TECHNOLOGY UPDATE PERFORMANCE INCENTIVES = HIGH PRODUCTIVITY Sewing Operator Incentive Schemes and Technology Solutions T he solution is a fair and direct incentive scheme for workers. effective amongst other incentive schemes as it provides a lot of motivation and is highly effective in increasing productivity. It is a supplement to other management techniques, and we may regard it as one of the important tools since it attempts to link wages with performance. Purpose of incentives The main purpose of incentives is to motivate workers to give his best. Incentive scheme is set to improve performance of workers, by making them work more effectively with less wastage of time, at a greater pace, and with better application to the job. An incentive scheme for the workers brings down the making cost when engineering methods are implemented simultaneously. Currently, performance incentive scheme in a factory is optional, but in the near future an incentive scheme would be become mandatory to run a attendance bonus. Few years ago bonus for attendance did not exist in garment export industry, however, now most of the companies are providing attendance bonus to their workers to reduce operator absenteeism. Similarly performance bonus for workers can break reduce garment making cost. I don’t need to both the factory owner and workers. Here is a case to describe the impact and importance of performance incentive. Case: Performance incentive given to operators based on line (group) Assume that a factory is currently running at become eligible for incentive earning is 45%. When line from 35% direct labor cost per garment reduces by 30%. See following illustration-1. Cost saving per garment = (38.80 – 27.16) = Rs. 11.64 and Cost reduction = (11.64*100/38.8)=30% Total saving per month from one line = (6,240 X 11.64) = Rs. 72,643.00 If the factory distributes 50% of the savings earned from extra production, each operator will earn Rs. 211.00 who are earning say 7000 rupees per month with overtime. Operator incentive earning reduce OT hour expenses. Incentive amount can be planned at lower or higher than 50-50 that should attract operator to give efforts to produce more. in OT Above calculations seem very interesting. Some of you may be already gone through what do you need to have such kind of productivity improvement? Requirements to run an Incentive Scheme effectively content (operations SAM) production and produced minutes Every factory owner knows this very well that if they distribute one dollar as performance based incentive to their operators they can earn and save in return more than that. But with implementing an incentive scheme for workers. Many are interested and think to start some kind of incentives to motivate their employees but still they fail to start. Why so? Major reasons for not having Incentive Schemes recording production data and calculate without human intervention. May 2013 PERFORMANCE INCENTIVES = HIGH PRODUCTIVITY Sewing Operator Incentive Schemes and Technology Solutions May 2013 Figures at Existing Line Figures at Improved line Operator Salary SAM per Garment 30 30 Machine/Line 30 30 (pieces) T he solution is a fair and direct incentive scheme for workers. effective amongst other incentive schemes as it provides a lot of motivation and is highly effective in increasing productivity. It is a supplement to other management techniques, and we may regard it as one of the important tools since it attempts to link wages with performance. Purpose of incentives The main purpose of incentives is to motivate workers to give his best. Incentive scheme is set to improve performance of workers, by making them work more effectively with less wastage of time, at a greater pace, and with better application to the job. An incentive scheme for the workers brings down the making cost when engineering methods are implemented simultaneously. Currently, performance incentive scheme in a factory is optional, but in the near future an incentive scheme would be become mandatory to run a attendance bonus. Few years ago bonus for attendance did not exist in garment export industry, however, now most of the companies are providing attendance bonus to their workers to reduce operator absenteeism. Similarly performance bonus for workers can break reduce garment making cost. I don’t need to both the factory owner and workers. Here is a case to describe the impact and importance of performance incentive. Case: Performance incentive given to operators based on line (group) Assume that a factory is currently running at become eligible for incentive earning is 45%. When line from 35% direct labor cost per garment reduces by 30%. See following illustration-1. Cost saving per garment = (38.80 – 27.16) = Rs. 11.64 and Cost reduction = (11.64*100/38.8)=30% Total saving per month from one line = (6,240 X 11.64) = Rs. 72,643.00 If the factory distributes 50% of the savings earned from extra production, each operator will earn Rs. 211.00 who are earning say 7000 rupees per month with overtime. Operator incentive earning reduce OT hour expenses. Incentive amount can be planned at lower or higher than 50-50 that should attract operator to give efforts to produce more. in OT Above calculations seem very interesting. Some of you may be already gone through what do you need to have such kind of productivity improvement? Requirements to run an Incentive Scheme effectively content (operations SAM) production and produced minutes Every factory owner knows this very well that if they distribute one dollar as performance based incentive to their operators they can earn and save in return more than that. But with implementing an incentive scheme for workers. Many are interested and think to start some kind of incentives to motivate their employees but still they fail to start. Why so? Major reasons for not having Incentive Schemes recording production data and calculate without human intervention.

