Upload
afriszal
View
20
Download
1
Embed Size (px)
DESCRIPTION
surat gudang
Citation preview
Kepada Yth:Ir.Fachrizal NaikemManager Logistik
SURAT PERMINTAAN BARANG
NO NAMA BARANG SPESIFIKASI SATUAN JUMLAH NO.ITEM1 MINYAK BEKISTING ROBINAIR LITER 14
Jakarta: 23 Maret 2015
Mengetahui : Diajukan Oleh :
(___________________) ( AFRIZAL ARDIANSYAH )KC/Kapro/SE
Form-P-1
Kepada Yth:Ir.Fachrizal NaikemManager Logistik
SURAT PERMINTAAN BARANG
KETERANGAN
Jakarta: 23 Maret 2015
Diajukan Oleh :
( AFRIZAL ARDIANSYAH )
MONITORING KEDATANGAN MATERIAL ( PO )
No TANGGAL Nomor PO Nama Barang Sat. Volume Harga Tanggal Besi Ulir D-25 mm Besi Ulir D-19 mm Besi Ulir D-13 mm Satuan Realisasi Sisa Realisasi Sisa Realisasi Sisa
1 28-07-06 1461/ORD/635R BesiI D-25mm btg 15,606.00 4,550.00 Besi D-19mm btg 16,533.00 Besi D-13mm btg 26,800.00
28-07-2006 1,000.00 14,606.00 - 16,533.00 1,211.00 25,589.00 31-07-2006 14,606.00 1,000.00 15,533.00 289.00 25,300.00 05-08-2006 1,000.00 13,606.00 1,000.00 14,533.00 1,500.00 23,800.00 12-08-2006 1,000.00 12,606.00 1,000.00 13,533.00 1,500.00 22,300.00 29-08-2006 650.00 11,956.00 600.00 12,933.00 1,200.00 21,100.00 30-08-2006 - 11,956.00 700.00 12,233.00 950.00 20,150.00
11,956.00 12,233.00 20,150.00 03-09-2006 115.00 11,841.00 1,000.00 11,233.00 1,500.00 18,650.00 03-09-2006 885.00 10,956.00 - 11,233.00 - 18,650.00 06-09-2006 1,000.00 9,956.00 540.00 10,693.00 18,650.00 07-09-2006 9,956.00 460.00 10,233.00 1,500.00 17,150.00 09-09-2006 1,000.00 8,956.00 1,000.00 9,233.00 1,500.00 15,650.00 14-09-2006 8,956.00 1,000.00 8,233.00 1,500.00 14,150.00 15-09-2006 660.00 8,296.00 - 8,233.00 14,150.00 17-09-2006 340.00 7,956.00 1,000.00 7,233.00 1,500.00 12,650.00 19-09-2006 650.00 7,306.00 - 7,233.00 - 12,650.00 21-09-2006 92.00 7,214.00 1,000.00 6,233.00 12,650.00 22-09-2006 258.00 6,956.00 - 6,233.00 1,500.00 11,150.00
6,956.00 6,233.00 11,150.00 Tahap II 6,956.00 6,233.00 11,150.00
25-09-2006 850.00 6,106.00 500.00 5,733.00 3,000.00 8,150.00 29-09-2006 - 6,106.00 500.00 5,233.00 3,000.00 5,150.00 04-10-2006 1,940.00 4,166.00 - 5,233.00 5,150.00 05-10-2006 610.00 3,556.00 1,000.00 4,233.00 5,150.00 06-10-2006 - 3,556.00 - 4,233.00 5,150.00 07-10-2006 - 3,556.00 - 4,233.00 5,150.00 08-10-2006 850.00 2,706.00 - 4,233.00 5,150.00 10-10-2006 870.00 1,836.00 - 4,233.00 5,150.00 - 10-10-2006 - 1,836.00 - 4,233.00 12-10-2006 850.00 986.00 - 4,233.00 13-10-2006 - 986.00 2,000.00 2,233.00 17-10-2006 - 986.00 100.00 2,133.00 04-11-2006 235.00 751.00 - 2,133.00 07-11-2006 - 751.00 - 2,133.00 18-11-2006 - 751.00 - 2,133.00 20-11-2006 - 751.00 - 2,133.00 - 23-11-2006 - 751.00 - 2,133.00 29-11-2006 650.00 101.00 2,133.00 04-12-2006 101.00 - 2,133.00
