65
Major PPP Projects in A.P

PPP&SEZ-2

Embed Size (px)

Citation preview

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 1/65

Major PPP Projects in A.P

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 2/65

Hyderabad Information Technology and

Engineering Consultancy 

HITEC City-Cyberabad

First Major PPP project with L&T & APIIC in1996

89 % equity by L&T and 11 % by APIIC in shape of land

Project area 158 acres

Total built up area 18.08 lakh sft

Cyber Towers 5.25 lakhs sft – fully occupied Cyber Gateway 7.83 lakhs sft – fully occupied

Cyber Pearl 5.00 lakhs sft – fully occupied

Total Investment Rs.450.00 crores

State of the art facilities, dedicated power supply

Successful and sustainable PPP model- putting

Hyderabad in Global I.T map

More than 100 MNCs operating and using facilities

Employment Generation of more than 65000 persons

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 3/65

Cyber Towers

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 4/65

Cyber Gateway

Cyber Gateway

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 5/65

Cyber Pearl

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 6/65

Mind Space Project

A Special Project for IT & IT enabled services Project area 110 acres at Madhapur 

APIIC Ltd & K.Raheja Corpn. P Ltd have jointly promoted

the project with 11 % and 89 % equity, respectively Modular Buildings with built up space of 4 million sft

completed

Total investment is around Rs.2000 crores with employmentgeneration of about 45000 persons

Secured approval for IT/ITES SEZ

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 7/65

Hotel

Inorbit Mall

Aerial View of MindSpace Cyberabad

Bank of America Oracle, Qualcomm

CSC

iSOFT, Verizon Accenture

SumTotal,CFC, Patni, Amazon,

IBM

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 8/65

Mindspace Cyberabad

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 9/65

Mindspace Cyberabad

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 10/65

Integrated Township &

Convention Centre

3 SPVs are formed for execution of the projects

APIIC Ltd and Emaar Holdings hold 26% and 74% equity inall 3 SPVs

Hyderabad International Convention Centre was built on anextent of 15 acres.

Besides equity, APIIC Ltd shall receive 2 and 3% Gross AnnualRevenue as lease rentals

The Golf Course with Boutique Hotel is developed on an extentof 235 acres.

The assets will revert to Govt. of A P after 66 years of leasewithout any encumbrances.

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 11/65

An integrated township, 18 – hole international golf course,a convention centre with 6000 seating capacity and a business hotel

Convention centre was inaugurated in Jan, 2006

Break-even in the 2nd year of operation as against normal period of 4 to 5 years

Business Hotel commenced operations in Mar, 2006

18-hole Golf was started in April 2008

Integrated Township Project is under execution and model homesand villas are constructed

703 flats in 8-blocks - construction works commenced andexpected to allot by March 2010

Integrated Township &

Convention Centre

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 12/65

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 13/65

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 14/65

International Convention Centre

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 15/65

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 16/65

Visakhapatnam Industrial

Water Supply Company

Project designed to meet the industrial water needs of theRINL, NTPC, VMC

Project formulated under B O O T

Promoted by APIIC, L&T, IL & FS,VMC & PSL Project cost Rs.453 crores

Project envisage drawals of 5 TMC of water from

River Godavari & 5 TMC from Yeleru

Project commissioned in Dec., 2004

The SPV is restructured with GVMC and APIIC as the promoters with the exit of all private players

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 17/65

Water Supply Scheme for APSEZ

Capacity : 95 mld, Outlay : Rs.74 Cr 

25 km Pipeline under Vizag Industrial Water Supply Project

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 18/65

Suction well pump house of water supply scheme

Ph I W t S l t APSEZ f VIWSCO

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 19/65

Phase I Water Supply to APSEZ from VIWSCO:

95 MLD (Rs.76 Crores)

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 20/65

Jawaharlal Nehru Pharma City,

Visakhapatnam

Project is promoted by APIIC & RAMKYInfrastructure Ltd & a JV Company in the name &

style of Ramky Pharma City (India) Limited was

incorporated

Equity structure

Ramky Infrastructure Ltd & associates 89%

 APIIC Limited (in shape of land) 11%

Project Cost Rs.315.00 Crores

Equity Rs.18.00 Crores

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 21/65

Jawaharlal Nehru Pharma

City, Visakhapatnam

 A unique project with support facilities like CommonEffluent Treatment Plant, Marine Outfall, Hazardous WasteManagement etc.

The Project area covers 2143 acres with an investment of Rs. 315 crores

 Allotments are made for 60 units covering about 800 acres – 21 units under implementation, 9 units commenced

commercial operation

Notification was issued by MoC, GoI conferring SEZ Statusfor 611.37 Acs.