PERFORMANCE INCENTIVES HIGH PRODUCTIVITY - Garment … incentive higher... · performance incentive scheme in a factory is ... if they distribute one dollar as performance based incentive

Embed Size (px)

Citation preview

Page 1: PERFORMANCE INCENTIVES HIGH PRODUCTIVITY - Garment … incentive higher... · performance incentive scheme in a factory is ... if they distribute one dollar as performance based incentive

TECHNOLOGY UPDATE

PERFORMANCE INCENTIVES

=

HIGH PRODUCTIVITY

Sewing Operator Incentive Schemes and

Technology Solutions

������������������������ ���� ����������� ���������������� ��� �� ��� ������������������� ����������������������������������������������� ������������������� ������ ������ ���������� ���� ������������������������� ��������������������������������� ����� ��� ��� ���� ��� �������������� ��� ������� ������ ���������������� ���� ������������������������������� ������� ������������ �������������������!������������������ ��� ���������������� �� �������� ���� ����� ���� ��������������� ������������������

The solution is a fair and direct

incentive scheme for workers.

effective amongst other incentive schemes as it provides a lot of motivation and is highly effective in increasing productivity. It is a supplement to other management techniques, and we may regard it as one of the important tools since it attempts to link wages with performance.

Purpose of incentivesThe main purpose of incentives is to motivate workers to give his best. Incentive scheme is set to improve performance of workers, by making them work more effectively with less wastage of time, at a greater pace, and with better application to the job. Anincentive scheme for the workers brings down the making cost when engineering methods are implemented simultaneously. Currently, performance incentive scheme in a factory is optional, but in the near future an incentive scheme would be become mandatory to run a

attendance bonus. Few years ago bonus for attendance did not exist in garment export industry, however, now most of the companies are providing attendance bonus to their workers to reduce operator absenteeism. Similarly performance bonus for workers can break

reduce garment making cost. I don’t need to

both the factory owner and workers. Here is a case to describe the impact and importance of performance incentive.

Case: Performance incentive given to operators based on line (group)

Assume that a factory is currently running at

become eligible for incentive earning is 45%. When line

from 35% direct labor cost per garment reduces by 30%. See following illustration-1.

Cost saving per garment = (38.80 – 27.16) = Rs. 11.64 and Cost reduction = (11.64*100/38.8)=30%Total saving per month from one line = (6,240 X 11.64) = Rs. 72,643.00 If the factory distributes 50% of the savings earned from extra production, each operator will earn Rs. 211.00

who are earning say 7000 rupees per month with overtime. Operator incentive earning

reduce OT hour expenses. Incentive amount can be planned at lower or higher than 50-50 that should attract operator to give efforts to produce more.

in OT

Above calculations seem very interesting. Some of you may be already gone through

what do you need to have such kind of productivity improvement?Requirements to run an Incentive Scheme effectively

content (operations SAM)

production and produced minutes

Every factory owner knows this very well that if they distribute one dollar as performance based incentive to their operators they can earn and save in return more than that. But

with implementing an incentive scheme for workers. Many are interested and think to start some kind of incentives to motivate their employees but still they fail to start. Why so?

Major reasons for not having Incentive Schemes

recording production data and calculate

without human intervention.

�� May 2013

PERFORMANCE INCENTIVES

=

HIGH PRODUCTIVITY

Sewing Operator Incentive Schemes and

Technology Solutions

������������������������ ���� ����������� ���������������� ��� �� ��� ������������������� ����������������������������������������������� ������������������� ������ ������ ���������� ���� ������������������������� ��������������������������������� ����� ��� ��� ���� ��� �������������� ��� ������� ������ ���������������� ���� ������������������������������� ������� ������������ �������������������!������������������ ��� ���������������� �� �������� ���� ����� ���� ��������������� ������������������

�� May 2013

Figures at Existing Line

Figures at Improved line

Operator Salary

SAM per Garment 30 30

Machine/Line 30 30

(pieces)

The solution is a fair and direct

incentive scheme for workers.

effective amongst other incentive schemes as it provides a lot of motivation and is highly effective in increasing productivity. It is a supplement to other management techniques, and we may regard it as one of the important tools since it attempts to link wages with performance.