- 2,133.00
15,606.00 - 14,400.00 2,133.00 26,800.00 -
REKAP KEBUTUHAN MATERIAL PROYEK
No No.SPB Nama Barang Sat. Volume ITEM PEKERJAAN
1 01/P1-BT/VII/06 Besi Ulir D-19 mm U-40 btg 14,400.00 u/Pek.Pembesian Soldier Pile Besi Ulir D-13 mm U-40 btg 6,000.00
2 02/P1-BT/VII/06 Besi Ulir D-25 mm U-40 btg 15,606.00 u/Pek.Pembesian Pondasi Bored PilBesi Ulir D-13 mm U-40 btg 20,800.00
3 62/P1-BT/IX/06 Besi Ulir D-19 mm U-40 btg 600.00 u/Pek. Pondasi TC 3 Unit Besi Ulir D-13 mm U-40 btg 566.00 Besi Ulir D-25 mm U-40 btg 150.00
4 63/P1-BT/IX/06 Besi Ulir D-25 mm U-40 btg 475.00 u/Pek. Capping Beam Besi Ulir D-10 mm U-40 btg 1,996.00
5 65/P1-BT/IX/06 Besi Ulir D-25 mm U-40 btg 1,726.00 u/Pek.Bored Pile 1500 & 1000 Besi Ulir D-13 mm U-40 btg 15,797.00
6 136/P1-BT/X/06 Besi Ulir D-13 mm U-40 btg 3,457.00 u/Pek.stek dinding & pla lt.1,2,3 Besi Ulir D-16 mm U-40 btg 618.00
7 141/P1-BT/X/06 Besi Ulir D-32 mm U-40 btg 6,689.00 u/Raf Foundation
8 222/P1-BT/XI/06 Besi Ulir D-13 mm U-40 btg 205.00 u/Pek.Kolom CA Besi Ulir D-25 mm U-40 btg 152.00
Besi Ulir D-10 mm U-40 btg 1,030.00 u/Pek.Peri Meter Beam Besi Ulir D-25 mm U-40 btg 736.00
Besi Ulir D-13 mm U-40 btg 2,381.00 u/Pek.Tambahan BP.1500 Besi Ulir D-25 mm U-40 btg 1,326.00
9 230/P1-BT/XI/06 Besi Ulir D-32 mm U-40 btg 9,250.00 u/Raf Foundation
10 231/P1-BT/XI/06 Besi Ulir D-19 mm U-40 btg 3,900.00 u/Pek.Bore Pile BP.1500 & 1000
11 235/P1-BT/XI/06 Besi Ulir D-32 mm U-50 btg 1,500.00 u/Pek.Kolom dari groun s/d bsm 4 Besi Ulir D-25 mm U-50 btg 2,700.00
12 238/P1-BT/XI/06 Besi Ulir D-13 mm U-40 btg 3,600.00 u/Pek.Kolom dari lt Bsm 4 s/d Gf Besi Ulir D-16 mm U-40 btg 8,800.00
Besi Ulir D-10 mm U-40 btg 1,000.00 u/Pek.Dinding Sher Wall Bsm 4 s/dBesi Ulir D-19 mm U-50 btg 4,700.00 Besi Ulir D-32 mm U-50 btg 1,296.00
13 273/P1-BT/XII/06 Besi Ulir D-32 mm U-40 btg 17,478.00 u/Raf Foundation
14 364/P1-BT/II/07 Besi Ulir D-10 mm U-40 btg 312.00 u/Peb.Slab Podium Besi Ulir D-13 mm U-40 btg 150.00 Besi Ulir D-19 mm U-40 btg 4,378.00 Besi Ulir D-22 mm U-40 btg 4,258.00 Besi Ulir D-25 mm U-40 btg 2,247.00 Besi Ulir D-32 mm U-50 btg 33,152.00 u/Raft Foundation
15 366/P1-BT/II/07 Besi Ulir D-19 mm U-50 btg 250.00 u/Pek Pemb.Area Podium Besi Ulir D-25 mm U-50 btg 447.00 Besi Ulir D-32 mm U-50 btg 375.00
16 401/P1-BT/II/07 Besi Ulir D-32 mm U-50 btg 265.00 U/Pek Tie Beam
