Distancia a cantera 22.5 kmAltura del Banco (K) 8 m EDiámetro de Barreno (d) 68 mmGrado de Atacado (p) 1.25 (con máquina)Dinamita 35% (s) 0.6Espacio entre barrenos ( E ) 0.75 V E/V = 0.75Inclinación 2 a 1 (f)Resistencia Específica de Roca (S) 0.6
V max 3 m
1. Carga de Fondo
1 b 3.35 kg/mlb 3.9 m
Carga de Fondo (Qf) 13.07 kg
2. Carga de Columna
1 p 2.3 kg/mlp 2.00 m
Carga de Columna (Qc) 4.60 kg
Carga Total (Qf+Qc) de 1 barreno 17.67 kg
3. Carga Específica
Volumen de barreno 54.00 m3Carga Específica (q) 0.33 kg/m3
Numero de barrenos 1516
Carga de toda la dinamita 26780.14 kgCosto de la dinamita 6 soles /kgCosto total de la dinamita 160680.84 solesCosto dinamita /m3 1.9633133896752Costo perforación de roca /m3 10.0 solesCosto de roca explotada / m3 12.0 soles
Costo de barreno 646.0 soles
CAMIONES Y CARGADORESRelacion camiones/cargadores 5
Velocidad del camion 20 Km/hora 1Tiempo en carga y descarga 36 minutos 10Tolva 10 m3 25Jornada 9 horas 8Hora extra 1 horasHora normal 8 horasCantidad de años 1 añosTiempo total 2250 horasDistancia total (ida y vuelta) 45 km
T = e/v 135 minutosTiempo total x viaje 171 minutos
Viajes total por jornada 3.1578947368421 viajesRendimiento x dia de 1 camion 31.578947368421 m3/dia
Número de camiones 17 camionesNúmero de cargadores 4 cargadores
Costo de operación de cargador 150 soles /horaCosto de operació x hora del camión 110 soles/hora
Costo de camiones S/. 4,207,500.00 soles S/. 5,557,500.00
Costo de cargadores S/. 1,350,000.00 soles
Costo de rodillado y colocado de plataforma
20 soles /m3Costo de plataforma 2415000 soles
Costo total por m3 terminada la plataforma
75.466215547266 soles/m3
2.25 mts
añomesesdiashoras
Horas Totales x Número de camiones x Costo horario
Largo kmEspesor de afirmado 0 mB menor del terraplén m
Coeficiente de Escombros (A) 10.00%Porcentaje de Expansión 64%Costo del material en banco 0 nuevos soles/m3
1. Volumen Geométrico
Vol. Geom. 120750.00 m3
2. Volumen de Transporte roca
nucleoVol. Transp. 134166.67 m3 dentellon
TOTAL3. Volumen de Banco
F.V. 0.61Vol. Banco 81841.6666666667 m3
Costo Total S/. 0.00
0 V banco = FV x V transporteFV = 1/(1 +%EXP)
0
0
0 0 0
B Mayor= 0
400000 Corte
132000 relleno11250 relleno
143250 Relleno
1
Vi = Vf / (1-A)V transp= V geom / (1-A)Vol Geom = Area sección x Long
V banco = FV x V transporteFV = 1/(1 +%EXP)
Vi = Vf / (1-A)V transp= V geom / (1-A)Vol Geom = Area sección x Long
FV = 1/(1 +%EXP)
DATOS
HP 250Vida económica 5 añosValor de adquisición S/. 650,000.00 Valor de salvataje 16% anualInterés anual 12.00% anualCombustible Petroleo