Purpose of incentivesThe main purpose of incentives is to motivate workers to give his best. Incentive scheme is set to improve performance of workers, by making them work more effectively with less wastage of time, at a greater pace, and with better application to the job. Anincentive scheme for the workers brings down the making cost when engineering methods are implemented simultaneously. Currently, performance incentive scheme in a factory is optional, but in the near future an incentive scheme would be become mandatory to run a

attendance bonus. Few years ago bonus for attendance did not exist in garment export industry, however, now most of the companies are providing attendance bonus to their workers to reduce operator absenteeism. Similarly performance bonus for workers can break

reduce garment making cost. I don’t need to

both the factory owner and workers. Here is a case to describe the impact and importance of performance incentive.

Case: Performance incentive given to operators based on line (group)

Assume that a factory is currently running at

become eligible for incentive earning is 45%. When line

from 35% direct labor cost per garment reduces by 30%. See following illustration-1.

Cost saving per garment = (38.80 – 27.16) = Rs. 11.64 and Cost reduction = (11.64*100/38.8)=30%Total saving per month from one line = (6,240 X 11.64) = Rs. 72,643.00 If the factory distributes 50% of the savings earned from extra production, each operator will earn Rs. 211.00

who are earning say 7000 rupees per month with overtime. Operator incentive earning

reduce OT hour expenses. Incentive amount can be planned at lower or higher than 50-50 that should attract operator to give efforts to produce more.

in OT

Above calculations seem very interesting. Some of you may be already gone through

what do you need to have such kind of productivity improvement?Requirements to run an Incentive Scheme effectively

content (operations SAM)

production and produced minutes

Every factory owner knows this very well that if they distribute one dollar as performance based incentive to their operators they can earn and save in return more than that. But

with implementing an incentive scheme for workers. Many are interested and think to start some kind of incentives to motivate their employees but still they fail to start. Why so?

Major reasons for not having Incentive Schemes

recording production data and calculate

without human intervention.

Page 2: PERFORMANCE INCENTIVES HIGH PRODUCTIVITY - Garment … incentive higher... · performance incentive scheme in a factory is ... if they distribute one dollar as performance based incentive

Line Eff 48 49 50 51 52 53 54 55 57 58 59

48

49

50

51

52

53

54

55

57

58

59

70

0 0

00

23.08

23.08

23.85

23.85

25.38

25.38 29.23

29.23 30.00

30.00

30.77

30.77 31.54

31.54 32.31

32.31 33.08

33.08 33.85 35.38

33.85 35.38

15.38

15.90

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

15.38

15.90

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

38.97

39.49

40.00

40.51

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

39.23

39.74

40.77

41.28

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

40.00

40.51

41.03

41.54

42.05

40.77

41.28

41.79

42.31

42.82

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

41.54

42.05

43.08

43.59

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

42.31

42.82

43.33

43.85

44.87 47.18 47.95 48.72 49.49 51.03 51.79 53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

43.08

43.59

44.10

44.13

43.85

44.87

45.38

45.90

45.13

45.38

45.90

47.44

47.18

48.21

47.44

47.95

48.97

48.21

48.72

49.23

49.74

48.97

49.49

50.00

50.51

49.23

49.74

50.77

51.28

50.oo

50.51

51.08

51.54

52.05

50.77

51.28

51.79

52.31

52.82

51.54

52.05

53.08

53.59

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.79

51.79

51.79

51.79

51.7951.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

individual incentive or a group incentive scheme would suit them to bring up opera tor motivation as well as labor productivity and debate goes on.

considered to make the scheme error proof. If the scheme is not designed correctly it would

without an established tool. They fear, in case in centive payment is calculated on spreadsheet by employees there may be chance of data manipulation which will have severe impact.

want to add multiple parameters in designing incentive scheme? Like individual

bonus plus attendance bonus. Total amount

these three.

undecided. Technology Solutions of the problems1. Standard Time setting for a product: Instead of guesswork factories can have one of the following technologies for setting time standards for sewing operations.

SewEasy Pvt. Ltd.