17 403/P1-BT/III/07 Besi Ulir D-10 mm U-40 btg 293.00 u/Pemb.Pondasi Pit Lift Besi Ulir D-13 mm U-40 btg 68.00 Besi Ulir D-19 mm U-40 btg 62.00 Besi Ulir D-25 mm U-40 btg 26.00 Besi Ulir D-32 mm U-50 btg 262.00
18 408/P1-BT/III/07 Besi Ulir D-10 mm U-40 btg 312.00 u/Pek Slab Podium & Rettining Wall Besi Ulir D-16 mm U-40 btg 300.00 BSM 4 Besi Ulir D-19 mm U-40 btg 200.00 Besi Ulir D-22 mm U-40 btg 200.00 Besi Ulir D-25 mm U-40 btg 1,340.00
19 417/P1-BT/III/07 Besi Ulir D-19 mm U-40 btg 450.00 u/Pemb.Slab Podium Besi Ulir D-25 mm U-40 btg 500.00
20 547/P1-BT/V/07 Besi Ulir D-25 mm U-40 btg 2,280.00 u/Balok , Plat B3 Besi Ulir D-22 mm U-40 btg 4,201.00 Besi Ulir D-19 mm U-40 btg 857.00 Besi Ulir D-16 mm U-40 btg 2,900.00
Besi Ulir D-13 mm U-40 btg 27,415.00 Besi Ulir D-10 mm U-40 btg 1,542.00 Besi Ulir D-32 mm U-40 btg 6.00
21 559/P1-BT/VI/07 Besi Ulir D-25 mm U-40 btg 2,070.00 u/Balok , Plat B2 Besi Ulir D-22 mm U-40 btg 4,260.00 Besi Ulir D-19 mm U-40 btg 790.00 Besi Ulir D-16 mm U-40 btg 3,080.00 Besi Ulir D-13 mm U-40 btg 25,770.00 Besi Ulir D-10 mm U-40 btg 2,010.00
22 602/P1-BT/VI/07 Besi Ulir D-19 mm U-40 btg 2,400.00 u/Serwall Besi Ulir D-19 mm U-40 btg 200.00 u/Gadangan
23 620/P1-BT/VI/07 Besi Ulir D-10 mm U-40 btg 2,850.00 u/Parameter Beam B3 s/d B1 Besi Ulir D-13 mm U-40 btg 4,640.00 u/Facing Wall B4 - GF Besi Ulir D-25 mm U-40 btg 1,050.00
24 621/P1-BT/VI/07 Besi Ulir P- 8 mm U-40 btg 1,200.00 Pek.STP B4 - Gf Besi Ulir D-10 mm U-40 btg 2,100.00 Pek Tangga B4 - Gf Besi Ulir D-13 mm U-40 btg 2,500.00 Besi Ulir D-16 mm U-40 btg 310.00
25 622/P1-BT/VI/07 Besi Ulir D-10 mm U-40 btg 1,470.00 u/Plat & Balok B1 Besi Ulir D-13 mm U-40 btg 11,300.00 Besi Ulir D-16 mm U-40 btg 2,280.00 Besi Ulir D-19 mm U-40 btg 970.00 Besi Ulir D-22 mm U-40 btg 1,050.00 Besi Ulir D-25 mm U-40 btg 1,100.00 Besi Ulir D-32 mm U-40 btg 47.00
26 642/P1-BT/VI/07 Besi Ulir P- 8 mm U-40 btg 785.00 u/B2 s/d Lt.5 Besi Ulir D-10 mm U-40 btg 28,283.00 Periode 30 Juni 31 Juli 07 Besi Ulir D-13 mm U-40 btg 3,599.00 Besi Ulir D-16 mm U-40 btg 34,784.00 Besi Ulir D-19 mm U-40 btg 10,360.00 Besi Ulir D-22 mm U-40 btg 528.00 Besi Ulir D-25 mm U-40 btg 1,925.00 Besi Ulir D-32 mm U-40 btg 6,159.00
27 747/P1-BT/8/07 Besi Ulir P- 8 mm U-40 btg 70.00 u/Pekerjaan Lt.6 & 7 tanpa besi Slab Besi Ulir D-10 mm U-40 btg 8,855.00 Besi Ulir D-13 mm U-40 btg 1,271.00 Besi Ulir D-16 mm U-40 btg 1,147.00 Besi Ulir D-19 mm U-40 btg 2,630.00
Besi Ulir D-22 mm U-40 btg 208.00 Besi Ulir D-25 mm U-40 btg 1,009.00 Besi Ulir D-32 mm U-40 btg 1,043.00