VPI Valor de depreciación anual 16.80%
Año1 S/. 650,000.00 1 VA2 S/. 540,800.00 0.832 VA3 S/. 431,600.00 0.664 VA4 S/. 322,400.00 0.496 VA5 S/. 213,200.00 0.328 VA6 VA7 VA8 VA9 0 VA10 0 VA
COSTO FIJO CAPECO 8%
Interés S/. 51,792.00 0.07968 VASeguros S/. 34,528.00 0.05312 VAMantenimiento 2/5 0.40 VADepreciación S/. 109,200.00 0.168 VA
Costo Fijo
0.7008 x VA2000
COSTO VARIABLECantidad S/. x galón Parcial
Combustible 6.7 S/. 15 S/. 100.50Lubricante 0.22 S/. 25 S/. 5.50Grasas y filtros S/. 106.00 20% S/. 21.20Jornal S/. 20
Costo variable S/. 147.20
COSTO DE OPERACIÓN
S/. 374.96 x Hora
valor salvataje <= 25% VA
VPI 0.664000000000000 VA
VPI de tablita 67.50.675 VA
Mantenimiento asumido 200.00%
S/. 227.76 x Hora
x Hora
Costo del combustible S/. 15.0 1 10 Petroleo Costo de lubricante S/. 25 25 8 GasolinaJornal del maquinista S/. 160
Tabla 1 VALORES PROMEDIO DE INVERSION PARA DIVERSOS VALORES DE SALVATAJE Y AÑOS DE VIDA UTIL
AÑOS 0% S/. 431,600.00 2 75
3 66.674 62.5
S/. 438,750.00 5 606 58.337 57.148 56.259 55.55
10 5511 54.5412 54.17
Tabla 1 VALORES PROMEDIO DE INVERSION PARA DIVERSOS VALORES DE SALVATAJE Y AÑOS DE VIDA UTIL
5% 10% 15% 20% 25%76 77.5 78.75 80 81.25
68.33 70 71.66 73.33 7564.38 66.25 68.12 70 71.87
62 64 66 68 7060.41 62.5 64.58 66.66 68.7559.28 61.43 63.57 65.71 67.8558.44 60.62 62.81 65 67.1957.77 60 62.22 64.45 66.6757.25 59.5 61.75 64 66.2556.81 59.09 61.36 63.63 65.9156.46 58.75 61.04 63.33 65.62
TABLA 2CONSUMOS HORARIOS DE COMBUSTIBLES Y LUBRICANTES
POTENCIA
40 1.0741 1.142 1.1343 1.1544 1.1845 1.2146 1.2347 1.2648 1.2949 1.3150 1.3451 1.3752 1.3953 1.4254 1.4555 1.4756 1.557 1.53
PETROLEO 0.0268 X Potencia
58 1.5659 1.5860 1.6161 1.6362 1.6663 1.6964 1.7165 1.7466 1.7767 1.7968 1.8269 1.8570 1.8871 1.972 1.9373 1.9674 1.9875 2.0176 2.0477 2.0678 2.0979 2.1280 2.1481 2.1782 2.283 2.2284 2.2585 2.2786 2.387 2.3388 2.3589 2.3990 2.4191 2.4492 2.4793 2.4994 2.5295 2.5596 2.5797 2.698 2.6399 2.65
100 2.68101 2.71102 2.73103 2.76104 2.79105 2.81
106 2.84107 2.87108 2.89109 2.92110 2.95111 2.97112 3113 3.03114 3.05115 3.08116 3.11117 3.14118 3.16119 3.19120 3.22121 3.24122 3.27123 3.3124 3.32125 3.35126 3.38127 3.4128 3.43129 3.46130 3.48131 3.51132 3.54133 3.56134 3.59135 3.62136 3.64137 3.67138 3.7139 3.73140 3.75141 3.78142 3.81143 3.83144 3.86145 3.89146 3.91147 3.94148 3.97149 3.99150 4.02151 4.05152 4.07153 4.1
