 0.0001

    2 bottom 3.794 0.0001

    Sec.Nam L.Comb.

    S12 top 54.880 7.353 9.802 27.183 28.769 364.210

    2 bottom 54.880 7.383 9.841 27.183 28.769 364.210

    Sec.Nam L.Comb. Result

    S12 top 133.033 54.880

    2 bottom 133.033 54.880

    - Y direction (All Width)

    Sec.Nam L.Comb. Using Bar (mm) Width b (m) d (cm)

    S12 top 1.769 15.600 77.315 208.484

    2 botom 4.908 15.600 77.315 208.484

    Sec.Nam L.Comb.

    S12 top 0.969 0.0000

    2 bottom 0.518 0.0000

    Sec.Nam L.Comb.

    S12 top 87.360 2.926 3.900 42.399 44.873 568.080

    2 bottom 87.360 1.564 2.084 42.399 44.873 568.080

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Loc. (m) As (cm2)

    67 - D16 @ 150

    67 - D16 @ 150

    Mu (tonf-m) Rn r.Req

    196.000

    196.787

    As1(cm2) As2(cm

    2) As3(cm

    2) As4(cm

    2) As5(cm

    2) Asmax(cm

    2)

    Select As(cm2)Using As(cm

    2)

    OK

    OK

    Loc. (m) As (cm2)

    105 - D16 @ 150

    105 - D16 @ 150

    Mu (tonf-m) Rn r.Req

    76.786

    41.066

    As1(cm2) As2(cm

    2) As3(cm

    2) As4(cm

    2) As5(cm

    2) Asmax(cm

    2)

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    23/29

    Page 22

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    Sec.Nam L.Comb. Result

    S1

    2 top 208.484 87.360

    2 bottom 208.484 87.360

    27/10/2014

    Copyright (c) GS E&C. All Rights Reserved

    Select As(cm2)Using As(cm

    2)

    OK

    OK

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    24/29

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    25/29

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    26/29

    Page 25

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    5.3 ONE WAY SHEAR FORCE

    5.3.1 One-Way Shear Formula

    ACI 318-05 CODE 11.3.1.1

    - For members subject to shear and flexure only.

    - f Vc= 0.8 2 fck B'w d (eq 11-3)

    - Vu

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    27/29

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    28/29

  • 5/19/2018 Perencanaan Analisis Pondasi Bayah

    29/29

    Page 28

    Calculation Sheet

    of

    Foundation

    Project Na. : Perencanaan Pondasi Batchi

    Project No. : 5

    Client : Motive Mulia

    5.4 TWO WAY SHEAR FORCE

    5.4.1 Two-Way Shear Formula

    Vu = Fz Shade Ratio

    (a) f Vc1= 0.8 2 (1 + 2/b c) fck bo d (eq 11-33)