28 773/P1-BT/7/07 Besi Ulir P- 8 mm U-40 btg 228.00 u/Pemb.Lt 8 s/d 15 Besi Ulir D-10 mm U-40 btg 16,535.00 tidak termasuk pembesian slab Besi Ulir D-13 mm U-40 btg 6,526.00 Besi Ulir D-16 mm U-40 btg 4,643.00 Besi Ulir D-19 mm U-40 btg 9,706.00 Besi Ulir D-22 mm U-40 btg 525.00 Besi Ulir D-25 mm U-40 btg 8,241.00 Besi Ulir D-32 mm U-40 btg 1,943.00
29 774/P1-BT/7/07 Besi Ulir P- 8 mm U-40 btg 353.00 u/Pemb.Lt 16 s/d 25 Besi Ulir D-10 mm U-40 btg 20,337.00 tidak termasuk pembesian slab Besi Ulir D-13 mm U-40 btg 11,004.00 Besi Ulir D-16 mm U-40 btg 5,073.00 Besi Ulir D-19 mm U-40 btg 5,506.00 Besi Ulir D-22 mm U-40 btg 281.00 Besi Ulir D-25 mm U-40 btg 10,140.00 Besi Ulir D-32 mm U-40 btg 2,801.00
30 996/P1-BT/1/08 Besi Ulir P- 6 mm U-40 btg 2,766.00 u/Struktur s/d lt.45 Besi Ulir P- 8 mm U-40 btg 5,510.00 Besi Ulir D-10 mm U-40 btg 79,431.00 Besi Ulir D-13 mm U-40 btg 26,791.00 Besi Ulir D-16 mm U-40 btg 6,051.00 Besi Ulir D-19 mm U-40 btg 3,041.00 Besi Ulir D-22 mm U-40 btg 8,322.00 Besi Ulir D-25 mm U-40 btg 32,170.00 Besi Ulir D-32 mm U-40 btg 4,024.00
SPB REALISASI Besi Ulir P- 6 mm U-40 btg 2,766.00 - Besi Ulir P- 8 mm U-40 btg 8,146.00 2,636.00
Besi Ulir D-10 mm U-40 btg 168,356.00 139,851.00 Besi Ulir D-13 mm U-40 btg 173,840.00 169,813.00 Besi Ulir D-16 mm U-40 btg 69,986.00 72,126.00 Besi Ulir D-19 mm U-40 btg 60,450.00 78,386.00 Besi Ulir D-19 mm U-50 btg 4,950.00 2,549.00 Besi Ulir D-22 mm U-40 btg 23,833.00 19,237.00 Besi Ulir D-25 mm U-40 btg 84,269.00 95,250.00 Besi Ulir D-25 mm U-50 btg 3,147.00 1,779.00 Besi Ulir D-32 mm U-40 btg 49,440.00 18,623.00 Besi Ulir D-32 mm U-50 btg 36,850.00 31,777.00
REKAP KEBUTUHAN MATERIAL PROYEK
ITEM PEKERJAAN TERKIRIM SISA KG
u/Pek.Pembesian Soldier Pile 14,400.00 - 6,000.00 -
- u/Pek.Pembesian Pondasi Bored Pil 15,606.00 -
20,800.00 - - - - -
u/Pek. Pondasi TC 3 Unit 600.00 - 566.00 - 150.00 -
- -
u/Pek. Capping Beam 475.00 - 1,996.00 -
- u/Pek.Bored Pile 1500 & 1000 1,726.00 - -
15,797.00 - - - - -
u/Pek.stek dinding & pla lt.1,2,3 3,457.00 - - 618.00 -
- u/Raf Foundation 6,689.00 - -
- u/Pek.Kolom CA 205.00 - -
152.00 - - -
u/Pek.Peri Meter Beam 1,030.00 - - 736.00 - -
- u/Pek.Tambahan BP.1500 2,381.00 - -
1,326.00 - - -
u/Raf Foundation 9,250.00 - - -
u/Pek.Bore Pile BP.1500 & 1000 3,900.00 - -
- u/Pek.Kolom dari groun s/d bsm 4 993.00 507.00 38,390.04
1,332.00 1,368.00 63,201.60 -
u/Pek.Kolom dari lt Bsm 4 s/d Gf 3,600.00 - - 8,800.00 - -
- u/Pek.Dinding Sher Wall Bsm 4 s/d 1,000.00 - -
2,299.00 2,401.00 64,250.76 - 1,296.00 98,133.12
- u/Raf Foundation - 17,478.00 1,323,434.16
- u/Peb.Slab Podium 312.00 - -
150.00 - - 4,378.00 - - 4,258.00 - - 2,247.00 - -