154 4.13155 4.15156 4.19157 4.21158 4.23159 4.26160 4.29161 4.31162 4.34163 4.37164 4.4165 4.42166 4.45167 4.48168 4.5169 4.53170 4.56171 4.58172 4.61173 4.64174 4.66175 4.69176 4.72177 4.74178 4.77179 4.8180 4.82181 4.85182 4.88183 4.9184 4.93185 4.96186 4.98187 5.01188 5.04189 5.07190 5.09191 5.12192 5.15193 5.17194 5.2195 5.23196 5.25197 5.28198 5.31199 5.33200 5.36205 5.49
210 5.63215 5.76220 5.9225 6.03230 6.16235 6.3240 6.43245 6.57250 6.7255 6.83260 6.97265 7.1270 7.24275 7.37280 7.5285 7.64290 7.77295 7.91300 8.04310 8.31320 8.58330 8.84340 9.11350 9.38360 9.65370 9.92380 10.18390 10.45400 10.72410 10.99420 11.26430 11.52440 11.79450 12.06460 12.33470 12.6480 12.86490 13.13500 13.4
TABLA 2CONSUMOS HORARIOS DE COMBUSTIBLES Y LUBRICANTES
1.61 0.02 0.01 0.011.65 0.02 0.01 0.01 HP 2201.69 0.03 0.01 0.011.73 0.03 0.01 0.01 VALOR 1 0.131.77 0.03 0.01 0.01 3 0.031.81 0.03 0.01 0.01 VALOR 3 0.041.85 0.03 0.01 0.011.89 0.03 0.01 0.011.93 0.03 0.01 0.011.97 0.03 0.01 0.012.01 0.03 0.01 0.022.05 0.03 0.01 0.022.09 0.03 0.01 0.022.13 0.03 0.01 0.022.17 0.03 0.01 0.022.21 0.03 0.01 0.022.25 0.03 0.01 0.022.29 0.03 0.01 0.02
GASOLINA 0.0402 x Potencia
ACEITE Motor
0.000603 x Potencia
ACEITE Hidráulico
ACEITE Transmisión
2.33 0.03 0.01 0.022.37 0.04 0.01 0.022.41 0.04 0.01 0.022.45 0.04 0.01 0.022.49 0.04 0.01 0.022.53 0.04 0.01 0.022.57 0.04 0.01 0.022.61 0.04 0.01 0.022.65 0.04 0.01 0.022.69 0.04 0.01 0.022.73 0.04 0.01 0.022.77 0.04 0.01 0.022.81 0.04 0.01 0.022.85 0.04 0.01 0.022.89 0.04 0.01 0.022.93 0.04 0.01 0.022.97 0.05 0.01 0.023.02 0.05 0.01 0.023.06 0.05 0.01 0.023.1 0.05 0.01 0.02
3.14 0.05 0.01 0.023.18 0.05 0.01 0.023.22 0.05 0.01 0.023.26 0.05 0.01 0.023.3 0.05 0.01 0.02
3.34 0.05 0.01 0.023.38 0.05 0.01 0.023.42 0.05 0.01 0.023.46 0.05 0.01 0.023.5 0.05 0.01 0.02
3.54 0.05 0.01 0.023.58 0.05 0.01 0.023.62 0.05 0.01 0.023.66 0.06 0.01 0.02
3 0.06 0.01 0.023.7 0.06 0.01 0.02
3.74 0.06 0.01 0.023.78 0.06 0.01 0.023.86 0.06 0.01 0.023.9 0.06 0.01 0.02
3.94 0.06 0.01 0.023.98 0.06 0.01 0.024.02 0.06 0.02 0.034.06 0.06 0.02 0.034.1 0.06 0.02 0.03
4.14 0.06 0.02 0.034.18 0.06 0.02 0.034.22 0.06 0.02 0.03
4.26 0.06 0.02 0.034.3 0.06 0.02 0.03
4.34 0.07 0.02 0.034.38 0.07 0.02 0.034.42 0.07 0.02 0.034.46 0.07 0.02 0.034.5 0.07 0.02 0.03
4.54 0.07 0.02 0.034.58 0.07 0.02 0.034.62 0.07 0.02 0.034.66 0.07 0.02 0.034.7 0.07 0.02 0.03
4.74 0.07 0.02 0.034.78 0.07 0.02 0.034.82 0.07 0.02 0.034.86 0.07 0.02 0.034.9 0.07 0.02 0.03