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 22/65

Jawaharlal Nehru Pharma

City, Visakhapatnam

M/s Coastal Waste Management Project operates

the waste management system

Common Effluent Treatment Plant (CETP) with 12

MLD capacity, with incinerator for organic waste isavailable

Environment Management Plan

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 23/65

Effluent Management Plan

Off shore

Pharma Units

Effluent Collection

CETP (12 MLD)

Diffuser 

- 15 Mt.

Marine

Out fall

Incinerator 

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 24/65

JAWAHARLAL NEHRU PHARMA CITY – LAYOUT PLAN

SEZ

CETP

TSDF

SSTWTP

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 25/65

Total area : 611.37 Acres

Net Plotted Area : 413.21 Acres

Total area allotted : 317.33 Acres

Allottees :

BIOCON, Bangalore,

Pharma Zell, GmbH (Completed construction)

Eisai Company Limited, Japan (Construction is in full swing)

Orchid Chemicals & Drugs Ltd, ChennaiShasun Chemicals & Drugs Ltd, Chennai (construction started)

 Amrutanjan Ltd, Chennai

 Andhra Sugars Ltd, Tanuku

Mylan Laboratories Limited, (Formerly Matrix Laboratories Limited)

GVK Industries Limited, Hyder 

 Aptuit Laurus Pvt. Ltd.,Smilax Laboratories Limited

Hetero Drugs Pvt. Ltd.,

Sai Advantium Pharma Ltd.,

Vijayasri Organics

JAWAHARLAL NEHRU PHARMA SEZ

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 26/65

Overhead Storage Reservoir 

Clariflocculator 

Clear Water Reservoir/Filter House

Cascade Aerator 

WATER TREATMENT PLANTJNPC

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 27/65

Pharma Zell  Vijayasri Organics Ltd

Rakshit PharmaGlochem Industries Ltd

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 28/65

Auctus Pharma Ltd Sreenivasa Pharma Pvt Ltd

Smilax Laboratories EISAI Pharmatechnology &

Manufacturing Private Limited`

R d T i h JN Ph Ci

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 29/65

Renowned Tenants in the JN Pharma City 

 , Japan  France

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 30/65

IT/ ITES SEZ, Vijayawada

• Total Extent: 30 acres

• Location: Kesarapalli (V), Gannavaram (M), Krishna District.

•  APIIC is the Developer of the project and L&T Infocity Limited wasselected as a Co-developer through bidding process.

• Equity (initially Rs.20 Cr): L&T Infocity Ltd (74 %) and APIIC (26%)

• Total project cost: Rs.450 Cr 

• Notification was issued by MoC, GoI conferring SEZ Status on15.01.2007.

• Developer status to the SPV Company was approved by GoI as“L&T Hitec City Limited” a joint venture of L&T Infocity Ltd & APIIC, in themonth of October 2007

• Construction of 1st Phase Building nearing completion

IT/ ITES SEZ Vijayawada

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 31/65

IT/ ITES SEZ, Vijayawada

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 32/65

IT/ ITES SEZ, Vijayawada

Aerial View First Building

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 33/65

 

SEZs in Andhra Pradesh 

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 34/65

Notified SEZs

Total Notified in the country  271 

Notified SEZs in AP -  58

58

4441

25 24 24

15

8 8

24

0

10

20

30

40

50

60

70

  A  n  d   h  r  a    P  r

  a  d  e  s   h

   T  a   l  m   i   l  n

  a  d  u

   M  a   h  a

  r  a  s   h   t  r

  a

   H  a  r  y  a

  n  a

   K  a  r  n  a

   t  a   k  a

  G  u   j   a  r

  a   t

   U   t   t  a  r

    P  r  a  d

  e  s   h

   K  e  r  a   l  a

   W  e  s   t    B

  e  n  g   a   l

  O   t   h  e

  r   S   t  a   t

  e  s

Source: www.sezindia.nic.in

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 35/65

Formal Approvals

Total Formal Approvals in the country  534 

100 99

62

48 4744

3124

79

0

20

40

60

80

100

120

   M  a   h  a

  r  a  s   h   t  r

  a

  A  n  d   h  r  a    P  r

  a  d  e  s   h

   T  a  m   i   l  n  a

  d  u

   K  a  r  n  a

   t  a   k  a

  G  u   j   a  r

  a   t

   H  a  r  y  a

  n  a

   U   t   t  a  r

    P  r  a  d

  e  s   h

   W  e  s   t    B

  e  n  g   a   l

  O   t   h  e

  r  s   S   t  a   t  e

  s

Source: www.sezindia.nic.in

Sector wise breakup of Notified SEZs in AP

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 36/65

Sector wise breakup of Notified SEZs in AP

SEZs Formally Approved : 99

Notified : 58

To be Notified : 41

( In principle Approval : 01)

Multi Product 3

IT/ITES 39

Footwear  1

Gems & Jewellery 1

Textile / Apparel 3

Semiconductor  1

Pharma/Formulations 4

Biotechnology 1

Electronic Hardware 1

Multi Services 1Paper  1

Aerospace 1

Food Processing 1

Total 58

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 37/65

Employment & Investments in SEZs

Total SEZs approved : 99 Nos.