u/Raft Foundation 30,875.00 2,277.00 172,414.44 -
u/Pek Pemb.Area Podium 250.00 - 447.00 - 375.00 -
- 265.00 -
- u/Pemb.Pondasi Pit Lift 293.00 - -
68.00 - - 62.00 - - 26.00 - - 262.00 -
- u/Pek Slab Podium & Rettining Wall 312.00 - -
300.00 - - 200.00 - - 200.00 - - 1,340.00 - -
- - u/Pemb.Slab Podium 450.00 - -
500.00 - - - -
2,280.00 - - 4,201.00 - - 857.00 - - 2,900.00 - -
27,415.00 - - 1,542.00 - - 6.00 - -
- - 2,070.00 - - 4,260.00 - - 790.00 - - 3,080.00 - - 25,770.00 - - 2,010.00 - -
- - 2,400.00 - - 200.00 - - - -
u/Parameter Beam B3 s/d B1 2,850.00 - u/Facing Wall B4 - GF 4,640.00 - -
1,050.00 - -
1,200.00 - Pek Tangga B4 - Gf 2,100.00 - -
2,500.00 - - 310.00 -
- 1,470.00 - 11,300.00 - - 2,280.00 - - 970.00 - 1,050.00 - -
903.00 1,100.00 - - 47.00 - -
- 785.00 - -
Periode 30 Juni 31 Juli 07 28,283.00 - - 3,599.00 - - 34,784.00 - - 10,360.00 - - 528.00 - - 1,925.00 - - 1,622.00 4,537.00 343,541.64
- u/Pekerjaan Lt.6 & 7 tanpa besi Slab 70.00 - -
8,855.00 - - 1,271.00 - - 1,147.00 - - 2,630.00 - -
208.00 - - 1,009.00 - -
1,043.00 78,975.96 - -
u/Pemb.Lt 8 s/d 15 228.00 - - tidak termasuk pembesian slab 16,535.00 - -
6,202.00 324.00 24,533.28 4,643.00 - - 9,706.00 - - 525.00 - - 8,241.00 - -
1,943.00 147,123.96 - -
u/Pemb.Lt 16 s/d 25 353.00 - - tidak termasuk pembesian slab 20,337.00 - -
11,004.00 - - 5,073.00 - - 5,506.00 - - 281.00 - - 10,140.00 - - 853.00 1,948.00 147,502.56
- 2,766.00 6,251.16 5,510.00 12,452.60 79,431.00 179,514.06 26,791.00 60,547.66 6,051.00 13,675.26 3,041.00 6,872.66 8,322.00 297,594.72 32,170.00 1,486,254.00 4,024.00 304,697.28
SELISIH KG (terhadap Rea.) LP.10 MUTASI 2,766.00 2,160.00 5,745.60 5,510.00 12,494.64 9,718.00 46,063.32 1,508.00
28,505.00 1,034,897.40 138,329.00 1,023,634.60 11,285.00 4,027.00 2,119,266.24 177,351.00 2,213,340.48 16,551.00 (2,140.00) 1,367,508.96 75,486.00 1,431,214.56 9,538.00 (17,936.00) 2,097,609.36 88,473.00 2,367,537.48 13,950.00 2,401.00 68,211.24 2,549.00 68,211.24 4,596.00 687,915.12 21,581.00 771,736.56 4,862.00 (10,981.00) 4,400,550.00 100,064.00 4,622,956.80 9,090.00 1,368.00 82,189.80 1,779.00 82,189.80 30,817.00 1,410,133.56 19,125.00 1,448,145.00 808.00 5,073.00 2,406,154.44 31,777.00 2,406,154.44
15,686,930.76 16,486,929.88
10 13 16.00 19.00 25 32 150,351.00 184,288.00 75,486.00 88,473.00 ### ###
4,338.00 52,806.00 9,418.00 23,600.00 22,871.00 ###
(146,013.00) ### (66,068.00) (64,873.00) ### ###
324.00 477.00
The Grove.324 The Grove.477
1,441.00
cukup
0./
15,000.00
33,417.00
6,226.00
32,770.00
22 500.00 17,880.00 19 450.00 12,042.00
29,922.00