4.94 0.07 0.02 0.034.98 0.07 0.02 0.035.02 0.08 0.02 0.035.07 0.08 0.02 0.035.11 0.08 0.02 0.035.15 0.08 0.02 0.035.19 0.08 0.02 0.035.23 0.08 0.02 0.035.27 0.08 0.02 0.035.31 0.08 0.02 0.035.35 0.08 0.02 0.035.39 0.08 0.02 0.035.43 0.08 0.02 0.035.47 0.08 0.02 0.035.51 0.08 0.02 0.035.55 0.08 0.02 0.035.59 0.08 0.02 0.035.63 0.08 0.02 0.035.67 0.09 0.02 0.035.71 0.09 0.02 0.035.75 0.09 0.02 0.035.79 0.09 0.02 0.035.83 0.09 0.02 0.035.87 0.09 0.02 0.035.91 0.09 0.02 0.035.95 0.09 0.02 0.035.99 0.09 0.02 0.036.03 0.09 0.02 0.036.07 0.09 0.02 0.036.11 0.09 0.02 0.036.15 0.09 0.02 0.03
6.19 0.09 0.02 0.036.23 0.09 0.02 0.036.27 0.09 0.02 0.036.31 0.09 0.02 0.036.35 0.1 0.02 0.036.39 0.1 0.02 0.036.43 0.1 0.02 0.036.47 0.1 0.02 0.036.51 0.1 0.02 0.036.55 0.1 0.02 0.036.59 0.1 0.02 0.036.63 0.1 0.02 0.036.67 0.1 0.02 0.036.71 0.1 0.02 0.036.75 0.1 0.02 0.036.79 0.1 0.02 0.036.83 0.1 0.02 0.036.87 0.1 0.02 0.036.91 0.1 0.02 0.036.95 0.1 0.02 0.036.99 0.1 0.02 0.037.04 0.11 0.02 0.037.08 0.11 0.02 0.037.12 0.11 0.02 0.037.16 0.11 0.02 0.037.2 0.11 0.02 0.03
7.24 0.11 0.02 0.037.28 0.11 0.02 0.037.32 0.11 0.02 0.037.36 0.11 0.02 0.037.4 0.11 0.02 0.03
7.44 0.11 0.02 0.037.48 0.11 0.02 0.037.52 0.11 0.02 0.037.56 0.11 0.02 0.037.6 0.11 0.02 0.03
7.64 0.11 0.02 0.037.68 0.12 0.02 0.037.72 0.12 0.02 0.037.76 0.12 0.02 0.037.8 0.12 0.02 0.03
7.84 0.12 0.02 0.037.88 0.12 0.02 0.037.92 0.12 0.02 0.037.96 0.12 0.02 0.03
8 0.12 0.02 0.038.04 0.12 0.02 0.038.24 0.12 0.03 0.04
8.44 0.13 0.03 0.048.64 0.13 0.03 0.048.84 0.13 0.03 0.049.05 0.14 0.03 0.049.25 0.14 0.03 0.049.45 0.14 0.03 0.049.65 0.14 0.03 0.049.85 0.15 0.03 0.04
10.05 0.15 0.03 0.0410.25 0.15 0.03 0.0410.45 0.16 0.03 0.0410.65 0.16 0.03 0.0410.85 0.16 0.03 0.0411.06 0.17 0.03 0.0411.26 0.17 0.03 0.0411.46 0.17 0.03 0.0411.66 0.17 0.03 0.0411.86 0.18 0.03 0.0412.06 0.18 0.03 0.0412.46 0.19 0.04 0.0512.86 0.19 0.04 0.0513.27 0.2 0.04 0.0513.67 0.21 0.04 0.0514.07 0.21 0.04 0.0514.47 0.22 0.04 0.0514.87 0.22 0.04 0.0515.28 0.23 0.04 0.0515.68 0.24 0.04 0.0516.08 0.24 0.04 0.0516.48 0.25 0.05 0.0616.88 0.25 0.05 0.0617.29 0.26 0.05 0.0617.69 0.27 0.05 0.0618.09 0.27 0.05 0.0618.49 0.28 0.05 0.0618.89 0.28 0.05 0.0619.3 0.29 0.05 0.0619.7 0.3 0.05 0.0620.1 0.3 0.05 0.06
VALOR PROMEDIO DE INVERSIONDATOS
Vida Util: 5 años
25.00%
75.00%
0.15
VDA = 15% % anual
Año0.25 VA + 0.75 VA 1.00 VA0.25 VA + 0.6 VA 0.85 VA
3° 0.25 VA + 0.45 VA 0.70 VA4° 0.25 VA + 0.3 VA 0.55 VA5° 0.25 VA + 0.15 VA 0.40 VA6° 0.25 VA + 0 VA VA7° 0.25 VA + -0.15 VA VA8° 0.25 VA + -0.3 VA VA
3.50 VA^ Solo positivos de esta columna
VPI = 3.50 VA = 0.7 VA5 años
Valor de salvataje:Sujeto a dep. Anual:
Depreciacion anual:
1°2°