2. Technology for Data Tracking and Analysis: To have accurate data for individual

tracking solutions are very helpful. Leadtec and G.Pro are such example. Barcode system is one law cost solution compared to RFID for

production data tracking. Few names those take apparel manufacturing industry to step ahead with real time data capturing and in depth data analysis are

system such as Leadtec, G.Pro Technologies

3. Designing of Incentive schemeEvery system has pros and cons. But you have to select one from the available resources. In case you don’t want to spend money for incentive calculation software packages use

Based on your incentive scheme prepare an

amount. Incentive matrix can be made simple incentive plan to a complex one. Once you made the incentive matrix, prepare another table for calculating operator incentives. Later when you calculate incentive amount of an operator for a duration or daily just you have to pick amount from the matrix. For example, one complex matrix has been shown below where scheme includes individual incentive and group incentives. In case you want to make your incentive calculation system automatic, Leadtec system

multiple incentive bonus system, an

tracking. It tracks individual operator

work on multiple operations in a day; system takes care to calculate operator’s total

operators.

can be used or can integrate own scheme.

same time – like incentive based on

incen tive)

TECHNOLOGY UPDATE

��May 2013

Line Eff 48 49 50 51 52 53 54 55 57 58 59

48

49

50

51

52

53

54

55

57

58

59

70

0 0

00

23.08

23.08

23.85

23.85

25.38

25.38 29.23

29.23 30.00

30.00

30.77

30.77 31.54

31.54 32.31

32.31 33.08

33.08 33.85 35.38

33.85 35.38

15.38

15.90

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

15.38

15.90

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

17.95

38.97

39.49

40.00

40.51

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

41.08

39.23

39.74

40.77

41.28

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

41.79

40.00

40.51

41.03

41.54

42.05

40.77

41.28

41.79

42.31

42.82

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

43.33

41.54

42.05

43.08

43.59

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

44.10

42.31

42.82

43.33

43.85

44.87 47.18 47.95 48.72 49.49 51.03 51.79 53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

53.33

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

54.10

43.08

43.59

44.10

44.13

43.85

44.87

45.38

45.90

45.13

45.38

45.90

47.44

47.18

48.21

47.44

47.95

48.97

48.21

48.72

49.23

49.74

48.97

49.49

50.00

50.51

49.23

49.74

50.77

51.28

50.oo

50.51

51.08

51.54

52.05

50.77

51.28

51.79

52.31

52.82

51.54

52.05

53.08

53.59

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

44.87

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.18

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

47.95

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

48.72

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

49.49

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.03

51.79

51.79

51.79

51.79

51.7951.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

51.79

TECHNOLOGY UPDATE

��May 2013

individual incentive or a group incentive scheme would suit them to bring up opera tor motivation as well as labor productivity and debate goes on.

considered to make the scheme error proof. If the scheme is not designed correctly it would

without an established tool. They fear, in case in centive payment is calculated on spreadsheet by employees there may be chance of data manipulation which will have severe impact.

want to add multiple parameters in designing incentive scheme? Like individual

bonus plus attendance bonus. Total amount

these three.

undecided. Technology Solutions of the problems1. Standard Time setting for a product: Instead of guesswork factories can have one of the following technologies for setting time standards for sewing operations.

SewEasy Pvt. Ltd.

2. Technology for Data Tracking and Analysis: To have accurate data for individual

tracking solutions are very helpful. Leadtec and G.Pro are such example. Barcode system is one law cost solution compared to RFID for

production data tracking. Few names those take apparel manufacturing industry to step ahead with real time data capturing and in depth data analysis are

system such as Leadtec, G.Pro Technologies

3. Designing of Incentive schemeEvery system has pros and cons. But you have to select one from the available resources. In case you don’t want to spend money for incentive calculation software packages use

Based on your incentive scheme prepare an

amount. Incentive matrix can be made simple incentive plan to a complex one. Once you made the incentive matrix, prepare another table for calculating operator incentives. Later when you calculate incentive amount of an operator for a duration or daily just you have to pick amount from the matrix. For example, one complex matrix has been shown below where scheme includes individual incentive and group incentives. In case you want to make your incentive calculation system automatic, Leadtec system

multiple incentive bonus system, an

tracking. It tracks individual operator

work on multiple operations in a day; system takes care to calculate operator’s total

operators.

can be used or can integrate own scheme.

same time – like incentive based on

incen tive)

Prasanta Sarkar holds an Engineering degree in Textile Technology from College of Textile Technology, erampore and Post Graduate in

Fashion Technology from National Institute of Fashion Technology, New Delhi. Previously he worked in a garment manufacturing and exports house in NCR and in an apparel

a consultant. He has visited many garment manufacturing companies in India and Bangladesh and conducted no. of training programs

on industrial engineering, quality management and sewing operator training. He did projects on productivity improvement, quality improvement, development of factory MIS systems.