5,090.00 Besi Ulir D-25 btg 2,280.00 2280 - 5,790.00 Besi Ulir D-22 btg 4,201.00 3061 1,140.00
Besi Ulir D-19 btg 857.00 857 - Besi Ulir D-16 btg 2,887.00 1580 1,307.00
Besi Ulir D-13 btg 27,415.00 16366 ### 42.00 Besi Ulir D-10 btg 1,542.00 1542 - 2,010.00 Besi Ulir D-32 btg 6.00 6.00
13,766.00 (13,649.00)
3,050.00
8/12 1,131.00 5/7 600.00
2,002.00 53,573.52 1,858.00 66,442.08 1,145.00 52,899.00
172,914.60 13 45,659.00 22 3,900.00
650.00 650.00 209.00 650.00 600.00 650.00 650.00
800.00
650.00 291.00
MUTASI
7,147.92 2,636.00 -
83,509.00 88,925.00 50,926.00 206,556.48 145,454.00 24,359.00 180,840.48 63,935.00 8,191.00 373,302.00 57,409.00 20,977.00
173,865.12 15,511.00 3,726.00 419,958.00 52,099.00 43,151.00
61,181.76 18,467.00 (156.00) 2,275.00
1,506,360.76
Kepada Yth :PT. FAJAR RAYAJl.Danau Sunter BaratDi Jakarta
PESANAN PEMBELIAN BARANGNo.13/SK/P3/PBI/PTK6/09
Berdasarkan Surat Penawaran Sdr .Via Telepontgl, 24 Maret 2015 Kami Mengharap Agar Saudara dapatMengirimkan Barang-barang Seperti Tersebut Dibawah Ini:
No Nama Barang Satuan/No.SC Sat. JumlahHarga Satuan Jumlah Harga
( Rp ) ( Rp )
1 MINYAK BEKISTING LITER 14.00 7,000.00 98,000.00
Sub Total : 98,000.00 Terbilang : Sembilan Juta Delapan ratus Sembilan Puluh Delapan Ribu Rupiah PPN 10% :Dua Ratus Empat Puluh Rupiah Total : 98,000.00 Tanggal Penyerahan : Tempat Penyerahan :tgl, 27 Maret 2015 PROYEK BAKRIE TOWER
JL.RASUNA SAID KUNINGAN JAKARTA
SPB:No:
Dengan Syarat - Syarat Sebagai Berikut : 1. Mutu Barang : Sesuai Dengan Contah Atau Standar Yang Telah Ditentukan Dan Memperhatikan
2. Penyerahan Barang : Penjual Menjamin Bahwa barang Diserahkan Dalam Keadaan Baik Dan Lengkap3. Sanksi : a. Apabila Penjual Terlambat Menyerahkan Barang Tersebut Diatas,Maka Penjual
Dikenakan Denda 0,1%(Satu Permil) dari Nilai barang Terlambat Dikirim Per- hari,Maksimum 5%(Lima Persen)dari Nilai Pesanan,Kecuali Terjadi Force Majeure.: b. Apa Bila Barang Yang Dikirim Tidak Sesuai Pasal 1 Tersebut Diatas Atau Ter- dapat Kerusakan / Cacat,Maka Penjual Akan Mengganti Dengan Barang Yang Sama Dalam WaktuSatu Hari Sejak Tanggal Pesanan Ini.
4. Pembayaran : a. Pembayaran Dilaksanakan Berdasarkan Tagihan Penjualan Yang Dilampiri Dengan Pesanan Pembelian Barang (P3)Dan Berita Acara Penerimaan/ Penyerahan.: b. Pembayaran Dilakukan, 60 Hari Setelah invoice diterima dan barang dikirim
5. Lain -Lain : . . .
Jakarta, 24 Maret 2015Setuju Mengirim Barang-Barang Hormat KamiDegan Syarat-Syarat Tersebut PT.HUTAMA KARYA (Persero)
PT. FAJAR RAYA
HARTONO Ir.Fachrizal NaikemManager Logistik
Persyaratan Mutu K3 Dan Lingkungan.