Total SEZs Notified : 58 Nos.

SEZs in Operation/under implementation : 40 Nos.

Direct Employment ( Projected) : 8,90,000 persons

Indirect Employment (Projected) : 16,10,000 persons

Total Projected Investment : Rs.70,000 Crores.

Employment (Generated so far): 61,905 persons

Direct : 33,933 persons

Indirect: 27,972 persons

•  Investment made so far : Rs.6,350 Cr 

Source: www.sezindia.nic,in

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 38/65

Employment Generated in Operational SEZs

• Total Employment :61,905 people

 – IT/ITES Sector : 33,632

DLF SEZ, HYD : 4875 APIIC IT SEZ( Sierra Atlantic),Hyd:3130

Wipro SEZ,HYD : 4440 L&T Phoenix, Hyderabad : 2950

JT Holdings, RR Dist: 1590 CMC,RR Dist :1530

 – Manufacturing Sector : 28,273

 Apache, Nellore:5561 Gems SEZ, RR District:5294

Divis Laboratories:1894 Brandix, Vizag :4200

 APIIC SEZ,Vizag:720 Parry Food Processing,Kakinada:558

(Multi Product)

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 39/65

Notified SEZs

• Notified SEZs : 58 Nos.

•  APIIC SEZs : 14

Other organizations : 02

 Assisted by APIIC : 21

Private Developers : 21

Total 58 Nos.

• Operational / Under Implementation : 40 Nos. 

•  APIIC SEZs : 07

 Assisted by APIIC : 16Private Developers : 17

Total 40 Nos. 

Details of land used for Notified SEZs (58)

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 40/65

Details of land used for Notified SEZs (58)

Total land : 20,869.497 Acres

Developed / Assisted by APIIC/Govt. (APIIC:14 / Assisted/other Govt. Org:23)

Patta (Dry) : 10,340.072 Acres

Patta ( Wet ) : 1,825.080 Acres

-------------------- 12,165.152 Acres

Govt. (Assigned) : 2,078.500 Acres

Govt.(Un assigned) : 4,035.057 Acres

-------------------- 6,113.557 Acres

Developed by Private Developers (21 nos)

Patta (Dry) : 2,590.788 Acres

---------------------

20,869.497 Acres (8,447.813 ha)

•The total cropped area in the State is 3.09 crore acres or 125,20,000 Hectares

• The land used for SEZs is 0.067 % of the total cropped area of 3.09 crore acres

(99.933 % of arable cropped area is available for agriculture)

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 41/65

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 42/65

Operational SEZs –

An Overview

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 43/65

UNIPARTS POKARNA

PILKINGTON WS Industries

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 44/65

4-lane approach road for APSEZ

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 45/65

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 46/65

I.Storm Water DisposalRoad Network 

 Water SupplyPower Supply

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 47/65

Training Centre –

Internal view

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 48/65

IT SEZ Madhurawada

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 49/65

KENEXA MAIN BUILDING

IT SEZ, Madhurawada

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 50/65

KENEXA Atrium

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 51/65

FAB City

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 52/65

Road in FAB City

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 53/65

SOLAR SEMI CONDUCTOR PVT LTD SEM INDIA FAB PVT LTD

SURAANA VENTURES XL TELECOM & ENERGY LTD

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 54/65

Solar Semiconductor flags off Ist export consignment of PV modules from Fab City.

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 55/65

Biotech SEZ, Medak

Genome Valley

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 56/65

Genome Valley

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 57/65

IT SEZ (Sierra Atlantic), Nanakramguda, Hyd

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 58/65

TSI (Wave Rock) IT SEZ, Nanakramguda

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 59/65

( ) , g

TCS Synergy Park IT SEZ Hyderabad

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 60/65

TCS Synergy Park IT SEZ, Hyderabad

HYD GEMS SEZ LTD

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 61/65

Training Centre

HYD GEMS SEZ LTD

Transport Facility

Apache - Footwear SEZ

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 62/65

Apache Footwear SEZ

Apache

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 63/65

So far employment created for 5500 persons

p

Apache - Footwear SEZ Nellore

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 64/65

Apache - Footwear SEZ, Nellore

7/27/2019 PPP&SEZ-2

http://slidepdf.com/reader/full/pppsez-2 65/65

Thank You