BUKU REGISTER PENERIMAAN BAHAN
NO TANGGAL NO.P4 NO.SPB NAMA BARANG SAT. VOL. H.SAT.
1 27-03-2015 875/P4-BT/3/15 001/P1-BT/3/15 MINYAK BEKISTING LITER 14.00 7000.000
2 01-06-2015 876/P4-BT/6/15 002/P1-BT/6/15 MINYAK BEKISTING LITER 14.00 7000.000
BUKU REGISTER PENERIMAAN BAHAN
STOCK
HARI INI S/D HR INI SUPPLIER
0 14 PT. FAJAR RAYA
2 16 PT. FAJAR RAYA
Form P-4
BERITA ACARA PENERRIMAAN / PENYERAHAN BARANGNomor :.
Pengirim :.. Order Pembelian :..Alamat :. Tanggal :..
:. Faktur No :..No.Kendaraan :. Tanggal :..
NO NAMA BARANG/BAHAN SAT. JUMLAH JUMLAHKETERANGAN
BAIK RUSAK HILANG
Jakarta,
Mengetahui : Yang Menyerahkan : Penerima Barang :
(---------------------------- ) '(-----------------------------) (---------------------)
KARTU GUDANGNAMA BARANG : MINYAK BEKISTINGSATUAN : LITERHARGA SATUAN :Rp.7000,00
HALAMAN :
TANGGALPENERIMAAN PENGELUARAN SALDO
KETERANGANHARI INI S/D HR INI HARI INI S/D HR INI HAI INI
27-03-2015 14 14 2 2 12
03-04-2015 0 14 2 4 8
20-04-2015 0 14 2 6 6
03-05-2015 0 14 2 8 4
17-05-2015 0 14 2 10 2
01-06-2015 14 28 0 10 16
SCHEDULE PENGIRIMAN MATERIAL DRYMIXPROYEK BAKRIE TOWER
NO URAIAN SAT. VOLUME STATUSSCHEDULE PENGIRIMAN
TOTAL SALDOPERIODE TGL, 31 Mei s/d 7 Juni 200831 2 3 4 5 6 7
1Skimcoat zak 100.00
Renc. 100.00 100.00 - Real. 100.00 100.00 -
@ 30 kg Kg 3,000.00 - - - - - 3,000.00 - 3,000.00
2Thinbed 101 zak 137.00
Renc. 37.00 50.00 ### 137.00 - Real. 37.00 50.00 ### 137.00 -
@ 40 kg Kg 5,480.00 - 1,480.00 - 2,000.00 - 2,000.00 - 5,480.00
3Concrete Fill zak 100.00
Renc. 50.00 ### 100.00 - Real. 50.00 ### 100.00 -
@ 40 kg Kg 4,000.00 - - - 2,000.00 - 2,000.00 - 4,000.00
4Plesteran zak 2,920.00
Renc. 480.00 360.00 480.00 320.00 480.00 320.00 480.00 2,920.00 Real. 320.00 390.00 480.00 320.00 480.00 320.00 480.00 2,790.00 130.00
@ 50 kg Kg 146,000.00 24,000.00 18,000.00 24,000.00 16,000.00 24,000.00 16,000.00 24,000.00 146,000.00
5Acian zak 217.00
Renc. 100.00 100.00 17.00 217.00 Real. 100.00 100.00 17.00 217.00 -
@ 30 kg Kg 6,510.00 - 3,000.00 - 3,000.00 - 510.00 - 6,510.00
164,990.00 24,000.00 22,480.00 24,000.00 23,000.00 24,000.00 23,510.00 24,000.00 164,990.00
Jakarta, 30 Mei 2008Dibuat oleh :
Ir.Zaim SusiloManager Logistik
PT.HUTAMA KARYAPROYEK BAKRIE TOWER
NO URAIAN SAT. VOLUMESTATUS
SCHEDULE PENGIRIMANTOTAL SALDOPERIODE TGL, 15 MEI 2008 s/d 30 MEI 2008
TANGGAL 15 16 17 19 21 22 23 24 26 27 28 29 30
1 AEROBLOK M3 499.20
Renc. 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 499.20 - Real. -
- TOTAL #REF! 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 38.40 499.20
Jakarta, 14 Mei 2008Dibuat oleh :
Ir.Zaim SusiloManager Logistik
SPBporekap spborderbk reg.penP-4KARTU GUDANGSCH DRYMIXSCH EARPBLOK